Mature technology
for 400 MW class CCPP
Turn Up refers to opening the Inlet Guide Vane base load design position
Increase of the maximum position of the inlet guide vane for T4 compressor by 6
Compressor mass flow increase up to 2.7 %
4 MW 4 MW
GT
Turn Up
Legend:
Starting point with
standard configuration
Starting point with Turn Up
Base load
96 % 97.5 % 100 % ~101.5 % Maximal load with Turn Up
GT load