You are on page 1of 2

Radiogram No.

4441u Form 24 for 01/03/07


SETTING UP ВКЮ1,2 FAN CONTROL CONFIGURATION WITH БРУС (MANUAL FAN SPEED
CONTROL UNIT)
GMT CREW ACTIVITY

06:00-06:10 Morning Inspection


06:10-06:40 Post-sleep
06:40-07:30 BREAKFAST
07:30-08:00 CDR, FE-2
Prep for Work
07:30-07:55
FE-1
07:55-08:05 Switch VOZDUKH to the automatic control mode
08:05-08:20 Daily Planning Conference (S-band)
08:30-09:10 FE-1 Filling EDV [KOB] for Elektron
08:40-09:10 OGS Rack rotation to install OGS equipment
CDR, FE-2
09:10-10:25 OGS H2/N2 Vent Hose Installation
09:10-09:40 СОЖ Maintenance. Verification of ИП-1 sensor position
FE-1
09:40-10:40 METEOROID. Dismantle MMK-2 Electronic Unit
10:25-10:40 LAB1D1 (AV-2) rack rotation to install OGS equipment
CDR, FE-2
10:40-11:10 LAB1P1 waste water hose connection
10:40-12:10 FE-1 Physical Exercise (TVIS) Day 4
11:10-11:25 LAB1D1 (AV-2) rack reinstallation after OGS hardware installation
CDR, FE-2
11:25-11:55 OGS and LAB1PD1 rack smoke detector reinstallation
12:10-13:40 CDR Physical Exercise (CEVIS)
12:10-12:20 Switching Vozdukh system to manual mode
FE-1 Setting up ВКЮ1,2 Fan Control Configuration with the БРУС device. Tagup with
12:20-14:00
specialists (S-band)
13:05-14:05 FE-2 Physical Exercise (RED)
Scheduled maintenance of Compound Specific Analyzer- Combustion Products
13:40-14:05 CDR
(CSA-CP)
14:00-14:05 FE-1 On MCC Go ISS O2 repress from Progress 357 СрПК (start)
14:05-15:05 LUNCH
15:05-15:20 FE-2 SLEEP - Actiwatch set up
15:05-15:10 CDR Compound Specific Analyzer- Combustion Products (CSA-CP) spot check
15:05-15:10 ISS O2 repress from Progress 357 СрПК (terminate)
FE-1 Setting up ВКЮ 1, 2 Fan Control Configuration with БРУС device. Tagup with
15:10-17:30
specialists (S-band)
15:20-16:00 SLEEP - data upload and initialization of two Actiwatch devices
FE-2
16:10-16:25 SLEEP - Actiwatch stow
16:20-16:40 CDR IMS update
16:25-17:55 FE-2 Physical Exercise (CEVIS)
16:40-16:55 RED inspection and access evaluation
CDR
16:55-17:55 Physical Exercise (RED)
17:30-18:30 FE-1 Physical Exercise (VELO + RED) day 4
17:55-18:35 CDR Evening work prep
17:55-18:00 Payload status check
18:00-18:15 FE-2 Questionnaire - journal entry
18:15-18:40
Evening work prep
18:30-18:40 FE-1
18:35-18:40 CDR Transfer TVIS/RED/CEVIS/HRM data to MEC
18:40-18:55 . Daily Planning Conference (S-band)
18:55-19:10 CDR US Ground Site VHF Test
18:55-19:30 FE-1, FE-2
Evening work prep
19:10-19:30 CDR
19:30-20:00 DINNER
20:00-20:30 Daily food prep
20:30-21:30 Pre-sleep
21:30-06:00 SLEEP
Note: See OSTP for references to US activities.
End of Radiogram

You might also like