PROGRAMADO EJECUTADO
FORMULA DESCRIPCIN PRESUPUESTO En la Semana Acumulado En la Semana Acumulado
US$ AVANCE (%) US$ AVANCE (%) US$ AVANCE (%) US$
001 RED DE AGUA POTABLE 18,961.78 0.00 0.00% 18,961.78 100.00% 0.00 0.00% 18,961.78
002 RED DE ALCANTARILLADO 62,833.40 0.00 0.00% 62,833.39 100.00% 0.00 0.00% 62,833.39
003 ELECTRICAS-SUBSISTEMA DE DISTRIBUCION PRIMARIA 7,238.52 0.00 0.00% 7,238.52 100.00% 187.78 2.59% 7,238.52
004 ELECTRICAS-SUBSISTEMA DE DISTRIBUCION SECUNDARIA 18,044.86 0.00 0.00% 18,044.86 100.00% 8,066.72 44.70% 18,044.86
005 PAVIMENTACION. 129,371.05 46,032.40 35.58% 118,151.35 91.33% 0.00 0.00% 72,118.95
006 CONSTRUCCION DE VEREDAS 74,812.69 0.00 0.00% 74,812.70 100.00% 0.00 0.00% 71,877.45
007 CONSTRUCCION DEL LOCAL COMUNAL TRES ESTRELLAS 30,734.44 0.00 0.00% 30,734.44 100.00% 1,038.05 3.38% 30,596.25
008 CONSTRUCCION DEL LOCAL COMUNAL VILLA EL SOL 37,972.01 0.00 0.00% 37,972.01 100.00% 0.00 0.00% 36,208.32
009 LOSA DEPORTIVA TRES ESTRELLAS : CONSTRUCCION DE GRADERIAS 9,231.26 0.00 0.00% 9,231.26 100.00% 0.00 0.00% 9,231.27
010 LOSA DEPORTIVA TRES ESTRELLAS : CONSTRUCCION DE LOSA 10,878.68 0.00 0.00% 10,878.68 100.00% 0.00 0.00% 10,878.68
011 CONSTRUCCION DEL PARQUE TRES ESTRELLAS 29,116.96 1,591.86 5.47% 29,116.97 100.00% 1,200.34 4.12% 28,725.46
012 CONSTRUCCION DEL PARQUE VILLA EL SOL 19,995.62 1,615.93 8.08% 19,995.60 100.00% 3,830.52 19.16% 18,312.76
AVANCE DE OBRA - UNDECIMA SEMANA 449,191.27 49,240.19 10.96% 437,971.56 97.50% 14,323.42 3.19% 385,027.69
RETRASO (-) O ADELANTO (+) -34,916.77 -7.77% -52,943.88
AVANCE ACUM.
AVANCE ACUM.
(%) Adelanto (+)
ACTIVIDADES (%) EJECUTADO
PROGRAMADO EJECUTADO Atraso (-)
AVANCE TOTAL OBRA (sin GG, Utilidad ni IGV) 97.50% 85.72% -11.79%
001 RED DE AGUA POTABLE 100.00% 100.00% 0.00%
002 RED DE ALCANTARILLADO 100.00% 100.00% 0.00%
003 ELECTRICAS-SUBSISTEMA DE DISTRIBUCION PRIMARIA 100.00% 100.00% 0.00%
004 ELECTRICAS-SUBSISTEMA DE DISTRIBUCION SECUNDARIA 100.00% 100.00% 0.00%
005 PAVIMENTACION. 91.33% 55.75% -35.58%
006 CONSTRUCCION DE VEREDAS 100.00% 96.08% -3.92%
007 CONSTRUCCION DEL LOCAL COMUNAL TRES ESTRELLAS 100.00% 99.55% -0.45%
008 CONSTRUCCION DEL LOCAL COMUNAL VILLA EL SOL 100.00% 95.36% -4.64%
009 LOSA DEPORTIVA TRES ESTRELLAS : CONSTRUCCION DE GRADERIAS 100.00% 100.00% 0.00%
010 LOSA DEPORTIVA TRES ESTRELLAS : CONSTRUCCION DE LOSA 100.00% 100.00% 0.00%
011 CONSTRUCCION DEL PARQUE TRES ESTRELLAS 100.00% 98.66% -1.34%
012 CONSTRUCCION DEL PARQUE VILLA EL SOL 100.00% 91.58% -8.42%
Cuadro Comparativo
Programado Vs. Ejecutado
Actividades
RED DE ALCANTARILLADO
PAVIMENTACION.
CONSTRUCCION DE VEREDAS
Activ
RED DE ALCANTARILLADO
PAVIMENTACION.
CONSTRUCCION DE VEREDAS
EJECUTADO
Acumulado
AVANCE (%)
100.00%
100.00%
100.00%
100.00%
55.75%
96.08%
99.55%
95.36%
100.00%
100.00%
98.66%
91.58%
85.72%
-11.79%
Cuadro Comparativo
ogramado Vs. Ejecutado
Porcentaje de Avance
AVANCE ACUM. (%) PROGRAMADO AVANCE ACUM. (%) EJECUTADO
.00% 40.00% 60.00% 80.00% 100.00% 120.00%
CONTRATO N : 7-308-05-BM
OBRA: OBRAS DEL PROYECTO DE MEJORAMIENTO INTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS" DE LA CIUDAD DE CHIMBOTE
SUBPRESUPUESTO: RED DE AGUA POTABLE
ENTIDAD CONTRATANTE: BANMAT SAC
SUPERVISOR: H.B. CONTRATISTAS GENERALES E.I.R.L.
CONTRATISTA: PCA INGENIERIA Y CONSTRUCCION S.A.C.
MODALIDAD DE EJECUCION: SUMA ALZADA
UBICACIN : DISTRITO DE CHIMBOTE, PROVINCIA DEL SANTA, DEPARTAMENTO DE ANCASH.
Primera Semana del 25.02.06 al 03.03.06 Segunda Semana del 04.03.06 al 10.03.06 Tercera Semana del 11.03.06 al 17.03.06
PRESUPUESTO FINAL
ITEM DESCRIPCIN PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO
PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL
UND CANTIDAD P.U. (US$) PARCIAL (US$) METRADO AVANCE (%) METRADO AVANCE (%) METRADO AVANCE (%) METRADO AVANCE (%) METRADO AVANCE (%) METRADO
(US$) (US$) (US$) (US$) (US$) (US$)
RED AGUA POTABLE- A.H. VILLA EL SOL Y TRES ESTRELLAS 18,961.78
01.00.00 OBRAS PRELIMINARES 1,309.66 1,309.66 100.00% -
01.01.00 TRANSPORTE DE MATERIALES GLB 1.00 927.07 927.07 1.00 927.07 100.00% - -
01..02.00 TRAZO Y REPLANTEO PARA AGUA M 981.00 0.39 382.59 981.00 382.59 100.00% - -
11.03.06 al 17.03.06 Cuarta Semana del 18.03.06 al 24.03.06 Quinta Semana del 25.03.06 al 31.03.06 Sexta Semana del 01.04.06 al 07.04.06 Septima Semana del 08.04.06 al 14.04.06
EJECUTADO PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO
PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL
AVANCE (%) METRADO AVANCE (%) METRADO AVANCE (%) METRADO AVANCE (%) METRADO AVANCE (%) METRADO AVANCE (%) METRADO AVANCE (%) METRADO AVANCE (%) METRADO
(US$) (US$) (US$) (US$) (US$) (US$) (US$)
0.00% 1,309.66 100.00%
0.00% - 1.00 927.07 100.00%
0.00% - 981.00 382.59 100.00%
1,727.55 36.74%
45.00 1,727.55 51.72% 60.00
152.00
-
337.57
61.27 100.00%
7.20 33.98 100.00% 7.20
0.54 27.29 100.00% 0.54
276.30 100.00%
9 276.30 100.00% 9
0.00% 2,545.21 13.42% 1,309.66 6.91% 5,223.38 27.55% 0.00 0.00% 4,309.38 22.73% 10,158.64 53.57% 1,727.55 9.11%
330.88 170.26 679.04 0.00 560.22 1,320.62 224.58
50.90 26.19 104.47 0.00 86.19 203.17 34.55
------------------ ------------------ ------------------ ------------------ ------------------ ------------------ ------------------
mana del 08.04.06 al 14.04.06 Octava Semana del 15.04.06 al 21.04.06 Novena Semana del 22.04.06 al 28.04.06 Decima Semana del 29.04.06 al 05.05.06 Undecima Semana del 06.05.06 al 10.05.06
EJECUTADO PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO PROGRAMADO
PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL PARCIAL
AVANCE (%) METRADO AVANCE (%) METRADO AVANCE (%) METRADO AVANCE (%) METRADO AVANCE (%) METRADO AVANCE (%) METRADO AVANCE (%) METRADO AVANCE (%)
(US$) (US$) (US$) (US$) (US$) (US$) (US$) (US$)
1,449.34 29.03%
149.04 19.35%
1,283.80 30.82%
1.80 19.35%
14.70 30.82%
789.41 69.88%
127.22 40.00%
57.14 50.00%
36.04 40.00%
29.58 50.00%
8.72 50.00%
189.18 100.00%
341.53 100.00%
337.57
61.27 -
33.98 100.00% - 0.00%
27.29 100.00% - 0.00%
276.30
276.30 100.00%
4,904.04 25.86% 2,974.63 15.69% 2,503.78 13.20% 214.98 1.13% 85.66 0.45% 0.00 0.00% 0.00 0.00% 0.00 0.00%
637.53 386.70 325.49 27.95 11.14 0.00 0.00 0.00
98.08 59.49 50.08 4.30 1.71 0.00 0.00 0.00
------------------ ------------------ ------------------ ------------------ ------------------ ------------------ ------------------ ------------------
Seguimiento del Cronograma de Ejecucion de la Undecima Semana de Obras
Del 06.05.06 al 10.05.06
CONTRATO N : 7-308-05-BM
OBRA: OBRAS DEL PROYECTO DE MEJORAMIENTO INTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS
SUBPRESUPUESTO: RED DE AGUA POTABLE
ENTIDAD CONTRATANTE: BANMAT SAC
SUPERVISOR: H.B. CONTRATISTAS GENERALES E.I.R.L.
