Professional Documents
Culture Documents
W E
LOCATION MAP
W E SCALE NTS
S
1 2 3 4 5 6 7 8 9 10 11
45.00
4.50 9.00 9.00 9.00 9.00 4.50
4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50
X 0.955 0.96
W-3
0.425
D-2
D-3 D-3
7.00
9.50
D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1
B 25mm DEP. 25mm DEP. 25mm DEP. 25mm DEP. 25mm DEP. 25mm DEP. 25mm DEP. 25mm DEP.
2.50
C
SECOND FLOOR PLAN
SCALE 1:100mts
Y
SCHEDULE OF WALL FINISHES
150mm THK. CHB w/ PLAIN CEMENT SCHEDULE OF FLOOR FINISHES
WF1 PLASTER (PAINT FINISH)
100mm THK. CHB PLAIN CEMENT FF1 NON SKID PLAIN CEMENT FLOOR FINISH
WF2 RAILINGS ( PAINT FINISH) NON SKID PLAIN CEMENT FLOOR FINISH
FF2 ROUGH FINISH w/ GROOVES
150mm THK. CHB w/ 200 x 200mm VITRIFIED
WF3 WALL TILES (GLAZED)
FF3 200 x 200 VITRIFIED FLOOR TILES (UNGLAZED)
100mm THK. CHB w/ 200 x 200mm VITRIFIED
WF4 WALL TILES (GLAZED)
1 2 3 4 5 6 7 8 9 10 11
45.00
4.50 9.00 9.00 9.00 9.00 4.50
0.425 0.96 1.20 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 1.825 1.40 1.275
X 0.955 0.96
W-4 W-3
0.425
D-2 D-2
D-3 D-3
7.00
9.50
D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1
B D-5
25mm DEP. 25mm DEP. 25mm DEP. 25mm DEP. 25mm DEP. 25mm DEP. 25mm DEP. 25mm DEP.
D-5
2.50
C
1.60
RAMP UP
RAMP UP
Y
GROUND FLOOR PLAN
SCALE 1:100mts
1 2 3 4 5 6 7 8 9 10 11
45.00 0.40mm THK. PRE-PAINTED LONG SPAN
CORRUGATED G.I. ROOFING SHEET
0.60 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 0.60
ANGULAR BAR 40 x 40 x 5 x
500mm ON EVERY PURLINS
2.50
D-2 D-2
D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 100mm CHB RAILING.
(TYPICAL) w/ PAINTED FINISH
12.43
D-2 D-2
(PAINT FINISH), TYPICAL
D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1
3.20
1 2 3 4 5 6 7 8 9 10 11
45.00
4.50 9.00 9.00 9.00 9.00 4.50
0.425 0.96 1.20 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 1.825 1.40 1.275
X 0.955 0.96
W-3
0.425
1.40
3.15
1.75
D-2
D-3 D-3
7.00
9.50
3.85
D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1
B 25mm DEP. 25mm DEP. 25mm DEP. 25mm DEP. 25mm DEP. 25mm DEP. 25mm DEP. 25mm DEP.
2.50
2.50
C
2.50
ON METAL FURRING
CHANNEL @ 400mm O.C.
0.50
0.60mm THK. (BASE METAL THICKNESS)
3.20
3.20
PRE-FORMED, PRE-PAINTED G.I GUTTER w/ 12 x
2.70
300mm FIBER CEMENT FASCIA BOARD (PAINT FINISH)
0.90
1.10
12.43
12.43
EXPOSED CEILING UNDER
150mm. THK. CHB WALL WITH PAINTED PLAIN
3.20
3.20
SLAB (PAINT FINISH)
CEMENT PLASTER WALL FIN ISH
1.10
SEE SUNBREAKER DETAILS
150mm THK. CHB WALL w/
PAINTED PLAIN CEMENT
3.20
3.20
1.40 PLASTER WALL FINISH
0.325
RIGHT SIDE ELEVATION LEFT SIDE ELEVATION SECTION THRU "X"
SCALE 1:100mts SCALE 1:100mts SCALE 1:100mts
1 2 3 4 5 6 7 8 9 10 11
45.00 0.60mm THK. (BASE METAL THICKNESS)
PRE-PAINTED ORDINARY RIDGE ROLL
0.60 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 0.60
0.40mm THK. PRE-PAINTED LONG SPAN
CORRUGATED G.I. ROOFING SHEET
ANGULAR BAR 40 x 40 x 5 x
500mm ON EVERY PURLINS
2.50
CONCRETE SUNBREAKER
W-3 W-4 W-3
(SEE DETAILS)
W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1
3.20
REAR ELEVATION
SCALE 1:100mts
1 2 3 4 5 6 7 8 9 10 11
45.00
4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50
2.50
3.20
W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1
12.43
3.20
1 2 3 4 5 6 7 8 9 10 11
45.00
4.50 9.00 9.00 9.00 9.00 4.50
4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50
A
CL-2 CL-2 CL-2 CL-2
7.00
9.50
B
2.50
C
GROUND FLOOR REFLECTED CEILING PLAN
SCALE 1:100mts
7.00
9.50
B
2.50
1 2 3 4 5 6 7 8 9 10 11
45.00
4.50 9.00 9.00 9.00 9.00 4.50
4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50
A
CL-2 CL-2
7.00
9.50
B
2.50
C
SECOND FLOOR REFLECTED CEILING PLAN
SCALE 1:100mts
2.50
2.50
4.50mm THK. FIBER CEMENT
4.50mm THK. FIBER CEMENT CEILING CEILING BOARD (PAINTED) ON
BOARD (PAINTED) ON METAL FURRING METAL FURRING CHANNEL @ G.I. SHEETS
CHANNEL @ 400mm O.C. 400mm O.C.
