You are on page 1of 24

PT Wijaya Karya (Persero), Tbk.

JAKARTA LRT PROJECT CORRIDOR 1 (PHASE 1):


KELAPA GADINGVELODROME PACKAGE P102

TECHNICAL CALCULATION

Calculation Summary of Foundation


(P167)
Doc. No. P102-105-DD-PL-P167-001-A

2017
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A
Calculation Summary of P167 Foundation
Bored piles in this P167 foundation are arranged in a group consisting of two rows each consist
of two piles, as can be seen on this figure below.

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 2


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A
Modelling Group Pile on GROUP Software
The analysis will use software GROUP as a tool. The software enables modeling 3D arrangements
of piles in group, connected with rigid pile cap. The view of group pile model is shown on the
figure below.

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 3


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A
Input Loading
The design load for pile group analysis is obtained from joint reactions on top of pile cap of P167
Only load case that representing the maximum value for each direction is chosen for analysis. The
load is presented on this table below:
Fx Fy Mz Fz My Mx
LOAD CASE
kN kN kNm kN kNm kNm
SLS 1 Max 7780 18 -12 -470 -10 19
SLS 2 Max 8075 19 -10 -491 -10 19
SLS 3 Max 8369 22 -9 -508 -4 19
SLS 3 Min 7266 33 16 -408 7 8
SLS 7 0 7053 25 28 -377 7 5
ULS 3 Max 11265 27 -31 -746 -22 32
ULS 7 Min 5907 141 478 44 166 -69
ULS 8 Max 8904 -87 -303 -1386 -405 98
ULS 8 Min 4633 133 353 679 418 -90
ULS 9 Max 6468 -99 -433 -688 -154 76
*note:
SLS = Service Load Case
ULS = Ultimate Load Case

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 4


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A
Result of GROUP Analysis
Summary of maximum pile reactions for each load combination
Bending Moment Immediate
Load Axial Shear (kN) Deflection (cm)
(kNm) Settlement
Combination (kN) (mm)
y-dir z-dir y-dir z-dir y-dir z-dir
SLS 1 Max 2493 -188 -11 6 -112 0.01 -0.12 1.70
SLS 2 Max 2583 -197 -12 7 -117 0.01 -0.13 1.76
SLS 3 Max 2671 -204 -13 7 -121 0.01 -0.14 1.83
SLS 3 Min 2321 -160 -14 9 -96 0.01 -0.10 1.58
SLS 7 2236 -146 -11 6 -88 0.01 -0.09 1.54
ULS 3 Max 3602 -306 -19 10 -180 0.01 -0.24 2.47
ULS 7 Min 1746 25 -77 40 17 0.01 0.01 1.29
ULS 8 Max 3631 651 94 -33 -343 -0.04 -0.58 1.98
ULS 8 Min 1980 282 -114 48 167 0.04 0.22 1.06
ULS 9 Max 2360 -282 100 -38 -167 -0.02 -0.22 1.43
Pile axial reaction per load combination
AXIAL (KN)
PILE SLS 1 SLS 2 SLS 3 SLS 3
SLS 7
Max Max Max Min
1 2465 2554 2638 2281 2211
2 2493 2583 2671 2321 2236
3 1821 1877 1937 1736 1714
4 1849 1907 1970 1776 1739
AXIAL (KN)
PILE ULS 3 ULS 7 ULS 8 ULS 8 ULS 9
Max Min Max Min Max
1 3553 1630 3631 754 2360
2 3602 1652 3593 844 2352
3 2454 1727 1286 1903 1307
4 2502 1746 1241 1980 1297

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 5


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A
The reaction of pile groups reactions are plotted in several graph below
Moment y-dir vs Depth