Elaborado por: Ing Edwin Gamarra Barrera. CONTRATISTA: PCA INGENIERIA Y CONSTRUCCION S.A.C.
Supervisor - HB Contratistas Generales E.I.R.L. MODALIDAD DE EJECUCION: SUMA ALZADA
Fecha: Ju.18.05.06 UBICACIN : DISTRITO DE CHIMBOTE, PROVINCIA DEL SANTA, DEPARTAMENTO DE ANCASH.
- -
Cuadro Comparativo
62.700 252.68 100.00% 62.70 252.68 100.00% Programado Vs. Ejecutado
4,992.84 100.00% 4,992.84 100.00%
186.000 770.04 100.00% 186.00 770.04 100.00%
795.000 4,165.80 100.00% 795.00 4,165.80 100.00% RED AGUA POTABLE- A.H. VILLA EL SOL Y TRES ESTRELLAS
186.000 9.30 100.00% 186.00 9.30 100.00%
Actividades
795.000 47.70 100.00% 795.00 47.70 100.00%
OBRAS PRELIMINARES
1,129.74 100.00% 1,129.74 100.00%
5.000 318.05 100.00% 5.00 318.05 100.00%
2.000 114.28 100.00% 2.00 114.28 100.00% MOVIMIENTO DE TIERRAS
5.000 90.10 100.00% 5.00 90.10 100.00%
4.000 59.16 100.00% 4.00 59.16 100.00%
2.000 17.44 100.00% 2.00 17.44 100.00% TUBERIAS
1.000 189.18 100.00% 1.00 189.18 100.00%
1.000 341.53 100.00% 1.00 341.53 100.00%
ACCESORIOS
4,702.18 100.00% 4,702.18 100.00%
87.000 3,339.93 100.00% 87.00 3,339.93 100.00%
12.000 523.92 100.00% 12.00 523.92 100.00%
CONEXIONES DOMICILIARIAS
22.000 796.84 100.00% 22.00 796.84 100.00%
1.000 41.49 100.00% 1.00 41.49 100.00%
OBRAS DEL PROYECTO DE MEJORAMIENTO INTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS" DE LA CIUDAD DE CHIMBOTE
Cuadro Comparativo
Programado Vs. Ejecutado
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
TUBERIAS
ACCESORIOS
CONEXIONES DOMICILIARIAS
PRUEBA HIDRAULICA
DESINFECCION DE TUBERIAS
OBRAS ESPECIALES
Porcentaje
AVANCE ACUM. (%) PROGRAMADO de Avance
AVANCE ACUM. (%) EJECUTADO
100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
Seguimiento del Cronograma de Ejecucion de la Undecima Semana de Obras
Del 06.05.06 al 10.05.06
CONTRATO N : 7-308-05-BM
OBRA: OBRAS DEL PROYECTO DE MEJORAMIENTO INTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS" DE
SUBPRESUPUESTO: RED ALCANTARILLADO
ENTIDAD CONTRATANTE: BANMAT SAC
SUPERVISOR: H.B. CONTRATISTAS GENERALES E.I.R.L.
CONTRATISTA: PCA INGENIERIA Y CONSTRUCCION S.A.C.
MODALIDAD DE EJECUCION: SUMA ALZADA
UBICACIN : DISTRITO DE CHIMBOTE, PROVINCIA DEL SANTA, DEPARTAMENTO DE ANCASH.
AVANCES ACUMULADOS
PROGRAMADO EJECUTADO
PARCIAL AVANCE PARCIAL AVANCE
METRADO METRADO
(US$) (%) (US$) (%)
AVANCE ACUM. (%)
ACTIVIDADES AVANCE ACUM. (%) EJECUTADO
1,949.36 100.00% 1,949.36 100.00% PROGRAMADO
1.000 799.35 100.00% 1.00 799.35 100.00% RED DE ALCANTARILLADO - A.H. VILLA EL SOL 100.00% 100.00%
1.000 600.01 100.00% 1.00 600.00 100.00% OBRAS PROVISIONALES 100.00% 100.00%
1.000 550.00 100.00% 1.00 550.00 100.00% OBRAS PRELIMINARES 100.00% 100.00%
MOVIMIENTO DE TIERRAS 100.00% 100.00%
2,562.29 100.00% 2,562.29 100.00% TUBERIAS 100.00% 100.00%
1,380.000 621.00 100.00% 1,380.00 621.00 100.00% CAMARAS DE INSPECCION 100.00% 100.00%
22.000 138.82 100.00% 22.00 138.82 100.00% CONEXIONES DOMICILIARIAS 100.00% 100.00%
41.000 50.43 100.00% 41.00 50.43 100.00% PRUEBA HIDRAULICA 100.00% 100.00%
2,760.000 1,269.60 100.00% 2,760.00 1,269.60 100.00% REPOSICION DE CARPETA ASFALTICA 100.00% 100.00%
28.000 482.44 100.00% 28.00 482.44 100.00%
Actividades
-
591.50 100.00% 591.50 100.00%
1,258.499 591.50 100.00% 1,258.52 591.50 100.00% RED DE ALCANTARILLADO - A.H. VILLA EL SOL Y TRES ESTRELLAS
ELLAS
NALES
ARES
RRAS
ERIAS
CCION
ARIAS
ULICA
LTICA
Porcentaje
GRAMADO de Avance
UTADO
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Seguimiento del Cronograma de Ejecucion de la Undecima Semana de Obras
Del 06.05.06 al 10.05.06
CONTRATO N : 7-308-05-BM
OBRA: OBRAS DEL PROYECTO DE MEJORAMIENTO INTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS" DE LA CIUDAD DE CHIMBOTE
SUBPRESUPUESTO: ELECTRICAS-SUBSISTEMA DE DISTRIBUCION PRIMARIA
ENTIDAD CONTRATANTE: BANMAT SAC
SUPERVISOR: H.B. CONTRATISTAS GENERALES E.I.R.L.
CONTRATISTA: PCA INGENIERIA Y CONSTRUCCION S.A.C. Elaborado por: Ing E
MODALIDAD DE EJECUCION: SUMA ALZADA Supervisor - HB Contra
UBICACIN : DISTRITO DE CHIMBOTE, PROVINCIA DEL SANTA, DEPARTAMENTO DE ANCASH.
AVANCES ACUMULADOS
EJECUTADO ACTIVIDADES AVANCE ACUM. (%) PROGRAMADO AVANCE ACUM. (%) EJECUTADO
PARCIAL 100.00% 100.00%
METRADO AVANCE (%) RED ELECTRICA-SUBSISTEMA PRIMARIO- A.H. VILLA EL SOL Y TRES ESTRELLAS
(US$)
7,238.52 100.00% OBRAS PRELIMINARES 100.00% 100.00%
391.38 100.00% MOVIMIENTO DE TIERRAS 100.00% 100.00%
110.00 25.30 100.00% SUMINISTRO E INSTALACION DE CABLES 100.00% 100.00%
1.00 366.08 100.00% SUMINISTRO E INSTALACION DE POSTES Y CRUCETAS 100.00% 100.00%
SUMINISTRO E INSTALACION ARMADOS 100.00% 100.00%
13.50 100.00% SUMINISTRO E INSTALACION DE RETENIDAS 100.00% 100.00%
2.00 13.50 100.00% SUMINISTRO E INSTALACION DE PUESTA A TIERRA 100.00% 100.00%
SUMINISTRO E INSTALACION DE SUB ESTACION/EQUIPO PROT 100.00% 100.00%
486.15 100.00% PRUEBAS ELECTRICAS 100.00% 100.00%
390.00 206.70 100.00%
15.00 279.45 100.00%
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
Cuadro Comparativo
Programado Vs. Ejecutado
Porcenta de Avance
PRESUPUESTO FINAL
ITEM DESCRIPCIN
UND CANTIDAD
RED ELECTRICA-SUBSISTEMA SECUNDARIO- A.H. VILLA EL SOL Y TRES ESTRELLAS
01.00.00 OBRAS PRELIMINARES
01.01.00 REPLANTEO TOPOG. RED SECUNDARIA KM 0.85
05.00.00 RETENIDAS
05.01.00 RETENIDA TIPO VIOLIN M 22.00
COSTO DIRECTO
GASTOS GENERALES 13%
UTILIDAD 2%
SUBTOTAL
IMPUESTO (IGV) 19%
TOTAL PRESUPUESTO
ma Semana de Obras
INTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS" DE LA CIUDAD DE CHIM
N SECUNDARIA
AVANCES ACUMULADOS
PRESUPUESTO FINAL
PROGRAMADO EJECUTADO
PARCIAL PARCIAL
P.U. (US$) PARCIAL (US$) METRADO AVANCE (%) METRADO
(US$) (US$)
RES ESTRELLAS 18,044.86 18,044.86 100.00% 18,044.86
88.64 88.64 100.00% 88.64
104.28 88.64 0.850 88.64 100.00% 0.85 88.64
JECUTADO
AVANCE (%) ACTIVIDADES
100.00% RED ELECTRICA-SUBSISTEMA SECUNDARIO- A.H. VILLA EL SOL Y TRES E
100.00% OBRAS PRELIMINARES
100.00% ARMADOS RED SECUNDARIA
CONDUCTORES DE COBRE
100.00% POSTE ,LUMINARIAS,LAMPARAS Y ACCESORIOS
100.00% RETENIDAS
100.00% PUESTA A TIERRA
100.00%
100.00%
100.00%
100.00%
100.00%
Actividades
100.00%
100.00% RED ELECTRICA-SUBSISTEMA SECUNDARIO- A.H. VILLA EL SOL Y TRES ESTRELLAS
100.00%
100.00%
OBRAS PRELIMINARES
100.00%
100.00%
ARMADOS RED SECUNDARIA
100.00%
100.00%
CONDUCTORES DE COBRE
100.00%
100.00%
POSTE ,LUMINARIAS,LAMPARAS Y ACCESORIOS
100.00%
RETENIDAS
PUESTA A TIERRA
AVANCE ACUM. (%) PROGRAMADO
AVANCE ACUM. (%) EJECUTADO
100.00%
Seguimiento del Cronograma de Ejecucion de la Undecima Semana de Obras
Del 06.05.06 al 10.05.06
: 7-308-05-BM
OBRAS DEL PROYECTO DE MEJORAMIENTO INTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VI
ELECTRICAS-SUBSISTEMA DE DISTRIBUCION SECUNDARIA
BANMAT SAC
H.B. CONTRATISTAS GENERALES E.I.R.L.
