You are on page 1of 3

-6 Date,

Ref No : cHN/Poc/rrippingtc-42t
0 0 4 13 _- ? flcT i.0l5r"
EVENT ANALYSIS REPORT
UNIT NO : 3 TPS: CSTPS Unit Gapacity : 210 MW
1. *HO Code Station Gode Tripping Date and time No. of days from last sync.
CSTPS U-3 T-10 1410812015 19:37
2015-2016

Last Overhaul (AOH/COH) Period in year since last


No of Days since last OH overhaul
synchronisation Date
2911212014

2. Operating conditions at the Load MW Coal Gycles in service Oil Support


time of Event :-
A,B,C,E,F
n in load because of hunting in CVSM
(Governing Problem)

@tections & protection on which GCB tripped:


First up : Boiler tripped on drum level very very high.
Main Protection: Boiler trip. Turbine Trip
GCB Opened on : Low fonrvard power 86 GT
M started. Load variation was from 88
drum
to 165 MW. Turbine master controltaken on manual to controlthe load. BFP master taken on manualto controlthe
eventually set
level. Due to continuous variation in CVSM and thereby in load,drum level could not maintained and
tripped on drum level high protection.
istics taken found ok. To minimise hunting
18t8115. Now hunting is reduced . On 08/09/2015 HPCV-1 unlocked and HPCV
-3 is locked in full
HpCV-1 kept open on
inspection of complete
open condittn.'Now hunting problem is conliderably reduced. To detect exact reason of hunting
governing is to be carried out in 4-5 days shut down'
the drum level
e. noot Gause Analysis :- Due to heavy and continuous in CVSM there was hunting in load. To control
be controlled and . Set
BFP master control was taken on manual. But as load variation was heavy drum level could not
tripped on drum level very high.
hort Term) :- 1. Complete inspection of all elements is to be carried out to detect
exact reason in 4-5 days shunt down of unit.
2. MOP overhaul and gear coupling work will be carried out in next opportunity'
Sfreventive action suggested (Long Term) :----

9. Similar event occurred last time:- u# 3 210 MW

/Short Term measures stated at Sr No 9:- Nil


10. Boiler lighted up Time- 20:55 hrs Date- 1410812015
11. T-A Set Synchronised Time- 01:00 Hrs Date- 151A812015
12. Remark '- Nil

Chief E er (O&M)
CSTPS, andrapur.

13. Recommendations of Works Section:

1. ProcuremenUReplacement ptan:
2. OperationalError:

3. Delay in Maintenance:

4. Delay in bringing back the Unit:

5. Training of Staff:

6. whether remedialaction is completed satisfactory & point is closed :

CE/DyCE(Works)
xHO Code will be given by Works Section
UNIT NO #3 Nature of tripping : Unit tripped on "Drum Level very High" due to
high variation in load because of hunting in CVSM (Governing
Problem)
Date & Time of trip t4/08/2015 L9:37

Hot start:
o
HPT -- 444 / 346
HPT lower casing Temperature >350 C Top/
Bottom
Turbine Casing Temp at Start up ( Deg C) IPT -- Top/ 426 /332
Bottom

Activity Date & Time Time taken Benchmar Reason for


from Boiler k time In deviation
lightup in hh:mm
hh:mm
Boiler lightup L4/OB/2015 20: 55

PRDS Charging
Self
FO Changeover L4/OB/2015 21 : 55 1 :00

Fire Killing

Header Blow Down


Com pletion
Boiler Relight UP

Vacuum Pulling 14/08/2015 21 : 15 0:20 0:30


com pletion

Roliing L5/08/2015 0:77 3:22 2:10 I PT d ifferentia I

expa nssion
sta bilisation , &
CVSM venting
ulnrk
Synch ron isation 15/0 B/20I5 1 :00 4:05 2:2A CVSM hunting
problem during
rolling .

Oil Support I5/OB/201 5 2:40 5:45


withd rawn at

Oil Cons (LDO / LDO 7 KL


FO) till oil FO 1B KL (LVFO)
withd rawn

Full Load/Max Load L5IOB/201s 5:00 B:05 L45


(MW) achieved at

Problems Faced 1 CVSM hunting problem during rolling.


Du ring Sta rt UP 2 IPT differential expanssion stabilisation.
3 Oil gun EF elevation problem.