You are on page 1of 16

ENVIRONMENTAL MANAGEMENT PLAN

Name of Works : Construction of 3 Nos. Ground Level Water Reservoir


Name of Contractor : M/s SS Construction
Location : Central Jail, Tuivamit, Sakawrtuichhun, Phunchawng And Lawipu

Mitigation Activities and Environmental Implementation Plan


Sl.No
method Central Jail Tuivamit
PRE-CONSTRUCTION STAGE

1 Utilities No dismantling and shiffting will be done No dismantling and shiffting will be done

Existing Cottage near the site will be


Existing cottage at the site can be used as
2 Construction Work camp arranged for sheltering of workers during
shelter for the workers
construction period

The location is surrounded by residential The location is at peak of a hill, and there
a. Location buildings however less disturbance will are few residential buildings however
be taken up less disturbance will be taken up

Potable water will be supply from the Potable water will be supply from the
b. Water Source
nearest source with tanker. nearest source with tanker.
Readily accessible to the work site and Work site accessibility will be made easy
hence no need of providing approach by providing approach road with prior
c. Accessibility road consent from SIPMIU.

Work camp will be cleaned everyday and Work camp will be cleaned everyday and
Camp cleanliness & waste
d. waste material will be disposed at nearest waste material will be disposed at nearest
management
public dumping site. public dumping site.

1
Mitigation Activities and Environmental Implementation Plan
Sl.No
method Central Jail Tuivamit
3 Sources of Material

Stone and aggregates will be collected Stone and aggregates will be collected
a. Stone from Industry quarry(Sakawrtuichhun) from Industry quarry(Sakawrtuichhun)
which is approved. which is approved.

Sand will be collected from the place Sand will be collected from the place
b. Sand
authorised by the concerned. authorised by the concerned.

Stockpile location will be selected to Stockpile location will be selected to


4 Stockpile Location
avoid disturbance with worker. avoid disturbance with worker.

Wastage material will be disposed off at Wastage material will be disposed off at
Disposal Area & public dumping site. Spoil collected public dumping site. Spoil collected
5
Management from excavation will be used for from excavation will be used for
backfilling backfilling

CONSTRUCTION STAGE
1 Air quality
Brand new Construction equipments will Brand new Construction equipments will
be used. Vehicles will be hired from be used. Vehicles will be hired from
public carriers which are certified from public carriers which are certified from
Pollution under control
MPCB. However, Dust emitted out of MPCB. However, Dust emitted out of
a. certificate, .. Suppression
construction work will be suppressed by construction work will be suppressed by
etc.,.
sprinkling water sprinkling water

2 Water Management
Waste water will be disposed to the Waste water will be disposed to the
a. Waste water management
nearest public drain. nearest public drain.

Stagnant water will be controlled and Stagnant water will be controlled and
b. Water logging drained it off as early as possible to drained it off as early as possible to
prevent breeding of mosquitoes. prevent breeding of mosquitoes.

2
Mitigation Activities and Environmental Implementation Plan
Sl.No
method Central Jail Tuivamit
Surface runoff will be controlled with Surface runoff will be controlled with
c. Surface runoff temporary drain connecting to nearest temporary drain connecting to nearest
outlet outlet
3 Ground quality

It will be controlled however if there is It will be controlled however if there is


a. Oil spillage any spillage the spillage area will be any spillage the spillage area will be
scrap out from the ground and disposed scrap out from the ground and disposed

4 Noise Level

Effort will be taken up to reduce noise Effort will be taken up to reduce noise
pollution. Work location being close to pollution. Work location being close to
a. Use silencer etc.,
settlement necessary precaution will be settlement necessary precaution will be
taken. taken.

5 Traffic management

Work location is in the outskirt area, Work location is in the outskirt area,
Route Planning/ Timing supply of material will easily be carried supply of material will easily be carried
a.
etc., out using the by-pass route. So there will out using the by-pass route. So there will
be no traffic disturbances. be no traffic disturbances.

6 Socio - Economic

Income generation Opportunities will be given to workers Opportunities will be given to workers
a. (Workers from local area willing to work from the nearest willing to work from the nearest
within 2 Km) settlement from work location. settlement from work location.

Only qualified workers will be deployed. Only qualified workers will be deployed.
b. Employment
This will be in regard to age, skill etc This will be in regard to age, skill etc

7 Gender equality

3
Mitigation Activities and Environmental Implementation Plan
Sl.No
method Central Jail Tuivamit
Man and women will be given equal Man and women will be given equal
a. Employment opportunity. opportunity.

