STRUCTURAL MATERIALS

Last Updated on: 2-Apr-2017


PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

COUNTRY OF EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE REF. NO. DESCRIPTION REV. NO. BRAND NAME ORIGIN SUBMITTAL SAMPLE SUB. DATE CONSULTANT REPLY CORRESPONDENCE STATUS COMMENTS

Qatar
1 J11-STMR-01A Submittal Steel Rebar 8mm~40mm 0 ERF 12-Jan-16 12-Jan-16 26-Jan-16 P71168/EAS/JC004 B

Concrete 20 SRC-Concrete 45OPC+ Micro silica - 45 Qatar


2 J11-STMR-02A Submittal 5631 OPC -60 OPC- 25 OPC 0 Al Watania 18-Apr-16 18-Apr-16 26-Apr-16 P71168/EAS/JIC155 B

Concrete 20 SRC-Concrete 45OPC+ Micro silica - 45 Qatar


3 J11-STMR-02B Submittal 5646 OPC -60 OPC- 25 OPC 0 Ramix 20-Apr-16 20-Apr-16 3-May-16 D

Concrete 20 SRC-Concrete 45OPC+ Micro silica - 45 Qatar


4 J11-STMR-02B Submittal 5646 OPC -60 OPC- 25 OPC 1 Ramix 9-May-16 9-May-16 26-May-16 P71168/EAS/JIC068 B
Qatar
5 J11-STMR-02C Submittal Light Weight Architectural Concrete 0

Concrete 20 - SRC-Concrete 45OPC+ Micro silica - Qatar


6 J11-STMR-02D Submittal 45 OPC -60 OPC- 25 OPC 2 Rabban 21-Mar-16 21-Mar-16 24-Mar-16 P71168/EAS/JIC0104 B

Gulf Flag Qatar


7 J11-STMR-03A Submittal Hollow & Solid block Size : 10 cm - 15 cm - 20 cm 0 Co D

Gulf Flag Qatar 17-Jul-16


8 J11-STMR-03A Submittal 6090 Hollow & Solid block Size : 10 cm - 15 cm - 20 cm 1 Co 17-Jul-2016 17-Jul-2016 23-Jul-16 D submit prequalification

Gulf Flag Qatar


9 J11-STMR-03A Submittal 6090 Hollow & Solid block Size : 10 cm - 15 cm - 20 cm 2 Co 1-Aug-2016 1-Aug-2016 4-Aug-16 P71168/EAS/JIC272 B

Gulf Flag Qatar


10 J11-STMR-03B Submittal Fire rated hollow & block size 10 cm-15 cm-20 cm 0 Co D

Gulf Flag Qatar


11 J11-STMR-03B Submittal 6090 Fire rated hollow & block size 10 cm-15 cm-20 cm 1 Co 17-Jul-2016 17-Jul-2016 23-Jul-16 D submit prequalification

Gulf Flag Qatar


12 J11-STMR-03B Submittal 6090 Fire rated hollow & block size 10 cm-15 cm-20 cm 2 Co 1-Aug-2016 1-Aug-2016 4-Aug-16 P71168/EAS/JIC272 B
Table of content
Qatar needed+technical data
13 J11-STMR-03C Submittal 5635 Hollow & Solid block Size : 10 cm - 15 cm - 20 cm / 0 HASSANES 20-Apr-16 20-Apr-16 9-May-16 D should be according to
Fire rated hollow & block size 10 cm-15 cm-20 cm CO
QCS2014+Previous
Hollow & Solid block Size : 10 cm - 15 cm - 20 cm / HASSANES Qatar approval needed
14 J11-STMR-03C Submittal 5635 Fire rated hollow & solid block size 10 cm-15 cm- 1 CO 29-Jun-2016 29-Jun-2016 29-Jun-2016 5-Jul-16 B
20 cm
United Gulf Qatar
15 J11-STMR-04 Submittal Cement 1 Cement Co 23-Feb-16 23-Feb-16 31-May-16 P71168/EAS/JIC197 A
Qatar Qatar
16 J11-STMR-05 Submittal 5236 Sand 0 National 25-Feb-16 25-Feb-16 31-May-16 P71168/EAS/JIC198 A
cement
India/Gene Qatar
17 J11-STMR-06 Submittal Anti-Termite Treatment 0 ral Hygenic 8-Feb-16 8-Feb-16 20-Feb-16 D
Control
Qatar
18 J11-STMR-07 Submittal Water Proofing (sub-structure) 1 AJSPC 19-Mar-16 19-Mar-16 7-Apr-16 P71168/EAS/JC005 B
The Qatar Resubmit specifying
19 J11-STMR-08 Submittal Backfilling Materials 1 Arabian 19-Mar-16 19-Mar-16 29-Mar-16 D
Foundation where to use
Water Proofing (Super-structure for wet area Tadmur Qatar
20 J11-STMR-09 Submittal Nitoproof30) 0 Trading 29-Jun-2016 29-Jun-2016 10-Jul-16 P71168/EAS/JIC244 B

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 1 of 43


STRUCTURAL MATERIALS
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

COUNTRY OF EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE REF. NO. DESCRIPTION REV. NO. BRAND NAME ORIGIN SUBMITTAL SAMPLE SUB. DATE CONSULTANT REPLY CORRESPONDENCE STATUS COMMENTS

Water Proofing (Super-structure for roof area) PU Tadmur Qatar Samples and warranty
21 J11-STMR-09A Submittal system 0 Trading 29-Jun-2016 29-Jun-2016 13-Jul-16 D needed
Submit the sample in
Water Proofing (Super-structure for roof area) PU Tadmur Qatar 4-Sep-2016 propper way +
22 J11-STMR-09A Submittal 6440 system 1 Trading 4-Sep-2016 4-Sep-2016 7-Sep-16 D
complete sample layer
bylayer
Water Proofing (Super-structure for roof area) PU Tadmur Qatar 1-Oct-2016
23 J11-STMR-09A Submittal 6440 system 2 Trading 1-Oct-2016 1-Oct-2016 3-Oct-16 P71168/EAS/JIC324 B

Water Proofing (Super-structure for roof area) Tadmur Qatar 8-Aug-16


24 J11-STMR-09B Submittal 6274 Membrane system 0 Trading 8-Aug-2016 8-Aug-2016 25-Aug-16 C not specified in specs

Tadmur Qatar
25 J11-STMR-10 Submittal Thermal Insulation 0 Trading 5-Apr-16 5-Apr-16 21-Apr-16 P71168/EAS/JIC146 B
Qatar
26 J11-STMR-11 Submittal Composite Wall Panels 0 5-Jan-2017
Qatar
Sodamco-
27 J11-STMR-12A Submittal Repair Material-Weber.rep 332 FR 1
Weber 23-Mar-16 23-Mar-16 30-Mar-16 P71168/EAS/JIC112 B
Qatar
Sodamco-
28 J11-STMR-12B Submittal Repair Material-Weber.tec 311 MC 1 Weber 20-Mar-16 20-Mar-16 30-Mar-16 P71168/EAS/JIC110 B
Qatar
Sodamco-
29 J11-STMR-12C Submittal Repair Material-Weber.rep 350 NSG 0 Weber 14-Mar-16 14-Mar-16 19-Mar-16 P71168/EAS/JIC089 B
UK
30 J11-STMR-12D Submittal Repair Material- Renderoc LA55 0 Fosroc 6-Apr-16 6-Apr-16 26-Apr-16 P71168/EAS/JIC154 B
UK
31 J11-STMR-12E Submittal Repair Material-Renderoc S 0 Fosroc 6-Apr-16 6-Apr-16 23-Apr-16 P71168/EAS/JIC150 B
UK
32 J11-STMR-12F Submittal Repair Material-Renderoc FCXtra 0 Fosroc 6-Apr-16 6-Apr-16 26-Apr-16 P71168/EAS/JIC153 B
UK
33 J11-STMR-12G Submittal 6569 Repair Material-Renderoc LA80 0 Fosroc 24-Oct-16 24-Oct-16 29-Oct-16 P71168/EAS/JIC345 B
Qatar
Sodamco-
34 J11-STMR-12H Submittal 6572 Repair Material-Weber.rep 501 ZRP 0
Weber 24-Oct-16 24-Oct-16 30-Oct-16 P71168/EAS/JIC348 B
Qatar
Sodamco-
35 J11-STMR-12I Submittal 6575 Repair Material-Weber.rep 331 TX 0 Weber 24-Oct-16 24-Oct-16 29-Oct-16 P71168/EAS/JIC346 B
Qatar 1. Have to provide the
Sodamco-
36 J11-STMR-12J Submittal 6576 Repair Material-Weber.rep 360 FR 0
Weber 24-Oct-16 24-Oct-16 30-Oct-16 P71168/EAS/JIC347 B country of origin 2.
have to raise the
Qatar
37 J11-STMR-12K Submittal 6597 Repair Material-MasterEmaco S 488 0 BASF 1-Nov-16 1-Nov-16 7-Nov-16 P71168/EAS/JIC361 B sample of product
before use. 3. Have to
Qatar raise inspection
38 J11-STMR-12L Submittal 6598 Repair Material-MasterEmaco S 422 0 BASF 1-Nov-16 1-Nov-16 7-Nov-16 P71168/EAS/JIC360 B request for each stage
of repairing work.
1. have to describe
Qatar
details to use of
39 J11-STMR-12M Submittal 6918 CEMFAIR PF 0 DCP 1-Nov-16 19-Feb-17 21-Feb-17 D materials & area to
Qatar use the material.
40 J11-STMR-12M Submittal 6918 CEMFAIR PF 1 DCP 25-Feb-17 25-Feb-17 26-Feb-17 P71168/EAS/JIC533 B

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 2 of 43


STRUCTURAL MATERIALS
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

COUNTRY OF EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE REF. NO. DESCRIPTION REV. NO. BRAND NAME ORIGIN SUBMITTAL SAMPLE SUB. DATE CONSULTANT REPLY CORRESPONDENCE STATUS COMMENTS

Qatar
Sodamco-
41 J11-STMR-13 Submittal Joint Sealant 0 weber 14-Mar-16 14-Mar-16 19-Mar-16 P71168/EAS/JIC093 B
UK
42 J11-STMR-13A Submittal Joint Sealant 0 Fosroc 21-Aug-00 6-Apr-16 24-Apr-16 P71168/EAS/JIC151 B
Qatar
43 J11-STMR-14 Submittal Precast car Stopper 0

UK Specefication number
44 J11-STMR-15 Submittal Filler Board 0 Fosroc 5-Apr-16 5-Apr-16 24-Apr-16 D not matching with
material
UK
45 J11-STMR-15 Submittal 5679 Filler Board 1 Fosroc 27-Apr-16 27-Apr-16 8-May-16 P71168/EAS/JIC169 B
Qatar
46 J11-STMR-16 Submittal Polyethylene Sheet (500 Micron & 1000 Micron) 0 Unitech 1-Mar-16 1-Mar-16 14-Mar-16 P71168/EAS/JIC078 B
Qatar
Sodamco-
47 J11-STMR-17A Submittal Anchoring and Bonding Epoxy-Weber.anc 405 BFX 1
weber 23-Mar-16 23-Mar-16 30-Mar-16 B
Qatar
Sodamco-
48 J11-STMR-17B Submittal Anchoring and Bonding Epoxy-Weber.ad 220 SBR 0 weber 26-Mar-16 26-Mar-16 30-Mar-16 B
USA
49 J11-STMR-17C Submittal 5678 Anchoring HY 110 0 HILTI 27-Apr-16 27-Apr-16 7-May-16 P71168/EAS/JIC168 B
Germany 8-Jun-16
50 J11-STMR-17D Submittal 5862 TP E SD-Team Pro Chemical Mortar 0 Team Pro TP 8-Jun-16 8-Jun-16 12-Jun-16 C
Germany 27-Jun-16 need to
51 J11-STMR-17D Submittal 5862 TP E SD-Team Pro Chemical Mortar 1 Team Pro TP 27-Jun-16 27-Jun-16 30-Jun-16 D submitManufacturer
pre-qualification
Germany
have to mention
52 J11-STMR-17D Submittal 5862 TP E SD-Team Pro Chemical Mortar 2 Team Pro TP 11-Jul-16 11-Jul-16 11-Aug-16 D country of origin
Germany
53 J11-STMR-17D Submittal 5862 TP E SD-Team Pro Chemical Mortar 3 Team Pro TP 15-Aug-16 15-Aug-16 24-Aug-16 P71168/EAS/JIC282 A 1. Material Inspection
request to be submit
USA before using. 2.
54 J11-STMR-17E Submittal 6630 Anchoring Hilti HIT-RE 500 V3 mortar with rebar 0 HILTI 17-Nov-16 17-Nov-16 19-Nov-16 P71168/EAS/JIC376 B Inspection
1. Have to request
submit
have
materialto raise
beforeforusing
each
USA Sample thestages to use
material on this
site 2.
55 J11-STMR-17F Submittal 6679 Anchoring Hilti HIT-RE 100 mortar with rebar 0 HILTI 28-Nov-16 28-Nov-16 3-Dec-16 P71168/EAS/JIC404 B material.
inspection request 3.
needed
USA 1.Have
needto include
designated
56 J11-STMR-17G Submittal 6720 Anchoring Hilti HIT-HY 200 mortar with rebar 0 HILTI 8-Dec-16 8-Dec-16 14-Dec-16 P71168/EAS/JIC414 B country to
purpose of use
origin.
this
material 2. have to
SPIT/ Ramco FRANCE submit sample with
57 J11-STMR-17H Submittal 6723 Chemical Anchor for Rebar SPIT EPOBAR 0 Trading & 21-Dec-16 25-Dec-16 25-Dec-16 5-Jan-17 P71168/EAS/JIC444 B this material before
Contracting using 3. inspection
Tadmur
Qatar 12-May-16 request need to raise
58 J11-STMR-18 Submittal 5785 Geotextile 0 Trading 12-May-16 12-May-16 31-May-16 P71168/EAS/JIC195 B before using this
material.

