Professional Documents
Culture Documents
PRESUPUESTO DE OBRA
OBRAS PRELIMINARES
1.00 LIMPIEZA DE TERRENO MANUAL M2 10.00 2.50 25.00
1.00 TRAZO Y REPLANTEO M2 10.00 2.50 25.00
2.00 MOVIMIENTO DE TIERRAS M3
2.10 EXCAVACION PARA CIMENTACION 1.00 0.70 10.00 7.00
RELLENO COMPACTADO CON MATERIAL PROPIO 1.00 0.40 8.80 3.52
ELIMINACION DE MATERIAL EXCEDENTE
3.00 CONCRETO SIMPLE
3.10 SOLADO e=0.05mts M2
Alas laterales 2.00 3.00 0.40 2.40
Piso 1.00 0.50 0.90 0.45
CONCRETO CICLOPEO PARA CIMENTACION CORRIDOS M3 2.00 2.50 0.40 0.50 1.00
3.20 EMBOQUILLADO MEZCLA CEMENTO HORMIGON e=0.30MTS M3 0.30 5.40 1.62
ENCOFRADO DE CIMIENTOS M2 4.00 2.50 0.50 5.00
4.00 OBRAS DE CONCRETO
4.10 CONCRETO DE Fc=175 kG/cm2 M3
Toma
Alas laterales 2.00 3.00 0.20 1.00 1.20
Piso 1.00 0.50 0.80 0.20 0.08
Canal
laterales 1.00 5.00 0.15 0.50 0.38
Piso 1.00 5.00 0.60 0.15 0.45
4.20 ENCOFRADO DE MUROS M2
Alas laterales 4.00 3.00 1.00 12.00
Caras 4.00 0.20 1.00 0.80
Canal
laterales 2.00 5.00 0.40 4.00
2.00 5.00 0.55 5.50
ACERO DE REFUERZO Fc=4200Kg/cm2 KG
Horizontal 11.00 3.20 1.02 35.90
Vertical 2.00 16.00 1.70 1.02 55.49
3.00 0.80 1.02 2.45
4.3 TARRAJEO DE MUROS M2
Alas laterales 4.00 3.00 1.00 12.00
Caras 4.00 0.20 1.00 0.80
4.3 COMPUERTA METALICA UND
Compuerta 0.40x1.00 angulo 2" plancha 1.00
MEDIANO
OBRAS PRELIMINARES
1.00 TRAZO Y REPLANTEO M2 18.00
2.00 MOVIMIENTO DE TIERRAS M3
2.10 EXCAVACION PARA CIMENTACION 1.00 10.00 0.80 0.50 4.00
3.00 CONCRETO SIMPLE
3.10 SOLADO e=0.05mts M2
Alas laterales 2.00 2.00 0.35 1.40
Piso 1.00 0.50 0.80 0.40
3.20 EMBOQUILLADO PARA TOMA e=0.30MTS M3 0.30 2.80 0.84
4.00 OBRAS DE CONCRETO
4.10 CONCRETO DE Fc=175 kG/cm2 M3
Toma
Alas laterales 2.00 2.00 0.20 1.00 0.80
Piso 1.00 0.50 0.80 0.20 0.08
Canal
laterales 1.00 5.00 0.15 0.40 0.30
Piso 1.00 5.00 0.60 0.15 0.45
4.20 ENCOFRADO DE MUROS M2
Alas laterales 4.00 2.00 1.00 8.00
Caras 4.00 0.20 1.00 0.80
Canal
laterales 2.00 5.00 0.40 4.00
2.00 5.00 0.55 5.50
ACERO DE REFUERZO Fc=4200Kg/cm2 KG
Horizontal 11.00 2.30 1.02 25.81
Vertical 2.00 10.00 1.15 1.02 23.46
3.00 0.80 1.02 2.45
4.3 TARRAJEO DE MUROS M2
Alas laterales 4.00 2.00 1.00 8.00
Caras 4.00 0.20 1.00 0.80
4.3 COMPUERTA METALICA UND
Compuerta 0.40x1.00 angulo 2" plancha 1.00
CHICO
OBRAS PRELIMINARES
1.00 TRAZO Y REPLANTEO M2 2.50 0.80 2.00
2.00 MOVIMIENTO DE TIERRAS M3
2.10 EXCAVACION PARA CIMENTACION 1.00 2.50 0.80 0.50 1.00
3.00 CONCRETO SIMPLE
3.10 SOLADO e=0.05mts M2
