WORKBOAT INTERNATIONAL DMCCO

MONTHLY REPORT

VESSEL: _____WBI TRINITY___________________ DEPARTMENT: ENGINE

MONTH: ___MARCH_____________________

PORT MAIN ENGINE COMPLETE OVERHAULING DONE BY CUMMINS TECHNICIANS


STBD MAIN ENGINE COMPLETE OVERHAULING DONE BY CUMMINS TECHNICIANS
NO 1 AUXILARY ENGINE COMPLETE OVERHAULING DONE BY CUMMINS TECHNICIANS
NO 2 AUXILARY ENGINE COMPLETE OVERHAULING DONE BY CUMMINS TECHNICIANS
NO 3 AUXILARY ENGINE COMPLETE OVERHAULING DONE BY CUMMINS TECHNICIANS
NO 1 ALTERNATOR SERVICED BY GRANDWELD SHIPYARDS
NO 2 ALTERNATOR SERVICED BY GRANDWELD SHIPYARDS
NO 3 ALTERNATOR SERVICED BY GRANDWELD SHIPYARDS
FIRE & GS PUMP OVERHAULD BY GRANDWELD SHIPYARDS
BALLAST PUMP OVERHAULD BY GRANDWELD SHIPYARDS
BILGE PUMP OVERHAULD BY GRANDWELD SHIPYARDS
A/C COLING PUMP OVERHAULD BY GRANDWELD SHIPYARDS
CHILLER PUMP OVERHAULD BY GRANDWELD SHIPYARDS
SEWAGE PUMP OVERHAULD BY GRANDWELD SHIPYARDS
ALL THE SEA CHEST & OVERBOARD VALVES OVERHAULD BY GRANDWELD SHIPYARDS
ALL THE FUEL TANKS CLEANED BY GRANDWELD SHIPYARDS
DIRTY OIL TANK & BILGE HOLDING TANK CLEANED BY GRANDWELD SHIPYARDS
PORT & STBD AFT NEW BILGE SUCTION LINE ABRICATED BY GRANDWELD SHIPYARDS
ALL SEA WATER STRAINERS NEWLY MADE BY GRANDWELD SHIPYARDS
PORT PROPELLER SHAFT & SEALS BEARINGS SERVICED BY GRANDWELD SHIPYARDS
STBD PROPELLER SHAFT & SEALS BEARINGS SERVICED BY GRANDWELD SHIPYARDS
RUDDER REPAIRED BY GRANDWELD SHIPYARDS
STEERIG ROOM BLOWER SERVICED BY GRAND WELD SHIPYARDS
GALLEY BLOWER SERVICED BY GRANDWELD SHIPYARDS
BOW THRUSTER ROOM BLOWER SERVICED BY GRANDWELD SHIPYARDS
ALL CONTROL PANNEL ELECTRICAL METERS CALIBRATED BY VOYAGE MARINE AUTOMATION
ALL SHIPS BATTERY CHARGERS REPAIRED BY VOYAGE MARINE AUTOMATION
ALL ACCOMODATION EXHAUST FAN RENEWED BY SHIPS ELECTRICIAN
ALL ACCOMODATION LIGHTING CHECKED & RENEWED BY SHIPS ELECTRICIAN
NO 1 A/C COMPRESSOR SERVICED BY SEALINE MARINE
NEW A/C CONTROL PANNEL FITTED BY SEALINE MARINE
NO 1 REEFER COMPRESSOR SERVICED BY SEALINE MARINE
NEW REEFER CONTROL PANNEL FITTED BY SEALINE MARINE
E/R PERIODICAL CLEANING DONE BY ENG.STAFF

CHIEF ENGINER:ABDUL GHONI F SIGNATURE :


WORKBOAT INTERNATIONAL DMCCO

* Delete if not applicable

Notes:
1) This form can be used by the Deck as well as the Engine Room Department.

2) Refer to Shipboard Operation Manual Document No: SOM-03-35: Planned Maintenance System, Section
35.5.5 for Usage Instruction

Form MR Rev. 00 Effective date: 01.04.2014 SOM-03-


35