SR. NO. DESCRIPTION PLANNED ACTUAL PLANNED V/S ACTUAL WEIGHTAGE SCORE
1 CHECKLIST STATUS (No) 10
2 CALIBRATION STATUS (No) 10
3 LEGAL COMPLIANCE STATUS (No) 10
4 EQUIPMENT FAILURE HISTORY 5
5 RCA AND CAPA STATUS 10
6 KAIZEN 5
7 OBJECTIVE STATUS 10
8 SAFETY OBSERVATION AND COMPLIANCE (No) 10
9 CRITICAL SPARE 5
10 5S AUDIT 5
11 RETURNABLE GATE PASS MATERIAL STATUS 5
12 TRAINING RECORDS 5
13 ATTENDANCE RECORDS 5
14 TOOLS CERTIFICATION LIST 5
TOTAL (OUT
OF 100)

Compliance %

Prepared By Approved By Authorized By


HOFINCONS
C/O VEDANTA LTD
MAINTANANCE PLAN[MP]
BF INSTRUMENTATION
Instrumentation Maintenance Plan for the month-BF Dec-16
SR. NO. CHECKLIST FORMAT NO. FREQUENCY PLANNED ACHIEVED
1 BLAST FURNACE PROPER FRMT/BF/ INST/ 01 MONTHLY 1 1
2 WEIGH BRIDGE FRMT/BF/ INST/ 02 WEEKLY 4 4
3 BLAST FURNACE TOP FRMT/BF/ INST/ 03 MONTHLY 1 1
4 GAS CLEANING SYSTEM FRMT/BF/ INST/ 04 MONTHLY 1 1
5 BLOWER FRMT/BF/ INST/ 05 MONTHLY 1 1
6 COMPLEX WATER PUMP SYSTEM FRMT/BF/ INST/ 06 MONTHLY 1 1
7 HOT BLAST STOVES FRMT/BF/ INST/ 07 MONTHLY 1 1
8 BF THERMOCOUPLE FRMT/BF/ INST/ 08 MONTHLY 1 1
9 FLARESTACK FRMT/BF/ INST/ 09 MONTHLY 1 1
10 STOCK HOUSE FRMT/BF/ INST/ 10 MONTHLY 1 1
11 CONTROL ROOM FRMT/BF/ INST/ 11 MONTHLY 1 1
12 GCS RTD'S FRMT/BF/ INST/ 12 QUATERLY 1 1
13 CAST HOUSE DEDUSTING FRMT/BF/ INST/ 13 MONTHLY 1 1
14 FIRE HYDRANT FRMT/BF/ INST/ 14 MONTHLY 1 1
15 GAS ANALYSER FRMT/BF/ INST/ 15 MONTHLY 1 1
16 STOCK HOUSE DEDUSTING FRMT/BF/ INST/ 16 MONTHLY 1 1
17 A SHIFT FRMT/BF/ INST/ 17 DAILY 31 31
18 B SHIFT FRMT/BF/ INST/ 18 DAILY 31 31
19 C SHIFT FRMT/BF/ INST/ 19 DAILY 31 31
20 REDUNDANCY POWER SUPPLY FRMT/BF/ INST/ 20 WEEKLY 4 4
21 FIRE ALARM CHECKLIST FRMT/BF/ INST/ 21 BIMONTHLY 1 1
22 PA CHECKLIST FRMT/BF/ INST/ 22 MONTHLY 1 1
23 ONLINE CO MONITOR FRMT/BF/ INST/ 23 MONTHLY 1 1
24 AUTO DRAIN FRMT/BF/ INST/ 24 FORTNIGHTLY 2 2
25 AC CHECKLIST FRMT/BF/ INST/ 25 MONTHLY 1 1
26 SLAG PCM CHECKLIST FRMT/BF/ INST/ 26 MONTHLY 1 1
27 UPS CHECKLIST FRMT/BF/ INST/ 27 MONTHLY 1 1
28 PCI CHECKLIST FRMT/BF/ INST/ 28 MONTHLY 1 1
29 GCP PUFFING CHECKLIST FRMT/BF/ INST/ 29 MONTHLY 1 1
30 BLOWER PUFFING CHECKLIST FRMT/BF/ INST/ 30 MONTHLY 1 1
31 PCI BAG HOUSE CHECKLIST FRMT/BF/ INST/ 31 MONTHLY 1 1
32 AIR COMPRESSOR CHECKLIST FRMT/BF/ INST/ 32 MONTHLY 1 1
33 CAMERA MONTHLY CHECKLIST FRMT/BF/ INST/ 33 MONTHLY 1 1
34 STAVE RTD MONTHLY CHECKLIST FRMT/BF/ INST/ 34 MONTHLY 1 1
35 WALKY TALKY CHECKLIST FRMT/BF/ INST/ 35 QUATERLY 1 1
36 PCI GAS ANALYZER CHECKLIST FRMT/BF/ INST/ 36 MONTHLY 1 1
37 MN AND FERRO BIN CHECKLIST FRMT/BF/ INST/ 37 MONTHLY 1 1
38 SCADA SYSTEM FRMT/BF/ INST/ 38 MONTHLY 1 1
39 PCI MILL CHECKLIST FRMT/BF/ INST/ 39 MONTHLY 1 1
40 RMHS PLC CHECKLIST FRMT/BF/ INST/ 40 MONTHLY 1 1
41 CAST HOUSE CHECKLIST FRMT/BF/ INST/ 41 MONTHLY 1 1
42 MAIN GATE DW STATION FRMT/BF/ INST/ 42 MONTHLY 1 1
43 CASTHOUSE DD UNLOADING SYSTEM FRMT/BF/ INST/ 43 MONTHLY 1 1
44 STOCK HOUSE DEDUSTING SUCTION VALVES MONTHLY CHECKLIST FRMT/BF/ INST/ 44 MONTHLY 1 1