Alas laterales 2.00 2.00 0.35 1.40
Piso 1.00 0.50 0.80 0.40
3.20 EMBOQUILLADO PARA TOMA e=0.30MTS M3 0.30 7.00 2.10
4.00 OBRAS DE CONCRETO
4.10 CONCRETO DE Fc=175 kG/cm2 M3
Toma
Alas laterales 2.00 2.00 0.20 1.00 0.80
Piso 1.00 0.50 0.80 0.20 0.08
Canal
laterales 1.00 5.00 0.15 0.40 0.30
Piso 1.00 5.00 0.60 0.15 0.45
4.20 ENCOFRADO DE MUROS M2
Alas laterales 4.00 2.00 1.00 8.00
Caras 4.00 0.20 1.00 0.80
Canal
laterales 2.00 5.00 0.40 4.00
2.00 5.00 0.55 5.50
ACERO DE REFUERZO Fc=4200Kg/cm2 KG
Horizontal 11.00 2.30 1.02 25.81
Vertical 2.00 10.00 1.15 1.02 23.46
3.00 0.80 1.02 2.45
4.3 TARRAJEO DE MUROS M2
Alas laterales 4.00 2.00 1.00 8.00
Caras 4.00 0.20 1.00 0.80
4.3 COMPUERTA METALICA UND
Compuerta 0.40x1.00 angulo 2" plancha 1.00
PEDESTAL
OBRAS PRELIMINARES
1.00 TRAZO Y REPLANTEO M2 1.50 1.50 2.25
2.00 MOVIMIENTO DE TIERRAS M3
2.10 EXCAVACION PARA CIMENTACION 1.00 2.50 0.80 0.50 1.00
3.00 CONCRETO SIMPLE
3.10 SOLADO e=0.05mts M2
Alas laterales 2.00 2.00 0.35 1.40
Piso 1.00 0.50 0.80 0.40
3.20 EMBOQUILLADO PARA TOMA e=0.30MTS M3 0.30 7.00 2.10
4.00 OBRAS DE CONCRETO
4.10 CONCRETO DE Fc=175 kG/cm2 M3
Toma
Alas laterales 2.00 2.00 0.20 1.00 0.80
Piso 1.00 0.50 0.80 0.20 0.08
Canal
laterales 1.00 5.00 0.15 0.40 0.30
Piso 1.00 5.00 0.60 0.15 0.45
4.20 ENCOFRADO DE MUROS M2
Alas laterales 4.00 2.00 1.00 8.00
Caras 4.00 0.20 1.00 0.80
Canal
laterales 2.00 5.00 0.40 4.00
2.00 5.00 0.55 5.50
ACERO DE REFUERZO Fc=4200Kg/cm2 KG
Horizontal 11.00 2.30 1.02 25.81
Vertical 2.00 10.00 1.15 1.02 23.46
3.00 0.80 1.02 2.45
4.3 TARRAJEO DE MUROS M2
Alas laterales 4.00 2.00 1.00 8.00
Caras 4.00 0.20 1.00 0.80
4.3 COMPUERTA METALICA UND
Compuerta 0.40x1.00 angulo 2" plancha 1.00
1 0.5 0.50
Metrado eucalipto 2 4 4 12 32
5 2 4 8 26.667
3 2 4 16 32 58.667
58.667
TOTAL
36.25
25.00
25.00 0 Operario 70.00 8.00 8.75 10.50
Oficial 60.00 8.00 7.50
7.00 Peon 45.00 8.00 5.63
3.52
3.48
2.85 P.U L=
2.11 16" 0.41 0.40 73.40 3.29 241.49 40.00 9,659.44 11,398.14
18" 0.46 0.45 92.44 3.29 304.13 40.00 12,165.10 14,354.82
22.30
93.84
15
12.80
1.00
18.00
4.00
1.80
0.84
1.63
18.30
51.71
8.80
1.00
0.00
1.00
1.80
2.10
1.63
18.30
51.71
8.80
13.33
1.00 13.30 2.00 26.60
13.40
0.00
1.00
1.80
2.10
1.63
18.30
51.71
585
8.80
1.00
36.21 18.34 664.05472
14.756772
TRANSPORTE DE MATERIALES
Cimentacion
cemento 4.2
Hormigon 0.8
Emboquillado
cemento 4.2 1
Hormigon 0.8
1
23
1
1
1
20
COSTOS DE EJECUCION DE OBRA.
