You are on page 1of 3

COMPETENCY NORMS FOR PERSONS WORKING IN THE PROCESS WITH SIGNIFIC

S.NO. DEPTT./ SECTION ACTICITY

1 Coil Section Winding, Pick-up assy.(F), Magneto


harness assy., Feeding assy. (F),
Feeding assy. (N), Pick-up assy. (N &
exp.) H T assy., Stator assy. , Visor
light assy.

2 Coil Section Winding, Pick-up assy.(F), Magneto


harness assy., Feeding assy. (F),
Feeding assy. (N), Pick-up assy. (N &
exp.) H T assy., Stator assy. , Visor
light assy.

3 Coil Section Winding, Pick-up assy.(F), Magneto


harness assy., Feeding assy. (F),
Feeding assy. (N), Pick-up assy. (N &
exp.) H T assy., Stator assy. , Visor
light assy.

4 Coil Section H T Coil potting & Feeding coil


Impreganation.

5 Coil Section H T Coil potting & Feeding coil


Impreganation.

LML:IE:QMSC:FM:36
LM L
ONS WORKING IN THE PROCESS WITH SIGNIFICANT ASPECT IN PRODUCTION -3

SIGNIFICANT ASPECT MIN. COMPETENCE NORMS


QUALIFICATION OJT EXPERIENCE

Fume generation while soldering High School 1 month 6 month


and tinning Intermediate 1 month 6 month
ITI 1 month 1 month

Generation and disposal of cloth, High School 1 month 6 month


Ice cream cup, brush, waste Intermediate 1 month 6 month
material resin & hardner, plastic ITI 1 month 1 month
powder while grinding, dropper,
silicone sealent, empty silicon
bottel, corrugated sheets etc.

Consumption of electrical energy High School 1 month 6 month


and compressed air. Intermediate 1 month 6 month
ITI 1 month 1 month

Disposal of resin and hardner High School 6 month 1 year


sample, Soaked cloth in potting Intermediate 6 month 1 year
material. Disposal of acetone and ITI 6 month 6 month
111 trichloroethane

Consumption of electrical energy High School 6 month 1 year


and compressed air. Intermediate 6 month 1 year
ITI 6 month 6 month

REVISION NO.: 00
HOD

You might also like