Moment z-dir vs Depth

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 6


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A
Shear y-dir vs Depth

Shear z-dir vs Depth

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 7


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A
Deflection y-dir vs Depth

Deflection z-dir vs Depth

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 8


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A
Axial Capacity of Pile (P167 / BL-05)
The calculation of axial capacity of single pile is given below (Length of pile 35 m + Pile cap thickness 2 m):
Outer Diameter = 1.2 m Allowable Axial Load = 11088.49 kN I= 0.102 m4
Thickness = 0.6 m Base Area = 1.1310 m2 n= 0.22
K = 350 SF = 2 G = 10382002 kN/m2
fc' = 29.05 Mpa Length of pile = 35 m J= 0.204 m4
E = 25332084.4 kN/m2 GJ = 2113518.13 kN-m2
Depth Soil N-SPT g c f E Layer sd sd ave Adhesion Ks d qs As-Outer Qs-outer Nc Nq qb Qb Q ultimate Q ULS (kN) Q SLS (kN)
3 2
(m) Type (blows/30cm) (kN/m ) (kN/m ) (degree) (kN/m 2) Thickness (kN/m 2) (kN/m 2) Factor (a p ) (degree) (kN/m 2) (m 2) (kN) (kN/m 2) (kN) (kN) Tekan Tarik Tekan Tarik
0 Clay Pile Cap 12 0 0 1774 0m 0 0 1.00 1.00 0.00 0 0.00 0 9.0 1.0 0 0 0 0 0 0 0
1 Clay Pile Cap 12 0 0 1774 1m 12 6 1.00 1.00 0.00 0 3.77 0 9.0 1.0 12 14 14 0 0 0 0
2 Clay Pile Cap 12 0 0 1774 1m 14 13 1.00 1.00 0.00 0 3.77 0 9.0 1.0 14 16 16 0 0 0 0
3 Very Soft Clay 3 13 19 0 4191 1m 18 16 1.00 1.00 0.00 19 3.77 71 9.0 1.0 186 211 281 53 53 35 35
4 Soft Clay 4 14 25 0 4996 1m 22 20 1.00 1.00 0.00 25 3.77 165 9.0 1.0 247 279 444 124 124 82 82
5 Soft Clay 5 14 31 0 5802 1m 26 24 0.93 1.00 0.00 29 3.77 275 9.0 1.0 307 347 622 206 206 137 137
6 Medium Clay 7 16 44 0 7413 1m 32 29 0.79 1.00 0.00 35 3.77 405 9.0 1.0 425 481 886 304 304 203 203
7 Medium Clay 8 16 50 0 8218 1m 38 35 0.72 1.00 0.00 36 3.77 541 9.0 1.0 488 552 1093 406 406 271 271
8 Medium Clay 11 16 69 0 10635 1m 44 41 0.51 1.00 0.00 35 3.77 674 9.0 1.0 663 750 1424 506 506 337 337
9 Medium Clay 11 16 69 0 10635 1m 51 47 0.51 1.00 0.00 35 3.77 808 9.0 1.0 669 757 1565 606 606 404 404
10 Medium Silt 10 16 63 20 9829 1m 57 54 0.58 1.06 12.00 49 3.77 991 14.8 6.4 1291 1460 2451 743 743 495 495
11 Medium Silt 12 17 75 20 11440 1m 63 60 0.50 1.06 12.00 51 3.77 1183 14.8 6.4 1519 1718 2901 888 888 592 592
12 Hard Silt 37 18 231 20 31578 1m 72 68 0.50 1.06 12.00 131 3.77 1677 14.8 6.4 3890 4400 6077 1258 1258 838 838
13 Hard Silt 44 19 275 20 37216 1m 81 76 0.50 1.06 12.00 155 3.77 2260 14.8 6.4 4596 5198 7458 1695 1695 1130 1130
14 Hard Silt 49 19 306 20 41244 1m 90 85 0.50 1.06 12.00 172 3.77 2910 14.8 6.4 5118 5788 8698 2183 2183 1455 1455
15 Hard Silt 50 19 313 20 42049 1m 99 94 0.50 1.06 12.00 178 3.77 3580 14.8 6.4 5270 5960 9540 2685 2685 1790 1790
16 Hard Silt 50 19 313 20 42049 1m 108 104 0.50 1.06 12.00 180 3.77 4257 14.8 6.4 5329 6027 10284 3193 3193 2128 2128
17 Hard Silt 50 19 313 20 42049 1m 118 113 0.50 1.06 12.00 182 3.77 4942 14.8 6.4 5388 6094 11036 3707 3707 2471 2471
18 Hard Clay 36 18 225 0 30772 1m 126 122 0.50 1.00 0.00 113 3.77 5366 9.0 1.0 2151 2433 7799 4025 4025 2683 2683
19 Hard Silt 38 18 238 20 32383 1m 134 130 0.50 1.06 12.00 148 3.77 5925 14.8 6.4 4383 4957 10881 4443 4443 2962 2962
20 Hard Silt 32 18 200 20 27550 1m 142 138 0.50 1.06 12.00 131 3.77 6419 14.8 6.4 3877 4385 10805 4815 4815 3210 3210