PCA INGENIERIA Y CONSTRUCCION S.A.C.
SUMA ALZADA
DISTRITO DE CHIMBOTE, PROVINCIA DEL SANTA, DEPARTAMENTO DE ANCASH.
Cuadro Comparativo
Programado Vs. Ejecutado
OBRAS PRELIMINARES
CONDUCTORES DE COBRE
AS,LAMPARAS Y ACCESORIOS
RETENIDAS
PUESTA A TIERRA
NCE ACUM. (%) PROGRAMADO
NCE ACUM. (%) EJECUTADO
100.00% 100.00% Porcenta100.00%
de Avance 100.00% 100.00% 10
cima Semana de Obras
00.00%
Seguimiento
CONTRATO N : 7-308-05-BM
OBRA: OBRAS DEL PROYECTO DE MEJORAMIENTO INTEGRAL DE BARRIOS EN EL B
SUBPRESUPUESTO: PAVIMENTACION
ENTIDAD CONTRATANTE: BANMAT SAC
SUPERVISOR: H.B. CONTRATISTAS GENERALES E.I.R.L.
CONTRATISTA: PCA INGENIERIA Y CONSTRUCCION S.A.C.
MODALIDAD DE EJECUCION: SUMA ALZADA
UBICACIN : DISTRITO DE CHIMBOTE, PROVINCIA DEL SANTA, DEPARTAMENTO DE ANCAS
PRESUPUESTO FINAL
ITEM DESCRIPCIN
UND CANTIDAD
PAVIMENTACION
01.00.00 OBRAS PROVISIONALES
01.01.00 MOVILIZACION Y DESMOBILIZACION DE EQUIPOS GLB 1.00
04.00.00 PAVIMENTO
04.01.00 IMPRIMACION ASFALTICA RC-250 M2 11,404.80
04.02.00 CARPETA ASFALTICA EN CALIENTE DE 2" M2 11,404.80
05.00.00 SARDINEL
05.01.00 SARDINELES PERALTADOS CONCRETO F'C=210 KG/CM2 ML 409.85
COSTO DIRECTO
GASTOS GENERALES 13%
UTILIDAD 2%
SUBTOTAL
IMPUESTO (IGV) 19%
TOTAL PRESUPUESTO
Seguimiento del Cronograma de Ejecucion de la Undecima Semana de Obras
Del 06.05.06 al 10.05.06
INTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS" DE LA CIUDAD DE CHI
2,280.96
0.20 2,280.96
54,596.00
0.91 3,869.07
0.86 266.19
0.79 9,009.79
2.57 7,552.41
2.18 24,862.46
2.35 9,036.08
3,184.53
7.77 3,184.53
ACTIVIDADES
PAVIMENTACION
OBRAS PROVISIONALES
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
PAVIMENTO
SARDINEL
Actividades
PAVIMENTACION
OBRAS PROVISIONALES
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
PAVIMENTO
SARDINEL
AVANCE ACUM. (%) PROGRAMADO
AVANCE ACUM. (%) EJECUTADO
0.00% 10.00% 20.00%
Seguimiento del Cronograma de Ejecucion de
Del 06.05.06 al 10.0
: 7-308-05-BM
OBRAS DEL PROYECTO DE MEJORAMIENTO INTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VI
PAVIMENTACION
BANMAT SAC
H.B. CONTRATISTAS GENERALES E.I.R.L.
PCA INGENIERIA Y CONSTRUCCION S.A.C.
SUMA ALZADA
DISTRITO DE CHIMBOTE, PROVINCIA DEL SANTA, DEPARTAMENTO DE ANCASH.
Cuadro C
Programad
Actividades
PAVIMENTACION
OBRAS PROVISIONALES
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
PAVIMENTO
SARDINEL
AVANCE ACUM. (%) PROGRAMADO
Porcentaje
AVANCE ACUM. (%) EJECUTADO
0.00% 10.00% 20.00% 30.00% 40.00% de Avance 50.00%
ograma de Ejecucion de la Undecima Semana de Obras
Del 06.05.06 al 10.05.06
Cuadro Comparativo
Programado Vs. Ejecutado
Porcentaje
0.00% de Avance 50.00% 60.00% 70.00% 80.00% 90.00% 100.00%
CIUDAD DE CHIMBOTE
PRESUPUE
ITEM DESCRIPCIN
UND
CONSTRUCCION DE VEREDAS
01.00.00 OBRAS PRELIMINARES
01.01.00 TRAZO Y REPLANTEO GLB
COSTO DIRECTO
GASTOS GENERALES 13%
UTILIDAD 2%
SUBTOTAL
IMPUESTO (IGV) 19%
TOTAL PRESUPUESTO
decima Semana de Obras
TEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS" DE LA CIUDAD DE CHIMB
A, DEPARTAMENTO DE ANCASH.
14,752.29
775.87 5.97 4,631.94
150.82 3.37 508.26
559.75 0.62 347.05
4,447.80 1.47 6,538.27
781.31 3.49 2,726.77
58,043.79
5,559.75 10.44 58,043.79
293.09
888.16 0.33 293.09
293.09 100.00%
888.168 293.09 100.00%
JECUTADO ACTIVIDADES
AVANCE (%) CONSTRUCCION DE VEREDAS
96.08% OBRAS PRELIMINARES
100.00% MOVIMIENTO DE TIERRAS
100.00% OBRAS DE CONCRETO SIMPLE
JUNTAS DE DILATACION
100.00%
100.00%
100.00%
100.00%
Actividades
100.00%
100.00% CONSTRUCCION DE VEREDAS
95.45%
95.45% OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
JUNTAS DE DILATACION
Cuadro Comparativo
Programado Vs. Ejecutado
VEREDAS
LIMINARES
E TIERRAS
TO SIMPLE
LATACION
PRESUPUEST
ITEM DESCRIPCIN
UND
CONSTRUCCION DEL LOCAL COMUNAL TRES ESTRELLAS
01.00.00 OBRAS PROVISIONALES
01.01.00 TRANSPORTE EQUIPOS, MATERIALES Y HERRAMIENTAS GLB
01.02.00 POZA ALM. AGUA PARA LA CONSTRUCCION GLB
01.03.00 GUARDIANIA GLB
05.01.00 ZAPATAS
05.01.01 ZAPATAS - CONCRETO 175 KG/CM2 M3
05.01.02 ZAPATAS - ENCOFRADO Y DESCENCOFRADO M2
05.01.03 ZAPATAS - ACERO DE REFUERZO KG
05.02.00 VIGAS DE CIMENTACION
05.02.01 VIGAS DE CIMENTACIN - CONC. 175 KG/CM2 M3
05.02.02 VIGAS DE CIMENTACIN - ENCOFRADO Y DESCENCOFRADO M2
05.02.03 VIGAS DE CIMENTACIN - ACERO DE REFUERZO KG
05.03.00 SOBRECIMIENTOS REFORZADOS
05.03.01 SOBRECIMIENTO REFORZADO 175 KG/CM2 M3
05.03.02 SOBRECIMIENTO REFORZADO - ENCOFRADO Y DESCENCOFRADO M2
05.03.03 SOBRECIMIENTO REFORZADO - ACERO DE REFUERZO KG
05.04.00 COLUMNAS
05.04.01 COLUMNAS - CONCRETO 210 KG/CM2 M3
05.04.02 COLUMNAS- ENCOFRADO Y DESCENCOFRADO M2
05.04.03 COLUMNAS - ACERO DE REFUERZO KG
05.05.00 VIGAS
05.05.01 VIGAS CONCRETO 210 KG/CM2 M3
05.05.02 VIGAS - ENCOFRADO Y DESCENCOFRADO M2
05.05.03 VIGAS- ACERO DE REFUERZO KG
05.06.00 LOSAS ALIGERADAS
05.06.01 LOSAS ALIGERADAS - CONCRETO 210 KG/CM2 M3
05.06.02 LOSAS ALIGERADAS.- ENCOFRADO Y DESCENCOFRADO M2
05.06.03 LOSAS ALIGERADOS.- ACERO DE REFURZO KG
05.06.04 LOSAS ALIGERADAS.- LADR. HUECO 15X30X30 UND
05.07.00 CISTERNA SUBTERRANEA
05.07.01 CISTERNA SUBTERRANEA - CONC. 175 KG/CM2 C/IMPERMEAB. M3
05.07.02 CISTERNA, ENCOFRADO Y DESENCOFRADO M2
05.07.03 CISTERNA SUBTERRANEA-ACERO REFUERZO KG
06.00.00 ALBAILERIA
06.01.00 MURO DE LADRILLO KK SOGA 1:5 CARAVISTA M2
08.00.00 CIELORRASOS
08.01.00 CIELORASO MEZCLA 1:5 E = 1.5 cm. M2
12.00.00 CERRAJERIA
12.01.00 BISAGRA ALUMINIZADA CAPUCHINA DE 4"X4" UND
12.02.00 BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" PZA
12.03.00 CERRADURA PARA PUERTA PRINCIPAL 3 GOLPES PZA
12.04.00 CERRADURA PTA. INTERIOR 2 GOLPES PZA
14.00.00 PINTURA
14.01.00 PINTURA EN CIELO RASO / LATEX LAVABLE M2
14.02.00 PINTURAS DE MUROS INT. Y EXT. AL LATEX - 02 MANOS M2
SUBTOTAL
IMPUESTO (IGV) 19%
TOTAL PRESUPUESTO
ecima Semana de Obras
NTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS" DE LA CIUDAD DE CHIMB
ESTRELLAS
142.56
158.40 0.64 101.38
158.40 0.26 41.18
1,022.46
55.81 7.23 403.51
15.68 3.51 55.04
134.52 0.85 114.34
181.89 1.86 338.32
48.16 2.31 111.25
1,949.27
30.86 4.20 129.61
11.26 36.62 412.34
12,393.59
1,452.68
10.14 68.83 697.94
49.50 7.24 358.38
392.44 1.01 396.36
497.57
1.32 80.91 106.80
17.58 9.18 161.38
227.12 1.01 229.39
77.09
0.23 76.15 17.51
4.69 7.41 34.75
24.58 1.01 24.83
3,933.65
9.81 93.01 912.43
92.17 11.83 1,090.37
1,911.73 1.01 1,930.85
2,764.84
7.42 75.90 563.18
52.54 13.12 689.32
1,497.37 1.01 1,512.34
3,144.84
10.81 74.63 806.75
123.53 6.61 816.53
958.56 1.01 968.15
1,152.93 0.48 553.41
522.92
1.77 104.28 184.58
18.70 8.11 151.66
184.83 1.01 186.68
2,118.13
169.18 12.52 2,118.13
2,531.48
25.68 3.42 87.83
338.36 3.84 1,299.30
