You are on page 1of 2

FITNESS FOR SERVICE CONSULTANCY

EVALUATING SAFETY AND RELIABILITY OF numerical simulations to support any fitness IMPROVING ASSET SAFETY AND
IN-SERVICE EQUIPMENT for service programme. As a long-standing
RELIABILITY
independent consultancy, our knowledge and
Real-life conditions can often differ expertise able us to provide the impartial
considerably from original design parameters advice valued both by our clients and across-
with significant consequences on deterioration industry.
mechanisms which affect equipment reliability
and safe operational life.

Owners and operators of critical assets,


therefore, need to rely on expert engineering
assessments when making decisions HELPING CUSTOMERS TO RESOLVE DAMAGE
to continue operation, alter operating ISSUES
parameters, repair or replace plant RINA Consultings involvement in fitness
equipment. for service assessments extends over SERVICES
the past 30-years which has enabled
RINA Consulting engineers have a proven us to develop a deep understanding of Global on-site mechanical and electrical
international reputation for the planning, industry-specific issues and life-limiting inspections
performing, supporting and auditing of damage mechanisms. Damage evaluation employing latest defect
inspection and assessment programmes for a assessment tools and techniques
variety of industries and equipment. As a result, we have a successful track-record Modern metallurgical testing and analysis
of helping our clients identify safety-critical facilities
The spectrum of mechanical and electrical items in need of immediate remediation State-of-the-art computational simulation
engineering knowledge and experience as well as support for long-term strategic methods
enables us to offer a broad range of technical asset planning for inspection, repair and In-house lifing and industry standard lifing
services from on-site field support to complex replacement programmes. techniques
EXPERIENCE-BASED ASSESSMENT ASSET EXPERIENCE:
It has been often found that risk-based
inspections (RBI) will highlight likely damage Rotating equipment: gas and steam turbines
mechanisms for a component as a whole, Combined cycle power generation equipment
but will not provide inspection teams with Conventional boilers
specific information concerning critical Heat exchangers
areas where examinations should focus. Columns and reactors
Pipework
RINA Consulting is able support its clients Fired heaters
with developing appropriate inspection Offshore structures
plans to identify susceptible life-limiting Storage tanks
locations as well as to provide on-site field Electrical generation, distribution and
operatives to undertake the inspection and switchgear.
carry out on-site assessments to provide
immediate engineering recommendations.

Following on-site examinations, RINA


Consulting can offer a comprehensive
list of services including detailed defect
assessments (including API Level 3) and
finite element simulations in order to
evaluate any damage identified during Based on our previous experience with
inspections. this equipment, we were able to identify
key locations on which to focus damage
ENSURING SAFETY IN A CHANGING assessments.
ELECTRICITY MARKET
The current electricity market means that Consequently as part of this study,
power generation companies need to computational simulations of equipment,
respond rapidly to changes in consumer including the high-pressure steam drum
demand in order to remain competitive. and outlet headers, were generated to
determine changes in transient thermal
Commercial pressures subsequently stresses at key locations during the two
influence engineering and operational start-up conditions.
decisions which often requires outside
technical support. Following this, fatigue assessments in-line
ABOUT RINA CONSULTING
with industry codes were conducted which
RINA Consulting is the engineering consultancy
RINA Consulting was commissioned by a UK supported the changes to the proposed
division of the RINA Group, and provides a wide
power generation company to evaluate its operational conditions. To reinforce this
range of services to critical industry sectors,
proposed operational changes to one of its decision, further fracture mechanics studies
including oil & gas, power, renewables, space &
combined cycle power stations. In particular, were conducted to determine the tolerability
defence, transport & infrastructure sectors.
we were asked to study the fatigue lives of to defects of HRSG components.
key components within the Heat Recovery
Steam Generation (HRSG) as a result of The end result of this work enabled our
changes to standard 2 Shifting starts to client to provide technical justifications to www.rinaconsulting.org
so-called Fast starts. operate with new rapid starts.

You might also like