21 Hard Silt 38 18 238 20 32383 1m 151 146 0.50 1.06 12.00 152 3.77 6992 14.8 6.4 4488 5075 12067 5244 5244 3496 3496
22 Stiff Silt 19 17 119 20 17079 1m 158 154 0.50 1.06 12.00 94 3.77 7347 14.8 6.4 2772 3135 10482 5510 5510 3674 3674
23 Stiff Silt 19 17 119 20 17079 1m 165 161 0.50 1.06 12.00 96 3.77 7708 14.8 6.4 2818 3187 10895 5781 5781 3854 3854
24 Hard Silt 31 18 194 20 26745 1m 173 169 0.50 1.06 12.00 135 3.77 8217 14.8 6.4 3981 4503 12720 6163 6163 4109 4109
25 Dense sand 44 18 0 45 34189 1m 181 177 1.00 1.75 26.80 110 3.77 8632 129.9 127.9 23105 26131 34763 6474 6474 4316 4316
26 Dense sand 30 17 0 39 22881 1m 187 184 1.00 1.69 23.70 110 3.77 9047 71.8 59.9 11222 12691 21738 6785 6785 4523 4523
27 Medium sand 29 17 0 39 22073 1m 194 191 1.00 1.67 23.45 110 3.77 9462 68.9 56.6 10984 12423 21885 7096 7096 4731 4731
28 Medium sand 24 16 0 37 18035 1m 200 197 1.00 1.55 22.15 110 3.77 9876 55.5 42.4 8485 9596 19473 7407 7407 4938 4938
29 Medium sand 25 16 0 37 18843 1m 206 203 1.00 1.57 22.42 110 3.77 10291 57.9 45.0 9272 10487 20778 7718 7718 5145 5145
30 Dense sand 40 17 0 43 30958 1m 214 210 1.00 1.75 25.97 110 3.77 10706 113.8 103.4 22071 24962 35667 8029 8029 5353 5353
31 Hard Clay 32 18 200 0 27550 1m 222 218 0.50 1.00 0.00 100 3.77 11083 9.0 1.0 2022 2286 13369 8312 8312 5541 5541
32 Stiff Clay 19 17 119 0 17079 1m 229 225 0.50 1.00 0.00 59 3.77 11306 9.0 1.0 1297 1467 12774 8480 8480 5653 5653
33 Hard Silt 37 18 231 20 31578 1m 237 233 0.50 1.06 12.00 168 3.77 11941 14.8 6.4 4948 5596 17536 8956 8956 5970 5970
34 Hard Silt 36 18 225 20 30772 1m 245 241 0.50 1.06 12.00 167 3.77 12570 14.8 6.4 4908 5551 18121 9428 9428 6285 6285
35 Hard Clay 34 18 213 0 29161 1m 254 249 0.50 1.00 0.00 106 3.77 12971 9.0 1.0 2166 2450 15420 9728 9728 6485 6485
36 Hard Clay 38 18 238 0 32383 1m 262 258 0.50 1.00 0.00 119 3.77 13418 9.0 1.0 2399 2714 16132 10064 10064 6709 6709
37 Stiff Clay 24 17 150 0 21106 1m 269 266 0.50 1.00 0.00 75 3.77 13701 9.0 1.0 1619 1831 15533 10276 10276 6851 6851
38 Stiff Clay 19 17 119 0 17079 1m 277 273 0.50 1.00 0.00 59 3.77 13925 9.0 1.0 1345 1522 15447 10444 10444 6963 6963
39 Hard Clay 26 18 163 0 22717 1m 284 280 0.50 1.00 0.00 81 3.77 14231 9.0 1.0 1747 1975 16207 10673 10673 7116 7116
40 Stiff Clay 19 17 119 0 17079 1m 291 288 0.50 1.00 0.00 59 3.77 14455 9.0 1.0 1360 1538 15993 10841 10841 7228 7228
41 Stiff Clay 21 17 131 0 18690 1m 299 295 0.50 1.00 0.00 66 3.77 14703 9.0 1.0 1480 1674 16376 11027 11027 7351 7351
42 Stiff Clay 20 17 125 0 17884 1m 306 302 0.50 1.00 0.00 63 3.77 14938 9.0 1.0 1431 1618 16556 11204 11204 7469 7469
43 Stiff Clay 24 17 150 0 21106 1m 313 310 0.50 1.00 0.00 75 3.77 15221 9.0 1.0 1663 1881 17102 11416 11416 7610 7610
44 Stiff Clay 19 17 119 0 17079 1m 320 317 0.50 1.00 0.00 59 3.77 15445 9.0 1.0 1389 1571 17016 11584 11584 7722 7722
45 Stiff Clay 20 17 125 0 17884 1m 328 324 0.50 1.00 0.00 63 3.77 15680 9.0 1.0 1453 1643 17323 11760 11760 7840 7840
46 Stiff Clay 21 17 131 0 18690 1m 335 331 0.50 1.00 0.00 66 3.77 15928 9.0 1.0 1516 1715 17643 11946 11946 7964 7964
47 Stiff Clay 23 17 144 0 20301 1m 342 339 0.50 1.00 0.00 72 3.77 16199 9.0 1.0 1636 1850 18049 12149 12149 8099 8099
48 Hard Clay 25 18 156 0 21912 1m 350 346 0.50 1.00 0.00 78 3.77 16493 9.0 1.0 1756 1986 18479 12370 12370 8247 8247
49 Hard Clay 30 18 188 0 25939 1m 358 354 0.50 1.00 0.00 94 3.77 16847 9.0 1.0 2045 2313 19160 12635 12635 8423 8423