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 3 of 43


STRUCTURAL MATERIALS
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

COUNTRY OF EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE REF. NO. DESCRIPTION REV. NO. BRAND NAME ORIGIN SUBMITTAL SAMPLE SUB. DATE CONSULTANT REPLY CORRESPONDENCE STATUS COMMENTS

Qatar
General 1. use steel as per
59 J11-STMR-19 Submittal 6825 Structural Steel Framing 0 Syndicate 5-Jan-2016 15-Jan-2017 15-Jan-2017 2-Feb-17 D project specifications.
Qatar
60 J11-STMR-19 Submittal 6825 Structural Steel Framing 1
General
5-Jan-2016 16-Feb-2017 19-Feb-2017 D Calculatuion for steel
Syndicate must be provided.
Qatar
General must be equivalent to
61 J11-STMR-19 Submittal 6825 Structural Steel Framing 2
Syndicate 5-Jan-2016 27-Feb-2017 8-Mar-2017 D conflor 46
Qatar
General
62 J11-STMR-19 Submittal 6825 Structural Steel Framing 3
Syndicate 5-Jan-2016 19-Mar-2017 21-Mar-2017 27-Mar-2017 A
samples required
Qatar 24-Oct-16 before installation and
63 J11-STMR-20 Submittal 6570 Backing Rod 0 UNITECH 24-Oct-2016 24-Oct-16 5-Nov-16 P71168/EAS/JIC354 B Request for Inspection
Qatar required.
Sodamco-
64 J11-STMR-21 Submittal Curing Compound 0
weber 14-Mar-16 14-Mar-16 19-Mar-16 P71168/EAS/JIC090 B
UK
65 J11-STMR-21A Submittal Curing Compound-Cocure WB309 0 Fosroc 5-Apr-16 5-Apr-16 24-Apr-16 P71168/EAS/JIC152 B
UK
66 J11-STMR-22A Submittal Pile Head Treatment-Grout & Cementitious void filler 0 Fosroc 7-Mar-16 7-Mar-16 15-Mar-16 P71168/EAS/JIC081 B
UK
67 J11-STMR-22B Submittal Pile Head Treatment-Resin System 0 Fosroc 7-Mar-16 7-Mar-16 15-Mar-16 P71168/EAS/JIC080 B

Sodamco-
Qatar Resubmit&specify
68 J11-STMR-23A Submittal Bitumen paint-Weber.dry bitum WB 0
weber 14-Mar-16 14-Mar-16 19-Mar-16 D
where to use
Qatar
Sodamco-
69 J11-STMR-24A Submittal Non-Shrink Grout-Weber.tec 305 HF 1
weber 20-Mar-16 20-Mar-16 30-Mar-16 P71168/EAS/JIC111 B
UK Specefication number
70 J11-STMR-24B Submittal Non-Shrink Grout-Fosroc Conbextra STD 0 Fosroc 5-Apr-16 5-Apr-16 24-Apr-16 P71168/EAS/JIC170 D not matching with
material
UK
71 J11-STMR-24B Submittal 5680 Non-Shrink Grout-Fosroc Conbextra STD 1 Fosroc 27-Apr-16 27-Apr-16 8-May-16 B
Qatar
Sodamco-
72 J11-STMR-24C Submittal 6573 Non-Shrinkage Grout-Weber.tec 304 VHS 0
weber 24-Oct-16 24-Oct-16 30-Oct-16 P71168/EAS/JIC349 B
Qatar Resubmit with
73 J11-STMR-25A Submittal Formwork-ACROW one side shutter formwork (press) 0 ACROW 26-Mar-16 26-Mar-16 30-Mar-16 D description of pouring
procedure by ACROW
Qatar 29-Aug-16 29-Aug-16 and design
After with load
pre-qualification
74 J11-STMR-25B Submittal Formwork-SIMPEX Wall & MKH 150 0 TMS 4-Sep-16 D calculation / Cancelled
to be approved
Unitech or Qatar
75 J11-STMR-26 Submittal Protection Board 0 approved cancelled
equals
Sodamco-
Qatar 15-Aug-16
76 J11-STMR-27 Submittal Plaster (weber.premix SP-11 + weber.premix SRC-2) 0 Weber 15-Aug-2016 15-Aug-2016 24-Aug-16 P71168/EAS/JIC283 B

77 J11-STMR-28 Submittal LC/J11/JC/SUB/007 Waterstop (PVC) 0 Fosroc Qatar 21-Mar-16 21-Mar-16 21-Mar-16 28-Mar-16 B

78 J11-STMR-29 Submittal LC/J11/JC/SUB/005 Fire Stop System 0 Hilti Qatar 17-Mar-16 12-Mar-16 16-Mar-16 B

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 4 of 43


STRUCTURAL MATERIALS
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

COUNTRY OF EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE REF. NO. DESCRIPTION REV. NO. BRAND NAME ORIGIN SUBMITTAL SAMPLE SUB. DATE CONSULTANT REPLY CORRESPONDENCE STATUS COMMENTS

79 J11-STMR-30 Submittal LC/J11/JC/SUB/010 RSM HEITFELD Expanded Metal High Rib 0 Qatar 3-May-16 13-Apr-16 3-May-16 D

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 5 of 43


ARCHITECTURAL MATERIALS
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

COUNTRY OF EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE REF. NO. DESCRIPTION REV. NO. BRAND NAME ORIGIN SUBMITTAL SAMPLE SUB. DATE CONSULTANT REPLY CORRESPONDENCE STATUS COMMENTS

1 J11-ARMR-01 Submittal 6611 Elevator 0 KONE or approved equals Finland/China 1-Dec-16 8-Nov-16 25-Jan-17 P71168/EAS/JIC484 B

2 J11-ARMR-1.1 Submittal 6634 Elevator Finishing Material 0 KONE or approved equals Finland/China 17-Nov-16 17-Nov-16 26-Jan-17 P71168/EAS/JIC489 B

3 J11-ARMR-01A Submittal 6612 Escalator 0 KONE or approved equals Finland/China 1-Dec-16 8-Nov-16 25-Jan-17 P71168/EAS/JIC487 B

4 J11-ARMR-1A.1 Submittal 6635 Escalator Finishing Material 0 KONE or approved equals Finland/China 17-Nov-16 17-Nov-16 26-Jan-17 P71168/EAS/JIC488 B

5 J11-ARMR-02 Submittal Metal Doors and Frames 0 Ram or approved equals UAE/KSA 25-Dec-16

SAFARI Project Suppliers or


6 J11-ARMR-03 Submittal Wood Doors 0 approved equals QATAR 25-Dec-16

7 J11-ARMR-04 Submittal Overhead Coiling Doors 0 25-Dec-16

8 J11-ARMR-05 Submittal Access Doors and Frames 0 Ram or approved equals UAE/KSA 25-Jan-17

9 J11-ARMR-06 Submittal Aluminum Windows 0 Reynaers or approved equals KSA 20-Dec-16

10 J11-ARMR-07 Submittal Aluminum Cladding 0 20-Dec-16

11 J11-ARMR-08 Submittal GRC 0 20-Dec-16

Qatar Metal Coats or approved


12 J11-ARMR-09 Submittal Steel Handrail 0 equals QATAR 3-Jan-17
split every material in
separate submittal form +
13 J11-ARMR-10 Submittal 6360 Paint 0 Jotun QATAR 15-Feb-17 22-Aug-16 28-Aug-16 D previous approval +
method statement +
physical sample at site
Split materials in each
14 J11-ARMR-10 Submittal 6360 Paint 1 Jotun QATAR 15-Feb-17 5-Sep-16 7-Sep-16 D
submittal

15 J11-ARMR-10 Submittal 6360 Paint (Internal Emulsion System) 2 Jotun QATAR 15-Feb-17 26-Sep-16 16-Oct-16 P71168/EAS/JIC333 B

method statement +
16 J11-ARMR-10A Submittal 6361 Traffic Coating 0 Jotun QATAR 15-Feb-17 22-Aug-16 28-Aug-16 P71168/EAS/JIC290 B physical sample required
before starting

17 J11-ARMR-10B Submittal 6360 Paint ( External Anti-Carbonation 2 Jotun QATAR 15-Feb-17 26-Sep-16 16-Oct-16 P71168/EAS/JIC333 B
System)

18 J11-ARMR-10C Submittal 6360 Paint (Internal Epoxy System) 2 Jotun QATAR 15-Feb-17 26-Sep-16 16-Oct-16 P71168/EAS/JIC333 B

National / White Lion Trading &


19 J11-ARMR-10D Submittal 6898 Paint (Internal Emulsion System) 0
Contracting
QATAR 12-Feb-17 12-Feb-17 18-Feb-17 C out of vendor list.

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 6 of 43


ARCHITECTURAL MATERIALS
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

COUNTRY OF EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE REF. NO. DESCRIPTION REV. NO. BRAND NAME ORIGIN SUBMITTAL SAMPLE SUB. DATE CONSULTANT REPLY CORRESPONDENCE STATUS COMMENTS

National / White Lion Trading &


20 J11-ARMR-10E Submittal 6898 Traffic Coating 0 Contracting QATAR 12-Feb-17 12-Feb-17 18-Feb-17 C out of vendor list.

21 J11-ARMR-10F Submittal 6898 Paint ( External Anti-Carbonation 0 National / White Lion Trading & QATAR 12-Feb-17 12-Feb-17 18-Feb-17 C out of vendor list.
System) Contracting

National / White Lion Trading &


22 J11-ARMR-10G Submittal 6898 Paint (Internal Epoxy System) 0 Contracting QATAR 12-Feb-17 12-Feb-17 18-Feb-17 C out of vendor list.

Qatar Metal Coats or approved


23 J11-ARMR-11 Submittal Decorative Formed Metal 0
equals
QATAR 10-Dec-16

Emirates Glass or approved


24 J11-ARMR-12 Submittal Glazing 0 equals UAE 10-Dec-16

Al-Abbar Group or approved


25 J11-ARMR-13 Submittal Glazed aluminum curtain walls 0 equals UAE 10-Dec-16

26 J11-ARMR-14 Submittal Metal-Framed skylight 0 Reynaers or approved equals KSA 10-Dec-16

27 J11-ARMR-15 Submittal Aluminum-Framed Entrance and 0 Dorma or approved equals Germany 10-Dec-16
storefront

28 J11-ARMR-16 Submittal Acoustical Tile Ceilings 0 Armstrong or approved equals USA 1-Feb-17
1. contractor to provide
29 J11-ARMR-17 Submittal Linear Metal Ceiling 0 1-Feb-17 specific area of application
for each material 2. shop
drawing reflecting
proposed stone
pre-qualification should be
30 J11-ARMR-18 Submittal 6506 Stone Paving and Flooring 0 Oryx Marble & Granite QATAR 1-Feb-17 26-Sep-16 28-Sep-16 D measurements are
approved first first
required 3. Haomogenous
1. contractor to provide
color scheme is
31 J11-ARMR-18 Submittal 6506 Stone Paving and Flooring 1 Oryx Marble & Granite QATAR 1-Feb-17 17-Oct-16 D specific area ofduring
mandatory application
the
for each
slabs material
selection2.4.shop
drawingtoreflecting
contractor provide ITP
proposed
pre-qualification
for review stone
shouldofbe
5. Method
32 J11-ARMR-19 Submittal 6506 Stone Facing 0 Oryx Marble & Granite QATAR 1-Feb-17 26-Sep-16 28-Sep-16 D measurements
approved are
first first
stement for installlation
required
and 3. Haomogenous
data sheet for all used
color scheme is
material 6. Final approval
33 J11-ARMR-19 Submittal 6506 Stone Facing 1 Oryx Marble & Granite QATAR 1-Feb-17 17-Oct-16 D mandatory
of during theis
material selection
slabs selection 4.
subject to clients approval.
contractor to provide +ITP
method statement
34 J11-ARMR-20 Submittal 6362 Resinous Flooring 0 Jotun QATAR 1-Feb-17 22-Aug-16 28-Aug-16 P71168/EAS/JIC286 B for review 5. Method
physical sample required of
stement forstarting
before installlation
and data sheet for all used
Emirates Neon or approved material 6. Final approval
35 J11-ARMR-21 Submittal Interior Signage 0
equals
UAE 15-Feb-17 of material selection is
subject to clients approval.

