Level 2 Location Risk Assessment Sheet

Production Title Time Ultimatum Location for Scene No(s). Scene 3

Location Wall Activity Climbing

PART B Risk Assessment


Hazards Who exposed Risk Control measures Risk
List what could cause harm from this List who might be harmed from this activity e.g. Decide the level of risk as For each hazard, list the measures you will be taking to minimise the risk identified Now decide level of risk
activity e.g. working at height, trip staff, contractors, contributors, public, etc. if you were to do the e.g. appointing competent persons, training received, planning, use of personal once all your controls are
hazard, fire, etc. activity without your protective equipment, provision of first aid, etc. in place
controls
Cast VERY LOW Practice at climbing VERY LOW

Concrete Wall LOW X LOW X


MEDIUM MEDIUM
HIGH HIGH
EXTREMELY HIGH EXTREMELY HIGH

Cast VERY LOW Practice at climbing VERY LOW

Height LOW LOW X


MEDIUM X MEDIUM
HIGH HIGH
EXTREMELY HIGH EXTREMELY HIGH
Cast and Crew VERY LOW Clearing any obstructions VERY LOW X
Environment LOW X LOW
MEDIUM MEDIUM
HIGH HIGH
EXTREMELY HIGH EXTREMELY HIGH
Everyone VERY LOW Not messing with props VERY LOW

Props LOW X LOW X


MEDIUM MEDIUM
HIGH HIGH
EXTREMELY HIGH EXTREMELY HIGH
VERY LOW VERY LOW
LOW LOW
MEDIUM MEDIUM
HIGH HIGH
EXTREMELY HIGH EXTREMELY HIGH

Director/Production Manager Signature Ashley Percival Date of Location Recce 14th June 2017