220 th CFB

Analysis on Operational Status of 220 t/h CFB Boilers

050041

220 t/h CFB

CFB

Abstract To cope with the problems revealed in the commissioning stage of 220
t/h boilers, the causes of the problems and their countermeasures are presented, which
provided good operation results.
KeywordsCFB boiler; operational analysis; improving measures

#16 HG220/9.8L.PM23 CFB


1 0.98 MPa260
2002 3

1
1.1
1

7 mmd50=1.21.5 mmd<100m 10%


1.2
CFB
1 2
U
2 5 m
1
U U

4 2
4 4

2 3 1
2 3

200 mm 3
L
L 2
3 D

2
2.1

a. L L 13

b. L L
L
c.
D
d. L 1

3 1
e.
2.2
CFB
32 mm4 mm

a.

32
mm4 mm
b. 2 1
=1.1
Vp=10 618 m3/h 1
Vh=16 700
m3/h

c.
1.8 MPa 1.4MPa
OFT
d.

e.

2.3
2.3.1
a.
35% TB 100%

b.

c.

2.3.2
60 000 m3/h 60%

2.4
07 mm
10 mm 10%

2.5
3 DCS 3
3 2 3

2.6

2.7

a.
b.
c.
d.
e.

3
3.1
a. L
b. L
L
c. 1 108 mm 133 mm 1
1
d. 1 2 3

e. 2
0.3 kPa
f. 1 700

3.2
a. 32
mm4 mm12Cr1MoV 57 mm3.5 mm1Cr18Ni9Ti
1 100 mm 1 300 mm
b. 1 670
1 900
1 900

c.

d. 5 s


e.
60% 10%15%
90%
900
f.

3.3
a.

b.

c.

3.4

2 3

3.5
3

050 mm 125 mm 200 mm

3.6

3.7

CFB

4
220 t/h CFB
220 t/h CFB
CFB

2004.07