Confdental

VNM MEGA Progect


MW Installation Checklist V1.0
Site A ID 359473 Site B ID

Link ID 359473-359039 Configuration

Subcontractor ITC Inspection Date

Site A
Checklist Items
No OK NOK NA
Environmental Physical Check

Grounding on site Check Point:


1. The indoor rack or outdoor cabinet grounding should connect to
the main grounding bar properly. 100

Indoor Unit Physical checks

IDU installaton Check Point:


1. The IDU installed properly,and positon is according to the TSSR. 101

All rights reserved. No spreading without permission of ZTE. 28 , 1


Confdental

IF cable installaton Check Point:


1. IF connector is tghtness.
2. IF cable is labeled. 102
3. XPIC cable is connected properly if applicable.

IF lightng protector Check Point:


1. IF lightng protector is installed between the IF cable and jumper
cable. 103
2. The grounding cable of the lightng protector is connected.

DC power supply Check Point:


1. The used circuit breaks were labeled 104
2. Main & Standby power from different circuit breaks

IDU grounding Check Point:


1. IDU grounding properly 105
2. IF lightng protector grounding properly

All rights reserved. No spreading without permission of ZTE. 28 , 2


Confdental

Outdoor Unit Physical checks

Antenna Polarizaton Check Point:


1. The antenna polarizaton should same with the design. 106
2. Antenna labeled (Mark on the back of the antenna)

Antenna installaton Check Point:


1. The antenna installaton positon is according to the TSSR. 106
(Zoom Out)

Antenna installaton:
(Zoom In) 106

All rights reserved. No spreading without permission of ZTE. 28 , 3


Confdental

LOS Check Point:


1. The LOS directon should be clear and no obstacles. 107

Mountng Pole installaton Check Point:


1. The Mountng Pole installed properly and tghtness. 108
2. The pole is installed vertcally.

ODU installaton Check Point:


1. IF cable labeled (use plastc label)
2. IF connector water proof done properly 109
3. ODU grounding properly

All rights reserved. No spreading without permission of ZTE. 28 , 4


Confdental

IF cable margin Check Point:


1. Reserve 3-5 meter IF cable 110
2. The reserved IF cable is binding properly

IF cable routng Check Point:


1. The IF cable is binding properly 111

IF cable grounding Check Point:


1. If the length of IF cable 20m, need 2 point IF grounding.
2. If the IF cable between 20m and 60m, need 3 point IF grounding, 112
if more than 60m, add another IF grounding for each 20m.
All rights reserved.
3. The No spreading
IF grounding to thewithout permission
grounding bar. of ZTE. 28 , 5
Confdental

IF cable grounding Check Point:


1. If the length of IF cable 20m, need 2 point IF grounding.
2. If the IF cable between 20m and 60m, need 3 point IF grounding, 112
if more than 60m, add another IF grounding for each 20m.
3. The IF grounding to the grounding bar.

Site B
Checklist Items
No OK NOK NA
Environmental Physical Check

Grounding on site Check Point:


1. The indoor rack or outdoor cabinet grounding should connect to
the main grounding bar properly. 100

All rights reserved. No spreading without permission of ZTE. 28 , 6


Confdental

Indoor Unit Physical checks

IDU installaton Check Point:


1. The IDU installed properly,and positon is according to the TSSR. 101

IF cable installaton Check Point:


1. IF connector is tghtness.
2. IF cable is labeled. 102
3. XPIC cable is connected properly if applicable.

IF lightng protector Check Point:


1. IF lightng protector is installed between the IF cable and jumper
cable. 103
2. The grounding cable of the lightng protector is connected.

All rights reserved. No spreading without permission of ZTE. 28 , 7


Confdental

DC power supply Check Point:


1. The used circuit breaks were labeled 104
2. Main & Standby power from different circuit breaks

IDU grounding Check Point:


1. IDU grounding properly 105
2. IF lightng protector grounding properly

Outdoor Unit Physical checks

Antenna Polarizaton Check Point:


1. The antenna polarizaton should same with the design. 106
2. Antenna labeled (Mark on the back of the antenna)

All rights reserved. No spreading without permission of ZTE. 28 , 8


Confdental

Antenna installaton Check Point:


1. The antenna installaton positon is according to the TSSR. 106
(Zoom Out)

Antenna installaton:
(Zoom In) 106

LOS Check Point:


1. The LOS directon should be clear and no obstacles. 107

All rights reserved. No spreading without permission of ZTE. 28 , 9


Confdental

Mountng Pole installaton Check Point:


1. The Mountng Pole installed properly and tghtness. 108
2. The pole is installed vertcally.

ODU installaton Check Point:


1. IF cable labeled (use plastc label)
2. IF connector water proof done properly 109
3. ODU grounding properly

IF cable margin Check Point:


1. Reserve 3-5 meter IF cable 110
2. The reserved IF cable is binding properly

All rights reserved. No spreading without permission of ZTE. 28 , 10


Confdental

IF cable routng Check Point:


1. The IF cable is binding properly 111

IF cable grounding Check Point:


1. If the length of IF cable 20m, need 2 point IF grounding.
2. If the IF cable between 20m and 60m, need 3 point IF grounding, 112
if more than 60m, add another IF grounding for each 20m.
3. The IF grounding to the grounding bar.

All rights reserved. No spreading without permission of ZTE. 28 , 11


3. The IF grounding to the grounding bar.

Confdental

Inventory Information

Inventory of Antenna

Site A Site B

Inventory of OMT or Coupler

Site A Site B

All rights reserved. No spreading without permission of ZTE. 28 , 12


Confdental

Site A Site B

Inventory of IDU Rack

Site A Site B

Inventory of ODU

Site A Site B

Inventory of Flexible waveguide

Site A Site B

Interference test RSL

All rights reserved. No spreading without permission of ZTE. 28 , 13


Confdental

Site A Site B
V

All rights reserved. No spreading without permission of ZTE. 28 , 14


Confdental

M MEGA Progect
allation Checklist V1.0
359039

1+0

2016/X/X

Installation Photo

All rights reserved. No spreading without permission of ZTE. 28 , 15


Confdental

All rights reserved. No spreading without permission of ZTE. 28 , 16


Confdental

All rights reserved. No spreading without permission of ZTE. 28 , 17


Confdental

All rights reserved. No spreading without permission of ZTE. 28 , 18


Confdental

All rights reserved. No spreading without permission of ZTE. 28 , 19


Confdental

Installation Photo

All rights reserved. No spreading without permission of ZTE. 28 , 20


Confdental

All rights reserved. No spreading without permission of ZTE. 28 , 21


Confdental

All rights reserved. No spreading without permission of ZTE. 28 , 22


Confdental

All rights reserved. No spreading without permission of ZTE. 28 , 23


Confdental

All rights reserved. No spreading without permission of ZTE. 28 , 24


Confdental

All rights reserved. No spreading without permission of ZTE. 28 , 25


Confdental

nventory Information

All rights reserved. No spreading without permission of ZTE. 28 , 26


Confdental

nterference test RSL

All rights reserved. No spreading without permission of ZTE. 28 , 27


Confdental

All rights reserved. No spreading without permission of ZTE. 28 , 28