DETERMINACIN DEL CENTRO PLSTICO DE LA SECCIN (CP) Se tomar con respecto a la parte inferior
(fibra mas traccionada)
+ 1 1 + 2 2 +
=
+
CP = 22.50 cm
c) PUNTO DE CARGA BALANCEADA : EL CONCRETO Y EL ACERO LLEGAN A SU MAXIMA CAPACIDAD AL MISMO TIEMPO
d = 39.25 cm
= =
+
a = 20.02 cm c = 23.55 cm
c 0.85*f'c
s1 C'1
a C=0.85*f'c*a*b 22.50 cm
d c s2 C'2
CP
E.N
s3 T3
22.50 cm
s4 T4
alexosmar_19@hotmail.com
ALEX OSMAR ACUA VASQUEZ - ING. CIVIL - CONCRETO ARMADO
.. = *Es = * = *
=
Capa As d E.N. fs F d CP M
1 7.92 cm2 17.81 cm 0.002268 4,762.93 kg/cm2 33.26 Tn 16.75 cm 5.57 Tn.m
2 3.96 cm2 6.64 cm 0.000845 1,775.29 kg/cm2 7.03 Tn 5.58 cm 0.39 Tn.m
3 3.96 cm2 -4.53 cm -0.000577 -1,212.36 kg/cm2 -4.80 Tn -5.58 cm 0.27 Tn.m
4 7.92 cm2 -15.70 cm -0.002000 -4,200.00 kg/cm2 -33.26 Tn -16.75 cm 5.57 Tn.m
CONCRETO Cc = 0.85*f'c*a*b 160.81 Tn 12.49 cm 20.09 Tn.m
Pb = 163.04 Tn Mb = 31.89 Tn.m
d) CONSIDERANDO LA PROFUNDIDAD DEL EJE NEUTRO IGUAL A UN PORCENTAJE DEL PERALTE EFECTIVO c = 0.10 * d
d = 39.25 cm
c = 3.93 cm
=
a = 3.34 cm
c 0.85*f'c
c a C=0.85*f'c*a*b
s1 T1 E.N
22.50 cm
d s2 T2
CP
s3 T3
22.50 cm
s4 T4
.. = *Es = * = *
=
Capa As d E.N. fs F d CP M
1 7.92 cm2 -1.82 cm -0.001392 -2,922.40 kg/cm2 -23.15 Tn 16.75 cm -3.88 Tn.m
2 3.96 cm2 -12.99 cm -0.009928 -20,848.27 kg/cm2 -16.63 Tn 5.58 cm -0.93 Tn.m
3 3.96 cm2 -24.16 cm -0.018464 -38,774.13 kg/cm2 -16.63 Tn -5.58 cm 0.93 Tn.m
4 7.92 cm2 -35.33 cm -0.027000 -56,700.00 kg/cm2 -33.26 Tn -16.75 cm 5.57 Tn.m
CONCRETO Cc = 0.85*f'c*a*b 26.80 Tn 20.83 cm 5.58 Tn.m
P = -62.87 Tn M = 7.28 Tn.m
e) CONSIDERANDO LA PROFUNDIDAD DEL EJE NEUTRO IGUAL A UN PORCENTAJE DEL PERALTE EFECTIVO c = 0.20 * d
d = 39.25 cm
c = 7.85 cm
=
a = 6.67 cm
c 0.85*f'c
c C=0.85*f'c*a*b
a
s1 C'1 E.N
22.50 cm
d s2 T2
CP
s3 T3
22.50 cm
s4 T4
alexosmar_19@hotmail.com
ALEX OSMAR ACUA VASQUEZ - ING. CIVIL - CONCRETO ARMADO
.. = *Es = * = *
=
Capa As d E.N. fs F d CP M
1 7.92 cm2 2.10 cm 0.000804 1,688.80 kg/cm2 13.38 Tn 16.75 cm 2.24 Tn.m
2 3.96 cm2 -9.06 cm -0.003464 -7,274.13 kg/cm2 -16.63 Tn 5.58 cm -0.93 Tn.m
3 3.96 cm2 -20.23 cm -0.007732 -16,237.07 kg/cm2 -16.63 Tn -5.58 cm 0.93 Tn.m
4 7.92 cm2 -31.40 cm -0.012000 -25,200.00 kg/cm2 -33.26 Tn -16.75 cm 5.57 Tn.m
CONCRETO Cc = 0.85*f'c*a*b 53.60 Tn 19.16 cm 10.27 Tn.m
P = 0.45 Tn M = 18.09 Tn.m
f) CONSIDERANDO LA PROFUNDIDAD DEL EJE NEUTRO IGUAL A UN PORCENTAJE DEL PERALTE EFECTIVO c = 0.30 * d
d = 39.25 cm
c = 11.78 cm
=
a = 10.01 cm
c 0.85*f'c
C=0.85*f'c*a*b
a
c s1 C'1
E.N 22.50 cm
d s2 T2
CP
s3 T3
22.50 cm
s4 T4
.. = *Es = * = *
=
Capa As d E.N. fs F d CP M
1 7.92 cm2 6.03 cm 0.001536 3,225.87 kg/cm2 25.55 Tn 16.75 cm 4.28 Tn.m
