CALCULO DEL COEFICIENTE DE REAJUSTE "K"

OBRA "CONSTRUCCION Y MEJORAMIENTO DE VEREDAS EN EL A.H. ESPERANZA ALTA,


PROVINCIA DE SANTA-ANCASH"
A.D.S. N A.D.S. N 015-2008-MPS
CONTRATISTA J & O CONSORCIO CONSTRUCTOR S.A.C.
ENTIDAD MUNICIPALIDAD PROVINCIAL DEL SANTA
P. BASE S/. 241,863.00
P. CONTRATADO S/. 241,863.00
F. R. S/. 1.00

VEREDAS

PORCENTAJE INDICE BASE DICIEMBRE ENERO


MONOMIO SIMBOLO DESCRIPCION INDICE FACTOR
INCIDENCIA % MAYO Indice K Indice K
1 M MANO DE OBRA INCLUIDO LEYES SOCIALES 47 0.359 100.00 374.78 396.82 0.380 342.98 0.329

2 C CEMENTO PORTLAND TIPO I 21 0.202 100.00 323.41 323.41 0.202 323.41 0.202

3 AMB AGREGADO GRUESO 5 0.154 66.88 204.69 214.80 0.108 211.27 0.106

BLOQUE Y LADRILLO 17 0.154 9.09 613.20 684.17 0.016 679.31 0.016

MADERA NACIONAL PARA ENCOF. Y CARPINT. 43 0.154 24.03 506.52 511.05 0.037 505.27 0.037

4 MM MAQUINARIA Y EQUIPO NACIONAL 48 0.105 35.24 318.76 345.06 0.040 346.87 0.040

MAQUINARIA Y EQUIPO IMPORTADO 49 0.105 64.76 236.91 267.37 0.077 270.14 0.078

5 I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.180 100.00 333.83 346.60 0.187 346.97 0.187

K= 1.047 0.995
RECLCULO DE REAJUSTES (SIN IGV) - PRESUPUESTO CONTRACTUAL

Obra : "CONSTRUCCION Y MEJORAMIENTO DE VEREDAS EN EL A.H. ESPERANZA ALTA,


PROVINCIA DE SANTA-ANCASH"
Entidad : MUNICIPALIDAD PROVINCIAL DEL SANTA
Contratista : J & O CONSORCIO CONSTRUCTOR S.A.C.
Presupuesto Referencial : S/. 241,863.00
Presupuesto Contratado con I.G.V. : S/. 241,863.00
Factor de Relacion : 1.00
Plazo de Ejecucin Contractual : 60 Dias Calendarios
Adjudicacin Directa Selectiva : A.D.S. N 015-2008-MPS

FACTOR REAJUSTE
AVANCE REAJUSTE DEDUCCIONES
VAL. MES DE REAJUSTE BRUTO REAJUSTE
N VALORIZACIN * ** EJECUTADO ACUMULADO MES/PAGO PROGRAM EJECUTADO ACUMULADO AUTORIZADO NETO
EFECTIVO MATERIALES
PROGRAMADO "V" * PROGRAMADO ** EJECUTADO "K" Vx(K-1) PROGRAMADO EJECUTADO ACUMULADO MES AUTORIZADO

01 noviembre-08 66,569.67 136,859.63 66,569.67 136,859.63 1.047 3,128.77 6,432.40 3,128.77 6,432.40 6,432.40 6,432.40 0.00 0.00 6,432.40

02 diciembre-09 134,442.34 46,060.26 201,012.01 182,919.89 1.047 6,318.79 2,164.83 9,447.56 8,597.23 8,597.23 2,164.83 0.00 0.00 2,164.83

03 diciembre-09 2,234.21 20,326.33 203,246.22 203,246.22 0.995 -11.17 -101.63 9,436.39 8,495.60 2,063.20 -101.63 0.00 0.00 -101.63

TOTAL 203,246.22 203,246.22 9,436.39 8,495.60 8,495.60 0.00 0.00 8,495.60


MUNICIPALIDAD PROVINCIAL DEL SANTA
DEPARTAMENTO DE LIQUIDACIN DE
OBRAS Y ORGANIZACIN

Obra: "CONSTRUCCION Y MEJORAMIENTO DE VEREDAS EN EL A.H. ESPERANZA ALTA,


PROVINCIA DE SANTA-ANCASH"

Entidad: MUNICIPALIDAD PROVINCIAL DEL SANTA


Contratista: J & O CONSORCIO CONSTRUCTOR S.A.C.
Proceso de Seleccin: A.D.S. N 024-2008-MPS
Prespuesto Referencial: S/. 241,863.00
Monto Contratado C/I.G.V. S/. 241,863.00
Factor de Relacin 1.00000

