Pag 1

OBIECTIVUL 6 STRAZI Proiect: nr:


Beneficiar Municipiul Satu Mare Faza: Pth.
Proiectant S.C. Arhi Dinamic
Executant:

F3 - LISTA cuprinzand cantitatile de lucrari


- lei -

SECTIUNEA TEHNICA SECTIUNEA FINANCIARA

Nr. Capitolul de lucrari U.M. C antitatea

0 1 2 3 4 5=3x4
OBIECTUL: AXENTE SEVER
STADIUL FIZIC: 270102 SUPRASTRUCTURA
1 TSE06B1 PREGATIREA PLATF.PAM.PT.STRAT 100 46,81
IZOLATOR SI REPARTITIE DIN NISIP MP material:
SAU BALAST EXEC. IN PAM.COEZIV manopera:
utilaj:
transport:
2 DA06B1 STRAT AGREG NAT CILINDRATE CU MC 1.872,20
FUNC REZIST FILTRANTIZOLAT material:
AERISIRE SI ANTICAP CU ASTER MEC manopera:
BALAST utilaj:
transport:
3 DA10B1 STRAT RUTIER MATER GRAN STAB MC 702,08
CU CIMENT SAU VAR SI ZGURA PRIN material:
MET AMES IN STATII FIXE AST MEC manopera:
utilaj:
transport:
3.L 7100016 AMESTEC STABILIZAT CU CIMENT DE MC 704,19
ZGURA 6%
5 TRA01A TRANSPORTUL RUTIER AL TONA 1.564,72
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. TRANSPORT BALAST STABILIZAT utilaj:
transport:
6 TRA01A TRANSPORTUL RUTIER AL TONA 4.172,58
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. TRANSPORT BALAST utilaj:
transport:
7 DB14B1 STRAT DE BAZA MIXTURI ASFALTICE TONA 673,99
EXEC LA CALD CU ASTERN material:
MECANICA manopera:
utilaj:
transport:
7.L 3270048 MIXTURA ASFALTICA AB 2/PRODUSE TONA 676,01
BALASTIERE
8 DA19A1 [ 2] STRAT ANTICONTAMINATOR MATER MP 5.637,60
TEXTIL NETESUT FILTR SINTETIC PE material:
AMPRIZA SAU PLATFORMA manopera:
DRUMULUI utilaj:
transport:
9 DB12B1 STRAT LEGAT BINDER DE CRIB EXEC TONA 449,33
LA CALD CU ASTERNERE MECANICA material:
manopera:
utilaj:
transport:
Pag 2
STADIUL FIZIC: 270102 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: AXENTE SEVER
STADIUL FIZIC: 270102 SUPRASTRUCTURA
9.L 3270049 MIXTURA ASFALTICA BAD TONA 450,68
25/PRODUSE CARIERA
10 DB16H1 IMBRAC BET ASF CU AGREGAT MP 4.680,51
MARUNT EXEC LA CALD IN GROS DE material:
4,0 CM ASTERN MECANICA manopera:
utilaj:
transport:
10.L 3270053 MIXTURA ASFALTICA BA 16/PRODUSE TONA 439,97
CARIERA
10.L 7110184 NISIP BITUMAT 14,04
TONA
11 DB02D1 140,43
AMORS SUPRAF STRAT BAZA SAU 100
IMBRAC EXIST IN VEDER APLIC MP material:
STRAT UZ MIX ASF CU EMULSIE manopera:
CATIONICA utilaj:
transport:
14 TRA01A TRANSPORTUL RUTIER AL TONA 1.650,00
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. utilaj:
transport:
15 DB01C1 CURATIREA PT APLIC IMBRAC SAU MP 9.721,02
TRATAM BITUM A STRATSUPORT DIN material:
SUPRA BIT DIN BET CIM SAU PAV manopera:
BITUM utilaj:
transport:
16 CA01B1 [ 1] TURNARE BETON SIMPLU IN PANTA MC 48,00
VOLUM > 3MC TURNARE BETON IN material:
PANTA PENTRU RIGOLE manopera:
utilaj:
transport:
16.L 2100995 BETON DE CIMENT B 400 STAS 3622 MC 48,12
17 DC04B1 M 305,00
TAIEREA CU MAS.CU DISC DIAMANT
ROST CONTRACTIE SI DILATATIE material:
BETON UZURA LA DRUMURI manopera:
utilaj:
transport:
18 DH14A1 M 305,00
CURATIREA MANUALA A
SANTURILOR SI RIGOLELOR material:
manopera:
utilaj:
transport:
19 TRA06A... TRANSPORTUL RUTIER AL TONA 115,20
BETONULUI- MORTARULUI CU material:
AUTOBETONIERA DE 5,5MC DIST. manopera:
=...... KM utilaj:
transport:
MP 3.792,00
20 CB01A1
COFRAJE IN CUZINETI FUND material:
PAHAR,FUND UTILAJE,DIN PAN manopera:
REF,DIN SCINDURI RAS SC SI SUBSC utilaj:
INCL SPIJIN transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Pag 3
STADIUL FIZIC: 270102 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 4
STADIUL FIZIC: 270103 TROTUARE
0 1 2 3 4 5=3x4
OBIECTUL: AXENTE SEVER
STADIUL FIZIC: 270103 TROTUARE
1 TSE06B1 PREGATIREA PLATF.PAM.PT.STRAT 100 33,67
IZOLATOR SI REPARTITIE DIN NISIP MP material:
SAU BALAST EXEC. IN PAM.COEZIV manopera:
utilaj:
transport:
2 DA06B1 STRAT AGREG NAT CILINDRATE CU MC 336,73
FUNC REZIST FILTRANTIZOLAT material:
AERISIRE SI ANTICAP CU ASTER MEC manopera:
BALAST utilaj:
transport:
3 DA10B1 [ 2] STRAT RUTIER MATER GRAN STAB MC 336,73
CU CIMENT 6% SAU VAR SI ZGURA material:
PRIN MET AMES IN STATII FIXE AST manopera:
MEC utilaj:
transport:
5 TRA01A TRANSPORTUL RUTIER AL TONA 750,48
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST STABILIZAT utilaj:
transport:
6 TRA01A TRANSPORTUL RUTIER AL TONA 750,48
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST utilaj:
transport:
7 DB16H1 IMBRAC BET ASF CU AGREGAT MP 3.367,33
MARUNT EXEC LA CALD IN GROS DE material:
4,0 CM ASTERN MECANICA manopera:
utilaj:
transport:
7.L 7110185 MIXTURI ASFALTICE BA8 TONA 316,53

8 DB02D1 AMORS SUPRAF STRAT BAZA SAU 100 101,01


IMBRAC EXIST IN VEDER APLIC MP material:
STRAT UZ MIX ASF CU EMULSIE manopera:
CATIONICA utilaj:
transport:
10 DB21A1 INCHID SUPRAF CU DRESSING GROS 100 33,67
LA STRATURILE DIRECT CIRCULATE MP material:
manopera:
utilaj:
transport:
10.L 7110184 NISIP BITUMAT TONA 14,10