124.45 5.91 735.50
52.54 7.01 368.31
8.70 4.66 40.54
720.18
123.53 5.83 720.18
1,090.70
14.26 4.63 66.02
14.26 12.08 172.26
130.74 6.52 852.42
649.58
25.68 16.93 434.76
93.40 2.30 214.82
898.12
5.76 45.49 262.02
9.60 66.26 636.10
155.85
12.00 2.99 35.88
9.00 2.93 26.37
2.00 20.61 41.22
3.00 17.46 52.38
138.19
4.83 28.61 138.19
1,038.06
123.53 1.77 218.65 123.53
515.35 1.59 819.41 515.35
531.91
4.00 45.96 183.84
4.00 36.52 146.08
1.00 152.27 152.27
4.00 12.43 49.72
859.19
4.00 44.42 177.68
7.00 22.08 154.56
38.46 8.84 339.99
19.60 4.01 78.60
5.00 6.28 31.40
2.00 18.32 36.64
1.00 40.32 40.32
484.27
9.00 6.50 58.50
42.20 1.31 55.28
18.70 1.56 29.17
2.00 8.70 17.40
1.00 15.83 15.83
3.00 18.41 55.23
1.00 10.58 10.58
1.00 15.41 15.41
1.00 78.70 78.70
1.00 148.17 148.17
2,171.18
17.00 8.23 139.91
14.00 20.06 280.84
1.00 31.33 31.33
1.00 121.26 121.26
14.00 49.75 696.50
3.00 19.82 59.46
35.00 3.21 112.35
1.00 54.86 54.86
188.90 2.27 428.80
35.00 1.18 41.30
196.70 1.04 204.57
US$ 30,734.44 0.00 0.00%
US$ 3,995.48 0.00
US$ 614.69 0.00
------------------ ------------------
US$ 35,344.61 0.00
US$ 6,715.48 0.00
========= =========
US$ 42,060.09 0.00
LAS" DE LA CIUDAD DE CHIMBOTE
JECUTADO
AVANCE (%)
99.55%
ACTIVIDADES
100.00%
100.00% LOCAL COMUNAL TRES ESTRELLAS
100.00% OBRAS PROVISIONALES
100.00% OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
100.00% CONCRETO SIMPLE
100.00% CONCRETO ARMADO
100.00% ALBAILERIA
REVOQUES, ENLUCIDOS Y MOLDURAS
100.00% CIELORRASOS
100.00% PISOS Y PAVIMENTOS
100.00% ZOCALOS Y CONTRAZOCALOS
100.00% CARPINTERIA DE MADERA
100.00% CERRAJERIA
100.00% VIDRIOS, CRISTALES Y SIMILARES
PINTURA
100.00% APARATOS SANITARIOS Y ACCESORIOS
100.00% INSTALACIONES SANITARIAS
100.00% SISTEMA DE AGUA FRIA
INSTALACIONES ELECTRICAS
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Actividades
100.00%
100.00%
Actividades
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00% 0.00% 10.00% 20.00% 30.00%
100.00%
100.00% AVANCE ACUM. (%) PROGRAMADO AVANCE ACUM. (%) EJECUTADO
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
99.55%
Seguimiento del Cronograma de Ejecucion de la Undecima
Del 06.05.06 al 10.05.06
: 7-308-05-BM
OBRAS DEL PROYECTO DE MEJORAMIENTO INTEGRAL DE BARRIOS EN EL BUM
CONSTRUCCION DEL LOCAL COMUNAL TRES ESTRELLAS
BANMAT SAC
H.B. CONTRATISTAS GENERALES E.I.R.L.
PCA INGENIERIA Y CONSTRUCCION S.A.C.
SUMA ALZADA
DISTRITO DE CHIMBOTE, PROVINCIA DEL SANTA, DEPARTAMENTO DE ANCASH.
Cuadro Comparativo
Programado Vs. Ejecutado
Actividades
Actividades
CTO DE MEJORAMIENTO INTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS
L LOCAL COMUNAL TRES ESTRELLAS
GENERALES E.I.R.L.
CONSTRUCCION S.A.C.
Cuadro Comparativo
Programado Vs. Ejecutado
LOCAL CO
OBRAS PR
OBRAS PR
MOVIMIEN
CONCRET
CONCRET
ALBAILER
REVOQUE
OBRAS PR
OBRAS PR
MOVIMIEN
CONCRET
CONCRET
ALBAILER
REVOQUE
CIELORRA
PISOS Y PA
ZOCALOS
CARPINTE
CERRAJER
VIDRIOS, C
PINTURA
APARATOS
INSTALACI
SISTEMA D
INSTALACI
Porcentaje
40.00%
de Avance 60.00%
50.00% 70.00% 80.00% 90.00% 100.00%
bras
OBRAS PROVISIONALES
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
CONCRETO ARMADO
ALBAILERIA
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
CONCRETO ARMADO
ALBAILERIA
CIELORRASOS
PISOS Y PAVIMENTOS
ZOCALOS Y CONTRAZOCALOS
CARPINTERIA DE MADERA
CERRAJERIA
PINTURA
INSTALACIONES SANITARIAS
INSTALACIONES ELECTRICAS
PRESUPUESTO FINAL
ITEM DESCRIPCIN
UND CANTIDAD
CONSTRUCCION DEL LOCAL COMUNAL VILLA EL SOL
01.00.00 OBRAS PROVISIONALES
01.01.00 TRANSPORTE EQUIPOS, MATERIALES Y HERRAMIENTAS GLB 1.00
01.02.00 POZA ALM. AGUA PARA LA CONSTRUCCIN GLB 1.00
01.03.00 GUARDIANIA GLB 1.00
05.01.00 ZAPATAS
05.01.01 ZAPATAS - CONCRETO 175 KG/CM2 M3 13.18
05.01.02 ZAPATAS - ENCOFRADO Y DESCENCOFRADO M2 41.27
05.01.03 ZAPATAS - ACERO DE REFUERZO KG 500.31
05.02.00 VIGAS DE CIMENTACION
05.02.01 VIGAS DE CIMENTACIN - CONC. 175 KG/CM2 M3 8.82
05.02.02 VIGAS DE CIMENTACIN - ENCOFRADO Y DESCENCOFRADO M2 70.56
05.02.03 VIGAS DE CIMENTACIN - ACERO DE REFUERZO KG 1,111.56
05.03.00 SOBRECIMIENTOS REFORZADOS
05.03.01 SOBRECIMIENTO REFORZADO 175 KG/CM2 M3 0.71
05.03.02 SOBRECIMIENTO REFORZADO - ENCOFRADO Y DESCENCOFRAD M2 9.47
05.03.03 SOBRECIMIENTO REFORZADO - ACERO DE REFUERZO KG 45.02
05.04.00 COLUMNAS
05.04.01 COLUMNAS - CONCRETO 210 KG/CM2 M3 6.35
05.04.02 COLUMNAS CONFINAM-CONCRETO 175 KG/CM2 M3 1.86
05.04.03 COLUMNAS- ENCOFRADO Y DESCENCOFRADO M2 105.92
05.04.00 COLUMNAS - ACERO DE REFUERZO KG 1,613.05
05.05.00 VIGAS
05.05.01 VIGAS CONCRETO 210 KG/CM2 M3 9.82
05.05.02 VIGA CONFINAM.-CONCRETO 175 KG/CM2 M3 1.20
05.05.03 VIGAS - ENCOFRADO Y DESCENCOFRADO M2 81.77
05.05.04 VIGAS- ACERO DE REFUERZO KG 1,592.37
05.06.00 LOSAS ALIGERADAS
05.06.01 LOSAS ALIGERADAS - CONCRETO 210 KG/CM2 M3 12.06
05.06.02 LOSAS ALIGERADAS.- ENCOFRADO Y DESCENCOFRADO M2 137.87
05.06.03 LOSAS ALIGERADOS.- ACERO DE REFURZO KG 985.27
05.06.04 LOSAS ALIGERADAS.- LADR. HUECO 15X30X30 UND 1,148.42
05.07.00 CISTERNA SUBTERRANEA
05.07.01 CISTERNA SUBTERRANEA - CONC 175 KG/CM2 M3 2.85
05.07.02 CISTERNA, ENCOFRADO Y DESENCOFRADO M2 12.10
05.07.03 CISTERNA SUBTERRANEA-ACERO REFUERZO KG 130.71
05.08.00 MUROS REFORZADOS
05.08.01 CONCRETO MUROS REFORZADOS F'C=140KG/CM2 M3 1.12
05.08.02 ENCOFRADO Y DESENCOF. MUROS REFORZADOS M2 16.68
05.08.03 ACERO EN MUROS REFORZADOS KG 21.48
05.09.00 ESCALERAS
05.09.01 CONCRETO ESCALERAS F'C=210 KG/CM2 M3 2.23
05.09.02 ENCOFRADO Y DESENCOF. NORMAL EN ESCALERAS M2 13.09
05.09.03 ACERO DE REFUERZO EN ESCALERAS KG 177.01
06.00.00 ALBAILERIA
06.01.00 MURO DE CABEZA LADRILLO KING-KONG DE ARCILLA M2 121.89
06.02.00 MURO DE SOGA LADRILLO KING-KONG DE ARCILLA M2 125.31
08.00.00 CIELORRASOS
08.01.00 CIELORASO MEZCLA 1:5 E = 1.5 cm. M2 137.87
12.00.00 CERRAJERIA
12.01.00 BISAGRA ALUMINIZADA CAPUCHINA DE 3 1/2"x3 1/2" UND 33.00
12.02.00 BISAGRA ALUMINIZADA CAPUCHINA DE 2" X 2" PZA 8.00
12.03.00 CERRADURA PARA PUERTA PRINCIPAL 3 GOLPES PZA 2.00
12.04.00 CERRADURA PTA. INTERIOR 2 GOLPES PZA 3.00
12.05.00 CERRADURA PTA. BAO SEG. INTERIOR C/MANIJA PZA 2.00
12.06.00 CERROJO DE ALUMINIO DE 2" PZA 4.00
14.00.00 PINTURA
14.01.00 PINTURA EN CIELO RASO / LATEX LAVABLE M2 137.87
14.02.00 PINTURA DE MUROS INT. Y EXT. AL LATEX - 02 MANOS M2 357.99
14.03.00 PINTURA EN VIGAS Y COLUMNAS AL LATEX M2 118.63
19.00.00 OTROS
19.01.00 BANCA DE CONCRETO REVESTIDO C/CEMENTO UND 2.00
19.02.00 LIMPIEZA FINAL DE OBRA GLB 1.00
COSTO DIRECTO
GASTOS GENERALES 13%
UTILIDAD 2%
SUBTOTAL
IMPUESTO (IGV) 19%
TOTAL PRESUPUESTO
a Semana de Obras
GRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS" DE LA CIUDAD DE CHIMBOT
DEPARTAMENTO DE ANCASH.