RESUMEN DE PAGOS REALIZADOS AL CONTRATISTA

VALORIZ. VALORIZ. REINTEG. VALORIZ. AMORTIZAC. VALORIZ. I.G.V. MONTO MULTA DEDUCCION LIQUIDO A PAGAR A FACT. POR CONTRATISTA
N Mes CONTR. BRUTA A. DIR. A. MAT. NETA 19% C/IGV Fondo de Garantia AL CONTRATISTA Val Neta Pagada IGV 19% Liquido recibir

01 Dec-08 136,859.63 - 136,859.63 - - 136,859.63 26,003.33 162,862.96 16,286.30 146,576.66 123,173.67 23,403.00 146,576.66
0 Jan-09 46,060.26 - 46,060.26 - - 46,060.26 8,751.45 54,811.71 5,481.17 49,330.54 41,454.23 7,876.30 49,330.54
03 Jan-09 20,326.33 - 20,326.33 - - 20,326.33 3,862.00 24,188.33 2,418.83 21,769.50 18,293.70 3,475.80 21,769.50

TOTAL 203,246.22 - 203,246.22 - - 203,246.22 38,616.78 241,863.00 24,186.30 217,676.70 182,921.60 34,755.10 217,676.70
MUNICIPALIDAD PROVINCIAL DEL SANTA

LIQUIDACIN FINAL DE OBRA


(EXPRESADO EN NUEVOS SOLES)

OBRA: "CONSTRUCCION Y MEJORAMIENTO DE VEREDAS EN EL A.H. ESPERANZA ALTA,


PROVINCIA DE SANTA-ANCASH"

PROCESO DE SELECCIN : A.D.S. N 015-2008-MPS


ENTIDAD: MUNICIPALIDAD PROVINCIAL DEL SANTA
CONTRATISTA: J & O CONSORCIO CONSTRUCTOR S.A.C.
Presupuesto Base : S/. 241,863.00
Presupuesto Contratado(c/IGV): S/. 241,863.00
Presupuesto Contratado(s/IGV): S/. 203,246.22
Factor de Relacin: 1.00000
Plazo de Ejecucin : 60 dias calendarios.

I AUTORIZADO Y PAGADO
1.1.0. Autorizado
1.1.1. Contrato Principal 203,246.22
Adicional N 1 0.00
Deductivo N 1 0.00
1.1.2. Reintegros Netos
Contrato Principal 8,495.60
Adicional N 1 0.00
Deductivo N 1 0.00
1.1.3. Intereses 0.00
1.1.4. Mayores Gastos Generales 0.00 211,741.82
1.1.5. IGV. (19 %) 40,230.95
251,972.77
1.2.0. Pagado
1.2.1. Contrato Principal 203,246.22
Adicional N 1 0.00
Deductivo N 1 0.00
1.2.2. Reintegros Netos
Contrato Principal 0.00
Adicional N 1 0.00
Deductivo N 1 0.00
1.2.3. Intereses 0.00
1.2.4. Mayores Gastos Generales 0.00 203,246.22
1.2.5. IGV. (19 %) 38,616.78
241,863.00

SALDO A FAVOR DEL CONTRATISTA.


- En Efectivo 8,495.60
- En IGV. 1,614.16
10,109.77

II ADELANTOS (SIN IGV)


2.1.0. Concedidos
2.1.1. Directo 0.00
2.1.2. Materiales 0.00
0.00
2.2.0. Amortizados
2.2.1. Directo 0.00
2.2.2. Materiales 0.00
0.00

SALDO A CARGO DEL CONTRATISTA 0.00


LIQUIDACIN FINAL DE OBRA
(EXPRESADO EN NUEVOS SOLES)

III FONDO DE GARANTIA (SIN IGV.)


3.1.0. Retenidos 0.00 0.00
3.2.0. Devueltos 0.00 0.00

SALDO A CARGO DEL CONTRATISTA 0.00

IV COSTO POR ELABORACION Y LIQUIDACION DE OBRA


4.1.0. Autorizado S/I.G.V. 0.00 0.00
4.2.0. Descontados 0.00 0.00
4.3.0. I.G.V. 0.00
SALDO A CARGO DEL CONTRATISTA 0.00

RESUMEN DE SALDOS
(Expresado en Nuevos Soles)

ITEM A CARGO DEL CONTRATISTA A FAVOR DEL CONTRATISTA


CONCEPTO
EFECTIVO IGV EFECTIVO IGV
I Autorizado y Pagado 0.00 0.00 8,495.60 1,614.16
II Adelantos (Sin IGV) 0.00 0.00 0.00 0.00
III Fondo de Garantia (*) 0.00 0.00 0.00 0.00
IV Costo por Elab. y Liq. de Obra 0.00 0.00 0.00 0.00
0.00 0.00 8,495.60 1,614.16

DEVOLUCION DE RETENCION DEL 10% DEL MONTO CONTRATADO


- En Efectivo S/. 20,324.62
- En IGV. S/. 3,861.68
DEVOLUCION DEL 10% M.C. S/. 24,186.30