12 DD02A1 [ 3] PAVELE SPECIALE DIN BETON PT MP 68,90


PERS CU DIZABIL. CU RELIEF PE UN material:
SUBSTR DE NISIP manopera:
utilaj:
transport:
13 TRA01A TRANSPORTUL RUTIER AL TONA 362,00
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Pag 5
STADIUL FIZIC: 270103 TROTUARE
0 1 2 3 4 5=3x4
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 6
STADIUL FIZIC: 270104 BORDURI MARI (DRUM)
0 1 2 3 4 5=3x4
OBIECTUL: AXENTE SEVER
STADIUL FIZIC: 270104 BORDURI MARI (DRUM)
1 DE10A1 BORDURI PREFABRICATE DIN BETON M 1.300,78
PT TROTUARE 20 X 25CM,PE material:
FUNDATIE DIN BETON 30 X 15 CM manopera:
utilaj:
transport:
1.L 2100933 BETON DE CIMENT B 100 STAS 3622 MC 58,54
2 TRI1AA08F2 DESCARCAREA TONA 156,09
MATERIALELOR,GRUPA A-GRELE SI material:
MARUNTE PRIN TRANS.PINA LA 10M manopera:
AUTO- RAMPA,TEREN CATEG. utilaj:
transport:
3 TRA06A TRANSPORTUL RUTIER AL TONA 140,48
BETONULUI- MORTARULUI CU material:
AUTOBETONIERA DE 5,5MC DIST. manopera:
= KM utilaj:
transport:
4 TRA02A TRANSPORTUL RUTIER AL TONA 156,09
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOCAMIONUL PE DIST.= KM. manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 7
STADIUL FIZIC: 270105 BORDURI MICI (TROTUARE)
0 1 2 3 4 5=3x4
OBIECTUL: AXENTE SEVER
STADIUL FIZIC: 270105 BORDURI MICI (TROTUARE)
1 DE11A1 BORD MICI PREF BETON 10 X 15 CM PT M 1.233,93
INCADR TROTUARESPATII VERZI ALEI material:
ASEZATE FUND BETON 10 X 20 CM
manopera:
utilaj:
transport:
1.L 2100933 BETON DE CIMENT B 100 STAS 3622 MC 24,68
2 TRI1AA08F2 DESCARCAREA MATERIALELOR, TONA 42,64
GRUPA A-GRELE SI MARUNTE PRIN material:
TRANS.PINA LA 10M AUTO- manopera:
RAMPA,TEREN CATEG. utilaj:
transport:
3 TRA06A TRANSPORTUL RUTIER AL TONA 59,23
BETONULUI- MORTARULUI CU material:
AUTOBETONIERA DE 5,5MC DIST. manopera:
= KM utilaj:
transport:
4 TRA02A TRANSPORTUL RUTIER AL TONA 42,64
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOCAMIONUL PE DIST.= KM. manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 8
STADIUL FIZIC: 270101 INFRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: AXENTE SEVER
STADIUL FIZIC: 270101 INFRASTRUCTURA
1 DG04A1 DESFACEREA DE BORDURI DE M 20,00
PIATRA SAU DE BETON ORICE material:
DIMENSIUNE ASEZATE PE NISIP manopera:
utilaj:
transport:
2 DG05C1 DECAP IMBR CU STRAT PINA LA 3CM MP 268,00
GROS FORMATE DIN ASFALT TURNAT material:
PE FUNDATIE DIN BETON manopera:
utilaj:
transport:
3 DG06B1 SPARG SI DESF BET CIM PE SUPRAF MC 26,80
LIMIT PT POZARE CABL COND POD material:
GURI,SCURG IN ALEI FUND DRUM manopera:
utilaj:
transport:
4 DG05A1 DECAP IMBR CU STRAT PINA LA 3CM MP 3.276,36
GROS FORMATE DIN COVOARE material:
ASFALTICE PERMANENTE,BETOANE manopera:
ASFALTICE utilaj:
transport:
5 TSE04A1 NIVELAREA SUPR.TEREN.SI 100 32,76
PLATF.DE TERASM. EXEC.CU MP material:
BULDOZ.PE TRACT.65-80 CP IN manopera:
TEREN CATEG. 1 SI 2 utilaj:
transport:
6 TRB01A11 TRANSPORTUL MATERIALELOR CU TONA 566,94
ROABA PE PNEURI INC ASEZARE material:
DESC ASEZARE GRUPA 1- 3 manopera:
DISTANTA 10 M utilaj:
transport:
7 TRI1AA01C1 INCARCAREA MATERIALELOR,GRUPA TONA 566,94
A-GRELE SI MARUNTE,PRIN material:
ARUNCARE RAMPA SAU TEREN- manopera:
AUTO CATEG. utilaj:
transport:
8 TRA01A TRANSPORTUL RUTIER AL TONA 566,94
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. utilaj:
transport:
9 TSA01D1 SAP.MAN.IN SPATII INTINSE IN MC 374,42
PAM.CU UMID.NAT.ARUNC.IN material:
DEPOZ.SAU VEHIC.LA H <0,6M manopera:
T.F.TARE utilaj:
transport:
10 TSC03G1 SAPAT.MEC.CU EXC.DE 0,41-0,7 MC 100 33,72
IN PAM CU UMIDITATE NATURAL MC material:
DESC.AUTO.TEREN CAT 3 manopera:
utilaj:
transport:
11 TSC35B21 EXC.TRA.INC.IN AUT.CU 100 33,72
INC.FRONT.PE SENILE 1,0-2,50MC.IN MC material:
PAM.TER.CAT.2 LA DIST.DE 11-20M manopera:
utilaj:
transport:
Pag 9
STADIUL FIZIC: 270101 INFRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: AXENTE SEVER
STADIUL FIZIC: 270101 INFRASTRUCTURA
12 T RA01A10P TRANSPORTUL RUTIER AL TONA 7.961,14
PAMINTULUI SAU MOLOZULUI CU material:
AUTOBASCULANTA DIST.= KM manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 10
STADIUL FIZIC: 270106 SEMNALIZARE
0 1 2 3 4 5=3x4
OBIECTUL: AXENTE SEVER
STADIUL FIZIC: 270106 SEMNALIZARE
1 DF18A1 PLANTARE STILPI PENTRU BUC 17,00
INDICATOARE DE CIRCULATIE material:
RUTIERA DIN METAL CONFECTIONATI manopera:
INDUSTRIAL utilaj:
transport:
1.L 2100933 BETON DE CIMENT B 100 STAS 3622 MC 1,70
1.L 6301793 STILP METALIC CONFECTIONAT BUC 17,00
INDUSTRIAL
2 DF19A1 MONTAREA INDICATOARELOR PTR BUC 4,00
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT manopera:
CEDEAZA TRECEREA utilaj:
transport:
2.L 7100017 INDICATOR CIRCULATIE TABLA BUC 4,00
OTEL+FOLIE R. TRIUNGHI LUNGIME=
700MM F 1 S1848
3 DF19A1 BUC 8,00
MONTAREA INDICATOARELOR PTR
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT manopera:
TRECERE DE PIETONI utilaj:
transport:
3.L 7101011 INDICATOR CIRCULATIE TABLA BUC 8,00
OTEL+FOLIE R. PATRAT LUNGIME=
600 MM F36 S1848
4 DF19A1 BUC 1,00
MONTAREA INDICATOARELOR PTR
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT INAINTE manopera:
utilaj:
transport:
4.L 7101140 BUC 1,00
INDICATOR CIRCULATIE TABLA
OTEL+FOLIE R. CERC D= 600 MM F41
S1848
5 DF19A1 BUC 1,00
MONTAREA INDICATOARELOR PTR
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT manopera:
ACCESUL INTERZIS utilaj:
transport:
5.L 7101140 INDICATOR CIRCULATIE TABLA BUC 1,00
OTEL+FOLIE R. CERC D= 600 MM F41
S1848
6 DF19A1 BUC 1,00
MONTAREA INDICATOARELOR PTR
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT STOP manopera:
utilaj:
transport:
6.L 7101619 INDICATOR CIRCULATIE TABLA BUC 1,00
OTEL+FOLIE R. OCTOGON H= 700MM
F35 S1848
7 DF19A1 MONTAREA INDICATOARELOR PTR BUC 2,00
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT DRUM manopera:
INGUSTAT utilaj:
transport:
7.L 7100017 INDICATOR CIRCULATIE TABLA BUC 2,00
OTEL+FOLIE R. TRIUNGHI LUNGIME=
700MM F 1 S1848
Pag 11
STADIUL FIZIC: 270106 SEMNALIZARE
0 1 2 3 4 5=3x4
OBIECTUL: AXENTE SEVER
STADIUL FIZIC: 270106 SEMNALIZARE
8 DF16B1 MARCAJE RUTIERE LONGIT SIMPLE KM 0,68
DUBLE CU INTRERUPERISAU material:
CONTINUE EXEC MEC VOP EMAIL manopera:
FARA MICR STIC utilaj:
transport:
9 DF17A1 MARCAJE LONGIT TRANSV SI MP 108,00
DIVERSE EXECUTATE MECANIZ CU material:
VOPSEA PE SUPRAFETE manopera:
CAROSABILE utilaj:
transport:
10 TSH05A1 ASTERNEREA PAM.VEGETAL PE MP 110,00
TEREN CU PANTA <20%,IN material:
STRAT.UNIFORME CU GROSIMEA DE manopera:
10CM utilaj:
transport:
11 TSH09A1 SEMANAREA GAZONULUI PE 100 1,10
SUPRAFETE ORIZONTALE SAU IN MP material:
PANTA SUB 30% * manopera:
utilaj:
transport:
12 TRB01A11 TRANSPORTUL MATERIALELOR CU TONA 0,11
ROABA PE PNEURI INC ASEZARE material:
DESC ASEZARE GRUPA 1- 3 manopera:
DISTANTA 10M utilaj:
transport:
13 TSD01B1 IMPRASTIEREA CU LOPATA A MC 11,00
PAMINT.AFINAT, STRAT UNIFORM material:
10-30CM.GROS CU SFARIM. manopera:
BULG.TEREN MIJL. utilaj:
transport:
14 TRA01AP TRANSPORTUL RUTIER AL PAMINTULUI TONA 3,10
SAU MOLOZULUI CU material:
AUTOBASCULANTA DIST.= KM manopera:
utilaj:
transport:
15 TSC03E1 SAPAT.MEC.CU EXC.DE 0,41-0,7 MC IN 100 14,30
PAM. CU UMIDITATE NATURAL MC material:
.DESC .AUTO. TEREN CAT 1 manopera:
utilaj:
transport:
16 TRA01AP TRANSPORTUL RUTIER AL PAMINTULUI TONA 25,80
SAU MOLOZULUI CU AUTOBASCULANTA material:
DIST.= KM manopera:
utilaj:
transport:
17 TSH12B1 UDAREA SUPRAFETELOR CU 100 1,10
FURTUNUL DE LA CISTERNA MP material:
manopera:
utilaj:
transport:
18 TRA05A TRANSPORT RUTIER TONA 110,00
MATERIALE,SEMIFABRICATE CU material:
AUTOVEHIC.SPECIALE(CISTERNA,BE manopera:
TON. ETC) PE DIST.DE KM utilaj:
transport:
Pag 12
STADIUL FIZIC: 270106 SEMNALIZARE
0 1 2 3 4 5=3x4
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 13
STADIUL FIZIC: 270107 ORGANIZARE DE SANTIER AFERENTA CAP. 5.1.1
0 1 2 3 4 5=3x4
OBIECTUL: AXENTE SEVER
STADIUL FIZIC: 270107 ORGANIZARE DE SANTIER AFERENTA CAP. 5.1.1.
1 RPCXS03A IMPREJMUIRE DIN CHERESTEA M 10,00
RASINOASE CU BULUMACI LEMN material:
FOIOASE manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 14
STADIUL FIZIC: 270108 O.S. AFERENTA CAP 5.1.2
0 1 2 3 4 5=3x4
OBIECTUL: AXENTE SEVER
STADIUL FIZIC: 270108 O.S. AFERENTA CAP. 5.1.2.
1 YC01RON DIFERENTA PRET MATERIALE - RON LEI 8.500,00
WC ECOLOGIC 2 BUC material:
manopera:
utilaj:
transport:
2 YC01RON DIFERENTA PRET MATERIALE - RON LEI 4.150,00
CONTAINER TIP BIROU 1 BUCATA material:
manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 15
STADIUL FIZIC: 270201 INFRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: BARBU LAUTARU
STADIUL FIZIC: 270201 INFRASTRUCTURA
1 DG04B1 DESFACEREA DE BORDURI DE M 15,00
PIATRA SAU DE BETON ORICE material:
DIMENSIUNE ASEZATA PE BETON manopera:
utilaj:
transport:
2 DG05C1 DECAP IMBR CU STRAT PINA LA 3CM MP 145,00
GROS FORMATE DIN ASFALT TURNAT material:
PE FUNDATIE DIN BETON manopera:
utilaj:
transport:
3 DG06B1 SPARG SI DESF BET CIM PE SUPRAF MC 14,50
LIMIT PT POZARE CABL COND POD material:
GURI,SCURG IN ALEI FUND DRUM manopera:
utilaj:
transport:
4 DG05A1 DECAP IMBR CU STRAT PINA LA 3CM MP 709,17
GROS FORMATE DIN COVOARE material:
ASFALTICE PERMANENTE,BETOANE manopera:
ASFALTICE utilaj:
transport:
5 TSE04A1 NIVELAREA SUPR.TEREN.SI 100 7,09
PLATF.DE TERASM. EXEC.CU MP material:
BULDOZ.PE TRACT.65-80 CP IN manopera:
TEREN CATEG.1 SI 2 utilaj:
transport:
6 TRB01A11 TRANSPORTUL MATERIALELOR CU TONA 153,60
ROABA PE PNEURI INC ASEZARE material:
DESC ASEZARE GRUPA 1- 3 manopera:
DISTANTA 10M utilaj:
transport:
7 TRI1AA01C1 INCARCAREA MATERIALELOR,GRUPA TONA 153,60
A-GRELE SI MARUNTE,PRIN material:
ARUNCARE RAMPA SAU TEREN- manopera:
AUTO CATEG. utilaj:
transport:
8 TRA01A TRANSPORTUL RUTIER AL TONA 153,60
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. utilaj:
transport:
9 TSA01D1 SAP.MAN.IN SPATII INTINSE IN MC 78,25
PAM.CU UMID.NAT.ARUNC.IN material:
DEPOZ.SAU VEHIC.LA H <0,6M manopera:
T.F.TARE utilaj:
transport:
10 TSC03G1 SAPAT.MEC.CU EXC.DE 0,41-0,7 MC 100 7,04
IN PAM CU UMIDITATE NATURAL MC material:
DESC.AUTO.TEREN CAT 3 manopera:
utilaj:
transport:
11 TRI1AA01C1 INCARCAREA MATERIALELOR,GRUPA TONA 1.662,72
A-GRELE SI MARUNTE,PRIN material:
ARUNCARE RAMPA SAU TEREN- manopera:
AUTO CATEG.1 utilaj:
transport:
Pag 16
STADIUL FIZIC: 270201 INFRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: BARBU LAUTARU
STADIUL FIZIC: 270201 INFRASTRUCTURA
12 T RA01AP TRANSPORTUL RUTIER AL TONA 1.662,72
PAMINTULUI SAU MOLOZULUI CU material:
AUTOBASCULANTA DIST.= KM manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 17
STADIUL FIZIC: 270202 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: BARBU LAUTARU
STADIUL FIZIC: 270202 SUPRASTRUCTURA
1 TSE06B1 PREGATIREA PLATF.PAM.PT.STRAT 10,13
IZOLATOR SI REPARTITIE DIN NISIP 100 material:
SAU BALAST EXEC. IN PAM.COEZIV MP manopera:
utilaj:
transport:
2 DA06B1 STRAT AGREG NAT CILINDRATE CU MC 303,93
FUNC REZIST FILTRANTIZOLAT material:
AERISIRE SI ANTICAP CU ASTER MEC manopera:
BALAST utilaj:
transport:
3 DA10B1 STRAT RUTIER MATER GRAN STAB MC 151,97
CU CIMENT SAU VAR SI ZGURA PRIN material:
MET AMES IN STATII FIXE AST MEC manopera:
utilaj:
transport:
3.L 7100016 AMESTEC STABILIZAT CU CIMENT DE MC 152,43
ZGURA 6%
5 TRA01A TRANSPORTUL RUTIER AL TONA 338,68
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. TRANSPORT BALAST STABILIZAT utilaj:
transport:
6 TRA01A TRANSPORTUL RUTIER AL TONA 677,37
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. TRANSPORT BALAST utilaj:
transport:
7 DA19A1 [ 2] STRAT ANTICONTAMINATOR MATER MP 1.217,40
TEXTIL NETESUT FILTR SINTETIC PE material:
AMPRIZA SAU PLATFORMA manopera:
DRUMULUI utilaj:
transport:
8 DB14B1 STRAT DE BAZA MIXTURI ASFALTICE TONA 145,89
EXEC LA CALD CU ASTERN material:
MECANICA manopera:
utilaj:
TONA transport:
8.L 3270048 MIXTURA ASFALTICA AB 2/PRODUSE 146,33
BALASTIERE
9 DB12B1 STRAT LEGAT BINDER DE CRIB EXEC TONA 97,26
LA CALD CU ASTERNERE MECANICA material:
manopera:
utilaj:
TONA transport:
9.L 3270049 MIXTURA ASFALTICA BAD 97,55
25/PRODUSE CARIERA
10 DB16H1 IMBRAC BET ASF CU AGREGAT MP 1.013,10
MARUNT EXEC LA CALD IN GROS DE material:
4,0 CM ASTERN MECANICA manopera:
utilaj:
transport:
10.L 3270053 MIXTURA ASFALTICA BA 16/PRODUSE TONA 95,23
CARIERA
10.L 7110184 NISIP BITUMAT TONA 3,04
Pag 18
STADIUL FIZIC: 270202 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: BARBU LAUTARU
STADIUL FIZIC: 270202 SUPRASTRUCTURA
11 DB02D1 AMORS SUPRAF STRAT BAZA SAU 100 30,39
IMBRAC EXIST IN VEDER APLIC MP material:
STRAT UZ MIX ASF CU EMULSIE manopera:
CATIONICA utilaj:
transport:
15 TRA01A TRANSPORTUL RUTIER AL TONA 391,00
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. utilaj:
transport:
16 DB01C1 CURATIREA PT APLIC IMBRAC SAU MP 2.026,20
TRATAM BITUM A STRATSUPORT DIN material:
SUPRA BIT DIN BET CIM SAU PAV manopera:
BITUM utilaj:
transport:
17 CA01B1 [ 1] TURNARE BETON SIMPLU IN PANTA MC 18,90
VOLUM > 3MC TURNARE BETON material:
SIMPLU IN PANTA PENTRU RIGOLE manopera:
utilaj:
transport:
17.L 2100995 BETON DE CIMENT B 400 STAS 3622 MC 19,05
18 TRA06A TRANSPORTUL RUTIER AL BETONULUI- TONA 45,73
MORTARULUI CU AUTOBETONIERA DE material:
5,5MC DIST. = KM
manopera:
utilaj:
transport:
19 DH14A1 CURATIREA MANUALA A M 270,00
SANTURILOR SI RIGOLELOR material:
manopera:
utilaj:
transport:
20 DC04B1 TAIEREA CU MAS.CU DISC DIAMANT M 270,00
ROST CONTRACTIE SI DILATATIE material:
BETON UZURA LA DRUMURI manopera:
utilaj:
transport:
21 CB01A1 COFRAJE IN CUZINETI FUND MP 170,00
PAHAR,FUND UTILAJE,DIN PAN material:
REF,DIN SCINDURI RAS SC SI SUBSC manopera:
INCL SPIJIN utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Pag 19
STADIUL FIZIC: 270202 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 20
STADIUL FIZIC: 270203 TROTUARE
0 1 2 3 4 5=3x4
OBIECTUL: BARBU LAUTARU
STADIUL FIZIC: 270203 TROTUARE
1 TSE06B1 PREGATIREA PLATF.PAM.PT.STRAT 100 6,48
IZOLATOR SI REPARTITIE DIN NISIP MP material:
SAU BALAST EXEC. IN PAM.COEZIV manopera:
utilaj:
transport:
2 DA06B1 STRAT AGREG NAT CILINDRATE CU MC 64,80
FUNC REZIST FILTRANTIZOLAT material:
AERISIRE SI ANTICAP CU ASTER MEC manopera:
BALAST utilaj:
transport:
3 DA10B1 [ 2] STRAT RUTIER MATER GRAN STAB MC 64,80
CU CIMENT 6% SAU VAR SI ZGURA material:
PRIN MET AMES IN STATII FIXE AST manopera:
MEC utilaj:
transport:
5 TRA01A TRANSPORTUL RUTIER AL TONA 144,42
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST STABILIZAT utilaj:
transport:
6 TRA01A TRANSPORTUL RUTIER AL TONA 144,42
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST utilaj:
transport:
7 DB16H1 IMBRAC BET ASF CU AGREGAT MP 647,98
MARUNT EXEC LA CALD IN GROS DE material:
4,0 CM ASTERN MECANICA manopera:
utilaj:
transport:
7.L 7110185 MIXTURI ASFALTICE BA8 TONA 60,91