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 9


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A

The calculation of group efficiency is given below:


Converse-Labarre
m 2 s (m) 2.4
n 2 26.6
D (m) 1.2 Efficiency 0.70
The capacity of pile in group pile is given below:
Depth Q ULS (kN) Q SLS (kN)
(m) Tekan Tarik Tekan Tarik
0 0 0 0 0
1 0 0 0 0
2 0 0 0 0
3 37 37 25 25
4 87 87 58 58
5 145 145 97 97
6 214 214 143 143
7 286 286 191 191
8 357 357 238 238
9 427 427 285 285
10 524 524 349 349
11 626 626 417 417
12 886 886 591 591
13 1195 1195 797 797
14 1538 1538 1026 1026
15 1892 1892 1261 1261
16 2250 2250 1500 1500
17 2613 2613 1742 1742
18 2837 2837 1891 1891
19 3132 3132 2088 2088
20 3393 3393 2262 2262
21 3696 3696 2464 2464
22 3884 3884 2589 2589
23 4075 4075 2717 2717
24 4344 4344 2896 2896
25 4563 4563 3042 3042
26 4782 4782 3188 3188
27 5002 5002 3334 3334
28 5221 5221 3481 3481
29 5440 5440 3627 3627
30 5659 5659 3773 3773
31 5859 5859 3906 3906
32 5977 5977 3985 3985
33 6312 6312 4208 4208
34 6645 6645 4430 4430
35 6857 6857 4571 4571
36 7093 7093 4729 4729
37 7243 7243 4829 4829
38 7361 7361 4907 4907
39 7523 7523 5015 5015
40 7641 7641 5094 5094
41 7772 7772 5181 5181
42 7897 7897 5264 5264
43 8046 8046 5364 5364
44 8164 8164 5443 5443
45 8289 8289 5526 5526
46 8420 8420 5613 5613
47 8563 8563 5709 5709
48 8719 8719 5812 5812
49 8906 8906 5937 5937

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 10


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A

Summary of pile axial check:


Pile axial reaction per load combination
AXIAL (KN)
PILE SLS 1 SLS 2 SLS 3 SLS 3
SLS 7
Max Max Max Min
1 2465 2554 2638 2281 2211
2 2493 2583 2671 2321 2236
3 1821 1877 1937 1736 1714
4 1849 1907 1970 1776 1739
AXIAL (KN)
PILE ULS 3 ULS 7 ULS 8 ULS 8 ULS 9
Max Min Max Min Max
1 3553 1630 3631 754 2360
2 3602 1652 3593 844 2352
3 2454 1727 1286 1903 1307
4 2502 1746 1241 1980 1297

Pile capacity
Qall (kN)
Ultimate Service
Comp. Tension Comp. Tension
7243 7243 4829 4829
From the results above, the axial reaction from group analysis is still less than capacity of pile in
a group. So, the pile can be considered safe from axial loading from upper structure.