0.60mm THK. (BASE METAL 0.60mm THK. (BASE METAL RIVET SPACED @ 100
W-3 THICKNESS) PRE-FORMED, THICKNESS) PRE-FORMED,
0.20
D-3 PRE-PAINTED G.I GUTTER w/ 12
3.20
3.20
PRE-PAINTED G.I GUTTER w/ 12 x
x 300mm FIBER CEMENT 300mm FIBER CEMENT FASCIA 5mm THK. CHANNEL
FASCIA BOARD (PAINT FINISH) BOARD (PAINT FINISH)
LC - PURLINS
0.90
1.50
150mm THK. CHB WALL WITH
W-3 PAINTED PLAIN CEMENT
100mm THK. CHB RAILING WITH LC-PURLINS @ 500mm O.C. w/ 65 x 65 x 6
9.60
9.60
D-3
3.20
3.20
PLASTER WALL FINISH
50mm G.I PIPE HANDRAIL x 140mm LONG CLIP ANGLE WELDED TO
(PAINT FINISH) PURLIN AND TOP CHORD OF TRUSS
3.20
G.I ROOFING SHEET (LONG SPAN)
150mm THK. CHB WALL WITH
PAINTED PLAIN CEMENT
PLASTER WALL FINISH
0.325
0.325
BAY SECTION (ALONG TOILET) BAY SECTION (ALONG CORRIDOR) SECTION "A"
SCALE 1:75mts SCALE 1:75mts SCALE 1:8mts
1 2 3 4 5 6 7 8 9 10 11
45.00
4.50 9.00 9.00 9.00 9.00 4.50
4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50
A
0.60mm THK. (BASE METAL THICKNESS)
PRE-PAINTED ORDINARY RIDGE ROLL
0.50mm THICK.
9.50
ANGULAR BAR 40 x 40 x 5 x
500mm ON EVERY PURLINS
0.42
VARIES 0.025
6mm THK. LAWANIT COVER BOTH SIDE WITH 6mm THK (420 MAX) 0.05 0.05
25 x 50mm FRAMING BOARD ORDINARY PLYWOOD
4.07
50 x 50mm TOP HOR.
2.03 2.03 FRAME (CURVED)
0.05
0.04
0.60
FR. 50 x 50mm TOP HOR.
S4S KD. TANG. HOR. 25 x 50mm
FRAME @ 600mm O.C. EDGE FRAMING
4 EQUAL SPACE
6mm THK LAWANIT BD.
1.00
5
A-5 150mm THK CHB WALL
1.20
FR. 50 x 50mm VERT.
0.04
0.06
0.12
BLACKBOARD W5200
2.03
4.07
2.03
LINE OF 150mm THK.
SECTION
SCALE 1:20mts
CHB WALL CHB t=150
50 x 50 VERTICAL 2-4" CWN SPACE
0.08
1.20
VERT. STUD @ 450 O.C. WOOD JAMB
PLAN VIEW B PANEL DOOR
SECTION LAWANIT BOARD
ELEMENTARY H650
PLYWOOD
SECONDARY H750
CLASSROOM
4.07
2.03 2.03
0.12
LINE OF 150mm THK. CHB WALL 10 x 10 x 2mm
LAWANIT BOARD MESHWIRE
.025
0.11
A-6
120 x 150 x 70mm
CHALKDUST BOX
PLAN VIEW A
BLACKBOARD DETAIL CHALK DUST BOX DETAIL CONN. SECTION DETAIL DOOR FRAME TYPICAL SECTION DETAIL
SCALE 1:25mts SCALE 1:15mts SCALE 1:20mts SCALE 1:5mts
0.20
0.20
w/ 38mm VERTICAL SUPPORT FLOOR FINISH w/ GROOVE LINE
@ 1200mm O.C (PAINT FINISH) 0.10
0.10
0.70 0.20 0.30 0.30 0.10
0.70 0.20
0.90
0.90
0.70
0.70
0.10
1.20
0.90
0.90
0.10
0.10
0.30
0.30
0.006
0.10 3.60 1.70 100mm THK.
GRAVEL BEDDING
5.30 0.10 3.60 1.70 NON-SKID PLAIN CEMENT
FLOOR FINISH
6mm GROOVE LINE
DETAILS OF RAMP DETAILED SECTION OF RAMP
SCALE 1:30mts SCALE 1:30mts
SPOT DETAILS
SCALE 1:30mts
4 EQUAL PARTS = 2.50 1.40 1.90 0.60
7 - BLADES
7 - BLADES
0.30
0.30
F F F F F F 4.70
0.635
0.635
14 - BLADES
14 - BLADES
0.30
2.40
2.40
2.40
2.40
1.20
1.765
1.765
0.90
0.90
SPOT DETAILS
2.10
2.10
2.10
2.10
1.20
SCALE 1:5mts
1.50
0.10
0.20
0.30
0.90
D-1 D-2 D-3 D-4 D-5
0.70
MAHOGANY PANEL DOOR ON 50 x 150mm HOLLOW CORE FLUSH TYPE SWING DOOR HOLLOW CORE FLUSH TYPE SWING SWING DOOR ON 50 x 150mm 12mm STEEL DOWEL
THK. M A HO GA NY JA M B FI XE D CL EA R ON 50 x 150mm MAHOGANY JAMB w/ MARINE DOOR ON 50 x 150mm MAHOGANY JAMB MAHOGANY DOOR JAMB COMPLETE w/ HOLLOW CORE FLUSH DOOR EMBED ON CONCRETE
GLASS TRANSOM COMPLETE WITH PLYWOOD FACING INSIDE AND ONDINARY w/ MARINE PLYWOOD FACING INSIDE HARDWARE AND ACCESSORIES WITH MARINE PLYWOOD FACING
HARDWARE AND ACCESSORIES OUTSIDE COMPLETE w/ HARDWARE AND AND ONDINARY OUTSIDE COMPLETE w/ NON-SKID PLAIN CEMENT
0.10
C Y L I N D E R T Y P E L O C K S E T ACCESSORIES PROVIDE KICK PLATE HARDWARE AND ACCESSORIES 8 SETS 1 SETS FLOOR FINISH w/ GROOVE
0.15
LINES
24 SETS 2 SETS 6 SETS
0.025
0.90
0.05 0.05
0.05
3.20
0.10
0.168
0.175
1.52
0.90
0.20
1.68
0.05
1.35
0.29
1.52
0.90
0.05
3.20
0.39
1.71
TYPICAL
0.85
0.30
SECTION DETAIL
SCALE 1:15mts 0.05 0.05
0.30
1.35
10 10 29
11 9 11 9 30 28
0.20
12 8 12 8 31 27
4.05
13 7 13 7 32 26
0
14 6 14 6 33 25
.16
5
2.70
0.90
15 5 15 5 34 24
0.05
16 4 16 23 35 23
3 17 22 36 22
2 18 21 37 21
D-3 1 19 20 38 20
UP DN UP DN
1.50
0.10
CHA NNEL @ 400mm O.C.
