You are on page 1of 2

TECHNICAL DATA SHEET

ADDITIVE VESSEL V-1001 (WHITE OIL) & V-1002 (BLACK OIL)

Document No. Sheet No.


Client IL&FS Prime Terminals FZC
MUCOG-150702-MEC-DS-022 1 Of 2

Consultant MUC OIL & GAS ENGINEERING CONSULTANCY

0 14/11/2016 Issued For Tender NV NV KM


Project IL&FS Prime Tank Terminal Phase II
B 19/09/2016 Issued For Client Review NV NV KM
A 19/06/2016 Issued For Client Review NV NV KM
Project No. 150702
Rev Date Description Prepared Checked Approved
1 GENERAL
2 Tag no. V-1001 & V-1002 7 Location Indoor Outdoor Concrete Pit
3 Quantity (Nos) 2 8 Orientation Horizontal Vertical
4 Capacity (m3) (Note 24) 1* 9 Closure Type (Note 24)
5 Dia (m) 1.1* 10 Support Skirt Leg Saddle
Size
6 Length Tan to Tan (m) 1* 11 Design Life (Years) 25
12 PROCESS DATA
13 Service Additive Vessel 19 Filling Rate (m3/hr) *
14 Fluid Additives 20 Emptying Rate (m3/hr) *
15 Specific gravity 0.8 - 1.5 21 Design specific gravity 1.5
16 Viscosity (Cst) 0.1 - 100 22
17 Toxicity No 23
18 24
25 MECHANICAL DETAILS
26 Design & Construction Code ASME BPVC Sec.VIII Div.1, Latest Edition 35 Maximum allowable working pressure(MAWP) Same as Design Pressure
27 Design Pressure (Internal) (barg) Atmospheric 36 Corrosion Allowance (mm) 3
28 Design Temperature Max. / Min (0C) 80 / 7.7 37 Joint Efficiency ( Shell / Head ) 1
29 Operating Pressure (Kpa) Atmospheric 38 Shell Thickness (mm) *
30 Operating Temperature ( 0C) Ambient 39 Ends Thickness (mm) *
31 Hydrotest Pressure (Kpa) UG-99b 40 Empty Weight (Kg) *
32 Wind Speed / Seismic Zone 160 km/hr / Zone 2A 41 Operating Weight (Kg) *
33 Design for Full Vacuum Required Not Required 42 Hydrotest Weight (Full of Water) (Kg) *
34 43
44 MATERIAL OF CONSTRUCTION
45 Shell A 240 316L 60 RF Pad A240 316L
46 Internal Lining Not Applicable 61 Heating Coil Not Applicable
47 Support SA 36 62 Insulation Not Applicable
48 Flanges A182 316L 63 Nozzle Bolting / Nuts SA 193 Gr. B7 / SA 194 Gr. 2H
49 Nozzle Necks A312 316L 64 Earthing Boss / Stud / Nut SS 316 L
50 Nozzle Pipes A312 316L 65 Gaskets for Nozzle SS 316L (Remarks 2)
51 Structural Steel SA 36 66 Anchor Bolts A 307 Gr.B
52 Welding Fittings A403 WPL 316L 67 Insulation Support Not Applicable
53 Pipes A312 316L 68 Vortex Breaker Not Applicable
54 Stairs, Handrails Platform SA 36 Galvanized 69 Internal Attachments Not Applicable
55 Head / Cone Bolted to Vessel
A240 316L 70 External Attachments A240 316L
56 Wear Plate A240 306L 71 Internal Bolting / Nuts SS 316 L
57 72 Name Plate SS 316 L
58 73
59 74
75 INTERNAL & EXTERNAL ATTACHMENTS
76 Manhole with Davit/Hinge Required Not Required 86 Insulation Supports/Clips Required Not Required
77 Lifting Lug Required Not Required 87 Fire Proofing Clip Required Not Required
78 Tailing Lug Required Not Required 88 Pipe support clip, if required Required Not Required
79 Earthing Lug ( 2 Nos. ) Required Not Required 89 Platform support clip Required Not Required
80 Name Plate Required Not Required 90 Inlet Pipe / DIP pipe Required Not Required
81 Vortex Breaker Required Not Required 91 Baffle Plate Required Not Required
82 Cathodic Protection (External) Required Not Required 92 Sacrificial Anodes Required Not Required
83 Dip Hatches Required Not Required 93 Pickling / Passivation Required Not Required
84 Hand Railing & Platform Required Not Required 94 Demister Pad Required Not Required
85 Inspection Hole with Davit/Hinge Required Not Required 95 Cage Ladder Required Not Required
96 FABRICATION AND TESTING REQUIREMENT
97 Fabrication Code ASME BPVC SEC.VIII, Div. 1, Latest Edition 106 Hydrostatic Test UGG- 99b
98 NDE Code ASME SEC. V Latest Edition 107 Stress Relief / PWHT As per Code Not Required
99 Welding Code ASME SEC. IX Latest Edition 108 Impact Test As per Code Not Required
100 Ultrasonic Inspection As per Code Not Required 109 Internal Lining / Coating Required Not Required
101 Magnetic Particle Inspection (MPI) As per Code Not Required 110 External Painting / Coatings As per Project painting Specification
102 Dye Penetrate Inspection (DPI) As per Code Not Required 111 Code Stamp Required Required Not Required
103 Third Party Inspection Required Not Required 112 HIC Testing (For plates) Required Not Required
104 Radiography Full Spot 113
105 114
115
116 REMARKS
117 1 For Sizes >= 2",SA 216 WCB/For Sizes< 2'', SA 105 N
118 2 3 mm Thick Oil Resistant Spiral Wound Stainless Steel With Compressed Fibre
119
120
121
122
123
124