item Descripcion Proveedor/contratis DNI/telf. Sectores Und cant p.u subtotal total
1.00 Bocatoma Vista Alegre
Materiales Ferret Santa Rosa Cemento Bls 20.00 24.50 490.00
Ferret Santa Rosa Hormigon m3 1.00 100.00 100.00
Ferret Santa Rosa Acero 1/2" Var 1.00 100.00 100.00
Madera Pie 1.00 100.00 100.00
Compuerta Und 1.00 650.00 650.00
1,440.00
Mano de obra Humberto Antaurco Rivera Peon Dia 15.00 45.00 675.00
Desiderio Gamarra Ro #980129909 Opeario Dia 5.00 70.00 350.00 1,025.00
Transporte rural Cemento Bls 20.00 18.00 360.00
Hormigon latas 200.00 8.00 1,600.00 1,960.00
13.00 Gachipuquio
14.00 Paccha
15.00 Ocupampa Santa rosa
16.00 Bocatoma Condorteico
Materiales Ferret Santa Rosa Cemento Bls 20.00 24.50 490.00
Ferret Santa Rosa Hormigon m3 4.00 100.00 400.00 890.00
Ferret Santa Rosa Acero 1/2" Var
Mano de obra Edgar Barrenechea Peon Dia 15.00 45.00 675.00
Opeario Dia 5.00 70.00 350.00 1,025.00
Transporte rural Cemento Bls 20.00 5.00 100.00
Hormigon latas 200.00 5.00 1,000.00 1,100.00
20.00 Yacuragra
21.00 San martin
22.00 Bocatoma Licuragra
Materiales Ferret Santa Rosa Cemento Bls 25.00 24.50 612.50
Ferret Santa Rosa Hormigon m3 4.00 100.00 400.00 1,012.50
Ferret Santa Rosa Acero 1/2" Var
Mano de obra Lenin Palacios Vasque 45814610 Peon Dia 15.00 45.00 675.00
Opeario Dia 5.00 70.00 350.00 1,025.00
Transporte rural Cemento Bls 20.00 10.00 200.00
Hormigon latas 200.00 8.00 1,600.00 1,800.00
Personal de obra
Residente de obra Mes 1.00 3,500.00 3,500.00
Supervisor Mes 1.00 5,000.00 5,000.00
Maestro de obra 1 mes 1.00 3,600.00 3,600.00
Maestro de obra 2 mes 1.00 4,500.00 4,500.00
Tareador mes 1.00 3,000.00 3,000.00
4,425.00
4,020.00
4,260.00
4,260.00
3,510.00
2,575.00
3,015.00
2,635.00
3,115.00
2,795.00
3,270.00
2,310.00
3,015.00
3,015.00
3,015.00
3,015.00
3,837.50
1,915.00
1,875.00
1,635.00
3,015.00
3,015.00
67,542.50
19,600.00
87,142.50
L A E=1/4" Peso P.u
Angulo 2"x2"x1/4" 6.00 0.10 0.01 7,850.00 29.91 2.89 86.30
Plancha Meta 2.40 1.10 0.01 7,850.00 131.60 2.89 379.70 12.00 4556.42838
Fierro 3/4" 6.00 2.24 2.93 39.26
Fierro 1.5" 6.00 0.0011 7,850.00 53.70 2.93 157.20
0.16666667
0.6
0.94248
1.54248
200 0.25708
38.1
PLANILLA DE METRADO
Propietario
Proyecto
Obra
Ubicacin
OBRAS PRELIMINARES
1.00 LIMPIEZA DE TERRENO MANUAL M2 10.00 2.50 25.00