194.40
0.64 138.24
0.26 56.16
1,289.33
7.23 537.26
10.12 66.99
3.51 93.12
0.85 138.37
1.86 302.79
2.31 150.80
2,381.18
4.20 144.02
36.62 803.08
76.56 557.36
7.55 109.93
5.06 766.79
16,195.40
1,711.28
68.83 907.18
7.24 298.79
1.01 505.31
2,484.05
80.91 713.63
9.18 647.74
1.01 1,122.68
169.71
76.15 54.07
7.41 70.17
1.01 45.47
3,658.99
93.01 590.61
91.42 170.04
11.83 1,253.03
1.02 1,645.31
3,523.67
75.90 745.34
67.74 81.29
13.12 1,072.82
1.02 1,624.22
3,357.72
74.63 900.04
6.61 911.32
1.01 995.12
0.48 551.24
527.41
104.30 297.26
8.11 98.13
1.01 132.02
242.81
77.84 87.18
8.03 133.94
1.01 21.69
519.76
91.74 204.58
10.42 136.40
1.01 178.78
3,485.14
17.14 2,089.19
11.14 1,395.95
2,429.09
3.42 57.63
3.84 1,325.34
5.91 361.99
7.01 402.23
4.66 70.37
2.47 211.53
803.78
5.83 803.78
1,332.83
4.63 89.78
12.08 234.23
6.52 861.68
7.81 147.14
670.68
16.93 285.27
16.53 26.28
2.30 110.63
6.25 61.19
5.13 12.41
7.95 174.90
1,849.50
45.09 625.85
67.32 949.21
29.89 240.91
33.53 33.53
206.85
1.81 59.73
1.74 13.92
20.61 41.22
17.46 52.38
15.02 30.04
2.39 9.56
529.15
27.35 321.91
17.27 207.24
1,001.85
1.77 244.03
1.59 569.20
1.59 188.62
580.03
45.96 183.84
35.00 140.00
152.27 152.27
13.55 54.20
12.43 49.72
724.67
17.44 69.76
16.96 84.80
11.42 11.42
8.84 150.28
4.01 136.34
6.28 18.84
20.83 83.32
40.32 80.64
89.27 89.27
505.00
6.50 58.50
1.31 11.79
1.56 59.28
1.67 11.69
2.10 5.25
15.83 79.15
17.62 35.24
13.82 13.82
15.41 15.41
7.33 7.33
10.58 10.58
18.41 36.82
27.09 27.09
133.05 133.05
1,720.70
6.23 80.99
5.01 20.04
11.71 105.39
6.69 46.83
7.09 7.09
7.40 7.40
1.84 115.92
1.80 121.50
1.08 182.52
1.04 176.28
3.07 15.35
71.40 71.40
18.16 18.16
17.32 17.32
138.45 138.45
47.79 286.74
19.82 59.46
13.60 54.40
18.55 74.20
121.26 121.26
232.71
79.77 159.54
73.17 73.17
529.15 100.00% -
11.770 321.91 100.00% -
12.000 207.24 100.00% -
1,001.86 100.00% -
137.870 244.03 100.00% -
357.993 569.20 100.00% -
118.631 188.62 100.00% -
232.71 100.00% -
2.000 159.54 100.00% -
1.000 73.17 100.00% -
CONTRATO N
OBRA:
SUBPRESUPUESTO:
ENTIDAD CONTRATANTE:
SUPERVISOR:
CONTRATISTA:
MODALIDAD DE EJECUCION:
UBICACIN :
ACTIVIDADES
CONSTRUCCION DEL LOCAL COMUNAL VILLA EL SOL
OBRAS PROVISIONALES
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
CONCRETO ARMADO
ALBAILERIA
REVOQUES, ENLUCIDOS Y MOLDURAS
CIELORRASOS
PISOS Y PAVIMENTOS
ZOCALOS, CONTRAZOCALOS Y REVESTIMIENTOS
CARPINTERIA DE MADERA Y METALICA
CERRAJERIA
VIDRIOS, CRISTALES Y SIMILARES
PINTURA
APARATOS SANITARIOS Y ACCESORIOS
INSTALACIONES SANITARIAS
SISTEMA DE AGUA FRIA
INSTALACIONES ELECTRICAS
OTROS
OBRAS PROVISIONALES
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
es
OBRAS PROVISIONALES
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
Actividades
CONCRETO ARMADO
ALBAILERIA
CIELORRASOS
PISOS Y PAVIMENTOS
CERRAJERIA
PINTURA
INSTALACIONES SANITARIAS
INSTALACIONES ELECTRICAS
OTROS
AVANCE ACUM. (%) PROGRAMADO
AVANCE ACUM. (%) EJECUTADO
93.00% 94.00% 95.0
Seguimiento del Cronograma de Ejecucion de la Undecima Seman
: 7-308-05-BM
OBRAS DEL PROYECTO DE MEJORAMIENTO INTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VI
CONSTRUCCION DEL LOCAL COMUNAL VILLA EL SOL
BANMAT SAC
H.B. CONTRATISTAS GENERALES E.I.R.L.
PCA INGENIERIA Y CONSTRUCCION S.A.C.
SUMA ALZADA
DISTRITO DE CHIMBOTE, PROVINCIA DEL SANTA, DEPARTAMENTO DE ANCASH.
Cuadro Comparativo
Programado Vs. Ejecutado
ILLA EL SOL
VISIONALES
ELIMINARES
DE TIERRAS
ETO SIMPLE
VISIONALES
ELIMINARES
DE TIERRAS
ETO SIMPLE
TO ARMADO
LBAILERIA
MOLDURAS
LORRASOS
AVIMENTOS
STIMIENTOS
Y METALICA
ERRAJERIA
SIMILARES
PINTURA
CCESORIOS
SANITARIAS
E AGUA FRIA
LECTRICAS
Porcentaje
de Avance
OTROS
AVANCE ACUM. (%) PROGRAMADO
AVANCE ACUM. (%) EJECUTADO
93.00% 94.00% 95.00% 96.00% 97.00%
de la Undecima Semana de Obras
parativo
. Ejecutado
Porcentaje
de Avance
PRESUPUES
ITEM DESCRIPCIN
UND
LOSA DEPORTIVA TRES ESTRELLAS:CONSTRUCCION DE GRADERIAS
01.00.00 OBRAS PROVISIONALES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB
GUARDIANIA GLB
05.03.00 COLUMNAS
05.03.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 M3
05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2
05.03.03 ACERO GRADO 60 EN COLUMNAS KG
05.04.00 GRADERIAS
05.04.01 CONCRETO EN GRADERIAS F'C=175 KG/CM2 M3
05.04.02 ENCOFRADO Y DESENCOFRADO DE GRADERIAS M2
05.04.03 ACERO GRADO 60 EN GRADERIAS KG
05.05.00 VIGAS
05.05.01 CONCRETO EN VIGAS F'C=175 KG/CM2 M3
05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2
05.05.03 ACERO GRADO 60 EN VIGAS KG
06.00.00 ALBAILERIA
06.01.00 MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM. M2
07.00.00 REVOQUES
07.01.00 TARRAJEO PULIDO EN GRADERIAS M2
07.02.00 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA M2
08.00.00 PINTURA
08.01.00 PINTURA EN MUROS EXTERIORES C/ LATEX M2
COSTO DIRECTO
GASTOS GENERALES 13%
UTILIDAD 2%
SUBTOTAL
IMPUESTO (IGV) 19%
TOTAL PRESUPUESTO
ndecima Semana de Obras
NTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS" DE LA CIUDAD DE CHIMB
UCCION DE GRADERIAS
AVANCES ACUMULADOS
PRESUPUESTO FINAL
PROGRAMADO EJECUTADO
PARCIAL
CANTIDAD P.U. (US$) PARCIAL (US$) METRADO AVANCE (%) METRADO
(US$)
9,231.26 9,231.26 100.00%
550.24 550.24 100.00%
1.00 222.64 222.64 1.000 222.64 100.00% 1.00
1.00 327.60 327.60 1.000 327.60 100.00% 1.00
MULADOS ACTIVIDADES
EJECUTADO LOSA DEPORTIVA TRES ESTRELLAS:CONSTR
PARCIAL
AVANCE (%) OBRAS PROVISIONALES
(US$)
9,231.27 100.00% OBRAS PRELIMINARES
550.24 100.00% MOVIMIENTO DE TIERRAS
222.64 100.00% OBRAS DE CONCRETO SIMPLE
327.60 100.00% OBRAS DE CONCRETO ARMADO
ALBAILERIA
24.19 100.00% REVOQUES
24.19 100.00% PINTURA
864.14 100.00%
133.32 100.00%
598.10 100.00%
132.72 100.00% P
398.05 100.00%
398.05 100.00%
811.64 100.00%
Actividades
274.05 100.00%
OBRAS PROVISIONALES
308.78 100.00%
228.81 100.00%
344.80 100.00%
91.12 100.00%
108.00 100.00% OBRAS DE CONCRETO SIMPLE
145.69 100.00%
2,258.33 100.00%
OBRAS DE CONCRETO ARMADO
1,054.68 100.00%
745.52 100.00%
ALBAILERIA
REVOQUES
OBRAS DE CONCRETO SIMPLE
458.13 100.00%
ALBAILERIA
476.45 100.00%
137.38 100.00%
135.41 100.00%
REVOQUES
203.66 100.00%
725.68 100.00%
725.68 100.00% PINTURA
1,586.44 100.00%
784.56 100.00% 100.00% 100.00%
801.88 100.00% AVANCE ACUM. (%) PROGRAMADO
AVANCE ACUM. (%) EJECUTADO
247.06 100.00%
247.06 100.00%
9,231.27 100.00%
1,200.07
184.63
------------------
10,615.97
2,017.03
=========
12,633.00
: 7-308-05-BM
OBRAS DEL PROYECTO DE MEJORAMIENTO INTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VI
LOSA DEPORTIVA TRES ESTRELLAS:CONSTRUCCION DE GRADERIAS
BANMAT SAC
H.B. CONTRATISTAS GENERALES E.I.R.L.