8 DB02D1 AMORS SUPRAF STRAT BAZA SAU 100 19,44


IMBRAC EXIST IN VEDER APLIC MP material:
STRAT UZ MIX ASF CU EMULSIE manopera:
CATIONICA utilaj:
transport:
10 DB21A1 INCHID SUPRAF CU DRESSING GROS 100 6,48
LA STRATURILE DIRECT CIRCULATE MP material:
manopera:
utilaj:
transport:
10.L 7110184 NISIP BITUMAT TONA 2,71

12 DD02A1 [ 3] PAVELE SPECIALE DIN BETON PT MP 15,00


PERS CU DIZABIL. CU RELIEF PE UN material:
SUBSTR DE NISIP manopera:
utilaj:
transport:
13 TRA01A TRANSPORTUL RUTIER AL TONA 79,00
MATERIALELOR, SEMIFABRICATELOR CU material:
AUTOBASCULANTA PE DIST.= KM.
manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Pag 21
STADIUL FIZIC: 270203 TROTUARE
0 1 2 3 4 5=3x4
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 22
STADIUL FIZIC: 270204 BORDURI MARI (DRUM)
0 1 2 3 4 5=3x4
OBIECTUL: BARBU LAUTARU
STADIUL FIZIC: 270204 BORDURI MARI (DRUM)
1 DE10A1 BORDURI PREFABRICATE DIN BETON M 280,00
PT TROTUARE 20 X 25CM,PE material:
FUNDATIE DIN BETON 30 X 15 CM manopera:
utilaj:
transport:
1.L 2100957 BETON DE CIMENT C 12/15 MC 42,30
2 TRA06A TRANSPORTUL RUTIER AL TONA 101,51
BETONULUI- MORTARULUI CU material:
AUTOBETONIERA DE 5,5MC DIST. manopera:
= KM utilaj:
transport:
3 TRA02A TRANSPORTUL RUTIER AL TONA 33,60
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOCAMIONUL PE DIST.= manopera:
KM. utilaj:
transport:
4 TRI1AA08F2 DESCARCAREA TONA 33,60
MATERIALELOR,GRUPA A-GRELE SI material:
MARUNTE PRIN TRANS.PINA LA 10M manopera:
AUTO- RAMPA,TEREN CATEG. utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 23
STADIUL FIZIC: 270205 BORDURI MICI (TROTUARE)
0 1 2 3 4 5=3x4
OBIECTUL: BARBU LAUTARU
STADIUL FIZIC: 270205 BORDURI MICI (TROTUARE)
1 DE11A1 BORD MICI PREF BETON 10 X 15 CM PT M 276,00
INCADR TROTUARESPATII VERZI ALEI material:
ASEZATE FUND BETON 10 X 20 CM
manopera:
utilaj:
transport:
1.L 2100933 BETON DE CIMENT B 100 STAS 3622 MC 5,52
2 TRA06A TRANSPORTUL RUTIER AL TONA 13,20
BETONULUI- MORTARULUI CU material:
AUTOBETONIERA DE 5,5MC DIST. manopera:
= KM utilaj:
transport:
3 TRA02A TRANSPORTUL RUTIER AL TONA 9,54
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOCAMIONUL PE DIST.= manopera:
KM. utilaj:
transport:
4 TRI1AA08F2 DESCARCAREA TONA 9,54
MATERIALELOR,GRUPA A-GRELE SI material:
MARUNTE PRIN TRANS.PINA LA 10M manopera:
AUTO- RAMPA,TEREN CATEG. utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 24
STADIUL FIZIC: 270206 SEMNALIZARE
0 1 2 3 4 5=3x4
OBIECTUL: BARBU LAUTARU
STADIUL FIZIC: 270206 SEMNALIZARE
1 DF18A1 PLANTARE STILPI PENTRU BUC 3,00
INDICATOARE DE CIRCULATIE material:
RUTIERA DIN METAL CONFECTIONA TI manopera:
INDUSTRIAL utilaj:
transport:
1.L 2100933 BETON DE CIMENT B 100 STAS 3622 MC 0,30
1.L 6301793 STILP METALIC CONFECTIONAT BUC 3,00
INDUSTRIAL
2 DF19A1 MONTAREA INDICATOARELOR PTR BUC 2,00
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT manopera:
TRECERE DE PIETONI utilaj:
transport:
2.L 7101023 INDICATOR CIRCULATIE TABLA BUC 2,00
OTEL+FOLIE R. PATRAT LUNGIME=
600 MM F37 S1848
3 DF19A1 BUC 1,00
MONTAREA INDICATOARELOR PTR
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT manopera:
CEDEAZA TRECEREA utilaj:
transport:
3.L 7100017 INDICATOR CIRCULATIE TABLA BUC 1,00
OTEL+FOLIE R. TRIUNGHI LUNGIME=
700MM F 1 S1848
4 DF16B1 KM 0,15
MARCAJE RUTIERE LONGIT SIMPLE
DUBLE CU INTRERUPERISAU material:
CONTINUE EXEC MEC VOP EMAIL manopera:
FARA MICR STIC utilaj:
transport:
5 DF17A1 MP 27,00
MARCAJE LONGIT TRANSV SI
DIVERSE EXECUTATE MECANIZCU material:
VOPSEA PE SUPRAFETE manopera:
CAROSABILE utilaj:
transport:
6 TRA01AP TRANSPORTUL RUTIER AL TONA 0,30
PAMINTULUI SAU MOLOZULUI CU material:
AUTOBASCULANTA DIST.= manopera:
KM
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 25
STADIUL FIZIC: 270207 ORGANIZARE DE SANTIER AFERENTA CAP. 5.1.1.
0 1 2 3 4 5=3x4
OBIECTUL: BARBU LAUTARU
STADIUL FIZIC: 270207 ORGANIZARE DE SANTIER AFERENTA CAP. 5.1.1.
1 RPCXS03A IMPREJMUIRE DIN CHERESTEA M 8,00
RASINOASE CU BULUMACI LEMN material:
FOIOASE manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 26
STADIUL FIZIC: 270208 O.S. AFERENTA CAP 5.1.2
0 1 2 3 4 5=3x4
OBIECTUL: BARBU LAUTARU
STADIUL FIZIC: 270208 O.S. AFERENTA CAP. 5.1.2.
1 YC01RON DIFERENTA PRET MATERIALE - RON LEI 4.150,00
CONTAINER TIP BIROU 1 BUCATA material:
manopera:
utilaj:
transport:
2 YC01RON DIFERENTA PRET MATERIALE - RON LEI 8.500,00
WC ECOLOGIC 2 BUC material:
manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 27
STADIUL FIZIC: 270301 INFRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: LAZARULUI
STADIUL FIZIC: 270301 INFRASTRUCTURA
1 DG04B1 DESFACEREA DE BORDURI DE M 660,00
PIATRA SAU DE BETON material:
ORICEDIMENSIUNE ASEZATA PE manopera:
BETON utilaj:
transport:
2 DG05C1 DECAP IMBR CU STRAT PINA LA 3CM MP 2.450,00
GROS FORMATE DIN ASFALT TURNAT material:
PE FUNDATIE DIN BETON manopera:
utilaj:
transport:
3 DG06B1 SPARG SI DESF BET CIM PE SUPRAF MC 245,00
LIMIT PT POZARE CABL COND POD material:
GURI,SCURG IN ALEI FUND DRUM manopera:
utilaj:
transport:
4 DG05A1 DECAP IMBR CU STRAT PINA LA 3CM MP 9.592,90
GROS FORMATE DIN COVOARE material:
ASFALTICE PERMANENTE,BETOANE manopera:
ASFALTICE utilaj:
transport:
5 TRB01A11 TRANSPORTUL MATERIALELOR CU TONA 1.512,02
ROABA PE PNEURI INC ASEZARE material:
DESC ASEZARE GRUPA 1- 3 manopera:
DISTANTA 10M utilaj:
transport:
6 TRI1AA01C1 INCARCAREA MATERIALELOR,GRUPA TONA 1.512,02
A-GRELE SI MARUNTE,PRIN material:
ARUNCARE RAMPA SAU TEREN- manopera:
AUTO CATEG.1 utilaj:
transport:
7 TRA01A... TRANSPORTUL RUTIER AL TONA 1.512,02
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= ...... manopera:
KM. utilaj:
transport:
8 TSA01D1 SAP.MAN.IN SPATII INTINSE IN MC 1.063,89
PAM.CU UMID.NAT.ARUNC.IN material:
DEPOZ.SAU VEHIC.LA H <0,6M manopera:
T.F.TARE utilaj:
transport:
9 TSC03G1 SAPAT.MEC.CU EXC.DE 0,41-0,7 MC 100 98,75
IN PAM CU UMIDITATE NATURAL MC material:
DESC.AUTO.TEREN CAT 3 manopera:
utilaj:
transport:
10 TSC35B21 EXC.TRA.INC.IN AUT.CU 100 98,75
INC.FRONT.PE SENILE 1,0-2,50MC.IN MC material:
PAM.TER.CAT.2 LA DIST.DE 11-20M manopera:
utilaj:
transport:
11 TRA01A...P TRANSPORTUL RUTIER AL TONA 22.607,71
PAMINTULUI SAU MOLOZULUI CU material:
AUTOBASCULANTA DIST.= ...... manopera:
KM utilaj:
transport:
Pag 28
STADIUL FIZIC: 270301 INFRASTRUCTURA
0 1 2 3 4 5=3x4
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 29
STADIUL FIZIC: 270302 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: LAZARULUI
STADIUL FIZIC: 270302 SUPRASTRUCTURA
1 TSE06B1 PREGATIREA PLATF.PAM.PT.STRAT 137,04
IZOLATOR SI REPARTITIE DIN NISIP 100 material:
SAU BALAST EXEC. IN PAM.COEZIV MP manopera:
utilaj:
transport:
2 DA06B1 STRAT AGREG NAT CILINDRATE CU MC 5.481,66
FUNC REZIST FILTRANTIZOLAT material:
AERISIRE SI ANTICAP CU ASTER MEC manopera:
BALAST utilaj:
transport:
3 DA10B1 STRAT RUTIER MATER GRAN STAB MC 2.055,62
CU CIMENT SAU VAR SI ZGURA PRIN material:
MET AMES IN STATII FIXE AST MEC manopera:
utilaj:
transport:
3.L 7100016 AMESTEC STABILIZAT CU CIMENT DE MC 2.061,79
ZGURA 6%
4 TRA01A TRANSPORTUL RUTIER AL TONA 4.581,36
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST STABILIZAT utilaj:
transport:
5 TRA01A TRANSPORTUL RUTIER AL TONA 12.217,00
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST utilaj:
transport:
6 DB14B1 STRAT DE BAZA MIXTURI ASFALTICE TONA 1.973,40
EXEC LA CALD CU ASTERN material:
MECANICA manopera:
utilaj:
transport:
6.L 3270048 MIXTURA ASFALTICA AB 2/PRODUSE TONA 1.979,32
BALASTIERE
7 DA19A1 [ 2] STRAT ANTICONTAMINATOR MATER MP 16.400,00
TEXTIL NETESUT FILTR SINTETIC PE material:
AMPRIZA SAU PLATFORMA manopera:
DRUMULUI utilaj:
transport:
8 DB12B1 STRAT LEGAT BINDER DE CRIB EXEC TONA 1.315,60
LA CALD CU ASTERNERE MECANICA material:
manopera:
utilaj:
transport:
8.L 3270049 MIXTURA ASFALTICA BAD TONA 1.319,55
25/PRODUSE CARIERA
9 DB16H1 IMBRAC BET ASF CU AGREGAT MP 13.704,14
MARUNT EXEC LA CALD IN GROS DE material:
4,0 CM ASTERN MECANICA manopera:
utilaj:
transport:
9.L 3270053 MIXTURA ASFALTICA BA 16/PRODUSE TONA 1.288,19
CARIERA
9.L 7110184 NISIP BITUMAT 41,11
TONA
Pag 30
STADIUL FIZIC: 270302 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: LAZARULUI
STADIUL FIZIC: 270302 SUPRASTRUCTURA
10 DB02D1 AMORS SUPRAF STRAT BAZA SAU 100 411,12
IMBRAC EXIST IN VEDER APLIC MP material:
STRAT UZ MIX ASF CU EMULSIE manopera:
CATIONICA utilaj:
transport:
11 TRA01A TRANSPORTUL RUTIER AL TONA 4.678,20
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. utilaj:
transport:
12 DB01C1 CURATIREA PT APLIC IMBRAC SAU MP 4.496,26
TRATAM BITUM A STRATSUPORT DIN material:
SUPRA BIT DIN BET CIM SAU PAV manopera:
BITUM utilaj:
transport:
13 CA01B1 [ 1] TURNARE BETON SIMPLU IN PANTA MC 308,32
VOLUM > 3MC TURNARE BETON material:
SIMPLU IN PANTA PENTRU RIGOLE manopera:
utilaj:
transport:
13.L 2100995 BETON DE CIMENT B 400 STAS 3622 MC 310,79