MUCOG-150702-MEC-DS-022 ADDITIVE VESSEL V-1001 (WHITE OIL) V-1002 (BLACK OIL) Page1 of 2
TECHNICAL DATA SHEET

ADDITIVE VESSEL V-1001 (WHITE OIL) & V-1002 (BLACK OIL)

Document No. Sheet No.


Client IL&FS Prime Terminals FZC
MUCOG-150702-MEC-DS-022 2 Of 2

Consultant MUC OIL & GAS ENGINEERING CONSULTANCY

0 14/11/2016 Issued For Tender NV NV KM


Project IL&FS Prime Tank Terminal Phase II
B 19/09/2016 Issued For Client Review NV NV KM
A 19/06/2016 Issued For Client Review NV NV KM
Project No. 150702
Rev Date Description Prepared Checked Approved
1 NOZZLE INDEX (Note 11)
2 Flange Type/
Sl. No. Nozzle No. Service Qty Size (in) Rating / SCH Remarks
3 Facing
4 1 N1 Inlet-1 1 1* 150# WNRF With Internal pipe till vessel bottom.
5 2 N2 Inlet-2 1 * 150# WNRF
6 3 N3 A/B Level Indicator 2 1* 150# WNRF
7 4 N4 Vent 1 2* 150# WNRF With Bird Screen
8 5 N5 Level Switch 1 2* 150# WNRF
9 6 N6 Drain 1 1* 150# WNRF
10 7 MH-1 A Man-Hole 1* 20* As per code As per code With Davit/Hinge
11 8
12 9
13 10
19
20
21 N4
22
23 N3A
24
25 N2
26 MH-1
27
N5
28
29 N3B
30 N1
31
32
33
34
N6
35
36
37
Above shown figure is indicative only and shall not restrict the design.
38
39 * To be provided / confirmed by EPC Contractor.
40 ** Applicable
41 Not Applicable
42 1 All Dimensions are in mm unless otherwise specified.
43 2 Bolt holes in flanges shall straddle main centre line of vessel.
44 3 Vendor shall provide lifting trunnion / Lifting Lug.
45 4 All carbon steel shall be fully killed.
46 5 Minimum flat head & cone thickness shall be 8mm. During detail engineering Contractor shall be responsible to check and provide thickness & ensure considering all
47 aspects of design and all compliance of codes & specification.
48 6 All flanges shall be as per ASME B16.5. Flange gasket face shall have 125 to 250 AARH finish.
49 7 All vessel external surface shall be painted as per Project Painting Specifications.
50 8 Vendor shall provide bolts and gaskets for all manway and nozzle with blind flange.
51 9 If required access platform shall be provided on top.
52 10 Filling and Emptying rate to be confirmed by EPC contractor during detailed engineering
53 11 Nozzle size and numbers shall be finalised during detail engineering.
54 12 Venting requirement shall cater for maximum compressed air inflow rate while line purging.
55 13 Unless otherwise specified the grade of Stainless steel used shall be 316L.
56 14 All attachments on the Shell / Head shall be same as that of the Shell/Head material.
57 15 Washers shall be provided under all nuts and bolt heads.
58 16 Potable Water shall be used for Hydrotest.
59 17 Any tank nozzle not connected to the piping system or appurtenance shall be closed with blind flange.
60 18 Gaskets used for Hydrotest shall be same as service gaskets. However Service gaskets shall not be used for Hydrotest.
61 19 Equipment shall be cleaned and dried after hydro-test.
62 20 Nozzle <= 2 shall be stiffened with 40 wide x 6 thk plates at 90 degrees apart.

63 21 All materials used for pressure components shall be normalized.


64 22 Material certificate shall be provided in accordance with Project QAQC specification.
65 23 Deleted
66 24 Flat Head & Cone Down Bottom, Refer P&ID # 150702-300-020