36 J11-ARMR-22 Submittal 6571 Wall and Door Protection 0 UNITECH QATAR 15-Nov-16 24-Oct-16 24-Oct-16 12-Feb-17 P71168/EAS/JIC506 B

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 7 of 43


ARCHITECTURAL MATERIALS
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

COUNTRY OF EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE REF. NO. DESCRIPTION REV. NO. BRAND NAME ORIGIN SUBMITTAL SAMPLE SUB. DATE CONSULTANT REPLY CORRESPONDENCE STATUS COMMENTS

37 J11-ARMR-23 Submittal Gypsum (Ceiling & Partitions) 0 Lafarge or approved equals Europe 20-Jan-17

38 J11-ARMR-24 Submittal Tiling 0 Jasba or approved equals Germany 1-Feb-17

39 J11-ARMR-25 Submittal Door Hardware 0 Tesa or approved equals Spain 15-Jan-17

40 J11-ARMR-26 Submittal Access Flooring 0 Crespi or approved equals Italy 15-Jan-17

41 J11-ARMR-27 Submittal Automatic Entrances 0 Novo Frem or approved equals Germany 15-Jan-17

42 J11-ARMR-28 Submittal 6917 Intumescent Painting 0 Carboline / General Syndicate Qatar 15-Feb-17 29-Mar-17 UR

42 J11-ARMR-28A Submittal 6977 Epoxy Polymide Paint ( Structural 0 Carboline / General Syndicate Qatar 5-Apr-17 5-Apr-17 5-Apr-17 waiting for site
Steel Painting ) confrimation

43 J11-ARMR-29 Submittal Impact Resistance Wall Surface 0 IPC or approved equals USA 1-Feb-17
Protection

44 J11-ARMR-30 Submittal Fixed Sun Screen 0 Reynaers or approved equals KSA 15-Feb-17

45 J11-ARMR-31 Submittal Curb stones 0 10-Feb-17

46 J11-ARMR-32 Submittal Canoby 0 15-Mar-17

1. As per IFC drawings is


Manar Building Maintenance
47 J11-ARMR-33 Submittal 6712 Faade Maintenance Equipment 0
Equipment
Spain 15-Dec-16 4-Dec-16 26-Jan-17 C not 1.
matching with your
out of vendor list
submittal., consider whole
system applica=ble for this
project. 2. consider
Electrical & Mechanical
Skyclimber /Manar Building
48 J11-ARMR-33 Submittal 6712 Faade Maintenance Equipment 1 Maintenance Equipment Spain 15-Dec-16 27-Feb-17 2-Mar-17 14-Mar-17 D issues. 3. Hove to consider
our new architectural plan
for Faade Maintenance.
4. Subcontractor to check
Atechbcn / Unitrac Trading & site with main-contractor
49 J11-ARMR-33A Submittal 6829 Faade Maintenance Equipment 0
Contracting Co.
Spain 15-Dec-16 19-Jan-17 26-Jan-17 C 1. out
to take of vendor list
moreinformation
to reflect on submittal.

Atechbcn / Unitrac Trading &


50 J11-ARMR-33A Submittal 6829 Faade Maintenance Equipment 1 Contracting Co. Spain 15-Dec-16 12-Mar-17 UR

51 J11-ARMR-34 Submittal Fountains 0 Culligan or approved equals USA 15-Mar-17

Expanded Metal Manufacturing


52 J11-ARMR-35 Submittal Plaster Accessories 0 Co or approved equals QATAR 15-Feb-17 26-May-16 11-Apr-16 2-May-16 B

53 J11-ARMR-36 Submittal Coal Tar Epoxy 0 BASF or approved equals QATAR 15-Mar-17

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 8 of 43


ARCHITECTURAL MATERIALS
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

COUNTRY OF EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE REF. NO. DESCRIPTION REV. NO. BRAND NAME ORIGIN SUBMITTAL SAMPLE SUB. DATE CONSULTANT REPLY CORRESPONDENCE STATUS COMMENTS

54 J11-ARMR-37 Submittal Toilet Compartment 0 Gibca or approved equals UAE 10-Jan-17

55 J11-ARMR-38 Submittal Toilet and Bath Accessories 0 Bradly or approved equals USA 10-Jan-17

56 J11-ARMR-39 Submittal 6519 Penetration Firestopping 0 UNITECH / STI QATAR 10-Nov-16 24-Oct-16 24-Oct-16 26-Jan-17 C 1. out of vendor list

Qatar Metal Coats or approved


57 J11-ARMR-40 Submittal S.S Handrail 0
equals
QATAR 1-Feb-17

58 J11-ARMR-41 Submittal Kitchen Units / Pantry 0 15-Mar-17

59 J11-ARMR-42 Submittal Tile adhesive 0 Sodamco or approved equals QATAR 20-Feb-17

60 J11-ARMR-44 Submittal Toilet cubicles 0 10-Mar-17


(mosaic tile ,edge tile, flat
tile revise & resubmit) /
(grout, tile
61 J11-ARMR-46 Submittal Swimming Pool Finishing Material 0 Metro Pool / IML Spain 15-Oct-16 4-Sep-16 4-Sep-16 16-Oct-16 D
adhesive,channel grating
& SS ladder approved as
noted)
62 J11-ARMR-47 Submittal Landscape 0 15-Apr-17
follow the specs desired,
provide PWC system and
63 J11-ARMR-48 Submittal 6476 Garbage Chute 0 UNITECH Qatar 1-Sep-16 5-Sep-16 7-Nov-16 D
quality certificates
needed.
WIDTHRAWN FROM
SUBMISSION DUE TO
64 J11-ARMR-48 Submittal 6476 Garbage Chute 1 UNITECH Qatar 1-Sep-16 15-Jan-17 CHANGE IN
SUBCONTRACTOR.

KSA / India 1. Provide Marafeq requiremetns /


SFSP & Horizon Chutes / specificationson garbage chute /
65 J11-ARMR-49 Submittal 6476 Garbage Chute 0 Multichoice Electro-Mechanical 1-Sep-16 6-Mar-17 14-Mar-17 D PWC 2. Garbage chute shall be in
Co. coordination & compatible with
PWC system. 3.

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 9 of 43


MECHANICAL MATERIALS
Last Updated on: 2-Apr-2017

PROJECT: AL JABER TWIN TOWER Approval Status


CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

COUNTRY OF EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE DIV. REF. NO. DESCRIPTION REV. NO. BRAND NAME ORIGIN SUBMITTAL SAMPLE SUB. DATE CONSULTANT REPLY CORRESPONDENCE STATUS COMMENTS

1 J11PLMR01 Submittal PLM PPR Pipes & Fittings 0 Cosmoplast Germany 17-Feb-2016 3-Mar-16 C
(Polypropylene)
PPR Pipes & Fittings
2 J11PLMR01 Submittal PLM 6220 (Polypropylene) 1 Cosmoplast Germany 1-Aug-2016 16-Aug-16 P71168/EAS/JIC274 B

3 J11PLMR02 Submittal PLM Copper Pipes (PLM) 0 Asma / Yorkshire UK 13-Feb-2016 28-Feb-16 P71168/EAS/JIC041 B
submit with
compliance statement
4 J11PLMR03 Submittal PLM HDPE Pipes and Fittings 0 Cosmoplast UAE 8-Feb-2016 2-Mar-16 C as per vender
list/Hepworth or
Terrain
5 J11PLMR03 Submittal PLM HDPE Pipes and Fittings 1 Cosmoplast UAE 9-Mar-2016 15-Mar-16 P71168/EAS/JIC079 B
Resubmit with
UPVC Pipes and Fittings Non - Hepworth or approved compliance statement
6 J11PLMR04 Submittal PLM Pressure 0 equal Qatar 8-Feb-2016 2-Mar-16 D and signature from
contracor
provide and
material
UPVC Pipes and Fittings Non - manfacturer
sample attahed on a
7 J11PLMR04 Submittal PLM 6594 Pressure 1 Cosmoplast Qatar 1-Nov-2016 1-Nov-2016 P71168/EAS/JIC355 B sample boardwith
prior to
Resubmit
any valve installation.
compliance statement
UPVC Pipes and Fittings Hi
8 J11PLMR05 Submittal PLM Pressure 0 Cosmoplast Qatar 8-Feb-2016 28-Feb-2016 D and signature from
contracor and
UPVC Pipes and Fittings Hi manfacturer
9 J11PLMR05 Submittal PLM 6188 Pressure 1 Cosmoplast Qatar 26-Jul-2016 2-Aug-2016 P71168/EAS/JIC262 A

Roof Drain, Floor Drain, Floor Dallmar / Al Tayeb WAITING FOR SITE DC
10 J11PLMR06 Submittal PLM 6983 Clean out & Floor Gullies 0 Water Technology Germany 6-Mar-16 9-Apr-17 9-Apr-17 CONFIRMATION FOR SUBMISSION
TO CONSULTANT

American standard or
11 J11PLMR07 Submittal PLM Sanitary Fixtures 0 approved equals USA 30-Apr-16

Bobric or approved
12 J11PLMR08 Submittal PLM Toilet Accessories 0 equals USA 30-Apr-16

Xylem LOWARA /
13 J11PLMR09 Submittal PLM 6821 Booster Pumpsets 0 Gazzoui & Partners Co. USA 26-Mar-16 14-Jan-2017 11-Feb-2017 P71168/EAS/JIC509 B

Lifting Pumpsets & Circulation submit supplier's


14 J11PLMR10 Submittal PLM 6249 pumps 0 Xylem LOWARA USA 4-Aug-2016 17-Aug-16 C not in vendor list+
prequalification
submit pumps
Lifting Pumpsets & Circulation hydraulic/head
15 J11PLMR10 Submittal PLM 6249 pumps 1 Xylem LOWARA USA 1-Nov-2016 1-Nov-2016 12-Nov-16 D calculation together
with submittal / letter
Lifting Pumpsets & Circulation sent to JEM on
16 J11PLMR10 Submittal PLM 6249 pumps 2 Xylem LOWARA USA 1-Nov-2016 14-Jan-2017 11-Feb-2017 P71168/EAS/JIC510 B
13/11/2016 ref 6628

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 10 of 43


MECHANICAL MATERIALS
Last Updated on: 2-Apr-2017

PROJECT: AL JABER TWIN TOWER Approval Status


CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

COUNTRY OF EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE DIV. REF. NO. DESCRIPTION REV. NO. BRAND NAME ORIGIN SUBMITTAL SAMPLE SUB. DATE CONSULTANT REPLY CORRESPONDENCE STATUS COMMENTS

submit supplier's
17 J11PLMR11 Submittal PLM 6249 Submersible Pump sets 0 Xylem LOWARA USA 4-Aug-2016 17-Aug-16 C not in vendor list+
prequalification
submit pumps
hydraulic/head
18 J11PLMR11 Submittal PLM 6249 Submersible Pump sets 1 Xylem LOWARA USA 1-Nov-2016 1-Nov-2016 12-Nov-16 D calculation together
with submittal / letter
19 J11PLMR11 Submittal PLM 6249 Submersible Pump sets 2 Xylem LOWARA USA 1-Nov-2016 14-Jan-2017 11-Feb-2017 B sent to JEM on
13/11/2016 ref 6628

20 J11PLMR12 Submittal PLM 6219 Water Heater 0 Atlantic /Safetech Italy 1-Aug-2016 16-Aug-16 C not in vendor list
electro mechanic

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 11 of 43


MECHANICAL MATERIALS
Last Updated on: 2-Apr-2017

PROJECT: AL JABER TWIN TOWER Approval Status


CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

COUNTRY OF EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE DIV. REF. NO. DESCRIPTION REV. NO. BRAND NAME SAMPLE SUB. DATE CONSULTANT REPLY STATUS COMMENTS
ORIGIN SUBMITTAL CORRESPONDENCE 1. 15 liter capacity is
not included in this
21 J11PLMR12 Submittal PLM 6219 Water Heater 1 Atlantic /Safetech Italy 30-Nov-2016 30-Nov-2016 14-Dec-2016 D proposed equipment
electro mechanic 2water
1. Someheater should
design
berequirements
horizontal type & to
Atlantic /Safetech 30, 40
fit & 50 water
inside.
specification are not
22 J11PLMR12 Submittal PLM 6219 Water Heater 2 electro mechanic Italy 27-Dec-2016 27-Dec-2016 3-Jan-2016 P71168/EAS/JIC437 B capacity
met.is2.acceptable.
Brand
Precision/ Hotline "BYWORTH" from UK
23 J11PLMR13 Submittal PLM 6724 Calorifires 0 Industrial Equipment India 30-Apr-2016 12-Dec-2016 26-Dec-2016 D is approved 3. Arrange
Co. WLL Technical meeting with
1. see comments
supplier for on
Precision/ Hotline equipment schedule
clarification. 4. See &
24 J11PLMR13 Submittal PLM 6724 Calorifires 1 Industrial Equipment India 30-Apr-2016 8-Jan-2017 28-Jan-2017 D compliance
commentsonstatement.
Co. WLL 2. comply
compliance to
statement
specifications.

Precision/ Hotline
25 J11PLMR13 Submittal PLM 6724 Calorifires 2 Industrial Equipment India 30-Apr-2016 8-Feb-2017 22-Feb-2017 P71168/EAS/JIC527 B
Co. WLL

Crane Valves Co. or


26 J11PLMR14 Submittal PLM PLM Valves & Accessories 0 approved equals UK 13-Feb-2016 28-Feb-2016 P71168/EAS/JIC039 B

K-Flex-UAE/Areodyne
27 J11PLMR15 Submittal PLM Pipe insulation and accessories 0 cooling system UAE 28-Feb-2016 1-Mar-2016 6-Mar-2016 P71168/EAS/JIC065 B

Teka or approved
28 J11PLMR16 Submittal PLM Kitchen Sink 0 equals Spain 30-Apr-16

29 J11PLMR17 Submittal PLM 6247 Water Meter 0 Badger Germany 25-Aug-2016 28-Aug-16 D sample needed

ITRON WATER WAITING FOR SITE DC


30 J11PLMR17 Submittal PLM 6247 Water Meter 1 METARS / FLOW France 27-Mar-17 27-Mar-17 CONFIRMATION FOR SUBMISSION
TO CONSULTANT
TECHSYSTEMS

provide new kahrama


30 J11PLMR18 Submittal PLM Water Meter Cabinet 0 AlFa/ Qatar Technical Qatar 6-Apr-2016 19-Apr-2016 D approval

31 J11PLMR18 Submittal PLM 6187 Water Meter Cabinet 1 AlFa/ Qatar Technical Qatar 26-Jul-2016 2-Aug-2016 P71168/EAS/JIC261 B
compliance statement
32 J11PLMR19 Submittal PLM GRP Water Tank 0 KORAVAN- Qatar 6-Apr-2016 19-Apr-2016 D signed by contractor
Malasiya/ASMA-Doha and supplier as per
project specefication
KORAVAN-
33 J11PLMR19 Submittal PLM 6186 GRP Water Tank 1 Malasiya/ASMA-Doha Qatar 26-Jul-2016 2-Aug-2016 P71168/EAS/JIC260 B
1. Some design
requirements &
34 J11PLMR20 Submittal PLM Domestic Water cooler units 0 30-Apr-16 specification are not
met. 2. Brand
BYWORTH/ Hotline "BYWORTH" from UK
35 J11PLMR21 Submittal PLM 6724 Steam Boilers 0 Industrial Equipment U.K. 12-Dec-2016 12-Dec-2016 26-Dec-2016 D is approved 3. Arrange
Co. WLL 1. see comments
Technical on
meeting with
BYWORTH/ Hotline equipment schedule
supplier for &
36 J11PLMR21 Submittal PLM 6724 Steam Boilers 1 Industrial Equipment U.K. 12-Dec-2016 8-Jan-2017 28-Jan-2017 D compliance statement.
clarification. 4. See
Co. WLL 2. comply
commentson to
specifications.
compliance statement