0.40
0.40
METAL CARRYING CHANNEL (CEILING JOIST )
0.30
0.10 0.10
PRIMARY
CHANNEL
CEILING FURRING
FIBER CEMENT CEILING SECTION
BOARD
PERSPECTIVE (CEILING)
SCALE NTS
SECTION THRU "X" SEE TRUSS DETAILS
SCALE 1:10mts
B O A R D ( P A I N T F I N I S H )
BASKET STRAINER
2- 65mm x 65mm BAR
0.10
BASKET STRAINER
4.5mm THK. FIBER CEMENT CEILING
BOARD ( PAINTED ) ON METAL FURRING 75mm PVC DOWNSPOUT
75mm PVC DOWNSPOUT
CHANNEL @ 400mm O.C. ( P A I N T F I N I S H )
( P A I N T F I N I S H )
SECTION DETAIL (EAVES) SECTION DETAIL (EAVES) SECTION DETAIL (CORNER CLG)
SCALE 1:20mts SCALE 1:10mts SCALE 1:10mts
0.20
4.50 4.50
0.425 0.550.85 0.85 1.825 1.825 1.40 0.85 0.425
0.60
0.25 0.15
1.40
2.00
0.60
3.15
3.15
0.10
1.75
1.15
0.10 0.60 0.10
1.10 0.80
1.60
1.60
0.50 0.30
0.15 DETAILED PLAN OF TOILET @ 2ND & 3RD FLOOR
0.07
0.07
0.25 0.20
0.80
0.80
0.25 SCALE 1:50mts
0.30
0.25
1 2 1 2
0.15
0.15
4.50 4.50
0.425 0.550.85 0.85 1.825 1.825 1.40 0.85 0.425
0.60
0.54
1.40
DETAILED SECTION OF COUNTER SINK
2.00
SCALE 1:50mts
3.15
3.15
URINAL TROUGH SECTION & DETAILS
1.75
SCALE 1:20mts
1.15
4.50 4.50
1.380 0.96 0.96 1.20 2.00 1.10 1.400
0.425 0.425
DETAILED PLAN OF TOILET @ GROUND FLOOR
SCALE 1:50mts
0.50
0.50
0.50
3.20
3.20
2.70
1.60
1.60
1.60
0.50
0.50
0.50
3.20
3.20
1.60
1.60
1.60
0.50
0.50
0.50
3.20
3.20
1.60
1.60
1.60
0.90
0.325
0.325
DETAILED SECTION OF FEMALE TOILETS DETAILED SECTION OF MALE TOILETS DETAILED SECTION OF FEMALE TOILETS DETAILED SECTION OF MALE TOILETS
SCALE 1:50mts SCALE 1:50mts SCALE 1:50mts SCALE 1:50mts
350mm MAX.
2. UNLESS OTHERWISE SHOWN, REINFORCEMENT IN CONTINUOUS SLAB SHALL BE CUT AS 1. UNLESS , OTHERWISE NOTED IN PLANS, CAMBER ALL BEAMS AND GIRDER AT
FOLLOWS. LEAST 6mm FOR EVERY 4.50m OF SPAN, EXCEPT CANTILEVERS FOR WHICH THE
7. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEEL,
MISCELLANEOUS IRON, PRE-CAST CONCRETE, ETC. SHALL BE SUBMITTED FOR ENGINEERS CAMBER SHALL BE AS NOTED IN PLANS OR AS ORDERED BY THE ENGINEER BUT
10
APPROVAL BEFORE FABRICATION. IN NO CASE LESS THAN 20mm FOR EVERY 3.0m OF FREE SPAN.
H
mi
L1 L2
n.
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS, 2. TYPICAL BARS BENDING AND CUTTING DETAILS SHALL BE AS SHOWN IN FIG. B - 1
L1/3 L1/3 L2/3
EQUIPMENT'S AND MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL, TOP BAR TOP BAR
ELECTRICAL AND MECHANICAL DRAWINGS.
LAP SPLICES ARE ALLOWED
9. ALL RESULTS OF MATERIAL TESTING FOR CONCRETE, REINFORCING BARS & STRUCTURAL ONLY IN THIS PORTION
CONF. REINF.
L1/6 BOTTOM BAR L1/5 L2/5 BOTTOM BAR JOINT HOOP SPACE @ "2Sh" WHEN THERE ARE
STEEL MUST BE NOTED & APPROVED BY THE STRUCTURAL DESIGNER. BEAMS HAVING WIDTH OF AT LEAST ONE-HALF THE L1 L2 L3
D
COLUMN WIDTH & DEPTHS NOT LESS THAN THREE L2/3 L2/3 L3/3 L3/3
QUARTERS OF THE DEEPEST BEAM THAT FRAME 2D 2D 2D 2D 2D
0.96
SPECIFIED BY THE ENGINEER, AND SHALL DEVELOP A MINIMUM COMPRESSIVE 3. IF SLABS ARE REINFORCED BOTHWAYS BARS ALONG THE SHORTER SPAN SHALL BE PLACED
Sh
D
STRENGTH AT THE END OF TWENTY EIGHT ( 28) DAYS W/ CORRESPONDING MAXIMUM BELOW THOSE ALONG THE LONG SPAN AT THE CENTER AND OVER THE LONGER SPAN BOTTOM BARS WEB BARS
2-12mm SIDE BARS
SIZE AGGREGATE & SLUMPS AS FOLLOW. FOR REINFORCING BARS NEAR THE SUPPORTS. THE SPACING OF THE BARS AT THE COLUMN TOP BARS
FOR COL. BAR SPLICES SEE TABLE OF MIN. LAP
COLUMN TIES AS
STRIPS SHALL NOT BE MORE THAN ONE AND A HALF ( 1 21 ) SLAB THICKNESS
SPLICE LENGTH OF COLUMN REINFORCEMENT
ALL OTHERS, INCLUDING 4. TEMPERATURE BARS FOR SLAB SHALL BE GENERALLY PLACED NEAR THE FACE IN TENSION (SPACING OF TIES ALONG THIS REGION SHALL NOT
SUSPENDED SLABS 4000 psi ( 27.6 mpa ) 20mm 100mm BE LESS THAN 100mm)
AND SHALL NOT BE LESS THAN 0.0025 x GROSS CROSS-SECTIONAL AREA ( Ag ) OF THE SLAB
COLUMNS 4000 psi ( 27.6 MPA ) 20mm 100mm ( SEE SCHEDULE BELOW )
TABLE "A" TABLE "B"
BEAMS, SLABS 4000 psi ( 27.6 MPA ) 20mm 100mm TENSION BARS COMPRESSION BARS
EMBEDMENT LENGTHS AND LAPPED EMBEDMENT LENGTHS AND LAPPED
SLAB ON FILL
Sh
3000 psi ( 27.6 MPA ) 20mm 100mm SPLICES IN MILLIMETERS SPLICES IN MILLIMETERS
D
BAR SIZE fc' = 20.7MPa (3000psi) fc' = 20.7MPa (4000psi) BAR SIZE fc' = 20.7MPa (3000psi) fc' = 20.7MPa (4000psi)
2. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS SCHEDULE OF MINIMUM SLAB REINFORCEMENT (DEFORMED) EMBEDMENT LAPPED (DEFORMED) EMBEDMENT LAPPED
EMBEDMENT LAPPED EMBEDMENT LAPPED
SUSPENDED SLABS ------------------------------------------------------------------ 20mm NOTE:
THICKNESS MINIMUM TEMPERATURE BARS 10mm 300 300 300 300 10mm 225 300 200 300
SLAB ON GRADE ----------------------------------------------------------------------- 40mm ALL CONCRETE REINF. DETAIL SHOULD BE
WALLS ABOVE GRADE --------------------------------------------------------------- 25mm 100mm 10mm @ 250mm EACH WAY DONE IN ACCORDANCE WITH THE LATEST 12mm 300 300 300 300 12mm 275 300 250 300
BEAM STIRRUPS AND COLUMN TIES ----------------------------------------------- 40mm
CONF. REINF.