PCA INGENIERIA Y CONSTRUCCION S.A.C.
SUMA ALZADA
DISTRITO DE CHIMBOTE, PROVINCIA DEL SANTA, DEPARTAMENTO DE ANCASH.
Cuadro Comparativo
Programado Vs. Ejecutado
RELLAS:CONSTRUCCION DE GRADERIAS
OBRAS PROVISIONALES
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
ALBAILERIA
REVOQUES
OBRAS DE CONCRETO SIMPLE
ALBAILERIA
REVOQUES
Porcentaje de Avance
PINTURA
Cuadro Comparativo
ogramado Vs. Ejecutado
Porcentaje de Avance
PRESUPUESTO FINAL
ITEM DESCRIPCIN
UND CANTIDAD
LOSA DEPORTIVA TRES ESTRELLAS:CONSTRUCCION DE LOSA
01.00.00 OBRAS PRELIMINARES
01.01.00 NIVELACION TRAZO Y REPLANTEO PRELIMINAR M2 700.00
01.02.00 TRANSPORTE EQUIPO, MATERIALES Y HERRAM. GLB 1.00
05.00.00 PINTURA
05.01.00 PINTURA DE LINEAS DE JUEGO E = 3" ML 252.73
06.00.00 EQUIPAMIENTOS
06.01.00 ARCO DE F G DE 2" UND 2.00
06.02.00 TABLERO DE BASQUET Y ACCESORIOS UND 2.00
06.03.00 NET DE VOLEYBOL UND 1.00
COSTO DIRECTO
GASTOS GENERALES 13%
UTILIDAD 2%
SUBTOTAL
IMPUESTO (IGV) 19%
TOTAL PRESUPUESTO
a Semana de Obras
EGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS" DE LA CIUDAD DE CHIMBO
CION DE LOSA
AVANCES ACUMULADOS
PRESUPUESTO FINAL
PROGRAMADO EJECUTADO
PARCIAL PARCIAL
P.U. (US$) PARCIAL (US$) METRADO AVANCE (%) METRADO
(US$) (US$)
10,878.68 10,878.68 100.00% 10,878.68
323.63 323.63 100.00% 323.63
0.25 175.00 700.000 175.00 100.00% 700.00 175.00
148.63 148.63 1.000 148.63 100.00% 1.00 148.63
- -
2,754.99 2,754.98 100.00% 2,754.98
6.32 48.41 7.660 48.41 100.00% 7.66 48.41
1.36 90.77 66.737 90.77 100.00% 66.74 90.77
1.46 1,022.00 700.000 1,022.00 100.00% 700.00 1,022.00
1.97 1,379.00 700.000 1,379.00 100.00% 700.00 1,379.00
2.31 214.81 92.989 214.81 100.00% 92.99 214.81
JECUTADO ACTIVIDADES
AVANCE (%) LOSA DEPORTIVA TRES ESTRELLAS:CONSTRUCCION DE L
100.00% OBRAS PRELIMINARES
100.00% MOVIMIENTO DE TIERRAS
100.00% CONCRETO SIMPLE
100.00% JUNTAS DE DILATACION
PINTURA
100.00% EQUIPAMIENTOS
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Actividades
PINTURA
100.00%
EQUIPAMIENTOS
AVANCE ACUM. (%) PROGRAMADO
AVANCE ACUM. (%) EJECUTADO
100.00% 100.00%
Seguimiento del Cronograma de Ejecucion de la
Del 06.05.06 al 10.05.0
: 7-308-05-BM
OBRAS DEL PROYECTO DE MEJORAMIENTO INTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VI
LOSA DEPORTIVA TRES ESTRELLAS:CONSTRUCCION DE LOSA
BANMAT SAC
H.B. CONTRATISTAS GENERALES E.I.R.L.
PCA INGENIERIA Y CONSTRUCCION S.A.C.
SUMA ALZADA
DISTRITO DE CHIMBOTE, PROVINCIA DEL SANTA, DEPARTAMENTO DE ANCASH.
Cuadro Comparativo
Programado Vs. Ejecutado
AS:CONSTRUCCION DE LOSA
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
JUNTAS DE DILATACION
PINTURA
EQUIPAMIENTOS
AVANCE ACUM. (%) PROGRAMADO Porcenta de Avance
AVANCE ACUM. (%) EJECUTADO
100.00% 100.00% 100.00% 100.00% 100.00% 100
ama de Ejecucion de la Undecima Semana de Obras
Del 06.05.06 al 10.05.06
omparativo
Vs. Ejecutado
rcenta de Avance
100.00% 100.00% 100.00% 100.00% 100.00%
IUDAD DE CHIMBOTE
00% 100.00%
Seguimiento del Cronograma de Ejecucion de la Undecima Semana de Obra
Del 06.05.06 al 10.05.06
CONTRATO N : 7-308-05-BM
OBRA: OBRAS DEL PROYECTO DE MEJORAMIENTO INTEGRAL DE BARRIOS EN EL B
SUBPRESUPUESTO: CONSTRUCCION DEL PARQUE TRES ESTRELLAS
ENTIDAD CONTRATANTE: BANMAT SAC
SUPERVISOR: H.B. CONTRATISTAS GENERALES E.I.R.L.
CONTRATISTA: PCA INGENIERIA Y CONSTRUCCION S.A.C.
MODALIDAD DE EJECUCION: SUMA ALZADA
UBICACIN : DISTRITO DE CHIMBOTE, PROVINCIA DEL SANTA, DEPARTAMENTO DE ANCAS
PRESUPU
ITEM DESCRIPCIN
UND
CONSTRUCCION DEL PARQUE TRES ESTRELLAS
01.00.00 OBRAS PROVISIONALES
01.01.00 MOVILIZACION DE MAQUINARIAS-HERRAMIENTAS PARA LA OBRA GLB
07.00.00 PINTURA
PINTURA DE SUPERFICIES C/ESMALTE 02 MANOS M2
08.00.00 VARIOS
BANCAS ORNAMENTALES SEGUN DISEO UND
COSTO DIRECTO
GASTOS GENERALES 13%
UTILIDAD 2%
SUBTOTAL
IMPUESTO (IGV) 19%
TOTAL PRESUPUESTO
decima Semana de Obras
GRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS" DE LA CIUDAD DE CHIMBOT
DEPARTAMENTO DE ANCASH.
606.43
891.82 0.48 428.07
891.82 0.20 178.36
3,537.34
468.45 0.92 430.97
468.45 1.66 777.63
891.82 0.62 552.93
54.06 5.07 274.08
891.82 1.43 1,275.30
64.88 3.49 226.43
9,365.46
9,325.63
47.31 74.04 3,502.83
540.65 10.77 5,822.80
39.83
0.74 53.82 39.83
1,711.17
405.49 4.22 1,711.17
6,347.49
841.63 7.49 6,303.81
124.80 0.35 43.68
637.50
179.75 1.72 309.17
21.57 4.51 97.28
153.50 1.30 199.55
26.25 1.20 31.50
55.74
1.00 39.16 39.16
1.00 16.58 16.58
404.12
156.75 0.17 26.65
156.75 1.60 250.80
4.61 6.32 29.14
22.84 4.27 97.53
2,575.43
6.00 5.96 35.76
156.75 3.59 562.73
6.00 329.49 1,976.94
394.19
6.00 3.26 19.56
156.75 2.39 374.63
289.79
1.00 64.86 64.86
1.00 51.81 51.81
8.00 21.64 173.12
1,209.00
12.00 100.75 1,209.00
JECUTADO
AVANCE (%)
98.66%
100.00% ACTIVIDADES
100.00% CONSTRUCCION DEL PARQUE TRES ESTRELLAS
OBRAS PROVISIONALES
100.00% OBRAS PRELIMINARES
100.00% MOVIMIENTO DE TIERRAS
100.00% OBRAS DE CONCRETO SIMPLE
REVOQUES, ENLUCIDOS Y MOLDURAS
100.00% PISOS Y PAVIMENTOS
100.00% PINTURA
100.00% VARIOS
100.00% REDES DE DISTRIBUCION DE AGUA
100.00% ACCESORIOS PARA RED DE AGUA
100.00% INST. ELECTRICAS : TRABAJOS PRELIMINARES
100.00% SUMINIST. E INST. DE DUCTOS Y POSTES
SUMINISTRO E INSTALACION DE CABLES
100.00% SUMINISTRO Y MONTAJE DE TABLEROS
SUMINIST. E INST. DE LUMINARIAS
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
OBRAS PROVISIONALES
100.00%
100.00% OBRAS PRELIMINARES
Actividad
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
61.00%
100.00%
OBRAS DE CONCRETO SIMPLE
100.00%
100.00% REVOQUES, ENLUCIDOS Y MOLDURAS
100.00%
100.00% PISOS Y PAVIMENTOS
100.00%
100.00% PINTURA
100.00%
VARIOS
100.00%
100.00%
REDES DE DISTRIBUCION DE AGUA
100.00%
100.00%
100.00% ACCESORIOS PARA RED DE AGUA
98.66%
Seguimiento del Cronograma de Ejecucion de la Undec
Del 06.05.06 al 10.05.06
: 7-308-05-BM
OBRAS DEL PROYECTO DE MEJORAMIENTO INTEGRAL DE BARRI
CONSTRUCCION DEL PARQUE TRES ESTRELLAS
BANMAT SAC
H.B. CONTRATISTAS GENERALES E.I.R.L.
PCA INGENIERIA Y CONSTRUCCION S.A.C.