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 11


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A

Pile Reinforcement Design


The bored piles reinforcement design consists of two parts. The first one is flexural reinforcement
and the second one is shear confinement.
Reinforcement for pile elevation 0-11 m (44 D25)

Confinement Reinforcement (0 3 m) Shear Reinforcement (3-11 m) (Spiral D13-100)


(Spiral D13-50) Section properties
Section properties Concrete K - 350

Concrete K - 350 f'c = 29.05 MPa


fy = 400 MPa
f'c = 29.05 MPa D = 1200 mm
fy = 400 MPa d = 960 mm
D = 1200 mm Ag = 1130973 mm2
Dc = 1050 mm = 0.7

conc. Cover = 75 mm
Forces
Vu = 343 kN
Ag = 1130973.4 mm2 Axial compress 1241 kN
Ac = 865901.5 mm2 Axial tension kN

s1 = 0.010
s2 = 0.01 Vc compress 715196 N
Vc tension 663215 N
D_rebar = 13 mm Vs = -225196 N

As = 132.7 mm2 Av min = 100 mm2


s = 50.5 mm Av req = -59 mm2

D_rebar = 13 mm
s = 100 mm
Av = 265 mm2
Av > max(Av min,Av req) OK

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 12


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A

Reinforcement for pile elevation 11-35 m (22 D25 + Spiral D13-200)

Section properties
Concrete K - 350
f'c = 29.05 MPa
fy = 400 MPa
D = 1200 mm
d = 960 mm
Ag = 1130973 mm2
= 0.7

Forces
Vu = 100 kN
Axial compress 1241 kN
Axial tension kN

Vc compress 715196 N
Vc tension 663215 N
Vs = -572339 N

Av min = 200 mm2


Av req = -298 mm2

D_rebar = 13 mm
s = 200 mm
Av = 265 mm2
Av > max(Av min,Av req) OK

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 13


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A

Pile Cap Reinforcement Design


Flexural moment in pile cap is derived from the axial reactions of each pile acting as point loads
with arm moment to the pier which caused flexural moment in pile cap.

AXIAL (kN)
PILE SLS 3 SLS 3 SLS 4 SLS 4
SLS 5
Max Min Max Min
1 1343 1139 1242 1062 1111
2 1701 1526 1603 1450 1430
3 4591 4362 4550 4312 4068
4 4898 4693 4860 4644 4341
AXIAL (kN)
PILE SLS 6 ULS 3 ULS 7 ULS 8 ULS 8
Min Max Min Max Min

1 1055 1797 -1164 3489 -1840


2 1443 2248 -587 3532 -1122
3 4314 6003 4705 3156 4920
4 4647 6455 5199 3198 5555

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 14


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A

1. Transversal Direction
Flexural moment in transversal direction
Total Axial Moment on Pile
Moment
Pile Reactions (kN) Cap (kNm)
Arm (m)
Comp. Tension M (+) M (-)

1+2 7021 -2962 0.2 1404 -592


3+4 12458 0 0.2 2492 0
The transversal pile cap reinforcement
TRANSVERSAL REINFORCEMENT
Transversal Transversal
Lower Section Upper Section
K - 350 K - 350
fc' = 29.05 MPa fc' = 29.05 MPa
b= 4200 mm b= 4200 mm
h= 2000 mm h= 2000 mm
d= 1800 mm d= 1800 mm
fy = 400 Mpa fy = 400 Mpa

Mu = 2491.62 kNm Mu = 592.30 kNm


Find As Find As
As = 4806.37 mm2 As = 1142.55 mm2

a= 18.54 mm Cari Nilai a


a= 4.41 mm
Find the Value of a
As = 4348 mm2 Find the Value of a
As min = 14742 mm2 As = 1030 mm2

Use Reinforcement Use Reinforcement


D= 32 mm D= 19 mm
As = 804 mm2 Bundled 1 As = 284 mm2 Bundled 1
Total = 18 buah Total = 4 buah
Space = 229 mm use : 200 Space = 1157 mm use : 200

Use D 32 200 Use D 19 200


As use = 16487 mm2 OK! As use = 5812 mm2 OK!

