TOPFLOW CONCRETE.

GATWICK AIRPORT
THE OPTIMUM HIGH-FINISH SOLUTION
Product TOPFLOW 10MM CONCRETE WITH STEEL FIBRES
Client MANSELL
Main contractor LANDBUILD
Location GATWICK AIRPORT IDL NORTH TERMINAL 2
Date of completion JULY 2013

Topflow 10mm concrete when used horizontally enables the rapid and
effortless construction of slabs and floors.

THE CHALLENGE OUR SOLUTION RESULTS AND BENEFITS


With a high throughput of passengers, To ensure that the concrete was Topflow 10mm Concrete
construction work at the International compliant with the specification demonstrated both fast drying and
Departures Lounge at North Terminal performance, as well as the early strength properties, ensuring
2 of Gatwick Airport had the potential construction constraints, Tarmac it also answered the requirement
to cause disruption. Therefore during provided structural design guidance for short timescales. Cube test
the casting of a concrete slab, to and technical support. Approximately results showed Topflow compressive
infill an existing void, it was essential 50m3 of Topflow 10mm Concrete strengths as high as 26MPa and
that disruption was minimised along with steel fibres was poured in 53MPa after two and 28 days
and the terminal remain open. The just a few hours, eliminating the need respectively, allowing a 100mm
concrete used for the slab was for mechanical vibration and power capping screed to be poured soon
required to have high early strength floating and allowing the terminal to after the initial pour. In addition,
and self compacting qualities. In a operate normally. The new floor infill without the need for mechanical
further consideration to passengers, was a 200mm composite slab using vibration, noise was also kept to the
the noise levels in laying the slab metal decking which will transfer required level. Overall, there was
needed to be kept to a minimum. 7.5kN/m2 live load and 3.7kN/m2 of minimum disruption and the new
super imposed load to the supporting floor space was able to be utilised
steel frame. within a relatively short time following
the pour.

For more details contact your topflow@tarmac.com or call 0800 1 218 218