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 12 of 43


MECHANICAL MATERIALS
Last Updated on: 2-Apr-2017

PROJECT: AL JABER TWIN TOWER Approval Status


CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

COUNTRY OF EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE DIV. REF. NO. DESCRIPTION REV. NO. BRAND NAME ORIGIN SUBMITTAL SAMPLE SUB. DATE CONSULTANT REPLY CORRESPONDENCE STATUS COMMENTS

BYWORTH/ Hotline
37 J11PLMR21 Submittal PLM 6724 Steam Boilers 2 Industrial Equipment U.K. 12-Dec-2016 8-Feb-2017 22-Feb-2017 P71168/EAS/JIC527 B
Co. WLL

FF
38 J11FFMR01 Submittal FF-ERW Pipes 0 steelmark middle east India 17-Feb-2016 5-Mar-2016 P71168/EAS/JIC059 B change of suppliers
FF Al Jazeera- Oman /
39 J11FFMR01 Submittal 6754 FF-ERW Pipes 1 TISCO Qatar 28-Dec-16 28-Dec-16 21-Jan-2017 P71168/EAS/JIC472 B change of suppliers
FF Jindal / Steelmark
40 J11FFMR01 Submittal 6885 FF-ERW Pipes 2 Middle East WLL India 6-Feb-2017 8-Mar-2017 8-Mar-2017 9-Mar-2017 P71168/EAS/JIC549 B

FF FF-Threaded Fittings &Grooved MECH/steelmark


41 J11FFMR02 Submittal Fittings 0 middle east China 17-Feb-2016 5-Mar-2016 P71168/EAS/JIC055 B change of suppliers
FF FF-Threaded Fittings &Grooved Various / Teyseer
42 J11FFMR02 Submittal 6744 Fittings 1 Industrial Supplies & Qatar 28-Dec-16 28-Dec-16 21-Jan-2017 P71168/EAS/JIC473 B
Services Co. W.L.L
FF
43 J11FFMR03 Submittal FF- Welded Fittings 0 Mech China 25-Feb-16
FF
44 J11FFMR04 Submittal 6358 Sprinklers 0 Viking USA 5-Sep-2016 5-Sep-2016 22-Sep-2016 P71168/EAS/JIC317 B
FF Fire Hose reel Cabinet including Sffeco / Vijay Arabia
45 J11FFMR05 Submittal 6855 Accessories 0 Fire & Security System KSA 31-Jan-2017 31-Jan-2017 2-Feb-2017 4-Feb-2017 D
W.L.L
FF
Fire Hose reel Cabinet including Sffeco / Vijay Arabia
46 J11FFMR05 Submittal 6855 Accessories 1 Fire & Security System KSA 31-Jan-2017 5-Mar-2017 7-Mar-2017 P71168/EAS/JIC546 B
W.L.L
FF Sffeco / Vijay Arabia
47 J11FFMR06 Submittal 6854 Landing Valve 0 Fire & Security System KSA 31-Jan-17 31-Jan-17 2-Feb-2017 4-Feb-2017 P71168/EAS/JIC502 B
W.L.L
FF WEFLO / Vijay Arabia
48 J11FFMR07 Submittal 6610 OS&Y Gate Valves 0 Fire & Security System UK 28-Mar-16 25-Dec-16 3-Jan-17 C
W.L.L
FF Rapidrop / Vijay Arabia
49 J11FFMR07 Submittal 6610 OS&Y Gate Valves 1 Fire & Security System UK 28-Mar-16 14-Jan-17 21-Jan-2017 P71168/EAS/JIC477 B
W.L.L
FF VIKING / Vijay Arabia
50 J11FFMR08 Submittal 6479 Alarm check valve assmbly 0 Fire & Security System UK 28-Mar-16 17-Jan-17 24-Jan-17 28-Jan-17 P71168/EAS/JIC494 B
WLL
FF VARIOUS / Vijay Arabia 1. SFFECO & NEFFCO
50 J11FFMR09 Submittal 6841 Zone Control Valve assmbly 0 Fire & Security System UK 28-Mar-16 24-Jan-17 28-Jan-17 P71168/EAS/JIC492 B approved brand as per
WLL material sample
FF Sffeco / Vijay Arabia submitted on site. 2
51 J11FFMR10 Submittal 6779 Fire Extinguisher & Fire Blanket 0 Fire & Security System KSA 1-Jan-16 29-Dec-16 7-Jan-17 P71168/EAS/JIC448 B type of extingusisher
W.L.L
FF Sffeco / Vijay Arabia to be as per
52 J11FFMR11 Submittal 6356 Breeching Inlet 0 Fire & Security System KSA 30-Jan-17 30-Jan-17 30-Jan-17 4-Feb-17 D requirements &
W.L.L specifications.
FF
Sffeco / Vijay Arabia
53 J11FFMR11 Submittal 6356 Breeching Inlet 1 Fire & Security System KSA 30-Jan-17 5-Mar-17 7-Mar-17 P71168/EAS/JIC543 B
W.L.L

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 13 of 43


MECHANICAL MATERIALS
Last Updated on: 2-Apr-2017

PROJECT: AL JABER TWIN TOWER Approval Status


CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA
Submit hydraulic
COUNTRY OF EXPECTED DATE OF CONSULTANTS INCOMING calculation to verify
S/R NO. SUBMITTAL REF. DOCUMENT TYPE DIV. REF. NO. DESCRIPTION REV. NO. BRAND NAME SAMPLE SUB. DATE CONSULTANT REPLY STATUS COMMENTS
ORIGIN SUBMITTAL CORRESPONDENCE 1000GPM capacity of
pump is sufficient
1. Patterson brand+is
FF contractor compare
54 J11FFMR12 Submittal 6354 Fire Pump set & Accessories 0 Patterson USA 5-Sep-2016 5-Sep-2016 D approved, should
1. Use software forbe
electrical load
manufactured
hydraulic of
in the
calculationsUSA
FF equipment
Certificate
2. note thatof with
origin
this
55 J11FFMR12 Submittal 6354 Fire Pump set & Accessories 1 Patterson USA 12-Dec-2016 12-Dec-2016 14-Dec-2016 D electrical
should
calculation load as
be provided
will alsoperbe
IFC/
used/letter
upon sent2.toother
delivery
submitted toJEM
FF on 29/9/2016
accessories
QCDD ref 6516
in this
Patterson / Vijay submitfor approval
supplier's at
56 J11FFMR12 Submittal 6354 Fire Pump set & Accessories 2 USA 25-Dec-2016 25-Dec-2016 7-Jan-2016 P71168/EAS/JIC445 B submittal
the end ofisthe
prequalificationapproved
project.
+
Arabia as per attached
submit pumps
FF Hyhod or approved certifivates.
hydraulic/head 3.
57 J11FFMR13 Submittal 6619 FM 200 System 0 equals UK 30-Apr-16 10-Nov-16 12-Nov-16 D Hydraulic
calculationCalculation
together
& fina;
with approval/ letter
submittal of
FF system
sent to shall
JEM on be by
KIDDIE / Al- approving authority
58 J11FFMR13 Submittal 6619 FM 200 System 1 Namothajieh for Safety USA 2-Jan-17 10-Jan-17 28-Jan-17 P71168/EAS/JIC495 B 13/11/2016 ref 6627
-QCDD
and Fire

FF 1. no objection for
VIKING / Vijay Arabia
59 J11FFMR14 Submittal 6835 Automatic Air vent 0 Fire & Security System UK 28-Mar-16 17-Jan-2017 24-Jan-2017 28-Jan-2017 P71168/EAS/JIC493 B supplier. 2. quantity
WLL and size should be as
per requirements.
1. Pre-action
FF assembly/ System &
VIKING / Vijay Arabia Accessories by Viking
60 J11FFMR15 Submittal 6479 Preaction System 0 Fire & Security System USA 28-Mar-16 28-Dec-16 8-Jan-17 P71168/EAS/JIC499 B
W.L.L 2.No objection for
Viking as brand to be
used.
FF
Rapidrop/ VIKING /
61 J11FFMR16 Submittal 6357 Foam System 0 SIEMENS / TYCO USA 25-Aug-2016 28-Aug-2016 P71168/EAS/JIC287 B

Carrier / United
Technologies Building
62 J11HVMR01 Submittal HVAC Air Handling Units 0 & Industrial System Turkey 23-Apr-16 29-Jan-17 22-Feb-17 D
WLL
Carrier / United
Technologies Building
63 J11HVMR02 Submittal HVAC Fresh Air Handling Units 0 & Industrial System Turkey 23-Apr-16 29-Jan-17 22-Feb-17 D
WLL
Carrier / United
Technologies Building
64 J11HVMR03 Submittal HVAC 6799 Fan Coil Units 0 & Industrial System Malaysia 23-Apr-16 29-Jan-17 22-Feb-17 D
WLL

Denco or approved
65 J11HVMR04 Submittal HVAC CRAC Units 0 equals UK 24-Apr-16

Carrier / United
Technologies Building
66 J11HVMR05 Submittal HVAC 6848 Split AC units 0 & Industrial System KSA / Korea 22-Apr-16 29-Jan-17 13-Feb-17 D
WLL

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 14 of 43


MECHANICAL MATERIALS
Last Updated on: 2-Apr-2017

PROJECT: AL JABER TWIN TOWER Approval Status


CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

COUNTRY OF EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE DIV. REF. NO. DESCRIPTION REV. NO. BRAND NAME ORIGIN SUBMITTAL SAMPLE SUB. DATE CONSULTANT REPLY CORRESPONDENCE STATUS COMMENTS

1. compliance
Alfa laval thermal, Inc statement to be
67 J11HVMR06 Submittal HVAC Heat Exchanger 0 or approved equals USA 26-Apr-16
specified 2. In
equipement schedule
columns to be added
S&P / Leminar Air for fan speed where to
68 J11HVMR07 Submittal HVAC 6758 Exhaust Fan 0 Conditioning Co. L.L.C Spain 27-Apr-16 28-Dec-2016 12-Jan-2017 D be installed, ESP based
on, temperature of
fans & number of
poles. 3. Catalogue for
S&P / Leminar Air each fan model to be
69 J11HVMR07 Submittal HVAC 6758 Exhaust Fan 1 Conditioning Co. L.L.C Spain 27-Apr-16 12-Feb-2017 26-Feb-2017 D attached for separate /
each fan.

S&P / Leminar Air


70 J11HVMR07 Submittal HVAC 6758 Exhaust Fan 2 Conditioning Co. L.L.C Spain 27-Apr-16 20-Mar-17 25-Mar-17 D

WAITING FOR SITE DC


71 J11HVMR07A Submittal HVAC 6962 CO Sensors & Panel 0 KIMESA / Pro-Trading Switzerland 16-Mar-17 16-Mar-17 CONFIRMATION FOR SUBMISSION
submitTOsupplier's
CONSULTANT

prequalification +
Xylem (Bell & Gossett; submit pumps
Div. of hydraulic/head
72 J11HVMR08 Submittal HVAC 6593 Chilled Water Pump sets 0 ITT Industries) or USA 25-Mar-16 1-Nov-2016 12-Nov-16 D calculation together
with submittal / letter
Approved Equals sent to JEM on
13/11/2016 letter ref
Xylem-Bell & Gossett / 6626
73 J11HVMR08 Submittal HVAC 6593 Chilled Water Pump sets 1 FJ Trading & USA 25-Mar-16 2-Mar-17 15-Mar-17 D
Engineering Co WLL submit supplier's
prequalification +
submit pumps
XYLEM, ELBI & hydraulic/head
74 J11HVMR09 Submittal HVAC 6596 Chilled Water Pressurization units 0 REFLEX / FJ TRADING & UAE 25-Mar-16 1-Nov-2016 12-Nov-16 D calculation together
ENGINEERING with submittal / letter
sent to JEM on
13/11/2016 letter ref
XYLEM, ELBI & 6625
75 J11HVMR09 Submittal HVAC 6596 Chilled Water Pressurization units 1 REFLEX / FJ TRADING & UAE 25-Mar-16 13-Mar-17 16-Mar-17 UR
ENGINEERING

Xylem (Bell & Gossett)


76 J11HVMR10 Submittal HVAC 6956 Expansion Tank 0 / FJ TRADING & USA 25-Mar-16 13-Mar-17 16-Mar-17 28-Mar-17 D
CONTRACTING

steelmark middle east/


77 J11HVMR11 Submittal HVAC Chilled water pipes 0 Jindal India 17-Feb-2016 5-Mar-2016 P71168/EAS/JIC057 B

MECH/steelmark
78 J11HVMR12 Submittal HVAC Chilled water Fittings 0 middle east China 17-Feb-2016 5-Mar-2016 P71168/EAS/JIC060 B

79 J11HVMR13 Submittal HVAC 6248 Chilled Water Valves and 0 FlowconMe Italy 25-Aug-2016 28-Aug-2016 D not in vendor list +
Accessories sample needed