SUMA ALZADA
DISTRITO DE CHIMBOTE, PROVINCIA DEL SANTA, DEPARTAMENTO DE ANCASH.
Cuadro Comparat
Programado Vs. Ejec
TRES ESTRELLAS
S PROVISIONALES
AS PRELIMINARES
ENTO DE TIERRAS
ONCRETO SIMPLE
DOS Y MOLDURAS
S PROVISIONALES
AS PRELIMINARES
ENTO DE TIERRAS
ONCRETO SIMPLE
DOS Y MOLDURAS
OS Y PAVIMENTOS
PINTURA
VARIOS
BUCION DE AGUA
RA RED DE AGUA
OS PRELIMINARES
UCTOS Y POSTES
ACION DE CABLES
AJE DE TABLEROS
Porcentaje d
T. DE LUMINARIAS
AVANCE ACUM. (%) PROGRAMADO
AVANCE ACUM. (%) EJECUTADO
0.00% 10.00% 20.00% 30.00% 40.00% 50.00%
de Ejecucion de la Undecima Semana de Obras
l 06.05.06 al 10.05.06
AMIENTO INTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS" DE LA CIUDAD
dro Comparativo
amado Vs. Ejecutado
Porcentaje de Avance
ITEM DESCRIPCIN
01.07.00 REVESTIMIENTOS
01.07.01 TARRAJEO DE SARDINELES FROTACHADO M,1:5,e=1.5cm
01.07.02 REVESTIMIENTO DE GRADAS C/MOR.1:4, PULIDO 1:2,e=1.5cm
01.08.00 PINTURA
01.08.01 PINTURA DE SUPERFICIES CON ESMALTE
01.09.00 OTROS
01.09.01 JUNTAS DILATACION C/ASFALTO E=1"
01.09.02 JUNTAS DILATACION C/ASFALTO E=1" SARDINEL
01.09.03 BANCAS ORNAMENTALES SEGUN DISEO
01.09.04 BASURERO METALICO SEGUN DETALLE
02.04.00 MANHOLES
02.04.01 DERIVACION A POSTE, MANHOL 0.35x035m C/MARCO Y TAPA
02.04.02 MANHOL DERIVACION DE C. A. 0.80x080m C/MARCO Y TAPA
COSTO DIRECTO
GASTOS GENERALES 13%
UTILIDAD 2%
SUBTOTAL
IMPUESTO (IGV) 19%
TOTAL PRESUPUESTO
Undecima Semana de Obras
6
EGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS" DE LA CIUDAD DE CHIMBO
, DEPARTAMENTO DE ANCASH.
744.94
GLB 1.00 273.84 273.84
M2 421.46 0.48 202.30
M2 1,344.00 0.20 268.80
1,953.12
M3 89.91 5.97 536.76
M3 19.52 5.07 98.97
M3 67.43 3.37 227.24
M2 449.55 0.62 278.72
M2 449.55 1.43 642.86
M3 48.30 3.49 168.57
352.55
M3 1.01 64.09 64.73
M3 3.80 53.82 204.52
M2 12.47 6.68 83.30
4,584.63
M3 22.94 73.90 1,695.27
M2 229.43 6.82 1,564.71
KG 1,311.53 1.01 1,324.65
3,271.98
M2 423.60 7.16 3,032.98
M2 25.95 9.21 239.00
558.55
M2 95.60 4.22 403.43
M2 29.49 5.26 155.12
6,393.98
23.65
M 139.10 0.17 23.65
460.64
M 139.10 1.60 222.56
M3 6.72 6.32 42.47
M3 45.81 4.27 195.61
523.07
M 129.10 3.59 463.47
M 10.00 5.96 59.60
333.13
UND 13.00 21.64 281.32
UND 1.00 51.81 51.81
341.15
M 129.10 2.39 308.55
M 10.00 3.26 32.60
2,677.80
UND 6.00 328.67 1,972.02
UND 6.00 117.63 705.78
1,765.02
UND 12.00 100.75 1,209.00
UND 6.00 92.67 556.02
202.61
UND 1.00 137.75 137.75
UND 1.00 64.86 64.86
66.91
GLB 1.00 66.91 66.91
519.94
326.70
M 124.60 1.72 214.31
M3 24.92 4.51 112.39
157.10
M 75.80 1.30 98.54
M 48.80 1.20 58.56
36.14
UND 1.00 16.58 16.58
GLB 1.00 19.56 19.56
744.94 100.00%
1.000 273.84 100.00% 1.00
421.462 202.30 100.00% 421.46
1,344.000 268.80 100.00% 1,344.00
1,953.11 100.00%
89.910 536.76 100.00% 89.91
19.519 98.97 100.00% 19.52
67.430 227.24 100.00% 67.43
449.552 278.72 100.00% 449.55
449.548 642.86 100.00% 449.55
48.299 168.57 100.00% 48.30
352.55 100.00%
1.010 64.73 100.00% 1.01
3.800 204.52 100.00% 3.80
12.470 83.30 100.00% 12.47
4,584.62 100.00%
22.940 1,695.27 100.00% 22.94
229.430 1,564.71 100.00% 229.43
1,311.523 1,324.64 100.00% 1,311.53
138.62 100.00%
95.600 138.62 100.00%
1,477.31 100.00%
33.750 11.81 100.00%
5.880 20.34 100.00%
12.000 1,180.68 100.00%
4.000 264.48 100.00%
6,393.98 100.00%
23.65 100.00%
139.102 23.65 100.00% 139.12
460.64 100.00%
139.100 222.56 100.00% 139.10
6.720 42.47 100.00% 6.72
45.810 195.61 100.00% 45.81
523.07 100.00%
129.100 463.47 100.00% 129.10
10.000 59.60 100.00% 10.00
333.13 100.00%
13.000 281.32 100.00% 13.00
1.000 51.81 100.00% 1.00
341.15 100.00%
129.100 308.55 100.00% 129.10
10.000 32.60 100.00% 10.00
2,677.80 100.00%
6.000 1,972.02 100.00% 6.00
6.000 705.78 100.00% 6.00
1,765.02 100.00%
12.000 1,209.00 100.00% 12.00
6.000 556.02 100.00% 6.00
202.61 100.00%
1.000 137.75 100.00% 1.00
1.000 64.86 100.00% 1.00
66.91 100.00%
1.000 66.91 100.00%
519.94 100.00%
326.70 100.00%
124.601 214.31 100.00% 124.60
24.920 112.39 100.00% 24.92
157.10 100.00%
75.800 98.54 100.00% 75.80
48.800 58.56 100.00% 48.80
36.14 100.00%
1.000 16.58 100.00% 1.00
1.000 19.56 100.00% 1.00
MULADOS
EJECUTADO
PARCIAL
AVANCE (%)
(US$)
18,312.76 91.58%
558.55 100.00%
403.43 100.00%
155.12 100.00%
PARQUE CENTRAL
-
CONSTRUCCION DEL PARQUE VILLA EL SOL
-
- PARQUE CENTRAL
-
-
- OBRAS PRELIMINARES
6,327.07 98.95%
MOVIMIENTO DE TIERRAS
23.65 100.00%
23.65 100.00% CONCRETO SIMPLE
Actividades
460.64 100.00%
222.56 100.00% CONCRETO ARMADO
42.47 100.00%
195.61 100.00% PISOS Y PAVIMENTOS
523.07 100.00%
463.47 100.00% REVESTIMIENTOS
59.60 100.00%
PINTURA
333.13 100.00%
281.32 100.00%
51.81 100.00% OTROS
341.15 100.00%
308.55 100.00% INSTALACIONES ELECTRICAS DE ALUMBRADO
32.60 100.00%
OBRAS PRELIMINARES
2,677.80 100.00%
1,972.02 100.00%
705.78 100.00% MOVIMIENTO DE TIERRAS
1,765.02 100.00%
SUMINIST. E INST. DE DUCTOS
1,209.00 100.00%
556.02 100.00%
MANHOLES
202.61 100.00%
137.75 100.00%
64.86 100.00% SUMINISTRO E INSTALACION DE CABLES NYY
326.70 100.00%
ACOMETIDA Y TABLERO CONTROL
214.31 100.00%
112.39 100.00%
PRUEBAS ELECTRICAS
MOVIMIENTO DE TIERRAS
SUMINIST. E INST. DE LUMINARIAS
PRUEBAS ELECTRICAS
157.10 100.00%
98.54 100.00%
INSTALACION SANITARIA DE RED DE AGUA FRIA
58.56 100.00%
Cuadro Comparati
Programado Vs. Ejec
PARQUE CENTRAL
Cuadro Comparati
Programado Vs. Ejec
PARQUE CENTRAL
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
CONCRETO ARMADO
PISOS Y PAVIMENTOS
REVESTIMIENTOS
PINTURA
OTROS
S ELECTRICAS DE ALUMBRADO
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
MANHOLES
PRUEBAS ELECTRICAS
MOVIMIENTO DE TIERRAS
MINIST. E INST. DE LUMINARIAS
PRUEBAS ELECTRICAS
MOVIMIENTO DE TIERRAS
98.95%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Cuadro Comparativo
Programado Vs. Ejecutado
Cuadro Comparativo
Programado Vs. Ejecutado
Porcentaje
00% 84.00% 86.00% 88.00% 90.00% 92.00% 94.00% 96.00
de Avance
STRELLAS" DE LA CIUDAD DE CHIMBOTE
CONTRATO N: : 7-308-05-BM
OBRA: OBRAS DEL PROYECTO DE MEJORAMIENTO INTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS" DE LA CIUDAD DE CHIMBOTE
ENTIDAD CONTRATANTE: BANCO DE MATERIALES SAC
SUPERVISOR: H.B. CONTRATISTAS GENERALES E.I.R.L.
CONTRATISTA: PCA INGENIERIA Y CONSTRUCCION S.A.C. Elaborado por: Ing Edwin Gamarra Barrera.
UBICACIN: DISTRITO DE CHIMBOTE, PROVINCIA DEL SANTA, DEPARTAMENTO DE ANCASH. Supervisor - HB Contratistas Generales E.I.R.L.