SALDO A FAVOR DEL CONTRATISTA:


- En Efectivo S/. 8,495.60
- En IGV. S/. 1,614.16
SALDO A FAVOR DEL CONTRATISTA S/. 10,109.76 Ojo verificar suma

MONTO TOTAL A CANCELAR


- En Efectivo S/. 28,820.22
- En IGV. S/. 5,475.84
TOTAL A PAGAR S/. 34,296.06
RESUMEN PRESUPUESTO CONTRACTUAL

OBRA :CONSTRUCCION Y MEJORAMIENTO DE VEREDAS EN EL A. H. ESPERANZA ALTA

A.D.S. N : 015-2008-MPS-OBRAS

CONTRATISTA : J & O CONSORCIO CONSTRUCTOR SAC.

UBICACIN : JR. BRASIL- ESPERANZA ALTA-CHIMBOTE - DEL SANTA - ANCASH

ENTIDAD : MUNICIPALIDAD PROVINCIAL DEL SANTA

P. BASE : S/. 241,863.00

P. OFERTADO : S/. 241,863.00

F. R. : 1.00000

INSPECTOR : ING. WILDER GIOVANNI GARAY JARA

RESIDENTE : ING TANIA ELVIRA ESPINOZA HARO

PRESUPUESTO N 01

ITEM DESCRIPCION MONTO S/.

VEREDAS

1.00 OBRAS PROVISIONALES 7,979.44

2.00 OBRAS PRELIMNARES 2,928.97

3.00 MOVIMIENTO DE TIERRAS 44,197.50

4.00 VEREDAS 107,358.67

5.00 JUNTAS DE DILATACION 911.32

6.00 VARIOS 3,219.36

COSTO DIRECTO 166,595.26

GASTOS GENERALES (12%) 19,991.43

UTILIDADES (10%) 16,659.53

SUB TOTAL 203,246.22

IGV 19% 38,616.78

TOTAL PRESUPUESTO REFERENCIAL 241,863.00


PRESUPUESTO DE OBRA N 01

OBRA :CONSTRUCCION Y MEJORAMIENTO DE VEREDAS EN EL A. H. ESPERANZA ALTA

A.D.S. N : 015-2008-MPS-OBRAS

CONTRATIS : J & O CONSORCIO CONSTRUCTOR SAC.

UBICACIN : JR. BRASIL- ESPERANZA ALTA-CHIMBOTE - DEL SANTA - ANCASH

ENTIDAD : MUNICIPALIDAD PROVINCIAL DEL SANTA

P. BASE : S/. 241,863.00

P. OFERTAD : S/. 241,863.00

F. R. : 1.00000

INSPECTOR : ING. WILDER GIOVANNI GARAY JARA

RESIDENTE : ING TANIA ELVIRA ESPINOZA HARO

PRESUPUESTO
ITEM DESCRIPCION
UNIDAD METRADO P. U. PARCIAL TOTAL
VEREDAS
01.00.00 OBRAS PROVISIONALES
01.01.00 TRANSPORTE DE EQUIPO, MATERIALES Y HERRA GLB 1.00 1,840.00 1,840.00
01.02.00 OFICINA, ALMACEN Y CASETA DE GUARDIANIA M2 18.00 142.29 2,561.22
01.03.00 CARTEL DE OBRA DE 6.00x5.00m - (Gigantografa) UND 1.00 1,121.64 1,121.64
01.04.00 SEALIZACION Y SEGURIDAD EN OBRA GLB 1.00 2,456.58 2,456.58 7,979.44
02.00.00 OBRAS PRELIMINARES
02.01.00 TRAZO NIVELACION Y REPLANTEO M2 2,277.95 0.86 1,959.04
02.02.00 DEMOLICION DE VEREDAS C/MAQUINA M2 213.64 4.54 969.93 2,928.97
03.00.00 MOVIMIENTO DE TIERRAS
03.01.00 CORTE SUPERFICIAL MANUAL HASTA 0.20 MT M3 569.49 12.94 7,369.20
03.02.00 PREPARACION DE SUB-RASANTE PARA VEREDAS M2 2,277.95 4.49 10,228.00
03.03.00 AFIRMADO DE 4" PARA VEREDAS M2 2,277.95 8.29 18,884.21
03.04.00 ELIMINACION DE MATERIAL EXCEDENTE M3 711.16 10.85 7,716.09 44,197.50
04.00.00 VEREDAS
04.01.00 CONCRETO VEREDA FC=140KG/CM2 E=4" I/ENC A M2 2,277.95 34.97 79,659.91
04.02.00 SARDINEL DE VEREDAS Fc=140KG/CM2 ML 2,065.53 13.41 27,698.76 107,358.67
05.00.00 JUNTAS DE DILATACION
05.01.00 JUNTAS DE DILATACION CON ASFALTO M 462.60 1.97 911.32 911.32
06.00.00 VARIOS
06.01.00 SUM. NIVELACION Y COLOCACION DE CAJAS AGUA UND 24.00 63.21 1,517.04
06.02.00 SUM. NIVELACION Y COLOCACION DE CAJAS DES UND 24.00 70.93 1,702.32 3,219.36
COSTO DIRECTO 166,595.26
GASTOS GENERALES 12% 19,991.43
UTILIDAD 10% 16,659.53
COSTO TOTAL (GG+UTIL.) 203,246.22
FACTOR DE RELACION 1.00000
COSTO TOTAL SIN IGV (C.TOT.+IGV.) S/. 203,246.22
IGV (19%) 38,616.78
COSTO TOTAL DE OBRA S/. 241,863.00
VALORIZACION DE AVANCE DE OBRA N 01-2008