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 15


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A

2. Longitudinal Direction
Flexural moment in longitudinal direction from the axial reactions of each pile is already covered
by the pier structure on pile-cap. Hence, the flexural reinforcement is sufficient by using the
minimum requirement.
LONGITUDINAL REINFORCEMENT
Longitudinal Longitudinal
Lower Section Upper Section
K - 350 K - 350
fc' = 29.05 MPa fc' = 29.05 MPa
b= 4200 mm b= 4200 mm
h= 2000 mm h= 2000 mm
d= 1800 mm d= 1800 mm
fy = 400 Mpa fy = 400 Mpa

Mu = 0.00 kNm Mu = 0.00 kNm


Find As Find As
As = 0.00 mm2 As = 0.00 mm2
Find the Value of a
a= 0.00 mm Find the Value of a
a= 0.00 mm
Find Actual As
As = 0 mm2 Find Actual As
As min = 14742 mm2 As = 0 mm2

Use Reinforcement Use Reinforcement


D= 32 mm D= 19 mm
As = 804 mm2 Bundled 1 As = 284 mm2 Bundled 1
Total = 18 Piece Total = 0 Piece
Space = 229 mm use : 200 Space = 0 mm use : 200

Use D 32 200 Use D 19 200


As use = 16487 mm2 OK! As use = 5812 mm2 OK!

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 16


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A

3. Punching Shear Reinforcement


The capacity of pile cap towards shear failure because of the pile axial reactions must be taken into
account. Hence, this punching shear analysis is being done. Pile cap shear capacity is determined
by the lowest value of:
ACI 318
2
1 = 0.17 (1 + )


2 = 0.083 ( + 2)

3 = 0.33
Pier Size Shear Zone around Pile Corner
p= 2500 mm D pile = 1200 mm
l= 2000 mm L1 = 1100 mm
b= 1.25 L2 = 1100 mm
Pile Cap Size L3 = 1697 mm
pc = 4200 mm Perimeter (bo) = 3897 mm
lc = 4200 mm s = 20
Thickness (d) = 2000 mm b= 1.55
2
fc' = 29.05 N/mm Shear Capacity
Normal Weight Concrete V c1 = 16383 kN
l= 1 V c2 = 42762 kN
Shear Zone around Pier V c3 = 13863 kN
pv = 4500 mm Vc = 13863 kN
lv = 4000 mm = 0.75
Perimeter (bo) = 17000 mm V n = V c = 10397.02
s = 40 Shear Force
Shear Capacity Influenced Pile = 1
V c1 = 80998 kN Qu = 4898.00 kN
V c2 = 101997 kN Vu = 4898.00 kN
V c3 = 60474 kN Vc > Vu
Vc = 60474 kN SAFE
= 0.75
V n = V c = 45355 kN
Shear Force
Influenced Pile = 2
Qu = 4898.00 kN
Vu = 9796.00 kN
Vc > Vu
SAFE
Based on the calculation above, this pile cap is still be able to withstand the occurring shear force.
Therefore, a shear confinement is not required.

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 17


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A

Settlement Check
Pile and Pile Cap Properties
Axial Load
Pile Properties Pile Cap Properties Q (Group) 12000 kN
D (m) 1.2 B (m) 3.6
Lpile (m) 35 L (m) 3.6 E quiv a le nt R a f t

Lequiv alent raf t (m) 23 Thick (m) 2 B (m) L (m) q n (kN / m 2 )

Base of Equivalent Raft (m) 25 15.1 15.1 52.6

Immediate settlement obtained from GROUP analysis.


Consolidation settlement calculation:
1. Obtain oedometer with formula

=
= 1/(2 )
=
=
2. Obtain consolidation

The total settlement of the pile group is then the sum of the immediate and consolidation
settlements calculated for each separate layer.
= +

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 18


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A

Calculation of oedometer
O e do m e t e r
S e t t le m e nt , o e d
D e pt h ( m ) T hic k ne s s , H ( m ) S o il T ype N SP T z/B z /qn z (kN/m 2) f 2 ( k N / m 2 ) m v ( m 2 / k N ) (mm)