Plan Actual % Compliance


Preventive Maintenance Compliance
141 141 100.00%

PREPARED BY APPROVED BY
BF Maintenance Plan for the month -DEC-2016
Sr.No Checklist Frequency Planned Achieved Remarks
1 Calibration of measuring equip.(Inhouse) Monthly 2 2
2 Calibration of measuring equip.(Inhouse) Quarterly 27 27
3 Calibration of measuring equip.(Inhouse) Half yearly 4 4
4 Calibration of measuring equip.(Inhouse) Yearly 9 9
5 Calibration of measuring equip.(External) Yearly 0 0
6 Calibration of test equipment.(Inhouse) Yearly 0 0

Plan Actual % Compliance


Calibration Maintenance Compliance
42 42 100.00%
Plan Actual % Compliance
Total Maintenance Compliance
183 183 100.00%

AUTHORISED SSL
HOFINCONS
C/o VEDANTA Ltd BF#3 - PIEP
Legal Compliance - - BF INSTRUMENTATION
( Ref - Maint. Resp Matrix Point 12 )

As per Description Frequency Dept Status Aug'16 Sep'16


contract

Planned 0 0
Calibration & stamping of CI weights/weigh bridge/weigh scales/ Pressure
12.2 Annually Inst
Calibrators Achieved 0 0

Planned 0 0
12.11 Calibration of water flow meters Annually Inst
Achieved 0 0
Planned 0 0
12.12 Calibration of online dust monitoring system-Sinter plant stack Annually Inst
Achieved 0 0

Total Planned 0 0
Instrumentation
Total Achieved 0 0
Percentage Achieved 100% 100%
Prepared By Approved By
OFINCONS
EDANTA Ltd BF#3 - PIEP
nce - - BF INSTRUMENTATION
aint. Resp Matrix Point 12 )
DEC'16

Oct'16 Nov'16 Dec'16 Jan'17 Feb'17 Mar'17 Apr'17 May'17 Jun'17 Jul'17

0 0 0 5 3 3 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 4 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 1 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 5 3 7 1 0 0 0
0 0 0 0 0 0 0 0 0 0
100% 100% 100% 0% 0% 0% 0% 0% 0% 0%
Authorized By
HOFINCONS
C/O SESA STERLITE LIMITED December-16

C&P ACTION OF BF INSTRUMENTATION FOR THE MONTH OF DECEMBER-2016

CORRECTIVE & PREVENTIVE ACTION FILE - BF INSTRUMENTATION MAINTENANCE - DEC-2016


Sr No. Date Downtime Hrs Equipment Problem Description Root cause Corrective/Preventive action C&P Action Status
No downtime for > 30mins in the month DEC'16