PERIODO : DEL 05/10/2008 AL 30/11/2008


OBRA :CONSTRUCCION Y MEJORAMIENTO DE VEREDAS EN EL A. H. ESPERANZA ALTA
CONCURS: ADJUDICACION DIRECTA SELECTIVA N 015-2008-MPS-OBRAS PLAZO DE EJECUCION : 60 DAS CALENDARIOS
PROPIETARIO
: MUNICIPALIDAD PROVINVIAL DEL SANTA PPTO. DE OBRA REFERENCIAL : S/. 241,863.00
CONTRATISTA
: J & O CONSORCIO CONSTRUCTOR SAC. PPTO. DE CONTRATO DE OBRA CON IGV. : S/. 241,863.00
PPTO. DE CONTRATO DE OBRA SIN IGV. : S/. 203,246.22
REGION : ANCASH FECHA DE ENTREGA DE TERRENO : 11/5/2008
DEPART. : ANCASH INICIO FISICO DE OBRA : 11/5/2008
PROV. : DEL SANTA TERMINO CONTRACTUAL DE OBRA : 1/4/2009
DISTRITO : CHIMBOTE AMPLIACION DE PLAZO : 0 DIAS
LOCALIDAD: ESPERANZA ALTA FACTOR DE REAJUSTE : 1.00000
INSPECTOR DE OBRA : ING. WILDER GIOVANNI GARAY JARA AVANCE FISICO EJECUTADO 67.34%
RESIDENTE DE OBRA : ING. TANIA ELVIRA ESPINOZA HARO AVANCE FISICO ACUMULADO 67.34%