125mm 10mm @ 225mm EACH WAY EDITION OF ACI DETAILING MANUAL. 16mm 300 400 300 400 16mm 350 400 325 400
WHERE CONCRETE IS EXPOSED TO 20mm 20mm
400 550 350 500 450 500 475 500
D
EARTH BUT POURED AGAINST FORMS -------------------------------------------- 50mm 150mm 10mm @ 185mm EACH WAY
25mm 25mm
WHERE CONCRETE IS DEPOSITED 600 800 550 750 550 625 550 625
175mm 10mm @ 150mm EACH WAY 28mm 28mm
750 1000 650 850 625 675 625 675
DIRECTLY AGAINST THE EARTH ----------------------------------------------------- 75mm
3. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSITION WITHOUT SEGREGATION. 200mm 10mm @ 140mm EACH WAY 32mm 950 1300 850 1100 32mm 700 775 700 775
RE-HANDLING OR PLACING SHALL BE DONE PREFERABLY WITH BUGGIES, BUCKETS OR
WHEELBARROWS, NO CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE FROM
HOPPER TO BUGGIES, WHEELBARROWS OR BUCKETS IN WHICH CASE THEY SHALL NOT EXCEED 3. IF THE BEAM REINFORCING BARS END IN A WALL THE CLEAR DISTANCE FROM THE BAR TO THE
SIX ( 6 ) METERS IN AGGREGATE LENGTH. FARTHER FACE OF THE WALL NOT BE LESS THAN 25mm. EMBEDMENT LENGTH SHALL BE AS
4. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS SHOWN IN A TABLE "A" FOR TENSION BARS AND TABLE "B" FOR COMPRESSION BARS UNLESS
LAP SPACE LENGTH: SPECIFIED IN PLAN. TOP BAR SHALL NOT BE SPLICED WITHIN THE COLUMN. AT LEAST TWO
UNLESS AUTHORIZED IN WRITING BY THE DESIGNERS AND ONLY FOR UNUSUAL CONDITIONS
5. UNLESS OTHERWISE NOTED IN THE PLANS ALL BEDDED SLABS SHALL BE REINFORCED WITH AT ANY LEVEL NO MORE THAN ALTERNATE BARS SHOULD BE SPLICED MIN. STIRRUPS SHALL BE PROVIDED AT ALL SPLICES.
WHERE VIBRATIONS IS EXTREMELY DIFFICULT TO ACCOMPLISH.
10mm AT 250mm O.C EACH WAY TO CENTER OF SLAB AND CONSTRUCTION JOINTS FOR SAME DISTANCE BETWEEN TWO ADJACENT BARS SPLICES SHALL BE 600mm.
5. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY POSITIONED & SHALL NOT BE LESS THAN 3.65 METER APART
SECURED IN PLACE PRIOR TO PLACING OF CONCRETE. 4. IF THERE ARE TWO OR MORE LAYERS OF REINFORCING BARS, USE 25mm BAR SEPARATORS
SPACED AT 1.0m ON CENTER IN NO CASE SHALL THERE BE LESS THAN TWO
6. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN ( 7 ) CONSECUTIVE DAYS 6. PROVIDE EXTRA REINFORCEMENTS FOR CORNER SLAB ( TWO ADJACENT DISCONTINUOUS
( 2 ) SEPARATORS BETWEEN TWO LAYERS OF BARS.
IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP, FOG SPRAYING, CURING EDGES ) AS SHOWN BELOW.
COMPOUNDS OR OTHER APPROVED METHODS. 5. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS OR STEEL SHAPES BE AS
7. CONCRETE SLAB REINFORCEMENTS SHALL BE PROPERLY SUPPORTED WITH 10mm STEEL
7. STRIPPING OF FORMS AND SHORES : CHAIR OR APPROVED EQUIVALENT SPACED AT 1.0 METER ON CENTER BOTHWAYS SHOWN IN FIG. B - 2 UNLESS SPECIFIED ELSEWHERE.
FOUNDATION -------------------------------------------------------------------------- 24 hrs.
SUSPENDED SLAB EXCEPT WHEN ----------------------------------------------- 8 days A
ADDITIONAL LOADS ARE IMPOSED
WALLS --------------------------------------------------------------------------------- 24 days 12 x 1000 LONG @
MID-DEPTH OF SLAB b
BEAMS --------------------------------------------------------------------------------- 24 days DOWN INTO EDGE BEAM. EXTENDED
4- 12@ 1800 LONG TOP BARS BEND @ EACH CORNER LAP SPLICE LENGTH:
COLUMNS ----------------------------------------------------------------------------- 24 days
BARS MINIMUM OF 1200 ( 4'-0" ) INTO BARS. 1- 12 TOP & AT ANY LEVEL NO MORE THAN
t
8. THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF POURING AND THE LOCATION OF THE
BOTTOM BARS ALTERNATE BARS SHOULD BE MAIN REINFORCEMENT
CONSTRUCTION JOINTS TO THE STRUCTURAL ENGINEER AT LEAST ( 4 ) DAYS PRIOR TO THE SPLICED. MIN. DISTANCE BET. see note
4- 12 BOTTOM BARS WEB BARS
t or 1/4D
WITHIN CENTER
POURING FOR APPROVAL.