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 15 of 43


MECHANICAL MATERIALS
Last Updated on: 2-Apr-2017

PROJECT: AL JABER TWIN TOWER Approval Status


CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

COUNTRY OF EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE DIV. REF. NO. DESCRIPTION REV. NO. BRAND NAME ORIGIN SUBMITTAL SAMPLE SUB. DATE CONSULTANT REPLY CORRESPONDENCE STATUS COMMENTS
Resubmit with
80 J11HVMR14 Submittal HVAC Temperature and Pressure Gauges 0 Winters Canada 17-Feb-2016 3-Mar-2016 D providing
samples&compliance
statement
81 J11HVMR14 Submittal HVAC 6293 Temperature and Pressure Gauges 1 Winters Canada 10-Aug-16 15-Aug-2016 16-Aug-2016 P71168/EAS/JIC275 B

82 J11HVMR15 Submittal HVAC Vibration Isolators 0 VIMCO/JGB UK 17-Feb-2016 5-Mar-2016 P71168/EAS/JIC058 B

83 J11HVMR16 Submittal HVAC Chilled Water Pipe Insulation 0 Themobreak Thailand 17-Feb-2016 5-Mar-2016 P71168/EAS/JIC061 B

Grilles,Diffusers,Registers & Fresh Ruskin Company or


84 J11HVMR17 Submittal HVAC air louvers 0 approved equals USA 27-Feb-16

85 J11HVMR18 Submittal HVAC GI Duct & Accessories 0 ASMA Qatar/Jindal India 13-Feb-2016 29-Feb-16 P71168/EAS/JIC045 B

Duct insulation (Internal


86 J11HVMR19 Submittal HVAC &External) 0 Themobreak Thailand 17-Feb-2016 5-Mar-2016 B

87 J11HVMR20 Submittal HVAC VCD,FD,MVCD,MFSD damper 0 SAFID -Qatar Qatar 17-Feb-2016 3-Mar-2016 C

Provide brand from


88 J11HVMR20 Submittal HVAC 6189 VCD,FD,MVCD,MFSD damper 1 SAFID -Qatar Qatar 26-Jul-2016 2-Aug-2016 C vendor list
VCD,FD,MVCD,MFSD damper & SAFID / Gulf Facilities
89 J11HVMR20 Submittal HVAC 6189 2 Trading & Contracting Qatar 18-Jan-2017 19-Jan-2017 22-Jan-2017 P71168/EAS/JIC478 B
Access Door Co.
90 J11HVMR21 Submittal HVAC Duct Connector 0 Aerodyne Cooling USA 17-Feb-2016 5-Mar-2016 P71168/EAS/JIC054 B
Systems/ Durodyne
1. 2 hrs fire rated duct.
Aerodyne Cooling 2. sheet metal
91 J11HVMR22 Submittal HVAC Flexible Duct and accessories 0 Systems/ Durodyne UAE 17-Feb-2016 5-Mar-2016 P71168/EAS/JIC052 B
thiccknss of ducts to
beas per specssection
Dew chem Trading & 233. 4. cmply with
92 J11HVMR23 Submittal HVAC Chemical treatment system 0 contracting Qatar 19-Apr-2016 2-May-2016 B
smacna's hvac duct
construction standards
93 J11HVMR24 Submittal HVAC 6760 Fire Rated Duct 0 WINDUCT / ASMA Qatar 29-Dec-16 29-Dec-16 3-Jan-2017 P71168/EAS/JIC435 B 5.should be flanged
type (not riveted
Computer Support connection). 6.submitt
94 J11HVMR25 Submittal HVAC 6939 Precision Air Conditioning Units 0 Germany 30-Apr-16 9-Mar-17 20-Mar-17 D 1. Material
small duct sample
System / STULTZ "TEAMPRO" is
prior to fabrication 7.
approved as shall be
final approval
ELBI / FJ Trading & alternative material
by QCDD acceptance/ as
95 J11HVMR26 Submittal HVAC 6957 Air Separator 0 Engineering Co. W.L.L Italy 12-Mar-17 13-Mar-17 16-Mar-17 28-Mar-17 D per samples submitted
approval
2. selection of
CMW Hangers & Support for MEP supports to be used
96 J11CWMR01 Submittal 6633 Services 0 TEAM PRO GERMANY 25-Feb-16 17-Nov-2016 21-Nov-2016 P71168/EAS/JIC377 B wiil be as per
manufacturer
CMW Flexible & Expansion Joint For specification and
97 J11CWMR02 Submittal (PLM, Fire & Chilled) 0 VIMCO/JGB USA 25-Feb-16 17-Feb-2016 5-Mar-2016 P71168/EAS/JIC056 B recommendation 3.
material is not listed
CMW PE Petro or approved on approved vendor
98 J11CWMR03 Submittal Fuel Transfer System 0 equals USA 31-Mar-16 list & will be subject to
cost saving.
CMW
99 J11CWMR04 Submittal Waring Tape for MEP works 0 Qatar National Plastic Qatar 21-Feb-16 6-Apr-2016 19-Apr-2016 P71168/EAS/JIC141 B

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 16 of 43


MECHANICAL MATERIALS
Last Updated on: 2-Apr-2017

PROJECT: AL JABER TWIN TOWER Approval Status


CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

COUNTRY OF EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE DIV. REF. NO. DESCRIPTION REV. NO. BRAND NAME ORIGIN SUBMITTAL SAMPLE SUB. DATE CONSULTANT REPLY CORRESPONDENCE STATUS COMMENTS

SPMR Materials Should be as


100 J11SPMR01 Submittal 6438 Swimming Pool MEP Material 0 Metro Pool / IML Spain 15-Oct-16 4-Sep-2016 28-Sep-2016 D per spects
SPMR
101 J11SPMR01 Submittal 6438 Swimming Pool MEP Material 1 Metro Pool / IML Spain 15-Oct-16 7-Jan-2017 2-Feb-2017 D

102 J11SPMR01 Submittal SPMR 6438 Swimming Pool MEP Material 2 Metro Pool / IML Spain 15-Oct-16 9-Feb-2017 12-Feb-2017 P71168/EAS/JIC528 B

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 17 of 43


ELECTRICAL MATERIALS
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

S/R NO. SUBMITTAL REF. DOCUMENT TYPE REF. NO. DESCRIPTION REV. NO. BRAND NAME COUNTRY OF EXPECTED DATE OF SAMPLE SUB. DATE CONSULTANT REPLY CONSULTANTS INCOMING STATUS COMMENTS
ORIGIN SUBMITTAL CORRESPONDENCE

Jaidah Motors & Trading /


1 J11ELMR01 Submittal PVC Conduits & Accessories 0 Clipsal 13-Feb-16 28-Feb-16 P71168/EAS/JIC040 A
Qatar
2 J11ELMR02 Submittal UPVC Duct pipes and Fittings 0 Qatar Pipe line & Fittings 29-Feb-16 12-Apr-16 21-May-16 B
Qatari Cable Management Provide original catalouge for furse
3 J11ELMR03 Submittal Earthing & Lightning Protection 0 8-Feb-16 29-Feb-16 D & Shop Drawing
System
Furse /Qatari cable UK
4 J11ELMR03 Submittal 6184 Earthing & Lightning Protection 1 management 26-Jul-16 2-Aug-16 A
ICMS-Qatar /Qatari Cable
5 J11ELMR04 Submittal Cable Tray & Trunking System 0 29-Feb-16 1-Mar-16 19-Mar-16 D Resubmit with alternative brand
Management System
ICMS-Qatar /Qatari Cable Qatar
6 J11ELMR04 Submittal 6170 Cable Tray & Trunking System 1 26-Jul-16 2-Aug-16 D Provide Sample
Management System 1. Manufacturer Logo should be
engraved or bossed in the sample.
ICMS-Qatar /Qatari Cable Qatar 2. Provide samples as per QCS
7 J11ELMR04 Submittal 6170 Cable Tray & Trunking System 2 6-Nov-16 7-Nov-16 15-Nov-16 27-Nov-16 D standard for Perforated Cable Tray
Management System with cover, Multi Compartment
Trunk with cover, Cable Ladder &
Expanded Metal Qatar Earth
1. NotContinuity
complyingStrap.
with project specs
8 J11ELMR04 Submittal 6170 Cable Tray & Trunking System 3 28-Dec-16 28-Dec-16 7-Jan-16 C 2. 1.
sample
not inshows
vendorpoor quality
Manufacturing Co. material
list cost
study to&besubmitted
finish
control
2. use only
manufactured tray & accessories
ICMS-Qatar /Qatari Cable Qatar not site manufactured accessories
9 J11ELMR04 Submittal 6170 Cable Tray & Trunking System 4 7-Jan-16 9-Jan-17 11-Jan-17 P71168/EAS/JIC458 B 3.use only curved bends no sharp
Management System bends allowed4. tray sections
should be QCS APPROVED
ITCC-KSA&Thomas&Betts- REQUIREMENTS& AS PER PROJECT
Not Approved Resubmit with
SPECS.
10 J11ELMR05 Submittal EMT Conduits & Accessories 0 USA/Qatari Cable 1-Mar-16 19-Mar-16 D alternative brand
Management System
ITCC-KSA&Thomas&Betts- KSA/USA not in vendor list Resubmit with
11 J11ELMR05 Submittal 6182 EMT Conduits & Accessories 1 USA/Qatari Cable 26-Jul-16 2-Aug-16 C alternative brand
Management System
Rexway/Qatari cable Malaysia 16-Oct-16 out of vendor list JEM should send
12 J11ELMR05 Submittal 6182 GI Conduits & Accessories 2 16-Oct-16 16-Oct-16 20-Oct-16 C justification letter/ letter sent to
management JEM ref 6537 on 20/10/2016
1. Brand is out of vendor list. 2.
Rexway/Qatari cable Malaysia 19-Dec-16 19-Dec-16 3-Jan-16 proposed brand is approved
alternative brand. 3. Contractor to
11 J11ELMR05 Submittal 6182 GI Conduits & Accessories 3 management P71168/EAS/JIC436 B submitt cost saving study. 4. all
pipes to be class 4, hot dipped
galvinized.
Gland-CMP-UK, Lugs-
12 J11ELMR06 Submittal Cable Glands & Lugs 0 Kompress-UK/Qatari Cable 29-Feb-16 1-Mar-16 19-Mar-16 D Resubmit with 630 mm sample size
1. approved (CMP-UK), all glands
Management System are provided from one
Gland-CMP-UK, Lugs- UK 19-Dec-16 19-Dec-16 8-Jan-17 manufacturer. 2. Cable gland should
fully matching & correcting sizw
13 J11ELMR06 Submittal 6736 Cable Glands 1 Kompress-UK/Qatari Cable P71168/EAS/JIC451 B 1. Approved
with cable sizes.(Kompress
3. countryUK) 2.
of origin
Management System Cable
and test
formatching
Lugs should
certificate
final approval
besubmitted
to be
with cable
fully
sizes.
during 3.
delivery
Gland-CMP-UK, Lugs- UK 19-Dec-16 31-Dec-16 8-Jan-17 Contractor to use correct
inspection.
J11ELMR06A Submittal Cable Lugs 1 Kompress-UK/Qatari Cable P71168/EAS/JIC450 B compression tools as per
manufacturer recommendation 3.
Management System Country of Origin and test
Italy certificate to be submitted for final
approval.
14 J11ELMR07 Submittal Transformer 0 Engineering Supplies / Tesar 16-Jul-16 2-Aug-16 B
precicion industries UK
15 J11ELMR08 Submittal 6191 Generator 0 26-Jul-16 2-Aug-16 C Brand not as vendor list

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 18 of 43


ELECTRICAL MATERIALS
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

S/R NO. SUBMITTAL REF. DOCUMENT TYPE REF. NO. DESCRIPTION REV. NO. BRAND NAME COUNTRY OF EXPECTED DATE OF SAMPLE SUB. DATE CONSULTANT REPLY CONSULTANTS INCOMING STATUS COMMENTS
ORIGIN SUBMITTAL CORRESPONDENCE

Qatar 27-Dec-16 27-Dec-16 11-Jan-17


16 J11ELMR08 Submittal 6191 Generator 1 Cummins / Ertibat Engineer C 1. provide cummins uk not uae

MEGABARRE Italy provide cataloug with the required


17 J11ELMR09 Submittal 6269 Busbar 0 4-Aug-16 22-Aug-16 D sizes as per approved drawing/
letter sent to JEM on 23/8/2016
provide original catalougn, provide
MEGABARRE Italy 10-Oct-16 full technical submittal, provide
18 J11ELMR09 Submittal 6269 Busbar 1 10-Oct-16 15-Oct-16 D country of origin cerificate, out of
1.vendor
Brandlist/ letter
is out sent to JEM
of vendorlist 2. on
out
15/10/2016
of vendor ref 6532
list material to be
Italy 24-Oct-16 provide sample
technically
cross
sutied showing
section & insulation
copper
and present
/
cost
letter
19 J11ELMR09 Submittal 6269 Busbar 2 MEGABARRE / Al-Faraj 24-Oct-16 12-Nov-16 D saving study. 3. proposed brand is
sent to JEM on 13/11/2016 letter
approcved alternative 4. contractor
to submit costref 6624stuudy 5. fire
saving
Italy 27-Dec-16 27-Dec-16 3-Jan-16 barriers should be used when
busbar is passing to a wall 6. bus
20 J11ELMR09 Submittal 6269 Busbar 3 MEGABARRE / Al-Faraj D bar supports shall be matching site
condition with intervals not
exceed Kahramaa and &
Italy 27-Dec-16 25-Mar-17 manufacturer requirements. 7.
21 J11ELMR09 Submittal 6269 Busbar 4 MEGABARRE / Al-Faraj B resubmit detail ed bill of quantity
Qatar with support ive busbar shop
drawing with details & cross section
(2D & 3D)
Italy 2-Jan-16
ABB / Faisal Jassim Trading WAITING FOR SITE DC
22 J11ELMR10 Submittal SMDBs 0 Co. LLC 5-Apr-16 CONFIRMATION FOR SUBMISSION
TO CONSULTANT

Italy 2-Jan-16
23 J11ELMR11 Submittal 6780 DBs 0 ABB / Faisal Jassim Trading 5-Apr-16
WAITING FOR SITE DC
CONFIRMATION FOR SUBMISSION
Co. LLC TO CONSULTANT

Italy
LVP, BATTERY CHARGER & CAP ABB / Faisal Jassim Trading
24 J11ELMR12 Submittal 6785 BANK 0 Co. LLC 5-Apr-16 2-Jan-17 CHANGE OF SUPPLIER

Italy
LVP, BATTERY CHARGER & CAP ABB / International Trading 1. Provide approcal of the
23 J11ELMR12 Submittal 6785 BANK 0 & Contracting Co. W.L.L 5-Apr-16 8-Jan-17 28-Jan-17 D subcontractor.