FORMULAVEREDAS
VALORIZACION ( SIN IGV) S/. 136,859.63 AVANCE FISICO EJECUTADO ACUMULADO : 67.34%

AVANCES
PRESUPUESTO ANTERIOR ACTUAL ACUMULADO SALDO
PART. DESCRIPCION UND METR. P.UNIT. PRESUP. METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZ. % METR. VALORIZADO %
VEREDAS
01.00.00 OBRAS PROVISIONALES
01.01.00 TRANSPORTE DE EQUIPO, MATERIALES Y HERRAMIENT GLB 1.00 1,840.00 1,840.00 0.00 0.00 0.00% 0.50 920.00 50.00% 0.50 920.00 50.00% 0.50 920.00 50.00%
01.02.00 OFICINA, ALMACEN Y CASETA DE GUARDIANIA M2 18.00 142.29 2,561.22 0.00 0.00 0.00% 18.00 2,561.22 100.00% 18.00 2,561.22 100.00% 0.00 0.00 0.00%
01.03.00 CARTEL DE OBRA DE 6.00x5.00m - (Gigantografa) UND 1.00 1,121.64 1,121.64 0.00 0.00 0.00% 1.00 1,121.64 100.00% 1.00 1,121.64 100.00% 0.00 0.00 0.00%
01.04.00 SEALIZACION Y SEGURIDAD EN OBRA GLB 1.00 2,456.58 2,456.58 0.00 0.00 0.00% 1.00 2,456.58 100.00% 1.00 2,456.58 100.00% 0.00 0.00 0.00%
02.00.00 OBRAS PRELIMINARES
02.01.00 TRAZO NIVELACION Y REPLANTEO M2 2,277.95 0.86 1,959.04 0.00 0.00 0.00% 2,277.95 1,959.04 100.00% 2,277.95 1,959.04 100.00% 0.00 0.00 0.00%
02.02.00 DEMOLICION DE VEREDAS C/MAQUINA M2 213.64 4.54 969.93 0.00 0.00 0.00% 213.64 969.93 100.00% 213.64 969.93 100.00% 0.00 0.00 0.00%
03.00.00 MOVIMIENTO DE TIERRAS
03.01.00 CORTE SUPERFICIAL MANUAL HASTA 0.20 MT M3 569.49 12.94 7,369.20 0.00 0.00 0.00% 437.52 5,661.51 76.83% 437.52 5,661.51 76.83% 131.97 1,707.69 23.17%
03.02.00 PREPARACION DE SUB-RASANTE PARA VEREDAS M2 2,277.95 4.49 10,228.00 0.00 0.00 0.00% 1,750.20 7,858.40 76.83% 1,750.20 7,858.40 76.83% 527.75 2,369.60 23.17%
03.03.00 AFIRMADO DE 4" PARA VEREDAS M2 2,277.95 8.29 18,884.21 0.00 0.00 0.00% 1,750.20 14,509.16 76.83% 1,750.20 14,509.16 76.83% 527.75 4,375.05 23.17%
03.04.00 ELIMINACION DE MATERIAL EXCEDENTE M3 711.16 10.85 7,716.09 0.00 0.00 0.00% 355.58 3,858.04 50.00% 355.58 3,858.04 50.00% 355.58 3,858.04 50.00%
04.00.00 VEREDAS
04.01.00 CONCRETO VEREDA FC=140KG/CM2 E=4" I/ENC ACABAD M2 2,277.95 34.97 79,659.91 0.00 0.00 0.00% 1,423.42 49,777.00 62.49% 1,423.42 49,777.00 62.49% 854.53 29,882.91 37.51%
04.02.00 SARDINEL DE VEREDAS Fc=140KG/CM2 ML 2,065.53 13.41 27,698.76 0.00 0.00 0.00% 1,290.69 17,308.15 62.49% 1,290.69 17,308.15 62.49% 774.84 10,390.60 37.51%
05.00.00 JUNTAS DE DILATACION
05.01.00 JUNTAS DE DILATACION CON ASFALTO M 462.60 1.97 911.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 462.60 911.32 100.00%
06.00.00 VARIOS
06.01.00 SUM. NIVELACION Y COLOCACION DE CAJAS AGUA UND 24.00 63.21 1,517.04 0.00 0.00 0.00% 24.00 1,517.04 100.00% 24.00 1,517.04 100.00% 0.00 0.00 0.00%
06.02.00 SUM. NIVELACION Y COLOCACION DE CAJAS DESAGUE UND 24.00 70.93 1,702.32 0.00 0.00 0.00% 24.00 1,702.32 100.00% 24.00 1,702.32 100.00% 0.00 0.00 0.00%
COSTO DIRECTO 166,595.26 0.00 0.00% 112,180.03 67.34% 112,180.03 67.34% 54,415.23 32.66%
GASTOS GENERALES 12% 19,991.43 0.00 13,461.60 13,461.60 6,529.83
UTILIDAD 10% 16,659.53 0.00 11,218.00 11,218.00 5,441.52
COSTO TOTAL (GG+UTIL.) 203,246.22 0.00 136,859.63 136,859.63 66,386.58
FACTOR DE RELACION 1.00000
COSTO TOTAL SIN IGV (C.TOT.+IGV.) S/. 203,246.22 0.00 136,859.63 136,859.63 66,386.58
IGV (19%) 38,616.78 0.00 26,003.33 26,003.33 12,613.45
COSTO TOTAL DE OBRA S/. 241,863.00 0.00 162,862.96 162,862.96 79,000.03
GERENTE GENERAL RESIDENTE DE OBRA INSPECTOR DE OBRA
RESUMEN DE LA VALORIZACION N 03
Periodo del 16/12/2008 al 19/12/2008

OBRA :CONSTRUCCION Y MEJORAMIENTO DE VEREDAS EN EL A. H. ESPERANZA ALTA


UBICACIN : JR. BRASIL- ESPERANZA ALTA-CHIMBOTE - DEL SANTA - ANCASH
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DEL SANTA
CONTRATISTA : J & O CONSORCIO CONSTRUCTOR SAC.
INSPECTOR : ING. WILDER GIOVANNI GARAY JARA
RESIDENTE : ING TANIA ELVIRA ESPINOZA HARO
PLAZO DE EJECUCION 60 DAS CALENDARIOS ADEL. DIRECTO SIN IGV: S/. 0.00
ENTREGA DE TERRENO 11/5/2008 ADEL. MATER. SIN IGV S/. 0.00
INICIO DE PLAZO CONTRACTUAL 11/5/2008
TERMINO PLAZO CONTRACTUAL 1/4/2009
FORMULA VEREDAS
PPTO. DE OBRA REFERENCIAL : S/. 241,863.00
PPTO. DE CONTRATO DE OBRA CON IGV. : S/. 241,863.00
PPTO. DE CONTRATO DE OBRA SIN IGV. : S/. 203,246.22
AVANCE FISICO ANTERIOR : 0.00%
AVANCE FISICO ACTUAL 0.00%
AVANCE FISICO ACUMULADO 0.00%

