Date Project Design / Drawing Time for Drawing / Design Total hours
2/1/2015 CHITRAKUT AMBER 1ST & Portico level form work, slab & beam details 4
10/2/2015 Akshaya private housing First, second,typical floor formwork &slab details 6
23/03/2015 sjr club house Formwork, beam and slab reinf. Details 2
26/06/2015 SJR club house Terrace floor formwork, beam& slab details 1
2/2/2016 SJR Park way upper basement TOWER-F&G Formwork, Beam,Slab details 3
18/02/2016 SJR park way Podium Stair case details between tower A&B 1
18/02/2016 SJR park way Podium Stair case details between tower B&C 1
18/02/2016 SJR park way Podium Stair case details between tower D&E 1
18/02/2016 SJR park way Podium Stair case details between tower E&F 1