SGT5-4000F packages

Mature technology
for 400 MW class CCPP

Unrestricted Siemens AG 2013 All rights reserved. Energy Sector / E F PR


Gas turbine modernization & upgrades
Turn Up main facts and scope

Turn Up refers to opening the Inlet Guide Vane base load design position
Increase of the maximum position of the inlet guide vane for T4 compressor by 6
Compressor mass flow increase up to 2.7 %

Unrestricted Siemens AG 2013 All rights reserved.


Page 26 1. June 2013 SGT5-4000F Energy Sector / E F PR
Gas turbine modernization and upgrades:
Turn Up upgrade benefits

4 MW 4 MW
GT

Turn Up
Legend:
Starting point with
standard configuration
Starting point with Turn Up
Base load
96 % 97.5 % 100 % ~101.5 % Maximal load with Turn Up
GT load

Operation closer to base load


Power benefit of 4 MW gas turbine load and up to 6 MW in combined cycle load