MODALIDAD DE EJECUCION: SUMA ALZADA Fecha: Ju.18.05.06
Periodo Avances Programados Proyectados (**) Avances Ejecutados Atraso (-) o Adelanto (+)
Acumulado Acumulado Acumulado Avance con Relacion
inicio fin Agua Potable Alcantarillado Red PrimariaRed SecundariaPavimentacion Veredas Local 3Estre Local Villa Graderias Losa Dep. Parque 3Estre Parque Villa Total Red Agua Alcantarillado Red Primaria Red Secund. Pavimentacion Veredas Local 3Estr. Local Villa Graderias Losa Parque 3Estr. Parque Villa Total al Programado
($) (%) ($) (%) ($) (%)
Seguimiento Semanal:
Inicio Obra: 2/25/2006 - 0
Semana 1 2/25/2006 3/3/2006 3,919.68 4,027.56 5,037.99 12,985.23 12,985.23 2.89% - 3,727.97 2,204.50 1,590.08 7,522.54 7,522.54 1.67% -5,462.69 -1.22% 57.93%
Semana 2 3/4/2006 3/10/2006 3,919.68 4,027.56 5,037.99 12,985.23 25,970.47 5.78% - 5,977.36 3,046.87 2,412.05 11,436.29 18,958.84 4.22% -7,011.63 -1.56% 73.00%
Semana 3 3/11/2006 3/17/2006 1,867.32 3,919.68 4,027.56 5,037.99 917.13 1,080.80 2,885.31 1,127.02 20,862.82 46,833.28 10.43% - 9,676.20 2,227.08 1,289.22 3,905.52 1,091.30 323.63 569.80 655.44 19,738.20 38,697.03 8.61% -8,136.25 -1.81% 82.63%
Semana 4 3/18/2006 3/24/2006 1,867.32 3,919.68 4,027.56 5,037.99 917.13 1,080.80 2,885.31 1,127.02 20,862.82 67,696.10 15.07% 1,309.66 10,098.85 4,659.70 1,423.82 2,746.66 1,199.35 - - - 21,438.04 60,135.07 13.39% -7,561.03 -1.68% 88.83%
Semana 5 3/25/2006 3/31/2006 2,723.86 7,743.17 965.14 2,405.98 17,249.47 6,545.23 3,445.84 4,247.26 1,326.92 1,563.72 3,889.48 2,316.05 54,422.12 122,118.22 27.19% - 3,137.28 391.38 88.64 8,436.21 8,340.92 1,849.49 2,313.00 1,224.98 - - - 25,781.89 85,916.96 19.13% -36,201.26 -8.06% 70.36%
Semana 6 4/1/2006 4/7/2006 3,366.27 10,610.79 1,688.99 4,210.47 30,186.58 11,454.16 3,009.56 3,654.21 1,634.25 1,925.90 4,642.61 3,207.82 79,591.60 201,709.82 44.91% 10,158.64 15,015.45 - - 6,973.68 3,368.24 5,254.50 6,819.71 3,405.68 1,375.98 2,189.60 952.47 55,513.95 141,430.92 31.49% -60,278.90 -13.42% 70.12%
Semana 7 4/8/2006 4/14/2006 3,366.27 10,610.79 1,688.99 4,210.47 15,093.29 11,454.16 3,009.56 3,654.21 1,634.25 1,925.90 4,642.61 3,207.82 64,498.31 266,208.13 59.26% 4,904.04 10,695.69 499.65 49.50 11,594.79 546.10 3,027.41 3,666.91 2,062.90 1,379.00 500.52 447.29 39,373.80 180,804.71 40.25% -85,403.41 -19.01% 67.92%
Semana 8 4/15/2006 4/21/2006 3,366.27 10,610.79 1,688.99 4,210.47 15,093.29 11,454.16 3,009.56 3,654.21 1,634.25 1,925.90 4,642.61 3,207.82 64,498.31 330,706.44 73.62% 2,503.78 4,172.20 1,741.26 2,017.07 8,855.81 11,737.78 2,229.11 2,655.91 123.53 6,659.80 6,883.32 666.51 50,246.09 231,050.80 51.44% -99,655.64 -22.19% 69.87%
Semana 9 4/22/2006 4/28/2006 2,404.48 7,579.14 1,206.42 3,007.48 15,093.29 11,856.32 2,149.68 2,610.15 1,167.32 1,375.65 3,632.28 2,792.84 54,875.04 385,581.48 85.84% 85.66 332.28 4,418.45 7,822.93 36,258.45 28,233.42 7,647.40 6,791.40 123.53 1,140.25 9,717.88 4,305.73 106,877.40 337,928.20 75.23% -47,653.28 -10.61% 87.64%
Semana 10 4/29/2006 5/5/2006 15,093.29 12,861.73 1,106.45 1,755.38 30,816.85 416,398.32 92.70% - - - - - 5,612.80 1,585.88 3,307.07 - - 7,664.00 7,454.80 25,624.55 363,552.75 80.93% -52,845.57 -11.76% 87.31%
Semana 11 5/6/2006 5/12/2006 10,780.92 9,186.95 790.32 1,253.84 22,012.03 438,410.35 97.60% - - - 8,066.72 - 7,151.40 - - - - - - 15,218.12 378,770.87 84.32% -59,639.48 -13.28% 86.40%
Semana 12 5/13/2006 5/19/2006 5,390.46 5,390.46 443,800.81 98.80% 187.78 1,038.05 1,200.34 3,830.52 6,256.70 385,027.57 85.72% -58,773.25 -13.08% 86.76%
Semana 13 5/20/2006 5/25/2006 5,390.46 5,390.46 449,191.27 100.00%
Fin Obra: 5/25/2006
Acumulado Semanal 18,961.78 62,833.40 7,238.52 18,044.86 129,371.05 74,812.69 30,734.44 37,972.01 9,231.26 10,878.68 29,116.96 449,191.27 18,961.78 62,833.28 7,238.52 18,044.86 72,118.95 71,877.45 30,596.25 36,208.32 9,231.27 10,878.67 28,725.46 18,312.76 385,027.57
-
Seguimiento Mensual (Oficial):
-
Mes 1 2/25/2006 3/27/2006 4,534.92 17,358.57 - 17,836.34 22,311.12 2,227.32 2,624.81 7,007.17 2,737.06 76,637.31 76,637.31 17.06% 1,309.66 29,480.38 - - - 6,886.78 7,964.40 10,654.32 2,290.66 323.63 569.80 655.44 60,135.07 60,135.07 13.39% -16,502.24 -3.67% 78.47%
Mes 2 3/28/2006 4/26/2006 14,426.86 45,474.83 7,238.52 18,044.86 129,371.05 49,089.24 12,898.10 15,660.89 7,003.94 8,253.87 19,896.89 13,747.80 341,106.85 417,744.16 93.00% 17,652.12 33,352.89 7,050.74 9,978.14 72,118.95 52,226.46 20,007.91 22,246.93 6,940.62 10,555.04 19,291.32 6,372.00 277,793.12 337,928.20 75.23% -79,815.96 -17.77% 80.89%
Mes 3 4/27/2006 5/25/2006 25,723.45 2,212.90 3,510.76 31,447.11 449,191.27 100.00% - - 187.78 8,066.72 - 12,764.20 2,623.93 3,307.07 - - 8,864.34 11,285.32 47,099.37 385,027.57 85.72% -64,163.70 -14.28% 85.72%
Mes 4 5/25/2006 -
Acumulado Mensual 18,961.78 62,833.40 7,238.52 18,044.86 129,371.05 74,812.69 30,734.44 37,972.01 9,231.26 10,878.68 29,116.96 19,995.62 449,191.27 18,961.78 62,833.28 7,238.52 18,044.86 72,118.95 71,877.45 30,596.25 36,208.32 9,231.27 10,878.67 28,725.46 18,312.76 385,027.57
(**) Corresponde a los avances que deberan ser programados semanalmente en cada periodo segn el Calendario Valorizado actualizado al inicio de Obra.
El da 25/02/2006 , da del inicio de la obra, es sbado
Se esta considerando meses de 30 das, a partir del inicio de la obra ?
Avance Acu mulado ($)
450,000.00
400,000.00
350,000.00
300,000.00
250,000.00
200,000.00
150,000.00
100,000.00
50,000.00
-
2/22/2006 3/4/2006 3/14/ 2006 3/24/2006 4/3/2006 4/13/2006 4/23/2006 5/3/2006 5/13/2006 5/23/2006 6/2/2006
Fecha de Evaluacin
Valorizacion Programada Ejecutado Semanal Semanal Proyectado
COMPARACION CALENDARIO VALORIZADO (OFICIAL) - SEGUIMIENTO SEMANAL
Del 06.05.06 al 10.05.06
CONTRATO N: : 7-308-05-BM
OBRA: OBRAS DEL PROYECTO DE MEJORAMIENTO INTEGRAL DE BARRIOS EN EL BUM: ASENTAMIENTOS HUMANOS "VILLA EL SOL Y TRES ESTRELLAS" DE LA CIUDAD DE CHIMBOTE
ENTIDAD CONTRATANTE: BANCO DE MATERIALES SAC
SUPERVISOR: H.B. CONTRATISTAS GENERALES E.I.R.L.
CONTRATISTA: PCA INGENIERIA Y CONSTRUCCION S.A.C. Elaborado por: Ing Edwin Gamarra Barrera.
UBICACIN: DISTRITO DE CHIMBOTE, PROVINCIA DEL SANTA, DEPARTAMENTO DE ANCASH. Supervisor - HB Contratistas Generales E.I.R.L.
MODALIDAD DE EJECUCION: SUMA ALZADA Fecha: Ju.18.05.06
Acumulado Mensual 18,961.78 62,833.40 7,238.52 18,044.86 129,371.05 74,812.69 30,734.44 37,972.01 9,231.26 10,878.68 29,116.96 19,995.62 449,191.27 18,961.78 62,833.28 7,238.52 18,044.86 72,118.95 71,877.45 30,596.25 36,208.32 9,231.27 10,878.67 28,725.46 18,312.76 385,027.57 85.72%
(**) Corresponde a los avances que deberan ser programados semanalmente en cada periodo segn el Calendario Valorizado actualizado al inicio de Obra.
Avance Acumulado ($)
500,000.00
450,000.00
400,000.00
350,000.00
300,000.00
250,000.00
200,000.00
150,000.00
100,000.00
50,000.00
-
2/22/2006 3/4/2006 3/14/2006 3/24/2006 4/3/2006 4/13/2006 4/23/2006 5/3/2006 5/13/2006 5/23/2006 6/2/2006