1. TC = Total Cost = Biaya Tetap (BTP) + Biaya Variabel = TFC + TVC.

2. TFC = Total Fixed Cost = Biaya Tetap Total (BTT).

3. TVC = Total Variabel Cost = Biaya Variabel Total (BVT).

4. ATC = Average Total Cost = Average Cost (AC) = Biaya rata-rata (BR) = BTP/TC

5. AFC = Average Fixed Cost = Biaya Tetap Rata-rata (BTR) = BTP/TFC

6. AVC = Average Variabel Cost = Biaya Variabel Rata-rata (BVR) = BTP/TVC

7. MC = Marginal Cost = Biaya Marginal (BM) = Tambahan biaya dibagi tambahan produk.