You are on page 1of 3
ANCHOR BOLT DESIGN (Canadian Code CSA A23.3 - 94): ANCHOR BOLT DESIGN (Canadian Code CSA A23.3 - 94) Edge distance, ED, = 310 mm ED» = 310 mm Bolt Spacing, SP, = 130 mm SP = 130 mm | Bolt dia, d, = 25mm Total Bolt Length, uy 6 ol Bolt Projection: Projection = 150 min Emebeded Length La, = Ly ~ Projection - 2d, 5 o—_ Leip = $0. ‘ Fi ANCHOR BOLT PLAN Hexagonal nut dia. dex = 15dy — dhex = 375mm Compressive strenth of concrete, ore Boars, ay =F, ay 400.87 mn? Resistance fators for bolts, 0.67 Tensile strength of anchor bolt, Fg, ay = 414 MPa Maximum Tension, qj = 200 kN Maximum Shear, Vy = 20kN (Column support reaction) Tension on each Bolt, Tp = — SOkN Maximum Shear, Dia of Vertical rebar, yg = 25mm — Total no. 6, 6 Area of 25diabar A, Total area of Rebar, Achar = bno 2s Acebar = 8000 mm? Factor for reinforcing bar, 9, = 0.85 Yield strength of rebar, 400 MPa Concrete factor, = 0.60 Edge Distance Check EDppjn = 100 mm EDgheck = if(EPpyin > min(ED, ,ED3), "CHECK" \"OK") ED her = "OK" log 3 ANCHOR BOLT DESIGN (Canadian Code CSA A23.3 - 94): Bolt Steenath Check, Steel Strenath Refer table 12.1 of Concrete Handbook, pa #12-9 Tensile capaily ofeach bot, 0554.2 Fy am Ty= WOLOLAN ¢ Bot Check, fo cheat = |oansoe ier 4] 51, as (Check = Bok Sate HECK" otherwise Ductilty Check, Concrete Strenath_ (Refer CSA A23,3-94, Append Effective stress area for tension in each bolt, ren = (ED + 0.5 SP}) (ED; +0.5SP3) Ajgn = 1406.25 em? Tensile capacity of each bot, Ty = 0.30, MPa Aten Ty = 138.64KN 2 | maps en Check Ductilty, Check? = |"DUCTILE* if T, 27, Reinforcement requ". otherwise [Check = "DUCTILET Ten = [Ty if Check2 = "Reinforcement requd* JOKN otherwise ‘Ten =OkN Development length of rebar depends on diameter of rebar. ‘Area of rebar required for ductile failure, a, Modified dia of rebar, co Refer clause 12.2.3 of CSA-A23.3-94 08 Fornormal density concrete, ky = 10 ky = 10 ky = 1.0 ky gg = 10 hy RE 3 ANCHOR BOLT DESIGN (Canadian Code CSA A23.3 - 94): Development length of bar, mod if ®mog £20 mm OAS ky ke ky Ky 20 0454 tay PE ba a> 22 MPa Development length avaliable, Ly 4yaiy = Lemp ~ (max(ED) D9) ~ SOmm ~ 25mm) Ly gyait= 315mm Checking of Development of Rebar, Checkd = |*OK" if Ly ya) =by "CHECK." otherwise [Checks = "OK Concrete Spalling check for shear force, Refer Figure D3, Appendix D, clause D4.3.6 (c) Effective stress area for shear along X-X Ayg = (ED, + 0.5 SP}) (2ED2 + SP) Ay = 281250mm* Effective stress area for shear along Y-Y, Ayy = (ED) + 0.5 SP) (26D, + SP)) Ayy= 281250mm? Effective Stress area for Shear, Ay = min(Ay

You might also like