SUMMARY

FTM YTD
MONTH C&P IDENTIFIED COMPLETED % COMPLETE C&P IDENTIFIED COMPLETED % COMPLETE
Apr-14 0 0 100% 0 0 100.0%
May-14 0 0 100% 0 0 100.0%
Jun-14 2 2 100% 2 2 100.0%
Jul-14 2 2 100% 4 4 100.0%
Aug-14 0 0 100% 4 4 100.0%
Sep-14 1 1 100% 5 5 100.0%
Oct-14 0 0 100% 5 5 100.0%
Nov-14 1 1 100% 6 6 100.0%
Dec-14 0 0 100% 6 6 100.0%
Jan-15 0 0 100% 6 6 100.0%
Feb-15 0 0 100% 6 6 100.0%
Mar-15 0 0 100% 6 6 100.0%
Apr-15 2 2 100% 7 7 100.0%
May-15 0 0 100% 8 8 100.0%
Jun-15 0 0 100% 8 8 100.0%
Jul-15 1 1 100% 9 9 100.0%
Aug-15 0 0 100% 9 9 100.0%
Sep-15 1 1 100% 10 10 100.0%
Oct-15 1 1 100% 11 11 100.0%
Nov-15 1 1 100% 11 11 100.0%
Dec-15 1 1 100% 11 11 100.0%
Jan-16 1 1 100% 11 11 100.0%
Feb-16 1 1 100% 11 11 100.0%
Mar-16 1 1 100% 11 11 100.0%
Apr-16 1 1 100% 11 11 100.0%
May-16 0 0 100% 11 11 100.0%
Jun-16 3 3 100% 14 14 100.0%
Jul-16 0 0 100% 14 14 100.0%
Aug-16 0 0 100% 14 14 100.0%
Sep-16 0 0 100% 14 14 100.0%
Oct-16 0 0 100% 14 14 100.0%
Nov-16 1 0 93% 15 14 93.3%
Dec-16 0 0 93% 15 14 93.3%

PREPARED BY APPROVED BY AUTHORISED SSL


Inspection
Sr. No. Date Observed by Unit Area
dd-mm-yyyy

CWPS &
871 8/27/2016 GRID round Abhijit BF Blower

Stock
919 9/1/2016 SCM discussion BF House

1359 Blower
10/31/2016 Hofincons Safety BF house

Weighbri
1488 11/25/2016 SCM discussion BF dge

LPG
1489 11/25/2016 SCM discussion SP bank
Safety observations Criticality Category Dept.

UNIDENTIFIED CYLINDER KEPT IN INSTRUMENTATION OFFICE TO Low 5S instrumentation


BE IDENTIFED

Last one month data of CO detector alarm for stock house to be


checked to ascertain number of times gas presence was Low Gas poisioninginstrumentation
detected in the area

Low
Blower suction 1 & 2 temperature gauge damage Defective tools / equ Instrument

During discussion of incident at Production weighbridge it was


suggested by chairmen of safety committee that one boom barrier Low InfrastructureInstrumentation
availaible in PIP to be repaired and installed before WB.

Defective toolsInstrumentation
/
LPG leak detection system to be verified Low equipments
Status
(completed, Target Responsibi Remark/Action taken Severity
Inprogress) Date lity

done 30.09.2016Subbaih 1

done ### Alarm recording facility provided. Being analyse 1

In progress Blower 1 temp gauge replaced with newone.blower


### 2 temp gauge not available.meteriel indented 1

not fusible 1

All LPG leakage detector tested hooter and


completed 16/12/2016 Aniket alarm found OK, at local but only LPG Det.2 plc 1
alarm not getting
No. of
Pending
Likelyhood Score Month Date days
for Grid
pending

1 1 8 1/2/2017 125 90-180 days

1 1 9 1/2/2017 121 90-180 days

10 1/2/2017 62 60-90 days


1 1

1 1 11 1/2/2017 37 30-60 days

1 1 11 1/2/2017 37 30-60 days


SR.
TITLE OF TRAIING TRAINEE NAME TRAINER NAME DATE
NO.
WI NO 40 CHEKING OF
1 ANIKET 13.12.2016
Stock rod encoders
ABEY
T.V SUBBAIAH
SHIVA
ANUP
LINTO
RUCHITHA
FERNANDES
SREEKANT
UMESH
DATTA RAM
HEMANT