National cable industry/ OMAN


25 J11ELMR13 Submittal Cables & Wires 0 ASMA 12-Apr-2016 19-Apr-2016 P71168/EAS/JIC144 B

26 J11ELMR14 Submittal Lighting Fixtures 0 30-Apr-16

SCHNEIDER / Integra France


27 J11ELMR15 Submittal 6793 Lighting & Dimming control Panel 0 International Trading & 25-Mar-16 9-Jan-17 D
Contracting Co. WLL
USA
WAITING FOR SITE DC
28 J11ELMR15 Submittal 6793 Lighting & Dimming control Panel 1 Creston / E-MediaNet-Qatar 25-Mar-16 6-Mar-17 CONFIRMATION FOR SUBMISSION
TO CONSULTANT

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 19 of 43


ELECTRICAL MATERIALS
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

S/R NO. SUBMITTAL REF. DOCUMENT TYPE REF. NO. DESCRIPTION REV. NO. BRAND NAME COUNTRY OF EXPECTED DATE OF SAMPLE SUB. DATE CONSULTANT REPLY CONSULTANTS INCOMING STATUS COMMENTS
ORIGIN SUBMITTAL CORRESPONDENCE

France
SCHNEIDER / Integra
29 J11ELMR16 Submittal 6793 Occupency sensors 0 International Trading & 25-Mar-16 9-Jan-17 D
Contracting Co. WLL

USA
WAITING FOR SITE DC
30 J11ELMR16 Submittal 6793 Occupency sensors 1 Creston / E-MediaNet-Qatar 25-Mar-16 6-Mar-17 CONFIRMATION FOR SUBMISSION
TO CONSULTANT

BMS (Building Management Honeywell or approved USA


31 J11ELMR17 Submittal System) 0 equals 23-Apr-16

ASTROPHYSICS / Hanwa USA


32 J11ELMR18 Submittal Access control System 0 15-Mar-16
Techwin
Germany
BOSCH, Integra, CMX, WAITING FOR SITE DC
33 J11ELMR19 Submittal 6949 Public Address (P.A) system 0 NETX / E-MediaNet Qatar 16-Mar-16 6-Mar-17 CONFIRMATION FOR SUBMISSION
TO CONSULTANT
WLL

Bosch / Various / Argon USA 1. Material is china made. 2.


structural cable is not as pe venue
34 J11ELMR20 Submittal 6818 CCTV System 0 Global Security Services 24-Apr-16 17-Jan-17 28-Jan-17 C light and accessories. 3. Equipment
not comply with specs.

WISI / LINK & SHIELD German


35 J11ELMR21 Submittal 6846 IPTV System 0 16-Mar-16 29-Jan-17 4-Feb-17 D
TECHNOLOGIES
Qatar
TRIAX, FLAMINGO, ANEIVA, WAITING FOR SITE DC
36 J11ELMR21 Submittal 6846 IPTV System 1 DELL & AMINO / E- 16-Mar-16 6-Mar-17 CONFIRMATION FOR SUBMISSION
TO CONSULTANT
MediaNet Qatar W.L.L
1. UPS should have maintenance
SCHNEIDER / Integra France bypass & isolating transformers as
37 J11ELMR22 Submittal 6823 UPS system 0 International Trading & 17-Mar-16 14-Jan-17 28-Jan-17 D per project specs. 2. batteries to to
necal cadium as per project specs.
Contracting Co. WLL 3. batteries to be factory assembled
SCHNEIDER / Integra France 1. Batterires to be factory
assembled 2. make load
38 J11ELMR22 Submittal 6823 UPS system 1 International Trading & 17-Mar-16 19-Feb-17 2-Mar-17 D calculations & sizzing calculations.
3. Provide UPS quality as per
Contracting Co. WLL project required.

39 J11ELMR23 Submittal Central Battary System 0 10-Apr-16


Switzerland not in vendor list submit alternative
40 J11ELMR24 Submittal 6294 Fire Alarm System 0 Vijay arabia / SIEMENS 25-Aug-16 6-Sep-16 D brand/ letter sent to JEM 9/6/2016
ref 6484
1. Explaination of the found
Switzerland enclosed material catalogues from
3 different company ( Siemens,
41 J11ELMR24 Submittal 6294 Fire Alarm System 1 Vijay arabia / SIEMENS 6-Nov-16 6-Nov-16 6-Nov-16 15-Nov-16 D Xtrails & Crowcon) 2. Materials
from Xtrails have no certificates
attaced
Switzerland
42 J11ELMR24 Submittal 6294 Fire Alarm System 2 Vijay arabia / SIEMENS 25-Dec-16 25-Dec-16 26-Jan-17 D

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 20 of 43


ELECTRICAL MATERIALS
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

S/R NO. SUBMITTAL REF. DOCUMENT TYPE REF. NO. DESCRIPTION REV. NO. BRAND NAME COUNTRY OF EXPECTED DATE OF SAMPLE SUB. DATE CONSULTANT REPLY CONSULTANTS INCOMING STATUS COMMENTS
ORIGIN SUBMITTAL CORRESPONDENCE

Switzerland 1. It is recommended to use single


43 J11ELMR24 Submittal 6294 Fire Alarm System 3 Vijay arabia / SIEMENS 25-Dec-16 19-Feb-17 4-Mar-17 D manufacturer for fire alarm.

USA
NEXANS / E-MediaNet- WAITING FOR SITE DC
44 J11ELMR25 Submittal 6951 Structured Cabling System 0 Qatar W.L.L 12-Apr-16 6-Mar-17 CONFIRMATION FOR SUBMISSION
TO CONSULTANT

UK 1. Resubmit for ID & owners


approval 2.Provide sample for
Crab Tree / Gazzaoui & metal and decorative finishes. 3.
45 J11ELMR26 Submittal 6889 Wiring Accessories 0 Partners 30-Mar-16 19-Feb-17 2-Mar-17 D provide full range of product
caltalogue. 4. Provide list
showing ,ocation of all finishing
types.
Germany
OBO Ackermann / Gazzaoui 1. provide sample for 3 phase floor
46 J11ELMR27 Submittal 6884 Floor Box 0 30-Mar-16 6-Feb-17 19-Feb-17 2-Mar-17 D
& Partners box.

Wrexham-UK/Al Mehrab
47 J11ELMR28 Submittal MICC Wires 0 Trading & Contracting UK 6-Apr-16 6-Apr-16 19-Apr-2016 P71168/EAS/JIC142 B

ABB/Jaidah motors & provide sample and type + provide


48 J11ELMR29 Submittal Isolators 0 trading Co Italy 14-Apr-16 19-Apr-2016 D holes 25mm

ABB/Jaidah motors & 1. Cable aluminum


provide Entry should bewith
type from
49 J11ELMR29 Submittal 6185 Isolators 1 Italy 26-Jul-16 2-Aug-16 D
trading Co bottom
sample side 2. isolators shall be as
aproved shop drawings &
equipment ratings 3. contractor to
ABB/Jaidah motors & provide submittal requirements
50 J11ELMR29 Submittal 6185 Isolators 2 Italy 6-Nov-16 7-Nov-16 15-Nov-16 27-Nov-16 P71168/EAS/JC-378 B certificates like country of origin
trading Co and warranty and guaranty
certificates prior to delivery of
materials 4. Contractor shall
provide spare parts as per specs
51 J11ELMR30 Submittal Fire Resistance Cables 0 Firecell/Mehrab Italy 20-Apr-16 20-Apr-16 29-May-16 C and QCS.

52 J11ELMR30 Submittal 6183 Fire Resistance Cables 1 Firecell/Mehrab Italy 26-Jul-16 2-Aug-16 B

ASTROPHYSICS / Hanwa 1. provide the approval of


53 J11ELMR31 Submittal 6759 Security Access Detection 0 USA 28-Dec-16 28-Dec-16 28-Jan-17 D subcontractor prior to the study of
Techwin the material.
1. CONTRACTOR TO USE DEEP BOX
54 J11ELMR32 Submittal 6671 GI Box & Accessories 0 SCHNEIDER Qatar 26-Nov-16 26-Nov-16 10-Dec-16 P71168/EAS/JC-411 B (47mm) thick as per selected in
catalogue 2. material is out of
ELECTRIC/Jaidah Electric vendor list approved as cost saving

ABB / Faisal Jassim Trading WAITING FOR SITE DC


55 J11ELMR33 Submittal 6783 MCC Panel 0 Co. LLC KSA 1-Jan-17 1-Jan-17 CONFIRMATION FOR SUBMISSION
TO CONSULTANT

DRAKA / ECS GLOBAL WIRE


56 J11ELMR34 Submittal 6821 FTP Cables 0 UK 14-Jan-17 14-Jan-17 15-Feb-17 P71168/EAS/JC-522 B
& CABLE WLL

CISA, DELL & SUPER MICRO / E- WAITING FOR SITE DC


57 J11ELMR35 Submittal 6950 Electronic Keycard System 0 MediaNet Qatar W.L.L USA 5-Mar-17 6-Mar-17 CONFIRMATION FOR SUBMISSION
TO CONSULTANT

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 21 of 43


ELECTRICAL MATERIALS
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

S/R NO. SUBMITTAL REF. DOCUMENT TYPE REF. NO. DESCRIPTION REV. NO. BRAND NAME COUNTRY OF EXPECTED DATE OF SAMPLE SUB. DATE CONSULTANT REPLY CONSULTANTS INCOMING STATUS COMMENTS
ORIGIN SUBMITTAL CORRESPONDENCE

Crab Tree / Qatari Cable


58 J11ELMR36 Submittal 6910 Ceiling Rose 0 UK 27-Mar-17 29-Mar-17 29-Mar-17 UR
Management System

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 22 of 43


PRE-QUALIFICATION ELECTRICAL
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

S/R NO. SUBMITTAL REF. DOCUMENT TYPE REF. NO. DIVISION DESCRIPTION REV. NO. BRAND NAME COUNTRY OF EXPECTED DATE OF SUB. DATE CONSULTANT REPLY CONSULTANTS INCOMING STATUS COMMENTS
ORIGIN SUBMITTAL CORRESPONDENCE

1 J11-ELSC-01 Pre-Qualification ELECTRICAL SMDBs, Dbs & LV Pannel 0

2 J11-ELSC-02 Pre-Qualification ELECTRICAL BMS (Building Management System) 0

3 J11-ELSC-03 Pre-Qualification ELECTRICAL CCTV System 0

26-Jan-17 29-Jan-17
WISI / LINK & SHIELD
4 J11-ELSC-04 Pre-Qualification 6845 ELECTRICAL IPTV System 0 TECHNOLOGIES C

5 J11-ELSC-05 Pre-Qualification ELECTRICAL Telephone Data & Computer system 0

24-Dec-16 24-Dec-16
Faisal Jassim Trading
6 J11-ELSC-06 Pre-Qualification 6742 ELECTRICAL Switch Gear 0 Co. LLC/ Pro-Master
CANCELLED SUPPLIER

Integra International 8-Jan-16 10-Jan-17 26-Jan-17


6 J11-ELSC-06 Pre-Qualification 6742 ELECTRICAL Switch Gear 0 Trading & Contracting D
Co.
28-Dec-16 28-Dec-16 26-Jan-17
ASTROPHYSICS /
7 J11-ELSC-07 Pre-Qualification 6755 ELECTRICAL Security Access Detection 0 Hanwa Techwin D

Integra International 7-Jan-17 9-Jan-17 18-Jan-17 1. objection on the approval


8 J11-ELSC-08 Pre-Qualification 6788 ELECTRICAL UPS 0 Trading & Contracting P71168/EAS/JC/471 B of suplier Integra
International Tading &
Co. Contracting.
1. proposed subcontractor
8-Jan-17 8-Jan-17 18-Jan-17 introduced schneider elctric
authorization letter while
SCHNEIDER / Integra most project reference are
9 J11-ELSC-09 Pre-Qualification 6797 ELECTRICAL LIGHTING CONTROLL SYSTEM 0 International Trading & D ABB kindly attached
Contracting Co. W.L.L previews approvals for
schneider and consultant
approvals and arrange site
14-Jan-17 14-Jan-17 26-Jan-17 visit.
ARGON GLOBAL
10 J11-ELSC-10 Pre-Qualification 6824 ELECTRICAL CCTV System 0 SECURITY SERVICES P71168/EAS/JC/486 B

30-Jan-17 1-Feb-17 2-Feb-17


LS Cable System/
11 J11-ELSC-11 Pre-Qualification 6851 ELECTRICAL Busbar 0 Jaidah Electrical P71168/EAS/JC/500 B

30-Jan-17 1-Feb-17 2-Feb-17


ECS GLOBAL WIRE &
12 J11-ELSC-12 Pre-Qualification 6852 ELECTRICAL FTP Cables 0 CABLE WLL P71168/EAS/JC/499 B

13 J11-ELSC-13 Pre-Qualification 6883 ELECTRICAL Wiring Accessories & Floor Boxes 0 Gazzaoui & Qatar 42772 42774 42781 P71168/EAS/JC/521 B
Partners WLL

