Reservoir Management is a Popular Topic
Cumulative SPE Papers With Reservoir Management As Keyword

3500

3000

2500
Number of Papers

2000

1500

1000

500

0
Jan-70 Jan-75 Jan-80 Jan-85 Jan-90 Jan-95 Jan-00 Jan-05 Jan-10
Date

Reservoir Management 1.2


Introduction
2008 PetroSkills LLC, All Rights Reserved
But What Does Reservoir Management Mean?

An ongoing continuous PROCESS


Developing and depleting resources in a manner
MAXIMIZING benefits, advantages, and economic
recovery
Judiciously employing time and manpower resources
while MINIMIZING waste
OPTIMIZING the process using current technology

Reservoir Management 1.3


Introduction
2008 PetroSkills LLC, All Rights Reserved
Why Do We Need Reservoir Management?
A reservoir can be produced only once
Many production options exist
Some reservoir processes are irreversible
Reserves can be irretrievably lost
Arbitrary development / production scheme can be
harmful
Contrary to established objectives or constraints
Adversely affect recovery
Some data can only be obtained at certain points in a
reservoirs life

Reservoir Management 1.4


Introduction
2008 PetroSkills LLC, All Rights Reserved
Reservoir Management Requires
Many Contributors
Production
Engineering
Gas and
Reservoir
Chemical
Engineering
Engineering

Geology Environmental
& &
Geophysics Legal Aspects

Reservoir
Management

Design and Economics


Construction &
Engineering Management

Research
Drilling & Service
Labs
Production
Operations

SPE 20748, 1990

Reservoir Management 1.5


Introduction
2008 PetroSkills LLC, All Rights Reserved
Because It Must Consider the Entire System

Water Treatment Water Wells


Hydrocarbon Transport

EOR Fluid
Production Facilities

Disposal Wells Injection Facilities

Production Wells Injection Wells


Reservoir
Reservoir Management 1.6
Introduction
2008 PetroSkills LLC, All Rights Reserved
Reservoir Management Priorities
Change During Field Life
Geological/Hydrological Considerations
Geophysical Exploration
Find Exploration Drilling
Delineation
Volumetrics/Reserves Estimation
Reservoir Characterization
Develop Drive Mechanism Assessment
Development Plan Alternatives

Implementation
Produce Data Acquisition and Reservoir Surveillance
Facility Maintenance

Production Enhancement
Optimize Recovery Enhancement
IOR & EOR Considerations

Reservoir Management 1.7


Introduction
2008 PetroSkills LLC, All Rights Reserved
Reservoir Management Pyramid

Recovery
Optimization

Production
Monitoring

Field Implementation

Development Planning

Reservoir Characterization

Set the Strategy What Value to Maximize

Reservoir Management 1.8


Introduction
2008 PetroSkills LLC, All Rights Reserved
Different Reservoir Management Approaches

PROACTIVE REACTIVE
(Preventive (Problem
Maintenance) Solving)
Priority Order Priority Order

Field Well
Reservoir Area
Area Reservoir
Well Field

Continual Periodic
Steering and Steering and
Optimization Alterations
Reservoir Management 1.9
Introduction
2008 PetroSkills LLC, All Rights Reserved
ONE SIZE DOES NOT FIT ALL

Each reservoir requires a


specific management process

Reservoir Management 1.10


Introduction
2008 PetroSkills LLC, All Rights Reserved
Good Reservoir Management

Results in:
1. Advancing (Accelerating) Production
2. Increasing Plateau Rate
3. Extending Plateau Life
4. Arresting (Flattening) Decline Rate
5. Enhancing Post-Plateau Production

Reservoir Management 1.11


Introduction
2008 PetroSkills LLC, All Rights Reserved
Course Agenda

Introduction
Defining Value
Risk and Uncertainty
Reservoir Characterization
Development Planning
Surveillance
Optimization
Relevant Case Studies and Problems Throughout