410t/h CFB MFT

Cause Analysis and Treatment on MFT Actuation in Commissioning


Phase of A 410 t/h CFB Boiler

1 2

1. 050041
2. 050021

410 t/h CFB


MFT
CFB
CFB MFT

Abstract Several MFT faults of boiler occurred in the commissioning phase of


technical renovation project of 4410 t/h CFB boilers in Hebei Power Cogeneration Co.,
Ltd. This paper analyzes and summaries these faults and proposes some suggestions and
prevention measures. The authors hope this paper can provided useful references to the
commissioning and operation of large CFB boilers.
Keywords CFB boiler; MFT; cause analysis; prevention measures

4
DG410/9.819 CFB 2 1 200 MW
1 1 2 168 h
MFT
MFT
CFB

1CFB MFT
CFB MFT
FSSS MFT
FSSS
CFB CFB
MFT MFT

a. >19.62 kPa 5 s
b. 5 s
c. <52 000 m3/h <5 kPa
d. >990
e. <650
f. 2 <6 110 m3/h 60 s
g. 2 J 8 s

2MFT
2.1 >200 mm<280 mm 5 s 3
2
2.1.1
a. 2 0.5 MPa
1
1 2 MFT
b. MFT

2.1.2

2.2 >2 489 Pa 5 s


2.2.1
J
,
MFT
2.2.2
CFB

2.3 <52 000 m 3/h <5 kPa


2.3.1
1 <5 kPa <52 000
m3/h MFT
2.3.2

5 kPa
2.4 650
2.4.1

650 MFT
2.4.2

MFT
10

2.5 160 t/h


2.5.1
a. 160 t/h
160 t/h MFT
b. 1
160 t/h
MFT
2.5.2

2.6
2.6.1
3 MFT
2.6.2

2.7 91 000 m 3/h40%


2.7.1
1
<91 000 m3/h MFT
2.7.2
2 1
91
000 m3/h

3
CFB MFT
MFTOFT
MFT

MFT 650
25%

MFT

MFT
MFT

4
MFT CFB MFT
MFT
MFT