The notion "same pay - for same work" The notion "same pay - for same work"
will be practised. Attendance register will be practised. Attendance register
b. Equal payment having separate columns indicating sex having separate columns indicating sex
and payment will be maintained for and payment will be maintained for
inspection and our compliance inspection and our compliance

Separate toilet for Man & women will be Separate toilet for Man & women will be
Separate toilet & day provided and day creche will be provided provided and day creche will be provided
c.
creche for women for those women labourer coming to for those women labourer coming to
work with their children. work with their children.

All workers health condition will be All workers health condition will be
check every Month at Nearest Health check every Month at Nearest Health
Occupational Health &
8 Centre. If it requires them to bring to the Centre. If it requires them to bring to the
Safety
Hospital, we will take to the nearest Hospital, we will take to the nearest
Hospital. Hospital.
Protective Helmet, glove and Boot will Protective Helmet, glove and Boot will
a. Protective Equipment be provided to the worker to prevent be provided to the worker to prevent
from any accidental incident. from any accidental incident.

Risky location created out of construction Risky location created out of construction
b. Barricading
work will be barricaded to ensure safety work will be barricaded to ensure safety

c. First-aid First aid will be provided at the site. First aid will be provided at the site.

POST CONSTRUCTION STAGE

Closure and clearing of


1 All wastage material within the work site will be cleared and diposed to the nearest Municipal dumping area.
debris etc.,.

4
Mitigation Activities and Environmental Implementation Plan
Sl.No
method Central Jail Tuivamit

2 Tree planting For any trees removed, trees will be planted at a ratio of 1:2. This will be planned in such a way so as to give aesthetic beauty.

5
on Plan
Sakawrtuichhun

Dismantling of R.C.C. work including


stacking of steel bars and disposal of
unserviceable material of the existing
Reservoir will be done before the
commencement of the works.

During construction works, shelter for


worker will be arranged nearby the
construction site

Govt. Primary School and Residential


Building is there by the side of effective
site area of which precautions would be
undertaken at minimum disturbances

Potable water will be supply from the


nearest source with tanker.
Readily accessible to the work site and
hence no need of providing approach
road

Work camp will be cleaned everyday and


waste material will be disposed at nearest
public dumping site.

6
on Plan
Sakawrtuichhun

Stone and aggregates will be collected


from Industry quarry(Sakawrtuichhun)
which is approved.

Sand will be collected from the place


authorised by the concerned.

Stockpile location will be selected to


avoid disturbance with worker.

Wastage material will be disposed off at


public dumping site. Spoil collected
from excavation will be used for
backfilling

Brand new Construction equipments will


be used. Vehicles will be hired from
public carriers which are certified from
MPCB. However, Dust emitted out of
construction work will be suppressed by
sprinkling water

Waste water will be disposed to the


nearest public drain.

Stagnant water will be controlled and


drained it off as early as possible to
prevent breeding of mosquitoes.

7
on Plan
Sakawrtuichhun
Surface runoff will be controlled with
temporary drain connecting to nearest
outlet

It will be controlled however if there is


any spillage the spillage area will be
scrap out from the ground and disposed

Effort will be taken up to reduce noise


pollution. Work location being close to
settlement necessary precaution will be
taken.

Work location is in the outskirt area,


supply of material will easily be carried
out using the by-pass route. So there will
be no traffic disturbances.

Opportunities will be given to workers


willing to work from the nearest
settlement from work location.

Only qualified workers will be deployed.


This will be in regard to age, skill etc

8
on Plan
Sakawrtuichhun
Man and women will be given equal
opportunity.

The notion "same pay - for same work"


will be practised. Attendance register
having separate columns indicating sex
and payment will be maintained for
inspection and our compliance

Separate toilet for Man & women will be


provided and day creche will be provided
for those women labourer coming to
work with their children.

All workers health condition will be


check every Month at Nearest Health
Centre. If it requires them to bring to the
Hospital, we will take to the nearest
Hospital.
Protective Helmet, glove and Boot will
be provided to the worker to prevent
from any accidental incident.

Risky location created out of construction


work will be barricaded to ensure safety

First aid will be provided at the site.

ed to the nearest Municipal dumping area.

9
on Plan
Sakawrtuichhun

anned in such a way so as to give aesthetic beauty.

10
ENVIRONMENTAL MANAGEMENT PLAN

Name of Works :Construction of 3 Nos. Ground Level Water Reservoir


Name of Contractor M/s SS Construction
Location Sihphir-I,Sihphir-II and ATC Durtlang

Sl Mitigation Activities and Environmental Implementation Plan


No method Sihphir-I Sihphir-II ATC Durtlang ATC Durtlang
PRE-CONSTRUCTION STAGE
Dismantling of R.C.C. work Dismantling of R.C.C. work No distmantling and No distmantling and
including stacking of steel including stacking of steel shiffting will be done shiffting will be done
bars and disposal of bars and disposal of
unserviceable material of the unserviceable material of the
1 Utilities existing Reservoir will be existing Reservoir will be
done before the done before the
commencement of the commencement of the
works. works.