WI NO 41 CHECKING OF
2 BLEEDER VALVE T.V SUBBAIAH 16.12.2016
PROXIMITY SWITCH
RUCHITHA
ABEY
SEKHAR
HEMANT
FERNANDES
UMESH
SREEKANT
GANESH
ANUP
ANIKET
SHIVA
DATTARAM

WI NO43 CHEKING OF
3 GANESH T.VSUBBAIAH 24.11.2016
PROXIMITY SWITCH BLT

GOPI
HEMANT
HOFINCONS
C/O VEDANTA LIMITED December-16
Shutdown lock /CO monitors/Walkie Talkie monitoring etc.
CHECKLIST OF ITEMS NOV-2016
S. No. DESCRIPTION IDENTIFICATION no ISSUED TO HOFINCONS AVAILABLE REMARKS
1 WALKIE-TALKIE VL/PIEP/32/33/34 3 3
3 CO- MONITOR INST 01/INST 02/INST 03 3 3
4 EVERYDAY TORCH : 1 1
5 CO-MONITOR CHARGERS : 2 2
6 WALKIE TALKIE CHARGERS : 3 3
8 LOTO LOCKS 94 TO 100 7 7

PREPARED BY APPROVED BY AUTHORISED SSL


HOFINCONS
C/O VEDANTA LIMITED

MAINTENANCE PLAN[MP] BF INSTRUMENTATION


DAILY SHIFT CHECKLISTS REPORT - NOV-16
DATE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
A Shif P P P P P P P P P P P P P P P P P
B Shif P P P P P P P P P P P P P P P P P
C Shif P P P P P P P P P P P P P P P P

WEEKLY CHECKLIST PLANNED


REDUNDANCY POWER SUPPLY 4/11/18/25.12.2016
WEIGH BRIDGE 4/11/18/25.12.2016

FORTNIGHTLY CHECKLIST PLANNED


AUTO DRAIN VALVE CHECKLIST 23.12.2016

MONTHLY CHECKLIST PLANNED


BLAST FURNACE PROPER 04.12.2016
BLAST FURNACE TOP 10.12.2016
GAS CLEANING SYSTEM 10.12.2016
BLOWER 10.12.2016
COMPLEX WATER PUMP SYSTEM 07.12.2016
HOT BLAST STOVES 10.12.2016
BF THERMOCOUPLE 02.12.2016
FLARESTACK 10.12.2016
STOCK HOUSE 04.12.2016
CONTROL ROOM 10.12.2016
CAST HOUSE DEDUSTING 08.12.2016
FIRE HYDRANT 24.12.2016
GAS ANALYSER 12.12.2016
STOCK HOUSE DEDUSTING 13.12.2016
PA CHECKLIST 11.12.2016
ONLINE CO MONITOR 20.12.2016
AUTO DRAIN 05.12.2016
AUTO DRAIN 23.12.2016
AC CHECKLIST 30.12.2016
SLAG PCM CHECKLIST 04.12.2016
UPS CHECKLIST 10.12.2016
PCI CHECKLIST 16.12.2016
GCP PUFFING CHECKLIST 21.12.2016
BLOWER PUFFING CHECKLIST 22.12.2016
PCI BAG HOUSE CHECKLIST 23.12.2016
AIR COMPRESSOR CHECKLIST 28.12.2016
CAMERA MONTHLY CHECKLIST 21.12.2016
STAVE RTD MONTHLY CHECKLIST 06.12.2016
PCI GAS ANALYZER CHECKLIST 10.12.2016
MN AND FERRO BIN CHECKLIST 05.12.2016
SCADA SYSTEM 17.12.2016
PCI MILL CHECKLIST 19.12.2016
RMHS PLC CHECKLIST 18.12.2016
CAST HOUSE CHECKLIST 16.12.2016
MAIN GATE DW STATION 16.12.2016
CASTHOUSE DD UNLOADING SYSTEM 26.12.2016
STOCK HOUSE DEDUSTING SUCTION VALVES CHECKLIST 26.12.2016
December-16