1.00 TRAZO Y REPLANTEO M2 10.00 2.50 25.00
2.00 MOVIMIENTO DE TIERRAS M3
2.10 EXCAVACION PARA CIMENTACION 1.00 0.70 10.00 7.00
RELLENO COMPACTADO CON MATERIAL PROPIO 1.00 0.40 8.80 3.52
ELIMINACION DE MATERIAL EXCEDENTE
3.00 CONCRETO SIMPLE
3.10 SOLADO e=0.05mts M2
Alas laterales 2.00 2.50 0.40 2.00
Piso 1.00 0.50 0.90 0.45
CONCRETO CICLOPEO PARA CIMENTACION CORRIDOS M3 2.00 2.00 0.40 0.50 0.80
3.20 EMBOQUILLADO MEZCLA CEMENTO HORMIGON e=0.30MTS M3 0.30 4.50 1.35
ENCOFRADO DE CIMIENTOS M2 4.00 2.00 0.50 4.00
4.00 OBRAS DE CONCRETO
4.10 CONCRETO DE Fc=175 kG/cm2 M3
Toma
Alas laterales 2.00 2.50 0.20 1.00 1.00
Piso 1.00 0.50 0.80 0.20 0.08
Canal
laterales 1.00 5.00 0.15 0.40 0.30
Piso 1.00 5.00 0.60 0.15 0.45
4.20 ENCOFRADO DE MUROS M2
Alas laterales 4.00 2.50 1.00 10.00
Caras 4.00 0.20 1.00 0.80
Canal
laterales 2.00 5.00 0.40 4.00
2.00 5.00 0.55 5.50
ACERO DE REFUERZO Fc=4200Kg/cm2 KG
Horizontal 10.00 2.70 0.97 26.08
Vertical 2.00 10.00 1.45 0.97 28.01
4.00 0.80 0.97 3.09
4.3 TARRAJEO DE MUROS M2
Alas laterales 4.00 2.50 1.00 10.00
Caras 4.00 0.20 1.00 0.80
4.3 COMPUERTA METALICA UND
Compuerta 0.40x1.00 angulo 2" plancha 1.00
MEDIANO
OBRAS PRELIMINARES
1.00 TRAZO Y REPLANTEO M2 18.00
2.00 MOVIMIENTO DE TIERRAS M3
2.10 EXCAVACION PARA CIMENTACION 1.00 10.00 0.80 0.50 4.00
3.00 CONCRETO SIMPLE
3.10 SOLADO e=0.05mts M2
Alas laterales 2.00 2.00 0.35 1.40
Piso 1.00 0.50 0.80 0.40
3.20 EMBOQUILLADO PARA TOMA e=0.30MTS M3 0.30 2.80 0.84
4.00 OBRAS DE CONCRETO
4.10 CONCRETO DE Fc=175 kG/cm2 M3
Toma
Alas laterales 2.00 2.00 0.20 1.00 0.80
Piso 1.00 0.50 0.80 0.20 0.08
Canal
laterales 1.00 5.00 0.15 0.40 0.30
Piso 1.00 5.00 0.60 0.15 0.45
4.20 ENCOFRADO DE MUROS M2
Alas laterales 4.00 2.00 1.00 8.00
Caras 4.00 0.20 1.00 0.80
Canal
laterales 2.00 5.00 0.40 4.00
2.00 5.00 0.55 5.50
ACERO DE REFUERZO Fc=4200Kg/cm2 KG
Horizontal 11.00 2.30 1.02 25.81
Vertical 2.00 10.00 1.15 1.02 23.46
3.00 0.80 1.02 2.45
4.3 TARRAJEO DE MUROS M2
Alas laterales 4.00 2.00 1.00 8.00
Caras 4.00 0.20 1.00 0.80
4.3 COMPUERTA METALICA UND
Compuerta 0.40x1.00 angulo 2" plancha 1.00
CHICO
OBRAS PRELIMINARES
1.00 TRAZO Y REPLANTEO M2 2.50 0.80 2.00
2.00 MOVIMIENTO DE TIERRAS M3
2.10 EXCAVACION PARA CIMENTACION 1.00 2.50 0.80 0.50 1.00
