You are on page 1of 1

Seat No.: _____ Enrolment No.

______

GUJARAT TECHNOLOGICAL UNIVERSITY


M.E Sem-I Remedial Examination April 2010
Subject code: 710701
Subject ame: Power System Modelling & Simulation
Date: 06 / 04 / 2010 Time: 12.00 noon 02.30 pm
Total Marks: 60
Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.

Q.1 (a) Prepare the algorithm for short circuit study. 06


(b) How to find out bus voltages after symmetrical fault at bus no r in n bus 06
system.
Q.2 (a) How the Zbus is assembled by current injection technique. 06
(b) If Ybus is available, how to find out Zbus from Ybus. 06
OR
(b) How to assemble Zbus by step by step method. 06

Q.3 (a) What are the applications of load flow study? 06


(b) Give bus classification stating importance of each in load flow study. 06
OR
Q.3 (a) Discuss the operating states of power system keeping security in view. 06
(b) Explain concept of power system security. 06

Q.4 (a) Write down SLFE equations for load flow study for Pi and Qi. 06
(b) Discuss D.C. load flow study stating its conditions. What is its importance? 06
OR
Q.4 (a) Write technical notes on : 06
(i) Primitive network. (ii) Links and Tree of the network.
(b) How to speed up solution of the load flow study problem? 06

Q.5 (a) Write technical notes on : 06


(i) Application of power system state estimation. (ii) Network observability.
(b) Explain multi-machine transient stability. 06

OR
Q.5 (a) What is sparsity in matrix? 06
(b) Explain Bewleys lattice diagram. 06

*************

You might also like