14 CB01A1 COFRAJE IN CUZINETI FUND MP 1.800,00


PAHAR,FUND UTILAJE,DIN PAN material:
REF,DIN SCINDURI RAS SC SI SUBSC manopera:
INCL SPIJIN utilaj:
transport:
15 DC04B1 TAIEREA CU MAS.CU DISC DIAMANT M 970,00
ROST CONTRACTIE SI DILATATIE material:
BETON UZURA LA DRUMURI manopera:
utilaj:
transport:
16 DH14A1 CURATIREA MANUALA A M 3.853,00
SANTURILOR SI RIGOLELOR material:
manopera:
utilaj:
transport:
17 TSC03E1 SAPAT.MEC.CU EXC.DE 0,41-0,7 MC IN 100 13,22
PAM. CU UMIDITATE .NATURAL MC material:
.DESC.AUTO.TE REN CAT 1 manopera:
utilaj:
transport:
18 TRA01AP TRANSPORTUL RUTIER AL TONA 2.379,60
PAMINTULUI SAU MOLOZULUI CU material:
AUTOBASCULANTA DIST.= manopera:
KM utilaj:
transport:
19 TSH05A1 ASTERNEREA PAM.VEGETAL PE MP 1.322,00
TEREN CU PANTA <20%,IN material:
STRAT.UNIFORME CU GROSIMEA DE manopera:
10CM utilaj:
transport:
Pag 31
STADIUL FIZIC: 270302 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: LAZARULUI
STADIUL FIZIC: 270302 SUPRASTRUCTURA
20 TSH09A1 SEMANAREA GAZONULUI PE 100 13,22
SUPRAFETE ORIZONTALE SAU IN MP material:
PANTA SUB 30% * manopera:
utilaj:
transport:
21 TSH12B1 UDAREA SUPRAFETELOR CU 100 13,22
FURTUNUL DE LA CISTERNA MP material:
manopera:
utilaj:
transport:
22 TRA05A... TRANSPORT RUTIER TONA 132,20
MATERIALE,SEMIFABRICATE CU material:
AUTOVEHIC.SPECIALE(CISTERNA,BE manopera:
TON. ETC)PE DIST.DE ...... KM utilaj:
transport:
23 TRB01A15 TRANSPORTUL MATERIALELOR CU TONA 1,32
ROABA PE PNEURI INC ASEZARE material:
DESC ASEZARE GRUPA 1- 3 manopera:
DISTANTA 50M utilaj:
transport:
24 TSD01B1 IMPRASTIEREA CU LOPATA A MC 132,20
PAMINT.AFINAT, STRAT UNIFORM material:
10-30CM.GROS CU SFARIM. manopera:
BULG.TEREN MIJL. utilaj:
transport:
25 DH14A1 CURATIREA MANUALA A M 650,00
SANTURILOR SI RIGOLELOR material:
manopera:
utilaj:
transport:
26 TSE01B1 NIVELAREA MANUALA A 100 24,70
TERENURILOR SI A PLATFORMELOR MP material:
CU DENIVELARI DE 10-20 CM IN manopera:
TEREN MIJLOCIU utilaj:
transport:
27 TSD05A1 COMPACTARE CU MAI.MEC.DE 100 2,50
150-200KG A UMPL.IN STRAT.DE MC material:
20-30CM EXCLUSIV UDARE STRAT DIN manopera:
PAM.NECOE utilaj:
transport:
28 DD02A2 PAVAJ EXECUTAT CU PAVELE MP 2.470,00
NORMALE CALIT II PE UN SUBSTR DE material:
NISIP manopera:
utilaj:
transport:
29 DF09A1 PARAP METALIC DEFORMABIL M 650,00
(FLEXIBIL) TIP A CU LISA SI STILPI material:
METALICI manopera:
utilaj:
transport:
29.L 2100957 BETON DE CIMENT C12/15 MC 53,95
29.L 6306377 PARAPET METALIC AVIND 75-100% KG 10.666,50
TEAVA TRASA
Pag 32
STADIUL FIZIC: 270302 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: LAZARULUI
STADIUL FIZIC: 270302 SUPRASTRUCTURA
30 TRA01A... TRANSPORTUL RUTIER AL TONA 600,67
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= ...... manopera:
KM. utilaj:
transport:
31 TRA06A TRANSPORTUL RUTIER AL TONA 875,36
BETONULUI- MORTARULUI CU material:
AUTOBETONIERA DE 5,5MC DIST. manopera:
= KM utilaj:
transport:
32 DH27B1 VOPSIREA PARAPETELOR DIN MP 650,00
METAL material:
manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 33
STADIUL FIZIC: 270303 TROTUARE
0 1 2 3 4 5=3x4
OBIECTUL: LAZARULUI
STADIUL FIZIC: 270303 TROTUARE
1 TSE06B1 PREGATIREA PLATF.PAM.PT.STRAT 100 89,77
IZOLATOR SI REPARTITIE DIN NISIP MP material:
SAU BALAST EXEC. IN PAM.COEZIV manopera:
utilaj:
transport:
2 DA06B1 STRAT AGREG NAT CILINDRATE CU MC 897,70
FUNC REZIST FILTRANTIZOLAT material:
AERISIRE SI ANTICAP CU ASTER MEC manopera:
BALAST utilaj:
transport:
3 DA10B1 [ 2] STRAT RUTIER MATER GRAN STAB MC 897,70
CU CIMENT 6% SAU VAR SI ZGURA material:
PRIN MET AMES IN STATII FIXE AST manopera:
MEC utilaj:
transport:
4 TRA01A TRANSPORTUL RUTIER AL TONA 2.000,71
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST STABILIZAT utilaj:
transport:
5 TRA01A TRANSPORTUL RUTIER AL TONA 2.000,71
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST utilaj:
transport:
6 DB16H1 IMBRAC BET ASF CU AGREGAT MP 8.977,02
MARUNT EXEC LA CALD IN GROS DE material:
4,0 CM ASTERN MECANICA manopera:
utilaj:
transport:
6.L 7110185 MIXTURI ASFALTICE BA8 TONA 843,84

7 DB02D1 AMORS SUPRAF STRAT BAZA SAU 100 269,31


IMBRAC EXIST IN VEDER APLIC MP material:
STRAT UZ MIX ASF CU EMULSIE manopera:
CATIONICA utilaj:
transport:
8 DB21A1 INCHID SUPRAF CU DRESSING GROS 100 89,77
LA STRATURILE DIRECT CIRCULATE MP material:
manopera:
utilaj:
transport:
8.L 7110184 NISIP BITUMAT TONA 37,44