MENTATION
16
18 19 20 21 22 23 24 25 26 27 28 29 30 31 Total
P P P P P P P P P P P P P P 31
P P P P P P P P P P P P P P 31
P P P P P P P P P P P P P P 31
P
HOFINCONS C/O VEDANTA LIMITED
Decembe
PENDING JOBS FOR ANNUAL PLANNER
BF INSTRUMENTATION
BF Maintenance Plan for the month -DEC-2016
Sr.No Checklist Frequency Planned Achieved
1 Calibration of measuring equip.(Inhouse) Monthly 2 2
2 Calibration of measuring equip.(Inhouse) Quarterly 27 27
3 Calibration of measuring equip.(Inhouse) Half yearly 4 4
4 Calibration of measuring equip.(Inhouse) Yearly 9 9
5 Calibration of measuring equip.(External) Yearly 0 0
6 Calibration of test equipment.(Inhouse) Yearly 0 0

PENDING JOBS OF ANNUAL PLANNER


DESCRIPTION DATE REMARKS

NIL no jobs pending


NIL

PREPARED BY APPROVED BY AUTHORISED SSL


C/O VEDANTA LIMITED
December-16

Remarks

ANNUAL PLANNER
REASON

ORISED SSL
BF INSTRUMENTATION
FIVE ' S ' AUDIT SHEET-BF3/SP INSTRUMENTATION MAINTENANCE[PLANT]

SUBZONE SUB LEADER S No


1
2
INST PCI OFFICE Abey John , Fernandes 3
4
5
1

CALIBRATION AND 2
SPARE PART STORE Subhaiah, Gopi 3
ROOM/CWPS OFFICE 4
5
6
CONTROL ROOM- PCI 1
BF
BLOWER 2
Reethesh, Sreekanth
SH 3
CWPS
4

PANEL ROOM - BF MAIN 1


BUILDING
LUBRICATION BF TOP
BF HYDRAULIC 2
SLAG
CHDD 3
Subbaiah, Ganesh
PCM
CWPS 4
SH,CHARGING AND
SHDD 5
COMPRESSOR
6

1
GAS ANALYZER ROOM - 2
PCI Rateesh, Rakesh 3
BF
4
5
1
2
MAIN SINTER SHOP PLC Anup, Shekhar 3
ROOM
4
5
1
2
PROPORTIONING PLC 3
ROOM Aniket ,Hemant
4
PROPORTIONING PLC
ROOM Aniket ,Hemant

5
6
1
2
TAIL END ESP PLC PANEL 3
ROOM/ HC SP INST Aniket , Hemant
OFFICE 4
5
6
PANEL ROOM - 1
MAIN ID FAN 2
PROP & SCREEN DD
FUEL AND FLUX Anup, Shekhar 3
HEAD END ESP
SM LUBRICATION 4

1
GAS ANALYZER ROOM Aniket , Hemant 2
3
Total Marks obtained
Max marks
Percentage marks

Name of Internal auditor


BF INSTRUMENTATION
TATION MAINTENANCE[PLANT] DATE:

EVALUATION CRITERIA MARKS


Condition and labelling of individual desks, drawer ACs 4.0
Cleanliness of floor & walls & ceiling 4.2
Proper positioning of furniture and office equipments 4.0
Stationary, files and material arrangements in drawers, almirahs 3.8
Adequate lighting & ventilation 4.0
Condition of furniture & calibration bench 4.2
Cleanliness of floor & walls & ceiling 4.2
Condition of labelling & visual display 4.5
Red tag & yellow tag area 4.0
Proper arrangement of helmets on helmat stand. 4.2
Notice Board maintenance 4.4
Condition and labelling of operating tables, PCs, ACs, Network switches 3.8
Cleanliness of floor & walls & ceiling 3.8
Panel door locking, drawing arrangements. 4.0
Condition of labelling & visual display. 3.8

Condition and labelling of PLC panel, Network switches, Acs. 3.8

Drawings availability in panel. 4.2

Cleanliness of floor & walls & ceiling. 4.0


Condition of labelling & visual display. 4.0
Panel door locking, drawing arrangements. 4.2

