Professional Documents
Culture Documents
River Street
Roads and Maritime Services is planning for a new bridge over the Macquarie River
in Dubbo and has identified the River Street corridor as the preferred option.Purvis Lane
ay
Preferred route option features:
hw
Hig
potentially extending the railway overbridge near Thompson Street
Narromine to G
ll
upgrading the intersection at Thompson Street
we
building a new road about one kilometre long that connects the new bridge
Ne
to the Newell Highway at Thompson Street
building a new bridge across the river
er
Upgraded intersection at Bourke Street and River Street, north Dubbo.
Riv
e
Existing highway
Vi
Railway River
c
Stree
to
t
ri
a
St
re
et
Street
Roads and Maritime is
(M
it
investigating intersection
ch
Bourke
lH
Thomps
on Str
eet e Se risier
il
Em Bridge o ad
o raR y )
Line Erskin bb h wa
R a il e Stre Co H i g
r a Railwa et n
nd overbr y e
Gi l g a
idge (G old
n e to
m i
ro
Nar
treet
arie S
Maqu
LH
Improving Br Fo
traffic flow Ba id rd
ge
)
ay
ir
d
w
St
gh
re
et
Hi
Improve
l
el
travel speeds
ew
(N
Cobra
Street
et
ell Hig
St
Street
Darling
Intersection
0 1.0
Wh
improvements
kilometres
Timing for building a new bridge in Dubbo is not confirmed and depends on planning approval and funding availability
RMS 17.268