9 TRA01A TRANSPORTUL RUTIER AL TONA 985,00


MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. utilaj:
transport:
10 DD02A1 [ 3] PAVELE SPECIALE DIN BETON PT MP 268,20
PERS CU DIZABIL. CU RELIEF PE UN material:
SUBSTR DE NISIP manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Pag 34
STADIUL FIZIC: 270303 TROTUARE
0 1 2 3 4 5=3x4
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 35
STADIUL FIZIC: 270304 BORDURI MARI (DRUM)
0 1 2 3 4 5=3x4
OBIECTUL: LAZARULUI
STADIUL FIZIC: 270304 BORDURI MARI (DRUM)
1 DE10A1 BORDURI PREFABRICATE DIN BETON M 3.826,30
PT TROTUARE 20 X 25CM,PE material:
FUNDATIE DIN BETON 30 X 15 CM manopera:
utilaj:
transport:
1.L 2100957 BETON DE CIMENT C12/15 MC 172,18
2 TRA06A TRANSPORTUL RUTIER AL TONA 413,24
BETONULUI- MORTARULUI CU material:
AUTOBETONIERA DE 5,5MC DIST. manopera:
= KM utilaj:
transport:
3 TRA02A TRANSPORTUL RUTIER AL TONA 459,15
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOCAMIONUL PE DIST.= manopera:
KM. utilaj:
transport:
4 TRI1AA08F2 DESCARCAREA TONA 459,15
MATERIALELOR,GRUPA A-GRELE SI material:
MARUNTE PRIN TRANS.PINA LA 10M manopera:
AUTO- RAMPA,TEREN CATEG. utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 36
STADIUL FIZIC: 270305 BORDURI MICI (TROTUARE)
0 1 2 3 4 5=3x4
OBIECTUL: LAZARULUI
STADIUL FIZIC: 270305 BORDURI MICI (TROTUARE)
1 DE11A1 BORD MICI PREF BETON 10 X 15 CM PT M 7.536,90
INCADR TROTUARESPATII VERZI ALEI material:
ASEZATE FUND BETON 10 X 20 CM
manopera:
utilaj:
transport:
1.L 2100957 BETON DE CIMENT C 12/15 MC 150,74
2 TRA06A TRANSPORTUL RUTIER AL TONA 362,00
BETONULUI- MORTARULUI CU material:
AUTOBETONIERA DE 5,5MC DIST. manopera:
= KM utilaj:
transport:
3 TRA02A TRANSPORTUL RUTIER AL TONA 260,50
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOCAMIONUL PE DIST.= manopera:
KM. utilaj:
transport:
4 TRI1AA08F2 DESCARCAREA TONA 260,50
MATERIALELOR,GRUPA A-GRELE SI material:
MARUNTE PRIN TRANS.PINA LA 10M manopera:
AUTO- RAMPA,TEREN CATEG. utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 37
STADIUL FIZIC: 270306 SEMNALIZARE
0 1 2 3 4 5=3x4
OBIECTUL: LAZARULUI
STADIUL FIZIC: 270306 SEMNALIZARE
1 DF18A1 PLANTARE STILPI PENTRU BUC 49,00
INDICATOARE DE CIRCULATIE material:
RUTIERA DIN METAL CONFECTIONA TI manopera:
INDUSTRIAL utilaj:
transport:
1.L 2100933 BETON DE CIMENT B 100 STAS 3622 MC 4,90
1.L 6301793 STILP METALIC CONFECTIONAT BUC 49,00
INDUSTRIAL
2 DF19A1 MONTAREA INDICATOARELOR PTR BUC 42,00
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT manopera:
TRECERE DE PIETONI 34 BUC + 2 utilaj:
BUC STATIE PISTA BICILISTI transport:
2.L 7101023 INDICATOR CIRCULATIE TABLA BUC 42,00
OTEL+FOLIE R. PATRAT LUNGIME=
600 MM F37 S1848
3 DF19A1 BUC 3,00
MONTAREA INDICATOARELOR PTR
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT manopera:
CEDEAZA TRECEREA utilaj:
transport:
3.L 7100017 INDICATOR CIRCULATIE TABLA BUC 3,00
OTEL+FOLIE R. TRIUNGHI LUNGIME=
700MM F 1 S1848
4 DF19A1 BUC 2,00
MONTAREA INDICATOARELOR PTR
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT STOP manopera:
utilaj:
transport:
4.L 7101619 INDICATOR CIRCULATIE TABLA BUC 2,00
OTEL+FOLIE R. OCTOGON H= 700MM
F35 S1848
5 DF19A1 MONTAREA INDICATOARELOR PTR BUC 2,00
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT DRUM manopera:
INGUSTAT PE AMBELE PARTI utilaj:
transport:
5.L 7100017 INDICATOR CIRCULATIE TABLA BUC 2,00
OTEL+FOLIE R. TRIUNGHI LUNGIME=
700MM F 1 S1848
6 DF16B1 KM 3,13
MARCAJE RUTIERE LONGIT SIMPLE
DUBLE CU INTRERUPERISAU material:
CONTINUE EXEC MEC VOP EMAIL manopera:
FARA MICR STIC utilaj:
transport:
7 DF17A1 MARCAJE LONGIT TRANSV SI MP 490,50
DIVERSE EXECUTATE MECANIZCU material:
VOPSEA PE SUPRAFETE manopera:
CAROSABILE utilaj:
transport:
8 TRA01AP TRANSPORTUL RUTIER AL TONA 4,90
PAMINTULUI SAU MOLOZULUI CU material:
AUTOBASCULANTA DIST.= manopera:
KM
utilaj:
transport:
procent material manopera utilaj transport total
Pag 38
STADIUL FIZIC: 270306 SEMNALIZARE
0 1 2 3 4 5=3x4
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 39
STADIUL FIZIC: 270307 ORGANIZARE DE SANTIER AFERENTA CAP. 5.1.1.
0 1 2 3 4 5=3x4
OBIECTUL: LAZARULUI
STADIUL FIZIC: 270307 ORGANIZARE DE SANTIER AFERENTA CAP. 5.1.1.
1 RPCXS03A IMPREJMUIRE DIN CHERESTEA M 18,00
RASINOASE CU BULUMACI LEMN material:
FOIOASE manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 40
STADIUL FIZIC: 270308 O.S. AFERENTA CAP 5.1.2
0 1 2 3 4 5=3x4
OBIECTUL: LAZARULUI
STADIUL FIZIC: 270308 O.S. AFERENTA CAP. 5.1.2.
1 YC01RON DIFERENTA PRET MATERIALE - RON LEI 4.150,00
CONTAINER TIP BIROU 1 BUCATA material:
manopera:
utilaj:
transport:
2 YC01RON DIFERENTA PRET MATERIALE - RON LEI 8.500,00
WC ECOLOGIC 2 BUC material:
manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 41
STADIUL FIZIC: 270401 INFRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: PANAIT ISTRATI
STADIUL FIZIC: 270401 INFRASTRUCTURA
1 DG04B1 DESFACEREA DE BORDURI DE M 31,00
PIATRA SAU DE BETON ORICE material:
DIMENSIUNE ASEZATA PE BETON manopera:
utilaj:
transport:
2 DG05C1 DECAP IMBR CU STRAT PINA LA 3CM MP 92,00
GROS FORMATE DIN ASFALT TURNAT material:
PE FUNDATIE DIN BETON manopera:
utilaj:
transport:
3 DG06B1 SPARG SI DESF BET CIM PE SUPRAF MC 9,20
LIMIT PT POZARE CABL COND POD material:
GURI,SCURG IN ALEI FUND DRUM manopera:
utilaj:
transport:
4 DG05A1 DECAP IMBR CU STRAT PINA LA 3CM MP 1.573,69
GROS FORMATE DIN COVOARE material:
ASFALTICE PERMANENTE,BETOANE manopera:
ASFALTICE utilaj:
transport:
5 TRB01A11 TRANSPORTUL MATERIALELOR CU TONA 259,27
ROABA PE PNEURI INC ASEZARE material:
DESC ASEZARE GRUPA 1- 3 manopera:
DISTANTA 10M utilaj:
transport:
6 TRI1AAC1 INCARCAREA MATERIALELOR,GRUPA TONA 259,27
A-GRELE SI MARUNTE,PRIN material:
ARUNCARE RAMPA SAU TEREN- manopera:
AUTO CATEG. utilaj:
transport:
7 TRA01A TRANSPORTUL RUTIER AL TONA 259,27
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. utilaj:
transport:
8 TSA01D1 SAP.MAN.IN SPATII INTINSE IN MC 168,80
PAM.CU UMID.NAT.ARUNC.IN material:
DEPOZ.SAU VEHIC.LA H <0,6M manopera:
T.F.TARE utilaj:
transport:
9 TSC03G1 SAPAT.MEC.CU EXC.DE 0,41-0,7 MC 100 15,19
IN PAM CU UMIDITATE NATURAL MC material:
DESC.AUTO.TEREN CAT 3 manopera:
utilaj:
transport:
10 TSC35B21 EXC.TRA.INC.IN AUT.CU 100 3.587,10
INC.FRONT.PE SENILE 1,0-2,50MC.IN MC material:
PAM.TER.CAT.2 LA DIST.DE 11-20M manopera:
utilaj:
transport:
11 TRA01AP TRANSPORTUL RUTIER AL TONA 3.587,10
PAMINTULUI SAU MOLOZULUI CU material:
AUTOBASCULANTA DIST.= manopera:
KM utilaj:
transport:
Pag 42
STADIUL FIZIC: 270401 INFRASTRUCTURA
0 1 2 3 4 5=3x4
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 43
STADIUL FIZIC: 270402 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: PANAIT ISTRATI
STADIUL FIZIC: 270402 SUPRASTRUCTURA
1 TSE06B1 PREGATIREA PLATF.PAM.PT.STRAT 100 22,48
IZOLATOR SI REPARTITIE DIN NISIP MP material:
SAU BALAST EXEC. IN PAM.COEZIV manopera:
utilaj:
transport:
2 DA06B1 STRAT AGREG NAT CILINDRATE CU MC 674,44
FUNC REZIST FILTRANT IZOLAT material:
AERISIRE SI ANTICAP CU ASTER MEC manopera:
BALAST utilaj:
transport:
3 DA10B1 STRAT RUTIER MATER GRAN STAB MC 337,22
CU CIMENT SAU VAR SI ZGURA PRIN material:
MET AMES IN STATII FIXE AST MEC manopera:
utilaj:
transport:
3.L 7100016 AMESTEC STABILIZAT CU CIMENT DE MC 338,23
ZGURA 6%
5 TRA01A TRANSPORTUL RUTIER AL TONA 751,56
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST STABILIZAT utilaj:
transport:
6 TRA01A TRANSPORTUL RUTIER AL 1.503,12
TONA
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST utilaj:
transport:
7 DA19A1 [ 2] STRAT ANTICONTAMINATOR MATER MP 2.690,00
TEXTIL NETESUT FILTR SINTETIC PE material:
AMPRIZA SAU PLATFORMA manopera:
DRUMULUI utilaj:
transport:
8 DB14B1 STRAT DE BAZA MIXTURI ASFALTICE TONA 323,73
EXEC LA CALD CU ASTERN material:
MECANICA manopera:
utilaj:
transport:
8.L 3270048 MIXTURA ASFALTICA AB 2/PRODUSE TONA 324,70
BALASTIERE
9 DB12B1 STRAT LEGAT BINDER DE CRIB EXEC TONA 215,
LA CALD CU ASTERNERE MECANICA 82 material:
manopera:
utilaj:
transport:
9.L 3270049 MIXTURA ASFALTICA BAD TONA 216,47
25/PRODUSE CARIERA
10 DB16H1 IMBRAC BET ASF CU AGREGAT MP 2.249,00
MARUNT EXEC LA CALD IN GROS DE material:
4,0 CM ASTERN MECANICA manopera:
utilaj:
transport:
10.L 3270053 MIXTURA ASFALTICA BA 16/PRODUSE TONA 211,41
CARIERA
10.L 7110184 NISIP BITUMAT 6,75
TONA
Pag 44
STADIUL FIZIC: 270402 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: PANAIT ISTRATI
STADIUL FIZIC: 270402 SUPRASTRUCTURA
11 DB02D1 AMORS SUPRAF STRAT BAZA SAU 100 67,44
IMBRAC EXIST IN VEDER APLIC MP material:
STRAT UZ MIX ASF CU EMULSIE manopera:
CATIONICA utilaj:
transport:
15 TRA01A TRANSPORTUL RUTIER AL TONA 808,35
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. utilaj:
transport:
16 DB01C1 CURATIREA PT APLIC IMBRAC SAU MP 4.496,26
TRATAM BITUM A STRATSUPORT DIN material:
SUPRA BIT DIN BET CIM SAU PAV manopera:
BITUM utilaj:
transport:
17 CA01B1 [ 1] TURNARE BETON SIMPLU IN PANTA MC 51,20
VOLUM > 3MC material:
manopera:
utilaj:
transport:
17.L 2100995 BETON DE CIMENT B 400 STAS 3622 MC 51,61
18 TRA06A TRANSPORTUL RUTIER AL BETONULUI- TONA 123,87
MORTARULUI CU AUTOBETONIERA DE material:
5,5MC DIST. = KM
manopera:
utilaj:
transport:
19 DH14A1 CURATIREA MANUALA A M 640,00
SANTURILOR SI RIGOLELOR material:
manopera:
utilaj:
transport:
20 DC04B1 TAIEREA CU MAS.CU DISC DIAMANT M 160,00
ROST CONTRACTIE SI DILATATIE material:
BETON UZURA LA DRUMURI manopera:
utilaj:
transport:
21 CB01A1 COFRAJE IN CUZINETI FUND MP 295,00
PAHAR,FUND UTILAJE,DIN PAN material:
REF,DIN SCINDURI RAS SC SI SUBSC manopera:
INCL SPIJIN utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Pag 45
STADIUL FIZIC: 270402 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 46
STADIUL FIZIC: 270403 TROTUARE
0 1 2 3 4 5=3x4
OBIECTUL: PANAIT ISTRATI
STADIUL FIZIC: 270403 TROTUARE
1 TSE06B1 PREGATIREA PLATF.PAM.PT.STRAT 100 12,40
IZOLATOR SI REPARTITIE DIN NISIP MP material:
SAU BALAST EXEC. IN PAM.COEZIV manopera:
utilaj:
transport:
2 DA06B1 STRAT AGREG NAT CILINDRATE CU MC 124,03
FUNC REZIST FILTRANTIZOLAT material:
AERISIRE SI ANTICAP CU ASTER MEC manopera:
BALAST utilaj:
transport:
3 DA10B1 [ 2] STRAT RUTIER MATER GRAN STAB MC 124,03
CU CIMENT 6% SAU VAR SI ZGURA material:
PRIN MET AMES IN STATII FIXE AST manopera:
MEC utilaj:
transport:
5 TRA01A... TRANSPORTUL RUTIER AL TONA 276,43
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= ...... manopera:
KM. PENTRU BALAST STABILIZAT utilaj:
transport:
6 TRA01A... TRANSPORTUL RUTIER AL TONA 276,43
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= ...... manopera:
KM. PENTRU BALAST utilaj:
transport:
7 DB16H1 IMBRAC BET ASF CU AGREGAT MP 1.240,34
MARUNT EXEC LA CALD IN GROS DE material:
4,0 CM ASTERN MECANICA manopera:
utilaj:
transport:
7.L 7110185 MIXTURI ASFALTICE BA8 TONA 116,59

8 DB02D1 AMORS SUPRAF STRAT BAZA SAU 100 37,20


IMBRAC EXIST IN VEDER APLIC MP material:
STRAT UZ MIX ASF CU EMULSIE manopera:
CATIONICA utilaj:
transport:
10 DB21A1 INCHID SUPRAF CU DRESSING GROS 100 12,40
LA STRATURILE DIRECT CIRCULATE MP material:
manopera:
utilaj:
transport:
10.L 7110184 NISIP BITUMAT TONA 5,17