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 23 of 43


PRE-QUALIFICATION ELECTRICAL
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

S/R NO. SUBMITTAL REF. DOCUMENT TYPE REF. NO. DIVISION DESCRIPTION REV. NO. BRAND NAME COUNTRY OF EXPECTED DATE OF SUB. DATE CONSULTANT REPLY CONSULTANTS INCOMING STATUS COMMENTS
ORIGIN SUBMITTAL CORRESPONDENCE

Light Control System, Occupancy Sensor,


Public Address System, IPTV System, E-MediaNet Qatar
14 J11-ELSC-14 Pre-Qualification 6948 ELECTRICAL Structured Cabling System & Electronic 0 W.L.L. Qatar 6-Mar-17 25-Mar-17 C
Keycard System

15 J11-ELSC-15 Pre-Qualification 6911 ELECTRICAL BMS (Building Management System) 0 AL JABER POWER Qatar 28-Mar-17 28-Mar-17
WAITING FOR SITE DC
CONFIRMATION FOR SUBMISSION
TECHNOLOGY TO CONSULTANT

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 24 of 43


PRE-QUALIFICATION MECHANICAL
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE DIVISION REF. NO. DESCRIPTION REV. NO. BRAND NAME SUBMITTAL SUB. DATE CONSULTANT REPLY CORRESPONDENCE STATUS COMMENTS

1. Contractor needs to submit


1 J11-MCSC-01 Pre-Qualification MECHANICAL 6684 Steam Boilers & Calorifires 0 Hotline Industrial 30-Nov-16 30-Nov-16 4-Dec-16 D list of ongoing or finished
Equipment Co. WLL projects in Qatar for site visit/
inspection.
1.no objection to Hotline
Industrial Equipment as a
subcontractor for boiler
Hotline Industrial ("BYWORTH" Brand) 2.
1 J11-MCSC-01 Pre-Qualification MECHANICAL 6684 Steam Boilers & Calorifires 1 Equipment Co. WLL 30-Nov-16 8-Jan-17 14-Jan-17 P71168/EAS/JC/464 B Contractor to resubmit propose
boiler as per project
specification complete with all
(replynecessary
sent to JEM
documents.
8/30/2016
ref 6423) consultant should be
Fire fighting, FM200, Foam, Fire Vijay Arabia Fire & notified Before subcontractor
2 J11-MCSC-02 Pre-Qualification MECHANICAL 0 15-Aug-16 28-Aug-16 B
Alarm System & Fire Pumpset Security /SIEMENS starts working in site + full time
site engineer by subcontractor
shoul be in site
out of vendor list, more
information needed, list of
Al-Namothajieh for projects accomplished in qatar
3 J11-MCSC-02A Pre-Qualification MECHANICAL Fire Safety, FM200 0 safety & fire system 10-Nov-16 10-Nov-16 12-Nov-2016 D needed & organizational
structure is blank/ letter sent
on 13/11/2016 ref 6629
1. provide previews approval s
by consultant/client 2. provide
Al-Namothajieh for completion certificate of
4 J11-MCSC-02A Pre-Qualification MECHANICAL 6683 Fire Safety, FM200 1 safety & fire system 30-Nov-16 30-Nov-16 7-Dec-16 D 1. your contractor
previews projects
must present
3. site
completion certificate of his
inspection
project herefor
inproject done
qatar. (his or
work
ongoing /passed
must be approved
QCDD Inspection ) 2. The
Al-Namothajieh for consultant holds the right for
5 J11-MCSC-02A Pre-Qualification MECHANICAL 6683 Fire Safety, FM200 2 safety & fire system 2-Jan-17 2-Jan-17 7-Jan-17 P71168/EAS/JC/447 B other site inspection to your
subcontractor. 3. You need to
submit another subcontractor
forNo
1. same FM200
objection on work as plan B
proposed
STULTZ / Computer in case
material your2.subcontractor
brand. Contractor to
submitcannot
as percomply
project with our
5 J11-MCSC-03 Pre-Qualification MECHANICAL 6946 Precision Air Conditioning Units 0 2-Mar-17 5-Mar-17 7-Mar-17 P71168/EAS/JC/544 B requirements. 3.
specificationrequirements.
material to be submitted from
country of origin specified in
Support System submittal.

6 J11-MCSC-04 Pre-Qualification MECHANICAL Fuel Transfer System 0

Gazzaoui & Partners- 1. no objection on the subcon


7 J11-MCSC-05 Pre-Qualification MECHANICAL 6669 Domestic Pumps 0 Qatar W.L.L 26-Nov-16 26-Nov-16 30-Nov-16 P71168/EAS/JC/398 B 2. products should be man

8 J11-MCSC-06 Pre-Qualification MECHANICAL 6670 Chilled Water Pump 0 FJ TRADING & 26-Nov-16 26-Nov-16 30-Nov-16 P71168/EAS/JC/399 B
ENGINEERING Co. W.L.L

S&P / Laminar Air 1. No objection to S&P as


supplier for HVAC power
ventilatorsl; listed in vendor list.
9 J11-MCSC-07 Pre-Qualification MECHANICAL 6751 Exhaust Fan 0 25-Dec-16 25-Dec-16 P71168/EAS/JC/446 B 2. contractor to submitt
material submittal as per
Conditiioning Co LLC specifications.

VCD,FD,MVCD,MFSD damper & SAFID / Gulf Facilities


10 J11-MCSC-08 Pre-Qualification MECHANICAL 6838 Access Door 0 Trading & Contracting 18-Jan-17 19-Jan-17 21-Jan-17 P71168/EAS/JC/474 B
Co.

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 25 of 43


PRE-QUALIFICATION MECHANICAL
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

EXPECTED DATE OF CONSULTANTS INCOMING


S/R NO. SUBMITTAL REF. DOCUMENT TYPE DIVISION REF. NO. DESCRIPTION REV. NO. BRAND NAME SUBMITTAL SUB. DATE CONSULTANT REPLY CORRESPONDENCE STATUS COMMENTS

Carrier / United
13 J11-MCSC-09 Pre-Qualification MECHANICAL 6780 Fan Coil Units 0 Technologies Building & 11-Jan-17 11-Jan-17 23-Jan-2017 P71168/EAS/JC/482 B
Industrial System WLL

Air Handling Units & Fresh Air Carrier / United


12 J11-MCSC-10 Pre-Qualification MECHANICAL 6799 0 Technologies Building & 11-Jan-17 11-Jan-17 23-Jan-2017 P71168/EAS/JC/483 B
Handling Units Industrial System WLL

Teyseer Industrial
13 J11-MCSC-11 Pre-Qualification MECHANICAL 6839 FF- ERW Pipes & FF-Threaded 0 Supplies & Services Co. 18-Jan-17 19-Jan-17 21-Jan-2017 P71168/EAS/JC/475 B CHANGE OF SUPPLIER
Fittings & Grooved Fittings
W.L.L

Jinda / Steelmark
14 J11-MCSC-12 Pre-Qualification MECHANICAL 6888 FF -ERW Pipes & Fittings 0 Middle East WLL 6-Feb-17 8-Feb-17 13-Feb-17 D

Jinda / Steelmark 1. CONFIRMATION FROM SUPPLIER


15 J11-MCSC-12 Pre-Qualification MECHANICAL 6888 FF -ERW Pipes & Fittings 1 Middle East WLL 6-Feb-17 20-Feb-17 26-Feb-17 P71168/EAS/JC/532 D STATING CLEARLY THAT SHORTAGE
IN SUPPLY FOR THE ITEM.

1. No objection with the prepared


Jinda / Steelmark brand. 2. During installation do not
16 J11-MCSC-12 Pre-Qualification MECHANICAL 6888 FF -ERW Pipes & Fittings 2 Middle East WLL 6-Feb-17 5-Mar-17 7-Mar-17 P71168/EAS/JC/545 B mix different brands on one legth
pipe installation.

ITRON WATER
17 J11-MCSC-13 Pre-Qualification MECHANICAL 6909 Water Meter 0 METERS / FLOW TECH 27-Mar-17 27-Mar-17 1-Apr-17 B
SYSTEMS

Roof Drain, Floor Drain, Floor WAITING FOR SITE DC


18 J11-MCSC-14 Pre-Qualification MECHANICAL 6984 Clean out & Floor gullies 0 Dallmar / Al Tayeb 9-Apr-17 9-Apr-17 CONFIRMATION FOR SUBMISSION
TO CONSULTANT

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 26 of 43


PRE-QUALIFICATION STRUCTURAL ARCHITECTURAL
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

S/R NO. SUBMITTAL REF. DOCUMENT TYPE DIVISION REF. NO. DESCRIPTION REV. NO. BRAND NAME EXPECTED DATE OF SUB. DATE CONSULTANT REPLY CONSULTANTS INCOMING STATUS COMMENTS
SUBMITTAL CORRESPONDENCE

International Technical
1 J11-SC-01 Pre-Qualification STR Laboratory Testing 0 Laboratory 11-Jan-16 11-Jan-16 12-Jan-16 P71168/EAS/JC001 A

Arab Center for Engineering


2 J11-SC-01A Pre-Qualification STR Laboratory Testing 1 Studies 8-Feb-16 8-Feb-16 10-Mar-16 P71168/EAS/JIC069 B

3 J11-SC-02 Pre-Qualification STR Anti-Termite Treatment 0 General Hygenic Control 8-Feb-16 8-Feb-16 20-Feb-16 B

4 J11-SC-03 Pre-Qualification STR Waterproofing Sub-Structural 1 JSPC 10-Feb-16 10-Feb-16 7-Apr-16 B

6 J11-SC-04 Pre-Qualification STR MEP Subcontractor 0 Al jeber Electro Mechanical 10-Jan-16 10-Jan-16 12-Jan-16 P71168/EAS/JC002 A

7 J11-SC-05A Pre-Qualification STR Waterproofing Super-Structure 0 TADMUR Roofs & Pools 11-Apr-16 11-Apr-16 2-May-16 B Table of Content
needed + method
statement +warranty
Bitumode Qatar sample for the
8 J11-SC-05B Pre-Qualification STR 6613 Waterproofing Super-Structure 0 9-Nov-16 9-Nov-16 13-Nov-16 D material + HSE policy +
Waterproofing Factory
product certificate of
origin
9 J11-SC-06 Pre-Qualification STR 6270 Structural steel 0 General Syndicate 4-Aug-16 4-Aug-16 11-Aug-16 C out of vendor list

9 J11-SC-06 Pre-Qualification STR 6270 Structural steel 1 General Syndicate 4-Aug-16 15-Jan-17 28-Jan-17 P71168/EAS/JIC496 B

10 J11-SC-07A Pre-Qualification STR Formwork 1 ACROW Formwork 20-Mar-16 20-Mar-16 26-Mar-16 P71168/EAS/JIC105 A
Site organization chart
& Manpower needed
11 J11-SC-07B Pre-Qualification STR 6408 Formwork 0 TMS 29-Aug-16 29-Aug-16 4-Sep-16 D + HSEG Plan to submit
+ Scope of work
1-Feb-17
12 J11-SC-08 Pre-Qualification ARCH Traffic Coating 0 BASF

13 J11-SC-09 Pre-Qualification ARCH Carpentary works 0 SAFARI Project Suppliers 11-Apr-16 11-Apr-16 13-Jun-16 C Bad experience with consultant

Schindler Elevators & Resubmit with 3 hard


14 J11-SC-10A Pre-Qualification ARCH Elevators & Escalators 0 Escalators 15-Oct-16 9-Mar-16 10-Mar-16 D copies / cancelled

15 J11-SC-10B Pre-Qualification ARCH Elevators & Escalators 0 KONE 15-Oct-16 9-Mar-16 19-Mar-16 D Method statement needed

16 J11-SC-10B Pre-Qualification ARCH 6600 Elevators & Escalators 1 KONE 1-Nov-16 1-Nov-16 6-Nov-16 P71168/EAS/JIC359 B

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 27 of 43


PRE-QUALIFICATION STRUCTURAL ARCHITECTURAL
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

S/R NO. SUBMITTAL REF. DOCUMENT TYPE DIVISION REF. NO. DESCRIPTION REV. NO. BRAND NAME EXPECTED DATE OF SUB. DATE CONSULTANT REPLY CONSULTANTS INCOMING STATUS COMMENTS
SUBMITTAL CORRESPONDENCE

17 J11-SC-10C Pre-Qualification ARCH Elevators & Escalators 0 HITACHI 15-Oct-16 10-Mar-16 10-Mar-16 D cancelled

18 J11-SC-10D Pre-Qualification ARCH 5630 Elevators & Escalators 0 TOSHIBA 15-Oct-16 18-Apr-16 4-May-16 D cancelled

Detailed methodology
19 J11-SC-10E Pre-Qualification ARCH 6168 Elevators & Escalators 0 MITSUBISHI 15-Oct-16 26-Jul-16 27-Jul-16 P71168/EAS/JIC258 A have to submit
Bad experience with
consultant and poor
20 J11-SC-10F Pre-Qualification ARCH 6169 Elevators & Escalators 0 ThyssenKrupp 15-Oct-16 26-Jul-16 25-Aug-16 P71168/EAS/JIC285 C Document
quality as perfor
his
completion/certificate
comments cancelled
with the name of oryx
21 J11-SC-11 Pre-Qualification ARCH 6341 Marble and Granite 0 ORYX 20-Aug-16 20-Aug-16 27-Aug-16 D + legal document
shows that elalfy is the
22 J11-SC-11 Pre-Qualification ARCH 6341 Marble and Granite 1 ORYX 10-Oct-16 10-Oct-16 15/10/2016 P71168/EAS/JIC332 B same as oryx

23 J11-SC-12 Pre-Qualification ARCH 5612 Aluminum & Glazing works 0 SASCO 18-Apr-16 18-Apr-16 5-May-16 P71168/EAS/JIC166 B
1-Dec-16
24 J11-SC-12A Pre-Qualification ARCH Aluminum & Glazing works 0
Method statement
25 J11-SC-13 Pre-Qualification ARCH 5692 Painting 0 JOTUN 27-Apr-16 27-Apr-16 8-May-16 D needed + Table of
content + valid trade
licence
26 J11-SC-13 Pre-Qualification ARCH 5692 Painting 1 JOTUN 8-Jun-16 8-Jun-16 12-Jun-16 A

27 J11-SC-13A Pre-Qualification ARCH 5883 Painting 0 National Paints 8-Jun-16 8-Jun-16 14-Jun-16 C Table
out of of content
vendor list
needed+management
structure of the
Gypsum works, Ceilling & Toilet company+method
28 J11-SC-14 Pre-Qualification ARCH 5693 Cubicles 0 AJASCO VISION 27-Apr-16 27-Apr-16 8-May-16 D
statement+HSE policy
Jascon Trading &
29 J11-SC-14A Pre-Qualification ARCH 6916 Gypsum & Ceilling Works 0 Contracting 28-Mar-17 28-Mar-17 28-Mar-17 UR

29 J11-SC-15 Pre-Qualification ARCH 6198 Swimming Pool 0 Metro Pools 26-Jul-16 26-Jul-16 3-Aug-16 B
1-Dec-16 17-Jan-17 26-Jan-17

30 J11-SC-16 Pre-Qualification ARCH 6829 Building Maintenance Unit 0 ATECHBCN / Unitrac C 1. out of vendor list
Trading & Contracting Co.