DESCRIPCION RESUMEN DE LA VALORIZACION


ANTERIOR ACTUAL ACUMULADO
1) VALORIZACION BRUTA
Valorizacin de Avance de Obra : (A) S/. 0.00 S/. 0.00 S/. 0.00
Reajuste por variacin de precios : (B) 0.00 0.00 0.00

VALORIZACION BRUTA REAJUSTADA (A+B) S/. 0.00 0.00 0.00

2) VALORIZACION NETA

Valorizacin Bruta Reajustada. (C) S/. 0.00 S/. 0.00 S/. 0.00
Amortizacin Adelanto en efectivo (D) S/. 0.00 S/. 0.00 S/. 0.00
Amortizacin Adelanto para materiales (E) S/. 0.00 S/. 0.00 S/. 0.00
Deduccin del reajuste por adelanto en efectivo (F) S/. 0.00 S/. 0.00 S/. 0.00
Deduccin del reajuste por adelanto en efectivo (G) S/. 0.00 S/. 0.00 S/. 0.00

VALORIZACION NETA (C-D-E-F-G) S/. 0.00 0.00 0.00

3) RESUMEN GENERAL DE PAGOS

Valorizacin Neta S/. 0.00 S/. 0.00 S/. 0.00


I.G.V. (19%) S/. 0.00 S/. 0.00 S/. 0.00
MONTO TOTAL A PAGAR AL CONTRAT. S/. 0.00 0.00 0.00

INSPECTOR DE OBRA RESIDENTE DE OBRA

GERENTE GENERAL
VALORIZACIONES PAGADAS EN NUEVOS SOLES
OBRA :CONSTRUCCION Y MEJORAMIENTO DE VEREDAS EN EL A. H. ESPERANZA ALTA
A.D.S. N : 015-2008-MPS-OBRAS
CONTRATISTA : J & O CONSORCIO CONSTRUCTOR SAC.
UBICACIN : JR. BRASIL- ESPERANZA ALTA-CHIMBOTE - DEL SANTA - ANCASH
ENTIDAD : MUNICIPALIDAD PROVINCIAL DEL SANTA
P. BASE : S/. 241,863.00
P. OFERTADO : S/. 241,863.00
F. R. S/. 1.00000
INSPECTOR : ING WILDER GIOVANNI GARAY JARA
RESIDENTE : ING TANIA ELVIRA ESPINOZA HARO
UBICACIN GEOGRAFICA :2
FECHA : FEBRERO 2009

Valorizacin VALORIZAC. Garanta de Otras Deducciones ( E ) NETO PAGADO S/. Comprob. de Pago
Amortizacin NETA Fiel
Monto S/. Adelantos Cumplimiento Gastos de Efectivo IGV Fecha de
N ( VN ) (10%) Multa No
Licit. y Pub. Cobranza
A B VN = A - B FG VN - FG - E 19%
01 136,859.63 136,859.63 13,685.96 123,173.67 23,403.00 001-0000002 05-Dec-2008
02 46,060.26 46,060.26 4,606.03 41,454.23 7,876.30 001-0000005 23-Dec-2008
03 0.00 0.00 0.00 0.00 0.00 001-0000007 29-Jan-2009

TOTAL 182,919.89 0.00 182,919.89 18,291.99 0.00 0.00 164,627.90 31,279.30

Adicion. o Deduct. VALORIZAC. Otras Deducciones ( E ) NETO PAGADO S/. Comprob. de Pago
Amortizacin Fondo de
NETA
Monto S/. Adelantos Garanta Gastos de Efectivo IGV Fecha de
N ( VN ) Multa No
Licit. y Pub. Cobranza
A B VN = A - B FG VN - FG - E 19%
01 0.00 0.00 0.00 0.00
0.00 0.00 0.00
TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

ADELANTOS NETO PAGADO S/. Comprob. de Pago


N Fecha de
Efectivo Materiales Efectivo IGV No
Cobranza
01 0.00 0.00
02 0.00 0.00
0.00
TOTAL 0.00 0.00 0.00 0.00

SUBTOTAL 164,627.90 31,279.30

TOTAL 195,907.20
RESUMEN DE MONTO RETENIDO FACTURADO (10% DE RETENCION)

VALORIZAC. MONTO VALORIZADO MONTO PAGADO MONTO RETENIDO MONTO RETENIDO MONTO A
PERIODO VALORIZADO
N CON I.G.V. S/. CON I.G.V. S/. FACTURADO NO FACTURADO FACTURAR