12 DD02A1 [ 3] PAVELE SPECIALE DIN BETON PT MP 30,00


PERS CU DIZABIL. CU RELIEF PE UN material:
SUBSTR DE NISIP manopera:
utilaj:
transport:
13 TRA01A TRANSPORTUL RUTIER AL TONA 131,00
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Pag 47
STADIUL FIZIC: 270403 TROTUARE
0 1 2 3 4 5=3x4
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 48
STADIUL FIZIC: 270404 BORDURI MARI (DRUM)
0 1 2 3 4 5=3x4
OBIECTUL: PANAIT ISTRATI
STADIUL FIZIC: 270404 BORDURI MARI (DRUM)
1 DE10A1 BORDURI PREFABRICATE DIN BETON M 646,30
PT TROTUARE 20 X 25CM,PE material:
FUNDATIE DIN BETON 30 X 15 CM manopera:
utilaj:
transport:
1.L 2100933 BETON DE CIMENT B 100 STAS 3622 MC 29,08
2 TRA06A TRANSPORTUL RUTIER AL TONA 69,00
BETONULUI- MORTARULUI CU material:
AUTOBETONIERA DE 5,5MC DIST. manopera:
= KM utilaj:
transport:
3 TRA02A TRANSPORTUL RUTIER AL TONA 77,56
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOCAMIONUL PE DIST.= manopera:
KM. utilaj:
transport:
4 TRI1AA08F2 DESCARCAREA TONA 77,56
MATERIALELOR,GRUPA A-GRELE SI material:
MARUNTE PRIN TRANS.PINA LA 10M manopera:
AUTO- RAMPA,TEREN CATEG. utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 49
STADIUL FIZIC: 270405 BORDURI MICI (TROTUARE)
0 1 2 3 4 5=3x4
OBIECTUL: PANAIT ISTRATI
STADIUL FIZIC: 270405 BORDURI MICI (TROTUARE)
1 DE11A1 BORD MICI PREF BETON 10 X 15 CM M 646,60
PT INCADR TROTUARESPATII VERZI material:
ALEI ASEZATE FUND BETON 10 X 20 manopera:
C utilaj:
transport:
1.L 2100933 BETON DE CIMENT B 100 STAS 3622 MC 12,93
2 TRA06A TRANSPORTUL RUTIER AL TONA 31,20
BETONULUI- MORTARULUI CU material:
AUTOBETONIERA DE 5,5MC DIST. manopera:
= KM utilaj:
transport:
3 TRA02A TRANSPORTUL RUTIER AL TONA 22,40
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOCAMIONUL PE DIST.= manopera:
KM. utilaj:
transport:
4 TRI1AA08F2 DESCARCAREA TONA 22,40
MATERIALELOR,GRUPA A-GRELE SI material:
MARUNTE PRIN TRANS.PINA LA 10M manopera:
AUTO- RAMPA,TEREN CATEG. utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 50
STADIUL FIZIC: 270406 SEMNALIZARE
0 1 2 3 4 5=3x4
OBIECTUL: PANAIT ISTRATI
STADIUL FIZIC: 270406 SEMNALIZARE
1 DF18A1 PLANTARE STILPI PENTRU BUC 6,00
INDICATOARE DE CIRCULATIE material:
RUTIERA DIN METAL CONFECTIONA TI manopera:
INDUSTRIAL utilaj:
transport:
1.L 2100933 BETON DE CIMENT B 100 STAS 3622 MC 0,60
1.L 6301793 STILP METALIC CONFECTIONAT BUC 6,00
INDUSTRIAL
2 DF19A1 MONTAREA INDICATOARELOR PTR BUC 4,00
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT manopera:
TRECERE DE PIETONI utilaj:
transport:
2.L 7101023 INDICATOR CIRCULATIE TABLA BUC 4,00
OTEL+FOLIE R. PATRAT LUNGIME=
600 MM F37 S1848
3 DF19A1 BUC 2,00
MONTAREA INDICATOARELOR PTR
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT manopera:
CEDEAZA TRECEREA utilaj:
transport:
3.L 7100017 INDICATOR CIRCULATIE TABLA BUC 2,00
OTEL+FOLIE R. TRIUNGHI LUNGIME=
700MM F 1 S1848
4 DF16B1 KM 0,32
MARCAJE RUTIERE LONGIT SIMPLE
DUBLE CU INTRERUPERISAU material:
CONTINUE EXEC MEC VOP EMAIL manopera:
FARA MICR STIC utilaj:
transport:
5 DF17A1 MP 54,00
MARCAJE LONGIT TRANSV SI
DIVERSE EXECUTATE MECANIZCU material:
VOPSEA PE SUPRAFETE manopera:
CAROSABILE utilaj:
transport:
45 TRA01AP TRANSPORTUL RUTIER AL TONA 0,60
PAMINTULUI SAU MOLOZULUI CU material:
AUTOBASCULANTA DIST.= manopera:
KM
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 51
STADIUL FIZIC: 270407 ORGANIZARE DE SANTIER AFERENTA CAP. 5.1.1.
0 1 2 3 4 5=3x4
OBIECTUL: PANAIT ISTRATI
STADIUL FIZIC: 270407 ORGANIZARE DE SANTIERA CAP. 5.1.1.
1 RPCXS03A IMPREJMUIRE DIN CHERESTEA M 8,00
RASINOASE CU BULUMACI LEMN material:
FOIOASE manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 52
STADIUL FIZIC: 270408 O.S. AFERENTA CAP 5.1.2
0 1 2 3 4 5=3x4
OBIECTUL: PANAIT ISTRATI
STADIUL FIZIC: 270408 O.S. AFERENTA CAP. 5.1.2.
1 YC01RON DIFERENTA PRET MATERIALE - RON LEI 4.150,00
CONTAINER TIP BIROU 1 BUCATA material:
manopera:
utilaj:
transport:
2 YC01RON DIFERENTA PRET MATERIALE - RON LEI 8.500,00
WC ECOLOGIC 2 BUC material:
manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 53
STADIUL FIZIC: 270501 INFRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: EMIL RACOVITA
STADIUL FIZIC: 270501 INFRASTRUCTURA
1 DG04B1 DESFACEREA DE BORDURI DE M 15,00
PIATRA SAU DE BETON ORICE material:
DIMENSIUNE ASEZATA PE BETON manopera:
utilaj:
transport:
2 DG05C1 DECAP IMBR CU STRAT PINA LA 3CM MP 68,00
GROS FORMATE DIN ASFALT TURNAT material:
PE FUNDATIE DIN BETON manopera:
utilaj:
transport:
3 DG06B1 SPARG SI DESF BET CIM PE SUPRAF MC 6,80
LIMIT PT POZARE CABL COND POD material:
GURI,SCURG IN ALEI FUND DRUM manopera:
utilaj:
transport:
4 DG05A1 DECAP IMBR CU STRAT PINA LA 3CM MP 784,43
GROS FORMATE DIN COVOARE material:
ASFALTICE PERMANENTE,BETOANE manopera:
ASFALTICE utilaj:
transport:
5 TRB01A11 TRANSPORTUL MATERIALELOR CU TONA 137,10
ROABA PE PNEURI INC ASEZARE material:
DESC ASEZARE GRUPA 1- 3 manopera:
DISTANTA 10M utilaj:
transport:
6 TRI1AA01C1 INCARCAREA MATERIALELOR,GRUPA TONA 137,10
A-GRELE SI MARUNTE,PRIN material:
ARUNCARE RAMPA SAU TEREN- manopera:
AUTO CATEG.1 utilaj:
transport:
7 TRA01A TRANSPORTUL RUTIER AL TONA 137,10
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. utilaj:
transport:
8 TSA01D1 SAP.MAN.IN SPATII INTINSE IN MC 82,32
PAM.CU UMID.NAT.ARUNC.IN material:
DEPOZ.SAU VEHIC.LA H <0,6M manopera:
T.F.TARE utilaj:
transport:
9 TSC03G1 SAPAT.MEC.CU EXC.DE 0,41-0,7 MC 100 7,41
IN PAM CU UMIDITATE NATURAL MC material:
DESC.AUTO.TEREN CAT manopera:
utilaj:
transport:
10 TSC35B21 EXC.TRA.INC.IN AUT.CU 100 7,41
INC.FRONT.PE SENILE 1,0-2,50MC.IN MC material:
PAM.TER.CAT.2 LA DIST.DE 11-20M manopera:
utilaj:
transport:
11 TRA01AP TRANSPORTUL RUTIER AL TONA 1.749,33
PAMINTULUI SAU MOLOZULUI CU material:
AUTOBASCULANTA DIST.= manopera:
KM utilaj:
transport:
Pag 54
STADIUL FIZIC: 270501 INFRASTRUCTURA
0 1 2 3 4 5=3x4
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 55
STADIUL FIZIC: 270502 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: EMIL RACOVITA
STADIUL FIZIC: 270502 SUPRASTRUCTURA
1 TSE06B1 PREGATIREA PLATF.PAM.PT.STRAT 100 12,21
IZOLATOR SI REPARTITIE DIN NISIP MP material:
SAU BALAST EXEC. IN PAM.COEZIV manopera:
utilaj:
transport:
2 DA06B1 STRAT AGREG NAT CILINDRATE CU MC 336,19
FUNC REZIST FILTRANTIZOLAT material:
AERISIRE SI ANTICAP CU ASTER MEC manopera:
BALAST utilaj:
transport:
3 DA10B1 STRAT RUTIER MATER GRAN STAB MC 168,09
CU CIMENT SAU VAR SI ZGURA PRIN material:
MET AMES IN STATII FIXE AST MEC manopera:
utilaj:
transport:
3.L 7100016 AMESTEC STABILIZAT CU CIMENT DE MC 168,59
ZGURA 6%
5 TRA01A TRANSPORTUL RUTIER AL TONA 374,63
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST STABILIZAT utilaj:
transport:
6 TRA01A TRANSPORTUL RUTIER AL 749,26
TONA
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST utilaj:
transport:
7 DA19A1 [ 2] STRAT ANTICONTAMINATOR MATER MP 1.344,00
TEXTIL NETESUT FILTR SINTETIC PE material:
AMPRIZA SAU PLATFORMA manopera:
DRUMULUI utilaj:
transport:
8 DB14B1 STRAT DE BAZA MIXTURI ASFALTICE TONA 161,37
EXEC LA CALD CU ASTERN material:
MECANICA manopera:
utilaj:
transport:
8.L 3270048 MIXTURA ASFALTICA AB 2/PRODUSE 161,85
TONA
BALASTIERE
9 DB12B1 STRAT LEGAT BINDER DE CRIB EXEC TONA 10
LA CALD CU ASTERNERE MECANICA 7,58
material:
manoper
a: utilaj:
9.L 3270049 MIXTURA ASFALTICA BAD TONA transport:
25/PRODUSE CARIERA 107,90
10 DB16H1 IMBRAC BET ASF CU AGREGAT MP 1.120,62
MARUNT EXEC LA CALD IN GROS DE material:
4,0 CM ASTERN MECANICA manopera:
utilaj:
transport:
10.L 3270053 MIXTURA ASFALTICA BA 16/PRODUSE TONA 105,34
CARIERA
10.L 7110184 NISIP BITUMAT 3,36
TONA
Pag 56
STADIUL FIZIC: 270502 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: EMIL RACOVITA
STADIUL FIZIC: 270502 SUPRASTRUCTURA
11 DB02D1 AMORS SUPRAF STRAT BAZA SAU 100 33,63
IMBRAC EXIST IN VEDER APLIC MP material:
STRAT UZ MIX ASF CU EMULSIE manopera:
CATIONICA utilaj:
transport:
15 TRA01A10 TRANSPORTUL RUTIER AL TONA 428,45
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= 10 manopera:
KM. utilaj:
transport:
16 DB01C1 CURATIREA PT APLIC IMBRAC SAU MP 2.241,00
TRATAM BITUM A STRATSUPORT DIN material:
SUPRA BIT DIN BET CIM SAU PAV manopera:
BITUM utilaj:
transport:
17 CA01B1 [ 1] TURNARE BETON SIMPLU IN PANTA MC 25,60
VOLUM > 3MC material:
manopera:
utilaj:
transport:
17.L 2100995 BETON DE CIMENT B 400 STAS 3622 MC 25,81
18 DH14A1 CURATIREA MANUALA A M 320,00
SANTURILOR SI RIGOLELOR material:
manopera:
utilaj:
transport:
19 DC04B1 TAIEREA CU MAS.CU DISC DIAMANT M 80,00
ROST CONTRACTIE SI DILATATIE material:
BETON UZURA LA DRUMURI manopera:
utilaj:
transport:
20 TSH05A1 ASTERNEREA PAM.VEGETAL PE MP 300,00
TEREN CU PANTA <20%,IN material:
STRAT.UNIFORME CU GROSIMEA DE manopera:
10CM utilaj:
transport:
21 TSH09A1 SEMANAREA GAZONULUI PE 100 3,00
SUPRAFETE ORIZONTALE SAU IN MP material:
PANTA SUB 30% * manopera:
utilaj:
transport:
22 TRB01A12 TRANSPORTUL MATERIALELOR CU TONA 0,30
ROABA PE PNEURI INC ASEZARE material:
DESC ASEZARE GRUPA 1- 3 manopera:
DISTANTA 20M utilaj:
transport:
23 TSD01B1 IMPRASTIEREA CU LOPATA A MC 30,00
PAMINT.AFINAT, STRAT UNIFORM material:
10-30CM.GROS CU SFARIM. manopera:
BULG.TEREN MIJL. utilaj:
transport:
Pag 57
STADIUL FIZIC: 270502 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: EMIL RACOVITA
STADIUL FIZIC: 270502 SUPRASTRUCTURA
24 TRA06A TRANSPORTUL RUTIER AL BETONULUI- TONA 61,94
MORTARULUI CU AUTOBETONIERA DE material:
5,5MC DIST. = KM
manopera:
utilaj:
transport:
50 TSC03E1 SAPAT.MEC.CU EXC.DE 0,41-0,7 MC IN 100 0,30
PAM. CU UMIDITATE .NATURAL MC material:
DESC.AUTO.TE REN CAT 1 manopera:
utilaj:
transport:
51 TRA01AP TRANSPORTUL RUTIER AL TONA 54,00
PAMINTULUI SAU MOLOZULUI CU material:
AUTOBASCULANTA DIST.= manopera:
KM utilaj:
transport:
52 CB01A1 COFRAJE IN CUZINETI FUND MP 148,00
PAHAR,FUND UTILAJE,DIN PAN material:
REF,DIN SCINDURI RAS SC SI SUBSC manopera:
INCL SPIJIN utilaj:
transport:
53 TSH12B1 UDAREA SUPRAFETELOR CU 100 3,00
FURTUNUL DE LA CISTERNA MP material:
manopera:
utilaj:
transport:
54 TRA05A TRANSPORT RUTIER TONA 30,00
MATERIALE,SEMIFABRICATE CU material:
AUTOVEHIC.SPECIALE (CISTERNA,BE manopera:
TON. ETC) PE DIST.DE KM utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 58
STADIUL FIZIC: 270503 TROTUARE
0 1 2 3 4 5=3x4
OBIECTUL: EMIL RACOVITA
STADIUL FIZIC: 270503 TROTUARE
1 TSE06B1 PREGATIREA PLATF.PAM.PT.STRAT 100 5,42
IZOLATOR SI REPARTITIE DIN NISIP MP material:
SAU BALAST EXEC. IN PAM.COEZIV manopera:
utilaj:
transport:
2 DA06B1 STRAT AGREG NAT CILINDRATE CU MC 54,24
FUNC REZIST FILTRANTIZOLAT material:
AERISIRE SI ANTICAP CU ASTER MEC manopera:
BALAST utilaj:
transport:
3 DA10B1 [ 2] STRAT RUTIER MATER GRAN STAB MC 54,24
CU CIMENT 6% SAU VAR SI ZGURA material:
PRIN MET AMES IN STATII FIXE AST manopera:
MEC utilaj:
transport:
5 TRA01A TRANSPORTUL RUTIER AL TONA 120,89
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST STABILIZAT utilaj:
transport:
6 TRA01A TRANSPORTUL RUTIER AL TONA 120,89
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST utilaj:
transport:
7 DB16H1 IMBRAC BET ASF CU AGREGAT MP 542,44
MARUNT EXEC LA CALD IN GROS DE material:
4,0 CM ASTERN MECANICA manopera:
utilaj:
transport:
7.L 7110185 MIXTURI ASFALTICE BA8 TONA 50,99