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 28 of 43


PRE-QUALIFICATION STRUCTURAL ARCHITECTURAL
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

S/R NO. SUBMITTAL REF. DOCUMENT TYPE DIVISION REF. NO. DESCRIPTION REV. NO. BRAND NAME EXPECTED DATE OF SUB. DATE CONSULTANT REPLY CONSULTANTS INCOMING STATUS COMMENTS
SUBMITTAL CORRESPONDENCE

1-Dec-16 9-Feb-17 18-Feb-17


1. Have to include management
strucutre 2. have to submitt shop
ATECHBCN / Unitrac drawing sample 3. have to include
31 J11-SC-16 Pre-Qualification ARCH 6829 Building Maintenance Unit 1 Trading & Contracting Co. D site organization chart 4. have to
submitt previews approval &
completion certificate.

1-Dec-16 26-Feb-17 9-Mar-17


ATECHBCN / Unitrac 1. Provide the method of statement
32 J11-SC-16 Pre-Qualification ARCH 6829 Building Maintenance Unit 2 Trading & Contracting Co. P71168/EAS/JIC548 B 2. Provide the material submittal.

32 J11-SC-17 Pre-Qualification ARCH Fountains 0 Culligan or approved equals 1-Feb-17

1-Dec-16
33 J11-SC-18 Pre-Qualification ARCH GRC works 0
STR Modern Emirates Heavy
34 J11-SC-19 Pre-Qualification Tower Crane 1 Cranes 20-Mar-16 20-Mar-16 26-Mar-16 P71168/EAS/JIC106 B
STR
35 J11-SC-19A Pre-Qualification Tower Crane 1 United Equipment Group 9-Apr-16 9-Apr-16 14-Apr-16 P71168/EAS/JIC134 B
ARCH
36 J11-SC-20A Pre-Qualification 6232 Garbage chute 0 Unitech 1-Aug-16 1-Aug-16 7-Aug-16 D include previous work experience
Detailed scope of work
ARCH needed + completion
37 J11-SC-20A Pre-Qualification 6232 Garbage chute 1 Unitech 13-Aug-16 13-Aug-16 24-Aug-16 D certificates for similar
project and similar
ARCH case to be presented
38 J11-SC-20A Pre-Qualification 6232 Garbage chute 2 Unitech 5-Sep-16 5-Sep-16 8-Sep-16 P71168/EAS/JIC307 B

ARCH
39 J11-SC-21 Pre-Qualification Building Maintenance Unit 0 ASMA 11-Apr-16 11-Apr-16 19-Apr-16 P71168/EAS/JIC143 B
ARCH
40 J11-SC-21A Pre-Qualification 6386 Building Maintenance Unit 0 MANAR 25-Aug-16 25-Aug-16 1-Sep-16 P71168/EAS/JIC295 B
ARCH
41 J11-SC-22 Pre-Qualification Metal Doors 0 SAFARI Project Suppliers 11-Apr-16 11-Apr-16 13-Jun-16 C Bad experience with consultant

ARCH 15-Dec-16 27-Feb-17 2-Mar-17


42 J11-SC-22A Pre-Qualification 6938 Hollow Metal Doors & Frames 0 Iron Technology Factory D 1. out of vendor list

ARCH 15-Dec-16 2-Apr-17 waiting for confirmation of the


43 J11-SC-22A Pre-Qualification 6938 Hollow Metal Doors & Frames 1 Iron Technology Factory submittal
Table of content
STR missing & industrial
43 J11-SC-23 Pre-Qualification 5645 Concrete Block 0 HASSANESCO 20-Apr-16 20-Apr-16 21-Apr-16 D permit + industrial
certificate expired

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 29 of 43


PRE-QUALIFICATION STRUCTURAL ARCHITECTURAL
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

S/R NO. SUBMITTAL REF. DOCUMENT TYPE DIVISION REF. NO. DESCRIPTION REV. NO. BRAND NAME EXPECTED DATE OF SUB. DATE CONSULTANT REPLY CONSULTANTS INCOMING STATUS COMMENTS
SUBMITTAL CORRESPONDENCE

STR
44 J11-SC-23 Pre-Qualification 5645 Concrete Block 1 HASSANESCO 27-Apr-16 27-Apr-16 8-May-16 P71168/EAS/JIC171 B Table of content
needed+management
ARCH structure of the
45 J11-SC-24 Pre-Qualification 5693 Ceiling Works 0 AJASCO VISION 27-Apr-16 27-Apr-16 8-May-16 D company+method
statement+HSE policy
STR valid CR needed +
46 J11-SC-25 Pre-Qualification Chemical anchor bolt 0 TEAM PRO 11-Jul-16 11-Jul-16 18-Jul-16 D method statement +
draft warranty
STR
47 J11-SC-25 Pre-Qualification 6197 Chemical anchor bolt 1 TEAM PRO 26-Jul-16 26-Jul-16 2-Aug-16 B
ARCH they have poor
48 J11-SC-26 Pre-Qualification 6192 Vinyl Tile 0 Salam EnterPrises 26-Jul-16 26-Jul-16 2-Aug-16 C performance and
black listed by ashghal
STR
49 J11-SC-27 Pre-Qualification 6231 Concrete Block 0 Gulf Flag 1-Aug-16 1-Aug-16 3-Aug-16 B
ARCH 1. General Syndicate is
50 J11-SC-28 Pre-Qualification 6270 steel & S.steel handrail 0 General Syndicate 4-Aug-16 4-Aug-16 11-Aug-16 C outofofvendor
out vendorlist
listas
per the client approval
ARCH as well as agreement
49 J11-SC-28 Pre-Qualification 6270 Steel & S.steel handrail 1 General Syndicate 4-Aug-16 15-Jan-17 28-Jan-17 P71168/EAS/JIC496 B order considered as
Contractor
approved.have
2. to
ARCH clarify & determine
51 J11-SC-29 Pre-Qualification 6363 Steel Reinforcement Coupler 0 Bardawil 22-Aug-16 22-Aug-16 27-Aug-16 D Agreement copy is
area of application /
attached.
ARCH Have Cancelled
to submit with
52 J11-SC-30 Pre-Qualification 6437 Landscape 0 ASPECT 4-Sep-16 4-Sep-16 7-Sep-16 D completion certificate
for previous projects
ARCH
53 J11-SC-30 Pre-Qualification 6437 Landscape 1 ASPECT 26-Sep-16 26-Sep-16 28-Sep-16 P71168/EAS/JIC322 A 1. Have to include
table of content &
STR maintain sequence 2.
XTRAMIX CONCRETE include company
54 J11-SC-31 Pre-Qualification 6617 Concrete 0 SOLUTIONS 9-Nov-16 9-Nov-16 12-Nov-16 P71168/EAS/JIC370 B
management structure
STR Ramco Trading & 3. have to provide
55 J11-SC-32 Pre-Qualification 6632 Chemical Anchor for Rebar 0 Contracting Co W.L.L 16-Nov-16 16-Nov-16 27-Nov-16 D warranty sample with
material submittal 4.
STR Ramco Trading & provide
1. Bring complete
sample on
56 J11-SC-32 Pre-Qualification 6632 Chemical Anchor for Rebar 1 Contracting Co W.L.L 4-Dec-16 4-Dec-16 10-Dec-16 B certificate
site. 5. Provide
HSC&Q Policy 6.
ARCH Include Brochure and
57 J11-SC-33 Pre-Qualification Interior signage 0 5-Mar-17 Catalogue
ARCH
58 J11-SC-34 Pre-Qualification Tiling 0 10-Feb-17

ARCH
59 J11-SC-35 Pre-Qualification Door hardware 0 15-Jan-17

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 30 of 43


PRE-QUALIFICATION STRUCTURAL ARCHITECTURAL
Last Updated on: 2-Apr-2017
PROJECT: AL JABER TWIN TOWER Approval Status
CLIENT: AL JABER GROUP Approved A
CONSULTANT: ADNAN SAFFARINI Approved as Noted B
Rejected C
Revise & Resubmit D
Under Review UR
Not Applicable NA

S/R NO. SUBMITTAL REF. DOCUMENT TYPE DIVISION REF. NO. DESCRIPTION REV. NO. BRAND NAME EXPECTED DATE OF SUB. DATE CONSULTANT REPLY CONSULTANTS INCOMING STATUS COMMENTS
SUBMITTAL CORRESPONDENCE

ARCH
60 J11-SC-36 Pre-Qualification Automatic entrances 0 20-Jan-17

ARCH
61 J11-SC-37 Pre-Qualification Toile & Bath accessories 0 15-Feb-17
ARCH
62 J11-SC-38 Pre-Qualification Kitchen Units 0 1-Mar-17
STMR
63 J11-SC-39 Pre-Qualification Chemical Anchor 0 Anton Nemeh 16-Jan-17 16-Jan-17 C
STR Need previous
64 J11-SC-40 Pre-Qualification 6526 Construction Building Materials 0 BASF 10-Oct-16 10-Oct-16 16-Oct-16 D approval of another
projects
STR
65 J11-SC-40 Pre-Qualification 6526 Construction Building Materials 1 BASF 24-Oct-16 24-Oct-16 26-Oct-16 P71168/EAS/JIC344 B
ARCH
Suzhou Gold Mantis
66 J11-SC-41 Pre-Qualification 6828 Interior Design 0 Construction Decoration 16-Jan-17 16-Jan-17 26-Jan-17 P71168/EAS/JIC490 B
Co., Ltd
ARCH
67 J11-SC-42 Pre-Qualification 6843 Grinding, Plastering & Painting 0 White Lion Trading & 24-Jan-17 24-Jan-17 11-Feb-17 P71168/EAS/JIC507 B
Contracting

Sinobautech Special
68 J11-SC-43 Pre-Qualification ARCH 6919 Faade & Cladding 0 Structure Construction Co., 25-Feb-17 26-Feb-17 2-Mar-17 P71168/EAS/JIC538 B
Ltd.

Pneumatic Waste Collection Multichoice Electro-


69 J11-SC-44 Pre-Qualification ARCH 6920 System & Garbage Chute 0 Mechanical Co. 20-Feb-17 20-Feb-17 25-Feb-17 P71168/EAS/JIC531 B

Qatar Engineering
70 J11-SC-45 Pre-Qualification STR 6985 Laboratory Testing 0 Laboratories W.L.L 9-Apr-17 9-Apr-17

Doc: JITC-C&P-FRM-12Rev: 0001 Nov 2016 Integrated Management System Page 31 of 43


AS OF :

Structural Material Submittals


SUMMARY QTY
Total Material Submittal 62
Total Submited 59
Total Approved 52
Total Under Review 0
Total Revise & Re-Submit 6
Total Rejected 1
Total Not Submitted 3
Total Approved % 83.87

Archetictural Material Submittals


SUMMARY QTY
Total Material Submittal 57
Total Submited 22
Total Approved 11
Total Under Review 2
Total Revise & Re-Submit 5
Total Rejected 5
Total Not Submitted 34
AS OF :
Total Approved % 19.30
AS OF :

Electrical Material Submittals


SUMMARY QTY
Total Material Submittal 36
Total Submited 26
Total Approved 15
Total Under Review 1
Total Revise & Re-Submit 9
Total Rejected 2
Total Not Submitted 9
Total Approved % 41.67

Mechanical Material Submittals


SUMMARY QTY
Total Material Submittal 64
Total Submited 54
Total Approved 44
Total Under Review 1
Total Revise & Re-Submit 11
AS OF :
Total Rejected 0
Total Not Submitted 8
Total Approved % 68.75
AS OF :

Structural & Architectural Pre-Qualification Submittals

SUMMARY QTY
Total Pre-Qualification
58
Submittal
Total Submited 51
Total Approved 35
Total Under Review 1
Total Revise & Re-Submit 10
Total Rejected 6
Total Not Submitted 6
Total Approved % 60.34

Mechanical & Electrical Pre-Qualification Submittals

SUMMARY QTY
Total Pre-Qualification
31
Submittal
Total Submited 23
AS OF :
Total Approved 18
Total Under Review 0
Total Revise & Re-Submit 4
Total Rejected 2
Total Not Submitted 7
Total Approved % 58.06
2-Apr-17
2-Apr-17
2-Apr-17
2-Apr-17
2-Apr-17
2-Apr-17