You are on page 1of 18

TRAINAIR PLUS

Training Developers Course (TDC)


Summary

214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS PPT 1


TRAINAIR PLUS Methodology Process
Decision Non-training
to proceed with analysis solutions

Analysis
Training needs
Feedback

Design and Production


Draft STP
Evaluation

STP
Implementation
214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS PPT 2
STP Development Process
Step 1 Step 2 Step 3
Preliminary Study Job Analysis Population Analysis

Problem Analysis
Break Down a Job Identify KSAs Acquired
Training Requirements
Determine Objectives Determine Learning Style
Analysis

Task List
Preliminary Study Report Population Analysis Report
Task Description

Training Solutions or
KSAs required KSAs Acquired
Non-training Solutions

Stage 1
Training Needs

214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS PPT 3


STP Development Process
Step 4 Step 5 Step 6
Production &
Design of Curriculum Design of Modules Developmental Testing

Sequence & Group Int. Obj. Prepare Instructor Guide Produce Training Material
Write End-of-Module Obj. Prepare Draft of Content Conduct Developmental
Design Mastery Test Prepare Tests Testing

Module Plan
Module Outline Test/Item Analysis
Job Aid

Teaching Points &


Instructional Events Draft Training Material
Source of Content

Stage 2
Draft STP

214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS PPT 4


STP Development Process
Step 7
Validation & Revision

Conduct Validation Delivery


Diagnose & Revise

Evaluation Report

Validated STP

Stage 3
Validated STP
214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS PPT 5
STP development process in the TPEM
START

CATC start the new STP


development process in
the TPeM

New proposed STP


Initial step: Insert new STP information
general information STP proposed
development schedule

ICAO Expert/Validator
selection

214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS 1


STP development process in the TPEM

ICAO TRAINAIR PLUS STP Code


initial approval assignment

Stage 1 Step 1 F8 STP development


project planning and schedule

Preliminary study F7

STP Evaluation Plan

Problems

214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS 1


STP development process in the TPEM

F1 Task list
Job Stage 1 Step 2
Function Function F2 Task description
Job analysis
Task Task Task
DACUM Job place
Subtask Subtask

Task Task
Element Element

214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS 1


STP development process in the TPEM
Tasks Descriptions
F2
Stage 1 Step 3
Population analysis
Required
K/S/A

Stage 1 Report Analysis


Stage 1 Report Analysis

Stage 1 approval

ICAO/Expert validator
review process and
Stage 1 approval

214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS 1


STP development process in the TPEM F3 Module Outline Form
Stage 2 Step 4
Task description Form F2
Design of
Curriculum
Sequence & Group Int.
Obj.
Write End-of-Module
Obj.
Design Mastery Test
Tests

Stage 2 Step 5 Job Aid Requierement Form


F4
F3
Design of
F6 Module Plan
Modules
Prepare Instructor
Guide
Prepare Draft of
Content
Prepare Job Aids
Prepare Tests

214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS 1


STP development process in the TPEM
Stage 2 Step 6
F5 Test Items Analysis
F4 Production &
Developmental Testing F9 Course Description
Course Content
F10
F11 Instructor Timetable
F6
F12 Facilities, Material
Job Aid and equipment
Tests
Requierement
Handouts
Form
Exercises
Job Aids
Trainees Manual
PPTs, Audio, Video, etc
Trainees Work Manual
Module Plan

Stage 2 Report

Design and Production


214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS 1
STP development process in the TPEM
Design and Production

Stage 2 Approval
Stage 2 Report

Stage 2 Report
Analysys and approval
by ICAO
Expert/Validator

214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS 1


STP development process in the TPEM
Validation
Instructor Guide Stage 2 Step 7
F6 Questionnaire
Validation delivery F14
F9 Course Integral
Course description and Revision F15
Evaluation
Course content F10
Instructors timetable F11
Facilities, Material F12
and equipment
Tests
Handouts
Ejxercises
Job Aids
Trainees Manual
PPTs, Audio, Video, etc
Trainees Work Manual
Stage 3 Report

Evaluation

214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS 1


STP development process in the TPEM

Stage 3 Approval

Stage 3 Report Stage 3 Report Analysis


and approval by ICAO
Evaluation Expert/Validator

214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS 1


STP development process in the TPEM

STP upload into


TPEMS

Final STP approval

STP in the virtual library


available to TP network
members
END

214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS 1


OBJECTIVES
Evaluation Cycle IMPACT
Impact on
Organizations operational
Objectives performance
Preliminary Study
Post-training Evaluation
Level 4
Job
Performance Impact on
Job Analysis job
Objectives
Post-training Evaluation performance
Population Analysis Level 3
Training
Impact on
Objectives
learning
Design of Curriculum Implementation
Level 2

Desired Design of Modules Trainees


Reactions reactions
(Objectives) Production and Implementation
Level 1 (Impacts)
Developmental Testing
Evaluation
STP
214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS PPT 16
Expectations compliance
Having completed the course, what is
your opinion taking into account your
initial expectations?

New information
New techniques for
An industry perspective on
Application or implementation for
Emerging issues & challenges
214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS PPT 17
Thank you

214/01/ICAO TDC Rev 3.3 TRAINAIR PLUS PPT 18

You might also like