400
ht
1- 12 EA. TWO ADJACENT BARS SPLICES see note
HALF OF "H"
t
9. THE CONTRACTOR SHALL FURNISH AND MAINTAIN ADEQUATE FORMS AND SHORING UNTIL TOP & BOTTOM SHALL BE 600mm. SLEEVES FOR UTILITY
THE CONCRETE MEMBERS HAVE ATTAINED THEIR WORKING CONDITION AND STRENGTH
D
PIPES MAX 1/5D
L/4
0
SLAB
38mm
0
1- 12 EA.
0
( 2000 psf ). CONTRACTOR SHALL REPORT TO THE ENGINEER, IN WRITING, THE ACTUAL TOP & BOTTOM
D
6
SOIL CONDITION UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF SOIL BEFORE
DEPOSITING CONCRETE. INTO TWO WAY SLAB EXTEND 6. WHEN A BEAM CROSSES A GIRDER, REST BEAM ON TOP OF GIRDER BARS, BEAM
BARS UP TO BEAM SUPPORT REINFORCING BAR SHALL BE SYMMETRICAL ABOUT CENTER LINE WHENEVER POSSIBLE.
2. FOOTINGS SHALL REST AT LEAST 15800mm BELOW NATURAL GRADE LINE UNLESS OMIT TRIMMER BARS WHERE
6
OTHERWISE INDICATED IN PLANS. NO FOOTING SHALL REST ON FILL. OPENING IS FRAMED BY BEAM BOTTOM BARS AT 7. GENERALLY NO SPLICES SHALL BE PERMITTED AT POINTS WHERE CRITICAL BENDING
0
SPLICE
0
MID SPAN STRESSES OCCUR, SPLICES WHERE NO PERMITTED SHALL BE INDICATED IN THE TABLE "A"
3. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENTS SHALL BE 75mm CLEAR AND "B" WELDED SPLICES SHALL BE DEVELOP IN TENSION AT LEAST 125% OF THE
EXTRA TOP BARS
FOR CONCRETE DEPOSITED THE GROUND AND 50mm FOR CONCRETE SPECIFIED YIELD STRENGTH OF THE BAR. NOT MORE THAN 50% OF THE BARS AT ANY ONE
DEPOSITED AGAINST A FORMWORK. @ SUPPORT SECTION IS ALLOWED TO BE SPLICED THEREIN.
(DOWEL)
1. UNLESS OTHERWISE SHOWN IN PLANS ALL CONCRETE HOLLOW BLOCKS AND CERAMIC BLOCKS COMPRESSIVE STRENGTH AT 28 DAYS fc' = 20.70 MPa ( 3,000 psi)
VERIFY ARCHITECTURAL
400
SHALL BE REINFORCED AS SHOWN IN THE SCHEDULE OF CONCRETE HOLLOW BLOCKS AND B REINFORCING BARS
CERAMIC BLOCK REINFORCEMENT a) FOR BARS 16mm AND GREATER fy = 275 MPa (40,000 psi)
2. PROVIDE 150mm X 300mm STIFFENER COLUMN REINFORCED WITH 4 -12mm WITH 6mm TIES AT b) FOR BARS LESS THAN 16mm fy = 230 MPa (33,000 psi)
150mm ON CENTER WHERE CONCRETE HOLLOW BLOCK TERMINATES AND AT EVERY 3.00m C STRUCTURAL STEEL, ASTM - A36
LENGTH OF CONCRETE HOLLOW BLOCK WALLS UNLESS NOTED IN STRUCTURAL PLANS. FOR TRUSSES, BRACINGS, AND STRUTS fy = 248MPa (36,000 psi)
D PURLINS
COLD FORMED LIGHT CAGE SHAPES fy = 248MPa (36,000 psi)
REINFORCING BARS SHALL HAVE 25mm CLEAR CONCRETE COVER FROM FACE OF WALL EXCEPT E MASONRY UNIT (CHB)
(DOWEL)
SCHEDULE OF CONCRETE HOLLOW BLOCK AND CERAMIC BLOCK REINFORCEMENT FOR WALLS IN CONTACT WITH THE GROUND WHERE A MINIMUM OF 60mm SHALL BE PROVIDED, NON - LOADING BEARING CHB WALLS fm' = 3.45 MPa (500psi)
400
AND FOR EXPOSED FACES FORMED WALLS WHERE THE MINIMUM SHALL BE 50mm CLEAR. F WELDS - USED E - 60xx ELECTRODE
2. CARRY VERTICAL BARS AT LEAST 60mm ABOVE FLOOR LEVEL TO PROVIDE FOR SPLICES WHEN G STRUCTURAL BOLTS, ASTM - A307
NECESSARY STOP AT 50mm BELOW TOP SLAB OR SOLID BAND WHERE THE WALL ENDS a) Ft = 96.60 MPa (14,000 psi) b) Fv = 69MPa(10,000 psi)
VERTICAL AND HORIZONTAL BARS SHALL BE SPLICED BY LAPPING A DISTANCE EQUAL TO 30
AND WIRED SECURELY WITH 16 G.I. WIRE PROVIDED THAT SPLICES IN ADJACENT BARS ARE
STAGGERED AT LEAST 1.50M OC
3. UNLESS OTHERWISE NOTED IN THE PLANS, ALL OPENINGS IN WALLS 250mm OR THICKER SHALL 1 WHERE A CONSTRUCTION JOINT IS TO BE MADE, THE SURFACE OF CONCRETE SHALL BE
BE REINFORCED AROUND WITH 2 - 20mm BARS FOR 225mm, 200mm, 175mm, 150mm, USE 2 - 16mm CLEANED AND ALL LAITANCE AND STANDING WATER REMOVED. SHEAR KEY SHALL BE
. FOR 125mm AND 100mm WALLS, USE 2 - 12mm BARS. ALL WALLS SPANNING SHALL HAVE PROVIDED AT THE JOINT.