0 0 Clay 1
1 1 Clay 1
2 1 Clay 3
3 1 Clay 3
4 1 Clay 4
5 1 Clay 5
6 1 Clay 7
7 1 Clay 8
8 1 Clay 11
9 1 Clay 11
10 1 Silt 10
11 1 Silt 12
12 1 Silt 37
13 1 Silt 44
14 1 Silt 49
15 1 Silt 50
16 1 Silt 50
17 1 Silt 50
18 1 Clay 36
19 1 Silt 38
20 1 Silt 32
21 1 Silt 38
22 1 Silt 19
23 1 Silt 19
24 1 Silt 31
25 1 sand 44
26 1 sand 30
27 1 sand 29
28 1 sand 24
29 1 sand 25
30 1 sand 40
31 1 Clay 32 2.1 0.08 4.4 350 0.00009 0.39
32 1 Clay 19 2.1 0.08 4.2 350 0.00015 0.63
33 1 Silt 37 2.2 0.08 4.0 350 0.00008 0.31
34 1 Silt 36 2.3 0.07 3.8 350 0.00008 0.30
35 1 Clay 34 2.3 0.07 3.7 350 0.00008 0.31
36 1 Clay 38 2.4 0.07 3.7 350 0.00008 0.27
37 1 Clay 24 2.5 0.07 3.7 350 0.00012 0.43
38 1 Clay 19 2.5 0.07 3.7 350 0.00015 0.55
39 1 Clay 26 2.6 0.07 3.7 350 0.00011 0.40
40 1 Clay 19 2.6 0.07 3.7 350 0.00015 0.55
41 1 Clay 21 2.7 0.07 3.7 350 0.00014 0.50
42 1 Clay 20 2.8 0.07 3.7 350 0.00014 0.52
43 1 Clay 24 2.8 0.07 3.7 350 0.00012 0.43
44 1 Clay 19 2.9 0.07 3.7 350 0.00015 0.55
45 1 Clay 20 3.0 0.07 3.7 350 0.00014 0.52
46 1 Clay 21 3.0 0.07 3.7 350 0.00014 0.50
47 1 Clay 23 3.1 0.07 3.7 350 0.00012 0.45
48 1 Clay 25 3.2 0.07 3.7 350 0.00011 0.42
49 1 Clay 30 3.2 0.07 3.7 350 0.00010 0.35
oed (mm) 8.39

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 19


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A

consolidation calculation:

From this table:


LB 15.1 D/LB 1.7 LB/D 0.6 d 0.64
g 1
c (mm) 5.37

Therefore, the total settlement is:


= 2.47 + 5.37 = 7.84

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 20


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A

Liquefaction Check

Depth Soil N-SPT


(m) Type (blows/30cm)
0 Very Soft Clay Pile Cap 1
1 Very Soft Clay Pile Cap 1
2 Very Soft Clay Pile Cap 3
3 Very Soft Clay 3
4 Soft Clay 4
5 Soft Clay 5
6 Medium Clay 7
7 Medium Clay 8
8 Medium Clay 11
9 Medium Clay 11
10 Medium Silt 10
11 Medium Silt 12
12 Hard Silt 37
13 Hard Silt 44
14 Hard Silt 49
15 Hard Silt 50
16 Hard Silt 50
17 Hard Silt 50
18 Hard Clay 36
19 Hard Silt 38
20 Hard Silt 32
21 Hard Silt 38
22 Stiff Silt 19
23 Stiff Silt 19
24 Hard Silt 31
25 Dense sand 44
26 Dense sand 30
27 Medium sand 29
28 Medium sand 24
29 Medium sand 25
30 Dense sand 40
31 Hard Clay 32
32 Stiff Clay 19
33 Hard Silt 37
34 Hard Silt 36
35 Hard Clay 34
36 Hard Clay 38
37 Stiff Clay 24
38 Stiff Clay 19
39 Hard Clay 26
40 Stiff Clay 19
41 Stiff Clay 21
42 Stiff Clay 20
43 Stiff Clay 24
44 Stiff Clay 19
45 Stiff Clay 20
46 Stiff Clay 21
47 Stiff Clay 23
48 Hard Clay 25
49 Hard Clay 30

Soil Data for P167 (BL-05):

Liquefaction occurs if there is top soil layers (depth 0-20m) of a loose sand layers (NSPT<15).
There is no loose sand layers found according to the boring log BL-05 data, thus liquefaction will
not occur.

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 21


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A

APPENDIX (SOIL DRILLING LOG BL05

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 22


Package P102 Main Works
Calculation Summary of Pile Foundation for P167
Doc No. P102-105-DD-PL-P167-001-A

Jakarta LRT Project Corridor 1 (Phase 1): Kelapa Gading Velodrome 23


Package P102 Main Works