Adequate lighting & ventilation 4.2

Condition and labelling of PLC panel, Acs. 4.0


Cleanliness of floor & walls & ceiling 3.8
Panel door locking & drawing arrangements. 4.2
Condition of labelling & visual display. 4.0
Tightness of calibration cylinders and calibration certificates. 4.0
Condition and labelling of PLC panels, isolation transformer and UPS. 4.2
Stationary, files and material arrangements in drawers, cupboards 11, 12. 4.0
Cleanliness of floor & walls & ceiling. 4.0
Adequate lighting & ventilation 4.2
Condition of labelling & visual display. 4.3
Condition and labelling of PLC panels, isolation transformers and UPS. 4.2
Cleanliness of floor & walls & ceiling. 3.8
Listing of spare equipments and their proper arrangements. 4.2
Material arrangements and listing in Cupboards C, D. 4.0
Adequate lighting & ventilation 3.8
Condition of labelling & visual display. 4.2
Condition and labelling of PLC panels, UPS, Acs 4.2
Cleanliness of floor & walls & ceiling. 4.0
Condition and arrangement of Instrumentation table and drawers. 3.8
Labelling of lockers and arrangements. 3.8
Adequate lighting & ventilation 4.2
Condition of labelling & visual display. 4.2
Condition and labelling of PLC panel, Network switches, Acs. 4.2
Cleanliness of floor & walls & ceiling. 4.0
Adequate lighting & ventilation 4.0

Condition of labelling & visual display. 4.2

Condition and labelling of PLC panel, Acs. 4.0


Condition, labelling and tightness of calibration cylinders etc. 4.2
Cleanliness of floor & walls & ceiling & ventilation 4.0
Total Marks obtained 203.0
Max marks 250
Percentage marks 81.2%

Name of Internal auditor T.V. Subbaiah


Aniket
24.12.2016

REMARKS
To be improved
Painting of walls required.
can be improved more.
can be improved more.

Calibration bench to be cleaned after use. Every


individual responsibility
Painting of walls required.

to be maintained.

to be maintained.

Improvement required in all panel rooms

Floor cleaning required in BF MCC PLC Room

Drawing to be made available in Mn dilution weigh


feeder panel

Cleaning required on floor, Painting required.

List to be updated for December month


Painting of walls required.

Cleaning of room to be ensured


Labeling to be done.
Painting of room is required.

to be improved more
arrangemnt to be made proper.
Ventialtion required. AC is not working.

Cleaning of Panel room to be ensured.

Cleaning to be done.

Painting required in the room


HOFINCONS
C/O VEDANTA LIMITED

TOOLS CERTIFICATION LIST -NOV'16


IDENTIFICATION NO. DEPT MATERIAL
HF/BF/INST/SOLDER GUN/01 INSTRUMENTATION Soldering gun
HF/BF/INST/SOLDER GUN/02 INSTRUMENTATION Soldering gun
HF/BF/INST/SOLDER GUN/03 INSTRUMENTATION Soldering gun
HF/BF/INST/SOLDER GUN/04 INSTRUMENTATION Soldering gun
HF/BF/INST/SOLDER GUN/05 INSTRUMENTATION Soldering gun
HF/BF/HB/01/INST.661-0316 INSTRUMENTATION Hand blower
H/LADDERNO:03 INSTRUMENTATION FRP LADDER
HF/INST/EXB/IND-DOM/03(A/C) INSTRUMENTATION EXTENSION BOARD
HF/BF/INST/HJ/128/16 INSTRUMENTATION HYDRAULIC JACK -10T
HF/BF/INST/VPUMP/01 INSTRUMENTATION Vaccum Pump
HF/SB/INST/06 INSTRUMENTATION Safety Belt
HF/SB/INST/07 INSTRUMENTATION Safety Belt

Prepared By Approved By
HOFINCONS
DANTA LIMITED December-16

CERTIFIED BY CERTIFIED ON VALID UPTO


Sitaram 2-Nov-16 1-Feb-17
Sitaram 2-Nov-16 1-Feb-17
Sitaram 2-Nov-16 1-Feb-17
Sitaram 2-Nov-16 1-Feb-17
Sitaram 2-Nov-16 1-Feb-17
Sitaram 9-Nov-16 8-Feb-17
Gajanan 30-Nov-16 28-Feb-17
Sitaram 2-Nov-16 1-Feb-17
Gajanan 8-Nov-17 7-Feb-17
Sitaram 2-Nov-16 1-Feb-17
Gajanan 12-Nov-16 11-Feb-17
Gajanan 12-Nov-16 11-Feb-17