VERTICAL REINFORCEMENT BENT TO A U - FORM LIKE STIRRUPS AND SPACED ACCORDING TO THE
SCHEDULE UNLESS OTHERWISE NOTED ( SEE FIG. 1 )
550
30 BAR DIA. 30 BAR DIA.
t/3
LINTELS IN BLOCK WALLS 40
500
(min.) (min.)
CLEAR TOTAL MIN. HEIGHT
50
VARIES
t/3
SPAN LENGTH fc' OF
t
("L") (L + 0.40m) (MPa) LINTEL
D/3 D/3
BOTTOM TOP STIRRUPS
(mm)
D/3
D
600 (MIN.)
t/3
1.20m 1.60m 200 1- 10 1- 10 6mm @ 200mm
1.50m 1.90m 14.0 200 1- 10 1- 10 6mm @ 200mm 500 550
1.80m 2.20m 200 1- 12 1- 10 6mm @ 200mm
250
2.10m 2.50m 250 1- 12 1- 10 6mm @ 200mm
2.40m 2.90m 17.0 250 1- 12 1- 10 6mm @ 200mm
2.70m 3.10m 250 1- 16 1- 12 10mm @ 200mm
3.00m 3.40m
20.0
300 1 - 16 1- 12 10mm @ 200mm 400
3.30m 3.70m 300 1 - 16 1- 12 10mm @ 200mm
3.60m 4.00m 300 1 - 20 1- 12 10mm @ 200mm
1. USE E70xx ELECTRODES FOR ALL MEMBERS WELDED.
2. WELDS SHALL DEVELOP THE FULL STRENGTH OF MEMBERS JOINED UNLESS OTHERWISE SHOWN
OR DETAILED IN THE DRAWINGS.
300
(TYP.)
1. STRUCTURAL STEEL TO BE USED FOR FABRICATION AND ERECTION OF THIS STRUCTURE SHALL
DOWEL
COMPLY WITH ALL THE PERTINENT PROVISION OF AISC SPECIFICATION OR DESIGN, FABRICATION
400
DOWEL
2. ALL STRUCTURAL STEEL SHAPES SHALL CONFORM TO ASTM A36 STRUCTURAL STEEL UNLESS 38mm CLEAR
OTHERWISE INDICATED.
250
3. ALL WELDED CONNECTIONS SHALL DEVELOP THE FULL STRENGTH OF THE MEMBERS CONNECTED.
4. UNLESS OTHERWISE SPECIFIED ALL WELDING RODS SHALL CONFORM AWS E60 ELECTRODES.
5. ALL BOLTS USED UNLESS OTHERWISE SPECIFIED SHALL BE ASTM A 307 BOLTS.
400
A. ALL EMBEDDED PIPES FOR UTILITIES, ETC. THAT PASS THRU BEAMS SHALL NOT EXCEED 100mm IN
OR 1 / 3 BEAM DEPTH WHICHEVER IS LESS, UNLESS OTHERWISE APPROVED IN WRITING BY THE
STRUCTURAL ENGINEER
B. NO PIPES SHALL BE ALLOWED TO PASS THRU BEAMS VERTICALLY. NOTES OF STIRRUPS:
C. NO PIPES SHALL BE EMBEDDED IN COLUMNS.
1 ALL REINFORCEMENT SHALL BE BENT COLD UNLESS
300 OTHERWISE PERMITTED BY THE STRUCTURAL
DOWEL
(TYP) ENGINEER.
400
DOWEL
db
1.25 L
100mm THK. CHB WALL - 2.11 kPA
D + 2db
L
D
B. LIVE LOAD
ROOF - 1.00 kPA 4db or 65mm
D
db
BASIC WIND VELOCITY, V = 250 KPH
200(mm) 200(mm) P = qh [(GCpf) - (GCpi)] (DESIGN WIND PRESSURE)
WHERE: qh = VELOCITY PRESSURE, kPA
db
GCpf = EXTERNAL PRESSURE COEFFICIENT
VERIFY DEPRESSION
12db
L
NOTE:
(min.) (min.) PURSUANT TO SECTION 4 OF ANNEX "A" OF THE D. SEISMIC LOAD ( NSCP 2010 )
D = FOR BEAM
t = FOR SLAB
D
D
FTB-1 FTB-2 FTB-2
T
6.00 3.40
DIMENSION 0.40 X 0.40 0.55 X 0.55 0.55 X 0.55 SECTION 50mm LEAN SECTION
MAINBARS 12 - 20mm 12-25mm 12 - 25mm CONCRETE
LATERAL TIES ( 10mm ) 3@50mm; 3@100mm, 3@150mm REST @ 200mm O.C 3@50mm; 3@100mm, 3@150mm REST @ 200mm O.C 3@50mm; 3@100mm, 3@150mm REST @ 200mm O.C 200mm R.C MICRO-PILE
200mm R.C MICRO-PILE
(SEE DETAILS) C B (SEE DETAILS) A
X = 1.30m Y = 2.50 Z = 2.20 L = 3.40
W = 3.40
W = 3.50
DIMENSION 0.435 X 0.435 0.610 X 0.610 0.585 X 0.585
MAINBARS 12-25mm 12 - 25mm 12 - 25mm
LATERAL TIES ( 10mm ) 3@50mm; 3@100mm, 3@150mm REST @ 200mm O.C 3@50mm; 3@100mm, 3@150mm REST @ 200mm O.C 3@50mm; 3@100mm, 3@150mm REST @ 200mm O.C
PLAN PLAN
A
LONGITUDINAL BARS
0.20
FOOTING 10mm RSB VERT.
BARS @ 0.60m OC
GRAVEL BED 12mm 400mm O.C
TRANSVERSE BARS
SCALE 1:20mts
100mm THK. CHB ALL CELLS
9.50
TRANSVERSE BARS
FFL
0.10
C
0.15
3 - 12mm EQUALLY SPACED
LONGITUDINAL BARS
0.15 0.30 0.15
BARS fy SHALL
BE 275 MPa (40,000 psi)
D
WELDED SPIRAL TIE SPLICE DETAIL 150 x 65 x 20 x
SCALE NTS
2.0mm LC PURLINS
65 x 65 x 6mm x 140mm LONG CLIP
0.30 ANGLE FULL WELD (VERTICALLY)
100 x 100 x 6mm THK.
T
T
REINFORCEMENT
0.05
0.30
10mm SPIRAL TIES 12mm x 150mm LONG VERT. & HOR.
