MCE 487
486
Temporary Works and Services of Bored Pile Construction
Rebar CagePile
Bored lifting Design
Trench Check
Stability
(Maximum 2.5 Weight
Cage meter Diameter)
25T & 35T
for Block D (CH5+580 - CH5+786.9)
Document No:
GECPL/DOC-3112/GN/09.179
GECPL/DOC-3218/GN/10.416
Submitted to:
Tuksu Engineering and Construction (s) Ltd.
28th24th
October 2010
July 2009
Date:
Designed By: GN
REF: Checked By:
Design Consideration:
(1) The hanger bars have to be provided symmetrically throughout bored pile steel cages to ensure loads
uniformly distributed to all hanger bar provided.
(2) This steel cage lifting is only designed for main bar of T25, T32 and T40.
Welding of 6mm fillet weld with 250mm length to be provided for connection between main bar
and hanger bar.
Note: Alternative of using rebar T 32 as hanger bar, with same number of hanger bar,
the maximum lifting capacity is 20T .
1
GeoEng Consultants
PROJECT: M CE487 Sheet No.: of
Date:
Designed By: GN
REF: Checked By:
Welding of 6mm fillet weld with 250mm length to be provided for connection between main bar
and hanger bar.
Note: Alternative of using rebar T 32 as hanger bar, with same number of hanger bar,
the maximum lifting capacity remained at 35T .
2
6
Figure 1 3
6
Figure 2 4