You are on page 1of 16

SKAA 2722 GEOTECHNIC 1

PROJECT
SEMESTER II, SESSION 2016/7

A. The site investigation of the Slope Remedial Work Project was carried out accordance
to the British Standard Code of Practice, BS 5930:1981 to explore the subsurface
condition of the failure slope. A total of 5 boreholes was drilled on site where BH3,
BH4 and BH5 are located on the Cross Section A-A.

The Location Plan, Survey Plan and Cross Section of A-A are given in Figure 1 and
Figure 2.

Figure 1: The Location Plan


WSP1 WSP2

Figure 2: Survey Plan and Cross Section of A-A


B. The boreholes location are shown in Figure 3.

The Borelogs of BH3, BH4 and BH5 present the results of the site investigation works.

The Standard Penetration Test (SPT) was conducted to determine the natural bearing
resistance of the subsoil.

Figure 3: The boreholes location


Table 1: The borelogs of BH3, BH4 and BH5
C. The groundwater level at location was monitored by installing two (2) nos. of standpipe
namely WSP1 and WSP2 as tabulated in Table 2 and Table 3.

Table 2: Water standpipe,WSP1 monitoring results

Borehole No. : WSP1


Ground Level : 0.000 mRL (Assumed)
Top Of Tube. : 0.165 mRL
Depth of WL Actual
Date Time from Top of Pipe Depth of Climate Remarks
(m) WL (m)
Initial
06-09-13 12:05 2.550 Fine
Reading
07-09-13 11:40 3.150 Fine

08-09-13 11:27 3.550 Fine

09-09-13 11:15 4.010 Fine

10-09-13 10:02 2.950 Fine

11-09-13 10:22 4.320 Fine


12-09-13 11:05 4.265 Fine
13-09-13 16:05 3.250 Fine
14-09-13 11:05 4.020 Fine
15-09-13 11:02 5.520 Fine
16-09-13 11:15 3.270 Fine
17-09-13 11:25 4.150 Fine
18-09-13 11:25 3.720 Fine
19-09-13 11:55 3.300 Fine
20-09-13 11:15 4.002 Fine
21-09-13 11:15 3.020 Fine
22-09-13 11:57 3.750 Fine
23-09-13 11:32 3.360 Fine
24-09-13 14:02 3.270 Fine

25-09-13 11:35 3.560 Fine

26-09-13 12:37 3.750 Fine

27-09-13 11:20 3.640 Fine

28-09-13 12:42 3.520 Fine

29-09-13 11:16 3.240 Fine


Table 3: Water standpipe, WSP2 monitoring results

Borehole No. : WSP2


Ground Level : 0.000 mRL (Assumed)
Top Of Tube. : 0.397 mRL
Depth of WL Actual
Date Time from Top of Pipe Depth of Climate Remarks
(m) WL (m)
Initial
06-09-13 12:09 2.918 Fine
Reading
07-09-13 11:45 2.819 Fine

08-09-13 11:20 2.979 Fine

09-09-13 11:15 3.397 Fine

10-09-13 11:07 2.995 Fine

11-09-13 11:15 3.207 Fine

12-09-13 11:08 3.072 Fine

13-09-13 16:09 2.968 Fine


14-09-13 11:15 2.965 Fine
15-09-13 11:08 2.863 Fine
16-09-13 11:20 2.920 Fine
17-09-13 11:30 2.952 Fine
18-09-13 11:30 2.865 Fine
19-09-13 11:30 2.865 Fine
20-09-13 11:15 2.702 Fine
21-09-13 11:15 2.8650 Fine
22-09-13 11:57 Fine Damage

Note:
Water Head at the WSP locations are calculated from the assumed ground level of 0.00mRL as the Reduce
level of these locations are not available.

D. Produce the soil profile of the slope for Cross-section A-A. The profile shall include the
followings:

1. Depth of each soil layer


2. Name of each soil layer
3. The shear strength values (total strength and effective strength) of angle of friction,
, cohesive strength, c and unit weight, for each layer
4. Piezometric line
E. The selected remedial work for the failure slope is by constructing a retaining wall at
the toe of the slope.

1. Find the best location for the constructing the retaining wall if the potential slip
surface failure is as shown in Figure 4. Explain why?

Figure 4: The potential slip surface failure

F. Acting as the geotechnical engineer for the site, you have to carry out the geotechnical
analysis for designing the retaining wall.

1. Calculate the all pressures distribution acting on the wall


2. Determine all forces acting on the retaining wall
3. Check the Factor of Safety for against (i) overturning, (ii) sliding along the base
and (iii) bearing capacity failure.

Draw the final detail of the designed retaining wall (i.e. the geometry of the wall, the
pressure distribution, as well as the forces acting on the wall, and the calculation of the
analysis) as shown in APPENDIX D (Figure 5: Example).
APPENDICES

APPENDIX A

APPENDIX B
APPENDIX C
APPENDIX D

Figure 5: Example