8 DB02D1 AMORS SUPRAF STRAT BAZA SAU 100 16,26


IMBRAC EXIST IN VEDER APLIC MP material:
STRAT UZ MIX ASF CU EMULSIE manopera:
CATIONICA utilaj:
transport:
10 DB21A1 INCHID SUPRAF CU DRESSING GROS 100 5,42
LA STRATURILE DIRECT CIRCULATE MP material:
manopera:
utilaj:
transport:
10.L 7110184 NISIP BITUMAT TONA 2,26

12 DD02A1 [ 3] PAVELE SPECIALE DIN BETON PT MP 15,00


PERS CU DIZABIL. CU RELIEF PE UN material:
SUBSTR DE NISIP manopera:
utilaj:
transport:
13 TRA01A TRANSPORTUL RUTIER AL TONA 59,00
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Pag 59
STADIUL FIZIC: 270503 TROTUARE
0 1 2 3 4 5=3x4
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 60
STADIUL FIZIC: 270504 BORDURI MARI (DRUM)
0 1 2 3 4 5=3x4
OBIECTUL: EMIL RACOVITA
STADIUL FIZIC: 270504 BORDURI MARI (DRUM)
1 DE10A1 BORDURI PREFABRICATE DIN BETON M 338,45
PT TROTUARE 20 X 25CM,PE material:
FUNDATIE DIN BETON 30 X 15 CM manopera:
utilaj:
transport:
1.L 2100933 BETON DE CIMENT B 100 STAS 3622 MC 15,23
3 TRA06A TRANSPORTUL RUTIER AL TONA 38,40
BETONULUI- MORTARULUI CU material:
AUTOBETONIERA DE 5,5MC DIST. manopera:
= KM utilaj:
transport:
4 TRA02A TRANSPORTUL RUTIER AL TONA 40,61
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOCAMIONUL PE DIST.= manopera:
KM. utilaj:
transport:
5 TRI1AA08F2 DESCARCAREA TONA 40,61
MATERIALELOR,GRUPA A-GRELE SI material:
MARUNTE PRIN TRANS.PINA LA 10M manopera:
AUTO- RAMPA,TEREN CATEG. utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 61
STADIUL FIZIC: 270505 BORDURI MICI (TROTUARE)
0 1 2 3 4 5=3x4
OBIECTUL: EMIL RACOVITA
STADIUL FIZIC: 270505 BORDURI MICI (TROTUARE)
1 DE11A1 BORD MICI PREF BETON 10 X 15 CM M 640,00
PT INCADR TROTUARESPATII VERZI material:
ALEI ASEZATE FUND BETON 10 X 20 manopera:
C utilaj:
transport:
1.L 2100957 BETON DE CIMENT C12/15 MC 12,80
2 TRA06A TRANSPORTUL RUTIER AL TONA 30,72
BETONULUI- MORTARULUI CU material:
AUTOBETONIERA DE 5,5MC DIST. manopera:
= KM utilaj:
transport:
3 TRA02A TRANSPORTUL RUTIER AL TONA 22,00
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOCAMIONUL PE DIST.= manopera:
KM. utilaj:
transport:
4 TRI1AA08F2 DESCARCAREA TONA 22,00
MATERIALELOR,GRUPA A-GRELE SI material:
MARUNTE PRIN TRANS.PINA LA 10M manopera:
AUTO- RAMPA,TEREN CATEG. utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 62
STADIUL FIZIC: 270506 SEMNALIZARE
0 1 2 3 4 5=3x4
OBIECTUL: EMIL RACOVITA
STADIUL FIZIC: 270506 SEMNALIZARE
1 DF18A1 PLANTARE STILPI PENTRU BUC 3,00
INDICATOARE DE CIRCULATIE material:
RUTIERA DIN METAL CONFECTIONA TI manopera:
INDUSTRIAL utilaj:
transport:
1.L 2100933 BETON DE CIMENT B 100 STAS 3622 MC 0,30
1.L 6301793 STILP METALIC CONFECTIONAT BUC 3,00
INDUSTRIAL
2 DF19A1 MONTAREA INDICATOARELOR PTR BUC 2,00
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT manopera:
TRECERE DE PIETONI utilaj:
transport:
2.L 7101023 INDICATOR CIRCULATIE TABLA BUC 2,00
OTEL+FOLIE R. PATRAT LUNGIME=
600 MM F37 S1848
3 DF19A1 BUC 1,00
MONTAREA INDICATOARELOR PTR
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT manopera:
CEDEAZA TRECEREA utilaj:
transport:
3.L 7100017 INDICATOR CIRCULATIE TABLA BUC 1,00
OTEL+FOLIE R. TRIUNGHI LUNGIME=
700MM F 1 S1848
4 DF16B1 KM 0,16
MARCAJE RUTIERE LONGIT SIMPLE
DUBLE CU INTRERUPERISAU material:
CONTINUE EXEC MEC VOP EMAIL manopera:
FARA MICR STIC utilaj:
transport:
5 DF17A1 MP 27,00
MARCAJE LONGIT TRANSV SI
DIVERSE EXECUTATE MECANIZCU material:
VOPSEA PE SUPRAFETE manopera:
CAROSABILE utilaj:
transport:
55 TRA01AP TRANSPORTUL RUTIER AL TONA 0,30
PAMINTULUI SAU MOLOZULUI CU material:
AUTOBASCULANTA DIST.= manopera:
KM
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 63
STADIUL FIZIC: 270507 ORGANIZARE DE SANTIER AFERENTA CAP. 5.1.1.
0 1 2 3 4 5=3x4
OBIECTUL: EMIL RACOVITA
STADIUL FIZIC: 270507 ORGANIZARE DE SANTIER AFERENTA CAP. 5.1.1.
1 RPCXS03A IMPREJMUIRE DIN CHERESTEA M 8,00
RASINOASE CU BULUMACI LEMN material:
FOIOASE manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 64
STADIUL FIZIC: 270508 O.S. AFERENTA CAP 5.1.2.
0 1 2 3 4 5=3x4
OBIECTUL: EMIL RACOVITA
STADIUL FIZIC: 270508 O.S. AFERENTA CAP. 5.1.2.
1 YC01RON DIFERENTA PRET MATERIALE - RON LEI 4.150,00
CONTAINER TIP BIROU 1 BUCATA material:
manopera:
utilaj:
transport:
2 YC01RON DIFERENTA PRET MATERIALE - RON LEI 8.500,00
WC ECOLOGIC 2 BUC material:
manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 65
STADIUL FIZIC: 270601 INFRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: TEILOR
STADIUL FIZIC: 270601 INFRASTRUCTURA
1 DG04B1 DESFACEREA DE BORDURI DE M 1.090,00
PIATRA SAU DE BETON material:
ORICEDIMENSIUNE ASEZATA PE manopera:
BETON utilaj:
transport:
2 DG05C1 DECAP IMBR CU STRAT PINA LA 3CM MP 84,00
GROS FORMATE DIN ASFALT TURNAT material:
PE FUNDATIE DIN BETON manopera:
utilaj:
transport:
3 DG06B1 SPARG SI DESF BET CIM PE SUPRAF MC 8,40
LIMIT PT POZARE CABL COND POD material:
GURI,SCURG IN ALEI FUND DRUM manopera:
utilaj:
transport:
4 DG05A1 DECAP IMBR CU STRAT PINA LA 3CM MP 2.357,59
GROS FORMATE DIN COVOARE material:
ASFALTICE PERMANENTE,BETOANE manopera:
ASFALTICE utilaj:
transport:
5 TRB01A11 TRANSPORTUL MATERIALELOR CU TONA 585,00
ROABA PE PNEURI INC ASEZARE material:
DESC ASEZARE GRUPA 1- 3 manopera:
DISTANTA 10M utilaj:
transport:
6 TRI1AA01C1 INCARCAREA MATERIALELOR,GRUPA TONA 585,00
A-GRELE SI MARUNTE,PRIN material:
ARUNCARE RAMPA SAU TEREN- manopera:
AUTO CATEG. utilaj:
transport:
7 TRA01A TRANSPORTUL RUTIER AL TONA 585,00
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. utilaj:
transport:
8 TSA01D1 SAP.MAN.IN SPATII INTINSE IN MC 217,74
PAM.CU UMID.NAT.ARUNC.IN material:
DEPOZ.SAU VEHIC.LA H <0,6M manopera:
T.F.TARE utilaj:
transport:
9 TSC03G1 SAPAT.MEC.CU EXC.DE 0,41-0,7 MC 100 19,60
IN PAM CU UMIDITATE NATURAL MC material:
DESC.AUTO.TEREN CAT manopera:
utilaj:
transport:
10 TSC35B21 EXC.TRA.INC.IN AUT.CU 100 19,60
INC.FRONT.PE SENILE 1,0-2,50MC.IN MC material:
PAM.TER.CAT.2 LA DIST.DE 11-20M manopera:
utilaj:
transport:
11 TRA01AP TRANSPORTUL RUTIER AL TONA 4.626,92
PAMINTULUI SAU MOLOZULUI CU material:
AUTOBASCULANTA DIST.= manopera:
KM utilaj:
transport:
Pag 66
STADIUL FIZIC: 270601 INFRASTRUCTURA
0 1 2 3 4 5=3x4
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 67
STADIUL FIZIC: 270602 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: TEILOR
STADIUL FIZIC: 270602 SUPRASTRUCTURA
1 TSE06B1 PREGATIREA PLATF.PAM.PT.STRAT 100 33,68
IZOLATOR SI REPARTITIE DIN NISIP MP material:
SAU BALAST EXEC. IN PAM.COEZIV manopera:
utilaj:
transport:
2 DA06B1 STRAT AGREG NAT CILINDRATE CU MC 1.178,80
FUNC REZIST FILTRANTIZOLAT material:
AERISIRE SI ANTICAP CU ASTER MEC manopera:
BALAST utilaj:
transport:
3 DA10B1 STRAT RUTIER MATER GRAN STAB MC 505,20
CU CIMENT SAU VAR SI ZGURA PRIN material:
MET AMES IN STATII FIXE AST MEC manopera:
utilaj:
transport:
3.L 7100016 AMESTEC STABILIZAT CU CIMENT DE MC 506,72
ZGURA
5 TRA01A TRANSPORTUL RUTIER AL TONA 1.126,00
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST STABILIZAT utilaj:
transport:
6 TRA01A TRANSPORTUL RUTIER AL TONA 2.628,00
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST utilaj:
transport:
7 DA19A1 [ 2] STRAT ANTICONTAMINATOR MATER MP 4.003,60
TEXTIL NETESUT FILTR SINTETIC PE material:
AMPRIZA SAU PLATFORMA manopera:
DRUMULUI utilaj:
transport:
8 DB14B1 STRAT DE BAZA MIXTURI ASFALTICE TONA 484,99
EXEC LA CALD CU ASTERN material:
MECANICA manopera:
utilaj:
transport:
8.L 3270048 MIXTURA ASFALTICA AB 2/PRODUSE TONA 486,45
BALASTIERE
9 DB12B1 STRAT LEGAT BINDER DE CRIB EXEC TONA 323,33
LA CALD CU ASTERNERE MECANICA material:
manopera:
utilaj:
transport:
9.L 3270049 MIXTURA ASFALTICA BAD TONA 324,30
25/PRODUSE CARIERA
10 DB16H1 IMBRAC BET ASF CU AGREGAT MP 3.368,00
MARUNT EXEC LA CALD IN GROS DE material:
4,0 CM ASTERN MECANICA manopera:
utilaj:
transport:
10.L 3270053 MIXTURA ASFALTICA BA 16/PRODUSE TONA 316,59
CARIERA
10.L 7110184 NISIP BITUMAT 10,10
TONA
Pag 68
STADIUL FIZIC: 270602 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: TEILOR
STADIUL FIZIC: 270602 SUPRASTRUCTURA
11 DB02D1 AMORS SUPRAF STRAT BAZA SAU 100 101,04
IMBRAC EXIST IN VEDER APLIC MP material:
STRAT UZ MIX ASF CU EMULSIE manopera:
CATIONICA utilaj:
transport:
15 TRA01A TRANSPORTUL RUTIER AL TONA 1.185,45
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. utilaj:
transport:
16 DB01C1 CURATIREA PT APLIC IMBRAC SAU MP 6.736,00
TRATAM BITUM A STRATSUPORT DIN material:
SUPRA BIT DIN BET CIM SAU PAV manopera:
BITUM utilaj:
transport:
17 CA01B1 [ 1] TURNARE BETON SIMPLU IN PANTA MC 72,64
VOLUM > 3MC material:
manopera:
utilaj:
transport:
17.L 2100995 BETON DE CIMENT B 400 STAS 3622 MC 73,22
18 TRA06A... TRANSPORTUL RUTIER AL BETONULUI- TONA 175,74
MORTARULUI CU AUTOBETONIERA DE material:
5,5MC DIST. = ........ KM
manopera:
utilaj:
transport:
19 DC04B1 TAIEREA CU MAS.CU DISC DIAMANT M 227,00
ROST CONTRACTIE SI DILATATIE material:
BETON UZURA LA DRUMURI manopera:
utilaj:
transport:
20 DH14A1 CURATIREA MANUALA A M 908,00
SANTURILOR SI RIGOLELOR material:
manopera:
utilaj:
transport:
21 TSH05A1 ASTERNEREA PAM.VEGETAL PE MP 130,00
TEREN CU PANTA <20%,IN material:
STRAT.UNIFORME CU GROSIMEA DE manopera:
10CM utilaj:
transport:
22 TSH09A1 SEMANAREA GAZONULUI PE 100 1,30
SUPRAFETE ORIZONTALE SAU IN MP material:
PANTA SUB 30% * manopera:
utilaj:
transport:
23 TRB01A18 TRANSPORTUL MATERIALELOR CU TONA 0,13
ROABA PE PNEURI INC ASEZARE material:
DESC ASEZARE GRUPA 1- 3 manopera:
DISTANTA 80M utilaj:
transport:
Pag 69
STADIUL FIZIC: 270602 SUPRASTRUCTURA
0 1 2 3 4 5=3x4
OBIECTUL: TEILOR
STADIUL FIZIC: 270602 SUPRASTRUCTURA
24 TSD01B1 IMPRASTIEREA CU LOPATA A MC 13,00
PAMINT.AFINAT, STRAT UNIFORM material:
10-30CM.GROS CU SFARIM. manopera:
BULG.TEREN MIJL. utilaj:
transport:
31 TSC03E1 SAPAT.MEC.CU EXC.DE 0,41-0,7 MC IN 100 0,13
PAM. CU UMIDITATE. NATURAL. MC material:
DESC.AUTO.TE REN CAT 1 manopera:
utilaj:
transport:
44 TRA01AP TRANSPORTUL RUTIER AL TONA 23,40
PAMINTULUI SAU MOLOZULUI CU material:
AUTOBASCULANTA DIST.= manopera:
KM utilaj:
transport:
45 TSH12B1 UDAREA SUPRAFETELOR CU 100 1,30
FURTUNUL DE LA CISTERNA MP material:
manopera:
utilaj:
transport:
46 TRA05A TRANSPORT RUTIER MATERIALE, TONA 0,13
SEMIFABRICATE CU AUTOVEHIC. material:
SPECIALE(CISTERNA,BE TON. manopera:
ETC)PE DIST.DE KM utilaj:
transport:
55 CB01A1 COFRAJE IN CUZINETI FUND MP 626,00
PAHAR,FUND UTILAJE,DIN PAN material:
REF,DIN SCINDURI RAS SC SI SUBSC manopera:
INCL SPIJIN utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 70
STADIUL FIZIC: 270603 TROTUARE
0 1 2 3 4 5=3x4
OBIECTUL: TEILOR
STADIUL FIZIC: 270603 TROTUARE
1 TSE06B1 PREGATIREA PLATF.PAM.PT.STRAT 100 4,66
IZOLATOR SI REPARTITIE DIN NISIP MP material:
SAU BALAST EXEC. IN PAM.COEZIV manopera:
utilaj:
transport:
2 DA06B1 STRAT AGREG NAT CILINDRATE CU MC 46,63
FUNC REZIST FILTRANTIZOLAT material:
AERISIRE SI ANTICAP CU ASTER MEC manopera:
BALAST utilaj:
transport:
3 DA10B1 [ 2] STRAT RUTIER MATER GRAN STAB MC 46,63
CU CIMENT SAU VAR SI ZGURA PRIN material:
MET AMES IN STATII FIXE AST MEC manopera:
utilaj:
transport:
5 TRA01A TRANSPORTUL RUTIER AL TONA 103,92
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST STABILIZAT utilaj:
transport:
6 TRA01A TRANSPORTUL RUTIER AL TONA 103,92
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. PENTRU BALAST utilaj:
transport:
7 DB16H1 IMBRAC BET ASF CU AGREGAT MP 466,26
MARUNT EXEC LA CALD IN GROS DE material:
4,0 CM ASTERN MECANICA manopera:
utilaj:
transport:
7.L 3270054 MIXTURA ASFALTICA BA 8/PRODUSE TONA 43,83
BALASTIERE
8 DB02D1 AMORS SUPRAF STRAT BAZA SAU 100 13,98
IMBRAC EXIST IN VEDER APLIC MP material:
STRAT UZ MIX ASF CU EMULSIE manopera:
CATIONICA utilaj:
transport:
10 DB21A1 INCHID SUPRAF CU DRESSING GROS 100 4,66
LA STRATURILE DIRECT CIRCULATE MP material:
manopera:
utilaj:
transport:
10.L 7110184 NISIP BITUMAT TONA 1,94