Existing room in the hall During construction works, Existing cottage at the site Existing cottage at the site
near the site will be shelter for worker will be can be used as shelter for the can be used as shelter for the
Construction Work arranging for sheltering of arranged nearby the workers workers
2 workers during construction construction site
camp
period
The location is surrounded High School is there by the Location is isolated at the Location is isolated at the
by residential buildings side of effective site area of peak of Hangi Lunglen peak of Hangi Lunglen
however less disturbance which precautions would be Tlang, but building Tlang, but building
will be taken up undertaken at minimum construction is ongoing construction is ongoing
disturbances beside the location that's beside the location that's
why contentment of the why contentment of the
a. Location landlord would be landlord would be
maintained in every actions maintained in every actions
especially in making especially in making
Fencing to guard the tanky Fencing to guard the tanky

Potable water will be supply Potable water will be supply Potable water will be supply Potable water will be supply
b. Water Source from the nearest source with from the nearest source with from the nearest source with from the nearest source with
tanker. tanker. tanker. tanker.
Readily accessible to the Work site accessibility will Existing approach road to Existing approach road to
work site and hence no need be made easy by providing Prayer mountain can be used Prayer mountain can be used
c. Accessibility of providing approach road approach road with prior as well, but requires passage as well, but requires passage
consent from SIPMIU. to the tanky area to the tanky area

Work camp will be cleaned Work camp will be cleaned Work camp will be cleaned Work camp will be cleaned
everyday and waste material everyday and waste material everyday and waste material everyday and waste material
Camp cleanliness & will be disposed at nearest will be disposed at nearest will be disposed at nearest will be disposed at nearest
d.
waste management public dumping site. public dumping site. public dumping site. public dumping site.

3 Sources of Material
Stone and aggregates will be Stone and aggregates will be Stone and aggregates will be Stone and aggregates will be
collected from Bungbangla collected from Bungbangla collected from Bungbangla collected from Bungbangla
a. Stone quarry which is approved. quarry which is approved. quarry which is approved. quarry which is approved.

Sand will be collected from Sand will be collected from Sand will be collected from Sand will be collected from
b. Sand the place authorised by the the place authorised by the the place authorised by the the place authorised by the
concerned. concerned. concerned. concerned.
Stockpile location will be Stockpile location will be Stockpile location will be Stockpile location will be
4 Stockpile Location selected to avoid disturbance selected to avoid disturbance selected to avoid disturbance selected to avoid disturbance
with worker. with worker. with worker. with worker.

Wastage material will be Wastage material will be Wastage material will be Wastage material will be
disposed off at public disposed off at public disposed off at public disposed off at public
Disposal Area & dumping site. Spoil dumping site. Spoil dumping site. Spoil dumping site. Spoil
5 collected from excavation collected from excavation collected from excavation collected from excavation
Management
will be used for backfilling will be used for backfilling will be used for backfilling will be used for backfilling

CONSTRUCTION STAGE
1 Air quality
Brand new Construction Brand new Construction Brand new Construction Brand new Construction
equipments will be used. equipments will be used. equipments will be used. equipments will be used.
Vehicles will be hired from Vehicles will be hired from Vehicles will be hired from Vehicles will be hired from
Pollution under control public carriers which are public carriers which are public carriers which are public carriers which are
a. certificate, .. Suppression certified from MPCB. certified from MPCB. certified from MPCB. certified from MPCB.
etc.,. However, Dust emitted out However, Dust emitted out However, Dust emitted out However, Dust emitted out
of construction work will be of construction work will be of construction work will be of construction work will be
suppressed by sprinkling suppressed by sprinkling suppressed by sprinkling suppressed by sprinkling
water water water water
2 Water Management
Waste water will be Waste water will be Waste water will be Waste water will be
Waste water disposed to the nearest disposed to the nearest disposed to the nearest disposed to the nearest
a.
management public drain. public drain. public drain. public drain.
Stagnant water will be Stagnant water will be Stagnant water will be Stagnant water will be
controlled and drained it off controlled and drained it off controlled and drained it off controlled and drained it off
as early as possible to as early as possible to as early as possible to as early as possible to
b. Water logging
prevent breeding of prevent breeding of prevent breeding of prevent breeding of
mosquitoes. mosquitoes. mosquitoes. mosquitoes.