ANCHOR BOLTS SPACED @ 500mm
O.C. ( SPACED ALTERNATELY) LRB-1
300mm x 300mm R.C. PILE
(TYP. 5 PLACES PER FOOTING 3) SECTION
12.0m LONG
SCALE 1:30mts
VARIES
65 x 65 x 6mm x 140mm LONG
CLIP ANGLE FULL WELD
0.05
150 x 65 x 20 x
3.50 2.0mm LC PURLINS
5 @ 0.05m PITCH
1.75 1.75
2.20
SPIRAL TIES
SCALE 1:30mts
B 0.60
3.40
0.60
EXTERIOR
VARIES
0
0.5
10mm
0.60
6.00
0
300mm x 300mm R.C. PILE 65 x 65 x 6mm x 140mm LONG CLIP 0.5
(TYP. 5 PLACES PER ANGLE FULL WELD (VERTICALLY)
2.50
1.70
FOOTING 3)
0
150 x 65 x 20 x 0.5
2.0mm LC PURLINS
0
0.5
A
1.00
1.00
3.40
5 @ 0.05m PITCH
100 x 100 x 6mm THK.
ANGULAR BASE PLATE
C
5
0.2 12mm x 150mm LONG VERT. & HOR.
ANCHOR BOLTS SPACED @ 500mm
0.15
1.70
5
O.C. ( SPACED ALTERNATELY)
0.2
1.30
ELEVATION
BENT PLATE 100 x 100
x 12 x 200mm LONG
0.05 0.05
0.60
0.60
0.60 0.60
CONNECTION OF
COLUMN FOOTING DETAILS (CF-1) COLUMN FOOTING DETAILS (CF-3) TYPICAL ELEVATION OF RC PILE PURLINS TO LRB-1
SCALE 1:30mts SCALE 1:30mts SCALE 1:15mts SCALE 1:15mts
0.10
LAP SPLICES ARE ALLOWED LAP SPLICES ARE ALLOWED
2D ONLY IN THIS PORTION 2D 2D ONLY IN THIS PORTION 2D
RCB-1 RCB-1
10mm CUTBARS
12mm BENTBARS 10mm TEMP.BARS @0.10m OC, BOTHWAYS
@0.20m OC, BOTHWAYS @0.20m OC, BOTHWAYS
DEPTH
DEPTH
TYPE OF STIRRUPS
SCALE NTS
1 2 3 4 5 6 7 8 9 10 11
45.00 DESIGN CRITERIA:
4.50 9.00 9.00 9.00 9.00 4.50
4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50
i. LIVE LOAD ________________________________1000Pa
ii. ALLOWABLE STRESSER
A 1. CONCRETE
a. FOR FOOTING, BEAMS AND SLABS
fc" = 20 MPa
2. CONCRETE MASONRY UNITS
DC-1 DC-1 DC-1 DC-1
(LOAD BEARING CHB)
7.00
DC-1 DC-1
fm' = 6.90 MPa, fM = 2.41 MPa
DC-1 DC-1
9.50
fy = 230 MPa
NOTE:
1.50
A
7.00
9.50
B
2.50
C
1.50
1 2 3 4 5 6 7 8 9 10 11
45.00
4.50 9.00 9.00 9.00 9.00 4.50
4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50
12mm. THREADED SAGROD
w/ STD. NUTS & WASHER
1.50
A
7.00
9.50
B
2.50
C
1.50
16mm. PLAIN BAR CROSS 2mm x 150 x 50mm. L.C PURLINS SP. @
ROOF FRAMING PLAN @ TOP CHORD LEVEL BRACE w/ STD. TURN BUCKLE
CLEATS VERTICALLY WELD (SEE DETAIL)
SCALE 1:100mts
0.30 0.05
0
0.4
0.168
0.4
0
0.40
0.10
PC-1
0.30
0.10
0.10 0.40 0.10 SPOT DETAIL
0.20 SCALE 1:20mts
0.4
SPOT DETAIL SPOT DETAIL SPOT DETAIL
0
SCALE 1:15mts
SCALE 1:20mts SCALE 1:20mts SCALE 1:20mts
0.20
0.40
0.20
0.10
0.10
0.15
SPOT DETAIL 12 x 12mm DRIP MOLD
SCALE 1:20mts
0.45
0
SCALE 1:10mts SCALE 1:20mts
0.4
0.60
5 6 CONCRETE SUN-BREAKER DETAILS
SCALE 1:10mts
0.30
0.40
0.50
SPOT DETAIL
0.25
0.10
SCALE 1:20mts
0.45
PC-1
DETAILED SECTION OF RAMP STAIR FRAMING PLAN DET. SECTION OF PC-1
SCALE 1:10mts
SCALE 1:30mts SCALE 1:50mts
4.75 4.75
4.70 B A
7.00
3 6.9
6.9 3
2.50
3.20
PC-1
7.00
4.00
3.20
0.325
STAIR FRAMING PLAN STAIR SECTION DETAIL ELEV. OF END WALL FRAME
SCALE 1:75mts SCALE 1:75mts SCALE 1:30mts
0.25
A
2- 75mm x 75mm x 6mm 2- 75mm x 75mm x 6mm 2- 65mm x 65mm x 6mm
6mm THK
0.40
GUSSET PLATE
65mm x 65mm x 6mm 6mm THK 6mm THK ( TYPICAL )
25mm THK LEVELING GROUT GUSSET PLATE GUSSET PLATE
0.25
0.25
( TYPICAL ) ( TYPICAL )
190 75
6mm THK
340
0.50 SPOT DETAIL "D" SPOT DETAIL "E" SPOT DETAIL "F"
615 SCALE 1:10mts SCALE 1:10mts SCALE 1:10mts
65
B 2 s-50 x 50 x 6 ( B ) 6
75
50
75
6 TOP CHORD
0.25
6mm THK
4-16mm x 350mm LONG GUSSET PLATE
BOTTOM CHORD L1
190
ANCHOR BOLTS w/ NUTS
220
322
223
( TYPICAL )
& WASHER
STITCH WELD
134
75
75
65mm x 65mm x 6mm
65
456 619
L3
CROSS BRACING
DETAIL OF GUSSET PLATE DETAIL OF ANCHORAGE SPOT DETAIL "F" DETAIL CONNECTION L2 L1
SCALE 1:10mts SCALE 1:10mts
SCALE 1:10mts SCALE 1:10mts
WELD DETAIL
A B C
SCALE NTS
0.60
0.03 0.03
4.75 4.75
0.05 0.05
0.03
1.25 1.25 1.13 1.13
0.05
SEE DETAILS
0.40mm THICK (BASE METAL THICKNESS) LONG
0
0.5 SPAN PRE PAINTED G.I ROOFING SHEETS WITH
0.60
TOTAL COATED THICKNESS OG 0.50mm THK.