12 DD02A1 [ 3] PAVELE SPECIALE DIN BETON PT MP 135,00


PERS CU DIZABIL. CU RELIEF PE UN material:
SUBSTR DE NISIP manopera:
utilaj:
transport:
13 TRA01A TRANSPORTUL RUTIER AL TONA 107,00
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOBASCULANTA PE DIST.= manopera:
KM. utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Pag 71
STADIUL FIZIC: 270603 TROTUARE
0 1 2 3 4 5=3x4
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 72
STADIUL FIZIC: 270604 BORDURI MARI (DRUM)
0 1 2 3 4 5=3x4
OBIECTUL: TEILOR
STADIUL FIZIC: 270604 BORDURI MARI (DRUM)
1 DE10A1 BORDURI PREFABRICATE DIN BETON M 889,27
PT TROTUARE 20 X 25CM,PE material:
FUNDATIE DIN BETON 30 X 15 CM manopera:
utilaj:
transport:
1.L 2100933 BETON DE CIMENT B 100 STAS 3622 MC 40,02
2 TRA06A TRANSPORTUL RUTIER AL TONA 96,00
BETONULUI- MORTARULUI CU material:
AUTOBETONIERA DE 5,5MC DIST. manopera:
= KM utilaj:
transport:
3 TRA02A TRANSPORTUL RUTIER AL TONA 107,00
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOCAMIONUL PE DIST.= manopera:
KM. utilaj:
transport:
4 TRI1AA08F2 DESCARCAREA TONA 107,00
MATERIALELOR,GRUPA A-GRELE SI material:
MARUNTE PRIN TRANS.PINA LA 10M manopera:
AUTO- RAMPA,TEREN CATEG. utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 73
STADIUL FIZIC: 270605 BORDURI MICI (TROTUARE)
0 1 2 3 4 5=3x4
OBIECTUL: TEILOR
STADIUL FIZIC: 270605 BORDURI MICI (TROTUARE)
1 DE11A1 BORD MICI PREF BETON 10 X 15 CM PT M 976,14
INCADR TROTUARESPATII VERZI ALEI material:
ASEZATE FUND BETON 10 X 20 CM
manopera:
utilaj:
transport:
1.L 2100933 BETON DE CIMENT B 100 STAS 3622 MC 19,52
2 TRA06A TRANSPORTUL RUTIER AL TONA 46,80
BETONULUI- MORTARULUI CU material:
AUTOBETONIERA DE 5,5MC DIST. manopera:
= KM utilaj:
transport:
3 TRA02A TRANSPORTUL RUTIER AL TONA 33,73
MATERIALELOR, SEMIFABRICATELOR material:
CU AUTOCAMIONUL PE DIST.= manopera:
KM. utilaj:
transport:
4 TRI1AA08F2 DESCARCAREA MATERIALELOR, TONA 33,73
GRUPA A-GRELE SI MARUNTE PRIN material:
TRANS.PINA LA 10M AUTO- manopera:
RAMPA,TEREN CATEG. utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 74
STADIUL FIZIC: 270606 SEMNALIZARE
0 1 2 3 4 5=3x4
OBIECTUL: TEILOR
STADIUL FIZIC: 270606 SEMNALIZARE
1 DF18A1 PLANTARE STILPI PENTRU BUC 21,00
INDICATOARE DE CIRCULATIE material:
RUTIERA DIN METAL CONFECTIONA TI manopera:
INDUSTRIAL utilaj:
transport:
1.L 2100933 BETON DE CIMENT B 100 STAS 3622 MC 2,10
1.L 6301793 STILP METALIC CONFECTIONAT BUC 21,00
INDUSTRIAL
2 DF19A1 MONTAREA INDICATOARELOR PTR BUC 18,00
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT manopera:
TRECERE DE PIETONI utilaj:
transport:
2.L 7101023 INDICATOR CIRCULATIE TABLA BUC 18,00
OTEL+FOLIE R. PATRAT LUNGIME=
600 MM F37 S1848
3 DF19A1 BUC 2,00
MONTAREA INDICATOARELOR PTR
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT manopera:
CEDEAZA TRECEREA utilaj:
transport:
3.L 7100017 INDICATOR CIRCULATIE TABLA BUC 2,00
OTEL+FOLIE R. TRIUNGHI LUNGIME=
700MM F 1 S1848
4 DF19A1 BUC 1,00
MONTAREA INDICATOARELOR PTR
CIRC RUT DIN TABL OTELSAU ALUM material:
PE UN STILP GATA PLANTAT STOP manopera:
utilaj:
transport:
4.L 7101619 BUC 1,00
INDICATOR CIRCULATIE TABLA
OTEL+FOLIE R. OCTOGON H= 700MM
F35 S1848
5 DF16B1 MARCAJE RUTIERE LONGIT SIMPLE KM 0,45
DUBLE CU INTRERUPERISAU material:
CONTINUE EXEC MEC VOP EMAIL manopera:
FARA MICR STIC utilaj:
transport:
6 DF17A1 MARCAJE LONGIT TRANSV SI MP 243,00
DIVERSE EXECUTATE MECANIZCU material:
VOPSEA PE SUPRAFETE manopera:
CAROSABILE utilaj:
transport:
47 TRA01A01P TRANSPORTUL RUTIER AL TONA 2,10
PAMINTULUI SAU MOLOZULUI CU material:
AUTOBASCULANTA DIST.= 1 KM manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Pag 75
STADIUL FIZIC: 270606 SEMNALIZARE
0 1 2 3 4 5=3x4
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 76
STADIUL FIZIC: 270607 ORGANIZARE DE SANTIER AFERENTA CAP. 5.1.1.
0 1 2 3 4 5=3x4
OBIECTUL: TEILOR
STADIUL FIZIC: 270607 ORGANIZARE DE SANTIER AFERENTA CAP. 5.1.1.
1 RPCXS03A IMPREJMUIRE DIN CHERESTEA M 8,00
RASINOASE CU BULUMACI LEMN material:
FOIOASE manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:
Pag 77
STADIUL FIZIC: 270608 O.S. AFERENTA CAP. 5.1.2.
0 1 2 3 4 5=3x4
OBIECTUL: TEILOR
STADIUL FIZIC: 270608 O.S. AFERENTA CAP. 5.1.2.
1 YC01RON DIFERENTA PRET MATERIALE - RON LEI 4.150,00
CONTAINER TIP BIROU 1 BUCATA material:
manopera:
utilaj:
transport:
2 YC01RON DIFERENTA PRET MATERIALE - RON LEI 8.500,00
WC ECOLOGIC 2 BUC material:
manopera:
utilaj:
transport:
procent material manopera utilaj transport total
Cheltuieli directe:
Recapitulatia: Recapitulatie 1 ianuarie 2011
CAS
Fond de risc
Concedii si
indemnizatii
Somaj
Fond de garantare
Sanatate
Total Inclusiv Cheltuieli Directe:
Cheltuieli indirecte
Total Inclusiv Cheltuieli indirecte:
Profit
Total Inclusiv Profit:

Cheltuieli directe:
Recapitulatie:
TOTAL GENERAL (faraTVA):

Executant,

Director General,

Raport generat cu ISDP GRATUIT , www.devize.ro, e-mail: suport@intelsoftdeviz.ro, tel.: 0236 477.007