Surface runoff will be Surface runoff will be Surface runoff will be Surface runoff will be
controlled with temporary controlled with temporary controlled with temporary controlled with temporary
c. Surface runoff drain connecting to nearest drain connecting to nearest drain connecting to nearest drain connecting to nearest
outlet outlet outlet outlet
3 Ground quality
It will be controlled however It will be controlled however It will be controlled however It will be controlled however
if there is any spillage the if there is any spillage the if there is any spillage the if there is any spillage the
spillage area will be scrap spillage area will be scrap spillage area will be scrap spillage area will be scrap
a. Oil spillage
out from the ground and out from the ground and out from the ground and out from the ground and
disposed disposed disposed disposed

4 Noise Level
Effort will be taken up to Effort will be taken up to Effort will be taken up to Effort will be taken up to
reduce noise pollution. Work reduce noise pollution. Work reduce noise pollution. Work reduce noise pollution. Work
location being close to location being close to location being close to location being close to
a. Use silencer etc., settlement necessary settlement necessary settlement necessary settlement necessary
precaution will be taken. precaution will be taken. precaution will be taken. precaution will be taken.

5 Traffic management
Work location is in the Work location is in the Work location is in the Work location is in the
outskirt area, supply of outskirt area, supply of outskirt area, supply of outskirt area, supply of
material will easily be material will easily be material will easily be material will easily be
Route Planning/ Timing carried out using the by-pass carried out using the by-pass carried out using the by-pass carried out using the by-pass
a.
etc., route. So there will be no route. So there will be no route. So there will be no route. So there will be no
traffic disturbances. traffic disturbances. traffic disturbances. traffic disturbances.

6 Socio - Economic
Opportunities will be given Opportunities will be given Opportunities will be given Opportunities will be given
Income generation to workers willing to work to workers willing to work to workers willing to work to workers willing to work
a. (Workers from local from the nearest settlement from the nearest settlement from the nearest settlement from the nearest settlement
area within 2 Km) from work location. from work location. from work location. from work location.

Only qualified workers will Only qualified workers will Only qualified workers will Only qualified workers will
be deployed. This will be in be deployed. This will be in be deployed. This will be in be deployed. This will be in
b. Employment regard to age, skill etc regard to age, skill etc regard to age, skill etc regard to age, skill etc

7 Gender equality
Man and women will be Man and women will be Man and women will be Man and women will be
a. Employment given equal opportunity. given equal opportunity. given equal opportunity. given equal opportunity.
The notion "same pay - for The notion "same pay - for The notion "same pay - for The notion "same pay - for
same work" will be same work" will be same work" will be same work" will be
practised. Attendance practised. Attendance practised. Attendance practised. Attendance
register having separate register having separate register having separate register having separate
b. Equal payment columns indicating sex and columns indicating sex and columns indicating sex and columns indicating sex and
payment will be maintained payment will be maintained payment will be maintained payment will be maintained
for inspection and our for inspection and our for inspection and our for inspection and our
compliance. compliance. compliance. compliance.

Separate toilet for Man & Separate toilet for Man & Separate toilet for Man & Separate toilet for Man &
women will be provided and women will be provided and women will be provided and women will be provided and
day creche will be provided day creche will be provided day creche will be provided day creche will be provided
Separate toilet & day for those women labourer for those women labourer for those women labourer for those women labourer
c.
creche for women coming to work with their coming to work with their coming to work with their coming to work with their
children. children. children. children.

All workers health condition All workers health condition All workers health condition All workers health condition
will be check every Monday will be check every Monday will be check every Monday will be check every Monday
at Nearest Health Centre. If at Nearest Health Centre. If at Nearest Health Centre. If at Nearest Health Centre. If
Occupational Health & it requires them to bring to it requires them to bring to it requires them to bring to it requires them to bring to
8 the Hospital, we will take to the Hospital, we will take to the Hospital, we will take to the Hospital, we will take to
Safety
the nearest Hospital. the nearest Hospital. the nearest Hospital. the nearest Hospital.

Protective Helmet, glove Protective Helmet, glove Protective Helmet, glove Protective Helmet, glove
and Boot will be provided to and Boot will be provided to and Boot will be provided to and Boot will be provided to
the worker to prevent from the worker to prevent from the worker to prevent from the worker to prevent from
a. Protective Equipment any accidental incident. any accidental incident. any accidental incident. any accidental incident.
Risky location created out of Risky location created out of Risky location created out of Risky location created out of
construction work will be construction work will be construction work will be construction work will be
b. Barricading barricaded to ensure safety barricaded to ensure safety barricaded to ensure safety barricaded to ensure safety

First aid will be provided at First aid will be provided at First aid will be provided at First aid will be provided at
c. First-aid the site. the site. the site. the site.
POST CONSTRUCTION STAGE
1 Closure and clearing of All wastage material within the work site will be cleared and diposed to the nearest
debris etc.,. Municipal dumping area.

2 Tree planting For any trees removed, trees will be planted at a ratio of 1:2. This will be planned in
such a way so as to give aesthetic beauty.