0
0.5
12mm. THREADED SAGROD
0
0.5
0.05
w/ STD. NUTS & WASHER
0.03
0
0.5 2mm x 150 x 50mm. L.C PURLINS SP. @
0 4-16 x 450 A307 ANCHOR
0.5 CLEATS VERTICALLY WELD (SEE DETAIL) 12mm THK. BASE PLATE BOLT w/ N & W (TYP.)
0 2 - 50 x 50 x 6mm
0.5
0
WEB MEMBERS
BASE PLATE DETAILS
0.5 SEE DETAILS 2 - 50 x 50 x 6mm TOP SCALE 1:15mts
2.50
0.30
SEE DETAILS
0.125
18 SEE DETAILS
0.2
0.50
SEE DETAILS
50mm PVC VP
50mm PVC VP (UNDER FLOOR SLAB)
DS DS DS DS DS DS
A
100mm PVC SP
C DS
DP
DS
DP DP
DS
DP
DS
DP
DS
2.30
MH MH MH
SEPTIC TANK
USE 1.5 WATER DEPTH
1 2 3 4 5 6 7 8 9 10 11
150mm uPVC 150mm CDP 150mm CDP 150mm CDP 150mm CDP
CB CB CB CB CB CB
100mm PVC SP
DS DS DS DS 100mm PVC SP DS
A 100mm PVC SS
50mm PVC VS
100mm PVC SP
50mm PVC VP
CDP
CDP
150mm
150mm
B
C DS DS DS DS
CB CB CB CB
150mm CDP 150mm CDP
7.00
9.50
B
2.50
C
DS DS DS DS DS
S-1a 150mm THK. + FIN. SLAB w/ 10mm
REBARS @ 300mm O.C BENT UP 2 OUT OF 3
@ L/4 FROM FACE SUPPORT BOTHWAYS
8.60
ROOF DRAINAGE LAYOUT
SCALE 1:100mts
0.15 4.00 0.15 2.00 0.15 2.00 0.15
10mm RSB @200mm
O.C BOTHWAYS
0.15
0.60
0.10 0.40 0.10
100mm PVCDS
2.00
2.30
25mm PVC
0.10
DRAIN PIPE
DRAINAGE PIPE
0.60
0.40
0.15
S2 150mm THK. + FIN. SLAB w/ 10mm REBARS @ 300mm 150mm CDP OUTLET
O.C BENT UP 2/3 OUT @ L/4 FACE SUPPORT AND
SHORT SPAN 10mm TEMP. BARS @ 300mm EW 16mm HANDLE BAR 0.40
0.10
4.00
8.60
0.15 2.00 0.15 2.00 PLAN
DETAIL SECTION OF DRAIN PINE
SCALE 1:25mts
0.60 0.60 0.60
150mm THK. SLAB w/ 0.60
0.15
10mm REBARS @
300mm BOTHWAYS 0.10 0.40 0.10
0.08 0.08
0.25
0.30
0.10
0.60
0.25 0.10 0.25
COMPOUND OR APPLY 150mm THK CHB w/ 10mm
ONE FACE BITUMEN TAR REBARS HOR. @ 2 LAYER
VERT. @ 600mm O.C
2.10
150mm CDP
1.50
0.60
0.40
2% SLOPE
PLASTERED w/
WATERPROOFING
INLET OUTLET
0.10
150mm CDP
2% SLOPE
0.10
0.20
0.05 0.05
0.05 0.50 0.05
SECTION 3 - 10mm REBARS
DETAIL OF SEPTIC TANK CONCRETE WALL w/ HOT APPLIED DETAIL OF CATCH BASIN MANHOLE COVER DETAIL
SCALE 1:10mts SCALE 1:5mts
SCALE 1:30mts ASPHALT WATERPROOFING (INSIDE FACE)
1 2 3 4 5 6 7 8 9 10 11
ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF FORTY-FIVE
b. ONE AND ONE-HALF METERS (1.50m) INSIDE THE PROPERTY LINES BEFORE THE
9.50
B 6.NOT LESS THAN 0.30 METER OF AIR SPACE MUST BE LEFT BETWEEN THE TOP
OF THE SEWAGE AND THE UNDER PART OF THE VAULT ROOF SLAB.
7. NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE BUILDING.
2.50
1 2 3 4 5 6 7 8 9 10 11
45.00
9.00 9.00 9.00 9.00 9.00
4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50
A
7.00
G.V
9.50
C.O
B S.P
2.50
VAC
V
C VS
VTR
WP
7.00
9.50
B WP WP
2.50
1 2 3 4 5 6 7 8 9
36.00
4.50 9.00 9.00 9.00 4.50
4.50 4.50 4.50 4.50 4.50 4.50
A
7.00
9.50
FACP FACP
LPA
OVERHEAD SERVICE MDP LPA
ENTRANCE REFER
B
TO RISER DIAGRAM
RAMP UP
GROUND FLOOR POWER LAYOUT
SCALE 1:100mts
7.00
9.50
B
2.50
1 2 3 4 5 6 7 8 9 10 11
45.00
4.50 9.00 9.00 9.00 9.00 4.50
4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50
A
7.00
9.50
B
2.50
RAMP UP
GROUND FLOOR LIGHTING LAYOUT
SCALE 1:100mts
25078
230 ) = 87.23 AMPERES
8002
230 ) 0.85 = 29.57 AMPERES
4 - 2.0mm2 TW
IN 20mm PVC
2ND FLOOR LINE
5.00
)
2
2 - 8.0mm THHN + IN 20mm PVC
8538 0.80 = 29.70 AMPERES 1 - 8.0mm2 TW GROUND 1-5.5mm2 TW(G) IN ENCLOSED ACB RATING:
230 IN 20mm PVC 20AT, 20AF, 230, 2P
1.80
25mm RSC
2 - 3.5mm2 THHN + 1 - 3.5mm2
GRD. FLOOR LINE TW(G) WIRE ON 20mm PVC
FIN. FLOOR LINE
LOAD SCHEDULE 1 - 5.5mm2 TW GROUND
IN 20mm PVC
SCALE NTS