1 Valorizacion de Avance N 01 162,862.96 146,576.67 16,286.29 0.00 0.00

2 Valorizacion de Avance N 02 54,811.71 49,330.53 5,481.18 0.00 0.00

3 Valorizacion de Avance N 03 0.00 - 0.00 2,418.83 2,418.83

- 0.00 0.00 0.00

TOTAL VALORIZACION TRAMITADOS 217,674.67 195,907.20 21,767.47 2,418.83 2,418.83

GERENTE GENERAL RESIDENTE DE OBRA INSPECTOR DE OBRA


CALCULO DE LA MULTA

OBRA :CONSTRUCCION Y MEJORAMIENTO DE VEREDAS EN EL A. H. ESPERANZA ALTA


A.D.S. N : 015-2008-MPS-OBRAS
CONTRATISTA : J & O CONSORCIO CONSTRUCTOR SAC.
UBICACIN : JR. BRASIL- ESPERANZA ALTA-CHIMBOTE - DEL SANTA - ANCASH
ENTIDAD : MUNICIPALIDAD PROVINCIAL DEL SANTA
P. BASE : S/. 241,863.00
P. OFERTADO : S/. 241,863.00
F. R. :1
INSPECTOR : ING. WILDER GIOVANNI GARAY JARA
RESIDENTE : ING TANIA ELVIRA ESPINOZA HARO
UBICACIN GEOGRAFICA :2
FECHA : FEBRERO 2009

I.- Multa por retraso en la Entrega de la Obra


(Esta multa no ser de aplicacin en los casos de rescicin de contratos)

A. Determinacin del Retraso en la terminacin de la obra

1 Fecha de inicio del plazo 11/5/2008


2 Plazo contractual en das calendarios 60
3 Fecha del termino del plazo contractual original 1/4/2009
4 Ampliaciones de plazo 0
5 Plazo vigente (plazo original + ampliaciones) 60
6 Fecha de vencimiento de plazo vigente 1/4/2009
7 Fecha de termino de la obra segn Inspector 12/19/2009
8 Das de retraso 0 Das calendario

B Atrazo total 0 Das calendario

C Multa por retraso en la entrega de la obra

Monto del contrato vigente S/. 241,863.00


Tope multa = 10% del contrato vigente S/. -
Penalidad Diaria= 0.10 X Monto del Contrato vigente con IG S/. -
F x Plazo de dias
Multa a considerar= Penalidad Dairia X N de dias de retrazo S/. -

II.- MONTO TOTAL DE LA MULTA S/. -


MONTO DEL CONTRATO VIGENTE
(EXPRESADO EN NUEVOS SOLES)

OBRA :CONSTRUCCION Y MEJORAMIENTO DE VEREDAS EN EL A. H. ESPERANZA ALTA

A.D.S. N : 015-2008-MPS-OBRAS

CONTRATISTA : J & O CONSORCIO CONSTRUCTOR SAC.

UBICACIN : JR. BRASIL- ESPERANZA ALTA-CHIMBOTE - DEL SANTA - ANCASH

ENTIDAD : MUNICIPALIDAD PROVINCIAL DEL SANTA

P. BASE : S/. 241,863.00

P. OFERTADO : S/. 241,863.00

F. R. :1

INSPECTOR : ING. WILDER GIOVANNI GARAY JARA

RESIDENTE : ING TANIA ELVIRA ESPINOZA HARO

UBICACIN GEOGRAFICA :2

FECHA : FEBRERO 2009

DESCRIPCION MONTO SIN IGV IGV TOTAL CON IGV

Contrato Principal 203,246.22 38,616.78 241,863.00

Adicional N 1 - -

Deduccin N 1 - - -

Mayores Gastos Generales - - -

Contrato Vigente 203,246.22 38,616.78 241,863.00

Monto Final del Contrato 241,863.00


RESUMEN DE LAS REGULARIZACIONES DE LOS REINTEGROS

OBRA :CONSTRUCCION Y MEJORAMIENTO DE VEREDAS EN EL A. H. ESPERANZA ALTA


A.D.S. N : 015-2008-MPS-OBRAS
CONTRATISTA : J & O CONSORCIO CONSTRUCTOR SAC.
UBICACIN : JR. BRASIL- ESPERANZA ALTA-CHIMBOTE - DEL SANTA - ANCASH
ENTIDAD : MUNICIPALIDAD PROVINCIAL DEL SANTA
P. BASE : S/. 241,863.00
P. OFERTADO : S/. 241,863.00
F. R. :1
INSPECTOR : ING. WILDER GIOVANNI GARAY JARA
RESIDENTE : ING TANIA ELVIRA ESPINOZA HARO
UBICACIN GEOGRAFICA :2
FECHA : FEBRERO 2009

REGULARIZACION MONTOS
DEL REINTEGRO SUB TOTAL IGV TOTAL
CONTRACTUAL 8,597.23 1,633.47 10,230.71
ADICIONAL - - -
DEDUCTIVO - - -
TOTAL 8,597.23 1,633.47 10,230.71
CALCULO DE LA REGULARIZACION DEL REINTEGRO DE VALORIZACIONES
CONTRACTUALES