3.00 CONCRETO SIMPLE
3.10 SOLADO e=0.05mts M2
Alas laterales 2.00 2.00 0.35 1.40
Piso 1.00 0.50 0.80 0.40
3.20 EMBOQUILLADO PARA TOMA e=0.30MTS M3 0.30 7.00 2.10
4.00 OBRAS DE CONCRETO
4.10 CONCRETO DE Fc=175 kG/cm2 M3
Toma
Alas laterales 2.00 2.00 0.20 1.00 0.80
Piso 1.00 0.50 0.80 0.20 0.08
Canal
laterales 1.00 5.00 0.15 0.40 0.30
Piso 1.00 5.00 0.60 0.15 0.45
4.20 ENCOFRADO DE MUROS M2
Alas laterales 4.00 2.00 1.00 8.00
Caras 4.00 0.20 1.00 0.80
Canal
laterales 2.00 5.00 0.40 4.00
2.00 5.00 0.55 5.50
ACERO DE REFUERZO Fc=4200Kg/cm2 KG
Horizontal 11.00 2.30 1.02 25.81
Vertical 2.00 10.00 1.15 1.02 23.46
3.00 0.80 1.02 2.45
4.3 TARRAJEO DE MUROS M2
Alas laterales 4.00 2.00 1.00 8.00
Caras 4.00 0.20 1.00 0.80
4.3 COMPUERTA METALICA UND
Compuerta 0.40x1.00 angulo 2" plancha 1.00
PEDESTAL
OBRAS PRELIMINARES
1.00 TRAZO Y REPLANTEO M2 1.50 1.50 2.25
2.00 MOVIMIENTO DE TIERRAS M3
2.10 EXCAVACION PARA CIMENTACION 1.00 2.50 0.80 0.50 1.00
3.00 CONCRETO SIMPLE
3.10 SOLADO e=0.05mts M2
Alas laterales 2.00 2.00 0.35 1.40
Piso 1.00 0.50 0.80 0.40
3.20 EMBOQUILLADO PARA TOMA e=0.30MTS M3 0.30 7.00 2.10
4.00 OBRAS DE CONCRETO
4.10 CONCRETO DE Fc=175 kG/cm2 M3
Toma
Alas laterales 2.00 2.00 0.20 1.00 0.80
Piso 1.00 0.50 0.80 0.20 0.08
Canal
laterales 1.00 5.00 0.15 0.40 0.30
Piso 1.00 5.00 0.60 0.15 0.45
4.20 ENCOFRADO DE MUROS M2
Alas laterales 4.00 2.00 1.00 8.00
Caras 4.00 0.20 1.00 0.80
Canal
laterales 2.00 5.00 0.40 4.00
2.00 5.00 0.55 5.50
ACERO DE REFUERZO Fc=4200Kg/cm2 KG
Horizontal 11.00 2.30 1.02 25.81
Vertical 2.00 10.00 1.15 1.02 23.46
3.00 0.80 1.02 2.45
4.3 TARRAJEO DE MUROS M2
Alas laterales 4.00 2.00 1.00 8.00
Caras 4.00 0.20 1.00 0.80
4.3 COMPUERTA METALICA UND
Compuerta 0.40x1.00 angulo 2" plancha 1.00
1 0.5 0.50
Metrado eucalipto 2 4 4 12 32
5 2 4 8 26.667
3 2 4 16 32 58.667
58.667
TOTAL
36.25
25.00
25.00 Operario 70.00 8.00 8.75 10.50
Oficial 60.00 8.00 7.50
7.00 Peon 45.00 8.00 5.63
3.52
3.48
Hormigon Cemento H C
2.45 SOLADO e=0.05mts 0.065 0.400 0.16 0.98
4.30 23.74
50.75
218.31
200.00 23.00
20.30
10.00
1.00
1.00
18.00
4.00
1.80
0.84
1.63
18.30
51.71
8.80
1.00
0.00
1.00
1.80
2.10
1.63
18.30
51.71
8.80
13.33
1.00 13.30 2.00 26.60
13.40
0.00
1.00
1.80
2.10
1.63
18.30
51.71
585
8.80
1.00
36.21 18.34 664.05472
14.7567715556