OBRA :CONSTRUCCION Y MEJORAMIENTO DE VEREDAS EN EL A. H. ESPERANZA ALTA


A.D.S. N : 015-2008-MPS-OBRAS
CONTRATISTA : J & O CONSORCIO CONSTRUCTOR SAC.
UBICACIN : JR. BRASIL- ESPERANZA ALTA-CHIMBOTE - DEL SANTA - ANCASH
ENTIDAD : MUNICIPALIDAD PROVINCIAL DEL SANTA
P. BASE : S/. 241,863.00
P. OFERTADO : S/. 241,863.00
F. R. :1
INSPECTOR : ING. WILDER GIOVANNI GARAY JARA
RESIDENTE : ING TANIA ELVIRA ESPINOZA HARO
UBICACIN GEOGRAFICA :2
FECHA : FEBRERO 2009

1 VALORIZACION CONTRACTUAL: Vc = V x Fr ---- VEREDAS

VALORIZACION CONTRACTUAL SIN IGV


FORMULAS DEL 05/11/08 DEL 01/12/08 DEL 16/12/08
AL 30/11/08 AL 15/12/08 AL 19/12/08
GENERAL 136,859.63 46,060.26 -

2 REGULARIZACION DE REINTEGROS
Rr = V x (K DICIEMBRE- 1) 0.047

FORMULAS Vc1 K DICIEMBRE Rr


GENERAL 136,859.63 1.047 6,432.40
SUMA 6,432.40

Rr = V x (K DICIEMBRE- 1) 0.047

FORMULAS Vc2 K DICIEMBRE Rr


GENERAL 46,060.26 1.047 2,164.83
SUMA 2,164.83

Rr = V x (K DICIEMBRE- 1) 0.047

FORMULAS Vc1 K DICIEMBRE Rr


GENERAL - 1.047 -
SUMA -

3 REINTEGROS TOTALES

Rt = 8,597.23

4 TOTAL A PAGAR

Rt = S/. 8,597.23
IGV (19%) 1,633.47
TOTAL S/. 10,230.71
RESUMEN DE SALDOS (Expresado en Nuevos Soles)

A cargo del Contratista A favor del Contratista


Item Concepto

Efectivo IGV Efectivo IGV

I AUTORIZADO Y PAGADO

- En efectivo

II ADELANTOS 0.00

III FONDO DE GARANTIA (1.71) (0.32)

IV REINTEGROS NETOS 8,597.23 1633.474618

V MULTA ATRASO DE OBRA

TOTAL Nuevos Soles S/. 0.00 0.00 8,595.52 1,633.15

SALDO DEL CONTRATISTA EN NUEVOS SOLES

- A FAVOR DEL CONTRATISTA S/. 8,595.52 Sin IGV

- A FAVOR DEL CONTRATISTA S/. 10,228.67 Con IGV

A FAVOR DEL CONTRATISTA FACTURADO S/. 21,767.47 ( 10% Retencin)

A FAVOR DEL CONTRATISTA NO FACTURADO S/. 2,418.83 ( 10% Retencin)

A FAVOR DEL CONTRATISTA NO FACTURADO S/. 10,230.71 (Reajustes)

TOTAL S/. 34,417.01


CALCULO DE INTERESES POR MORA EN EL PAGO DE VALORIZACIONES CONTRACTUALES

OBRA "CONSTRUCCION Y MEJORAMIENTO DE VEREDAS EN EL A.H. ESPERANZA ALTA,


A.D.S. N A.D.S. N 015-2008-MPS
CONTRATISTA J & O CONSORCIO CONSTRUCTOR S.A.C.
UBICACIN #REF!
ENTIDAD MUNICIPALIDAD PROVINCIAL DEL SANTA
P. BASE S/. 241,863.00
P. OFERTADO S/. 241,863.0
F. R. S/. 1.00
INSPECTOR #REF!
RESIDENTE #REF!
UBICACIN GEOGRAFICA :2
FECHA #REF!

MONTO PAGOS A CUENTA EN SOLES MAX. FECHA FECHA DIAS DE PORCENTAJE TOTAL
VALORIZACION INTERES
ADEUDADO CHEQUE LEGAL REAL MORA TAMN DE INTERES I.G.V. A
LIQUIDO DEDUC. TOTAL
N MES m=(VL) N DE PAGO DE PAGO (n) (ievn) m * ievn CANCELAR
01 Nov-2008 136,859.63 41231749 136,859.63 136,859.63 ### ### 0 0.0000% 0.00 0.00 0.00

02 Dec-2008 46,060.26 49330.54 46,060.26 46,060.26 ### ### 0 0.0000% 0.00 0.00 0.00

03 Dec-2008 0.00 41232024 0.00 0.00 31-Jan-2009 29-Jan-2009 0 0.0000% 0.00 0.00 0.00

TOTAL 182,919.89 182,919.89 0.00 182,919.89 VALORIZACION DE INTERESES 0.00 0.00 0.00

You might also like