2 3.96 cm2 -5.14 cm -0.001309 -2,749.42 kg/cm2 -10.89 Tn 5.58 cm -0.61 Tn.m
3 3.96 cm2 -16.31 cm -0.004155 -8,724.71 kg/cm2 -16.63 Tn -5.58 cm 0.93 Tn.m
4 7.92 cm2 -27.48 cm -0.007000 -14,700.00 kg/cm2 -33.26 Tn -16.75 cm 5.57 Tn.m
CONCRETO Cc = 0.85*f'c*a*b 80.40 Tn 17.50 cm 14.07 Tn.m
P = 45.17 Tn M = 24.24 Tn.m
g) CONSIDERANDO LA PROFUNDIDAD DEL EJE NEUTRO IGUAL A UN PORCENTAJE DEL PERALTE EFECTIVO c = 0.40 * d
d = 39.25 cm
c = 15.70 cm
=
a = 13.35 cm
c 0.85*f'c
C=0.85*f'c*a*b
c s1 a C'1
E.N 22.50 cm
d s2 T2
CP
s3 T3
22.50 cm
s4 T4
alexosmar_19@hotmail.com
ALEX OSMAR ACUA VASQUEZ - ING. CIVIL - CONCRETO ARMADO
.. = *Es = * = *
=
Capa As d E.N. fs F d CP M
1 7.92 cm2 9.96 cm 0.001902 3,994.40 kg/cm2 31.64 Tn 16.75 cm 5.30 Tn.m
2 3.96 cm2 -1.21 cm -0.000232 -487.07 kg/cm2 -1.93 Tn 5.58 cm -0.11 Tn.m
3 3.96 cm2 -12.38 cm -0.002366 -4,968.53 kg/cm2 -16.63 Tn -5.58 cm 0.93 Tn.m
4 7.92 cm2 -23.55 cm -0.004500 -9,450.00 kg/cm2 -33.26 Tn -16.75 cm 5.57 Tn.m
CONCRETO Cc = 0.85*f'c*a*b 107.20 Tn 15.83 cm 16.97 Tn.m
P = 87.01 Tn M = 28.66 Tn.m
h) CONSIDERANDO LA PROFUNDIDAD DEL EJE NEUTRO IGUAL A UN PORCENTAJE DEL PERALTE EFECTIVO c = 0.50 * d
d = 39.25 cm
c = 19.63 cm
=
a = 16.68 cm
c 0.85*f'c
s1 a C'1
c C=0.85*f'c*a*b 22.50 cm
d s2 C'2
E.N
CP
s3 T3
22.50 cm
s4 T4
.. = *Es = * = *
=
Capa As d E.N. fs F d CP M
1 7.92 cm2 13.88 cm 0.002122 4,455.52 kg/cm2 33.26 Tn 16.75 cm 5.57 Tn.m
2 3.96 cm2 2.71 cm 0.000414 870.35 kg/cm2 3.45 Tn 5.58 cm 0.19 Tn.m
3 3.96 cm2 -8.46 cm -0.001293 -2,714.83 kg/cm2 -10.75 Tn -5.58 cm 0.60 Tn.m
4 7.92 cm2 -19.63 cm -0.003000 -6,300.00 kg/cm2 -33.26 Tn -16.75 cm 5.57 Tn.m
CONCRETO Cc = 0.85*f'c*a*b 134.00 Tn 14.16 cm 18.97 Tn.m
P = 126.70 Tn M = 30.91 Tn.m
i) CONSIDERANDO LA PROFUNDIDAD DEL EJE NEUTRO IGUAL A UN PORCENTAJE DEL PERALTE EFECTIVO c = 0.60 * d
d = 39.25 cm
c = 23.55 cm
=
a = 20.02 cm
c 0.85*f'c
s1 C'1
c a C=0.85*f'c*a*b 22.50 cm
d s2 C'2
CP
E.N
s3 T3
22.50 cm
s4 T4
alexosmar_19@hotmail.com
ALEX OSMAR ACUA VASQUEZ - ING. CIVIL - CONCRETO ARMADO
.. = *Es = * = *
=
Capa As d E.N. fs F d CP M
1 7.92 cm2 17.81 cm 0.002268 4,762.93 kg/cm2 33.26 Tn 16.75 cm 5.57 Tn.m
2 3.96 cm2 6.64 cm 0.000845 1,775.29 kg/cm2 7.03 Tn 5.58 cm 0.39 Tn.m
3 3.96 cm2 -4.53 cm -0.000577 -1,212.36 kg/cm2 -4.80 Tn -5.58 cm 0.27 Tn.m
4 7.92 cm2 -15.70 cm -0.002000 -4,200.00 kg/cm2 -33.26 Tn -16.75 cm 5.57 Tn.m
CONCRETO Cc = 0.85*f'c*a*b 160.81 Tn 12.49 cm 20.09 Tn.m
P = 163.04 Tn M = 31.89 Tn.m
j) CONSIDERANDO LA PROFUNDIDAD DEL EJE NEUTRO IGUAL A UN PORCENTAJE DEL PERALTE EFECTIVO c = 0.70 * d
d = 39.25 cm
c = 27.48 cm
=
a = 23.36 cm
c 0.85*f'c
s1 C'1
c a C=0.85*f'c*a*b 22.50 cm
d s2 C'2
CP
E.N
s3 T3
22.50 cm
s4 T4
.. = *Es = * = *
=
Capa As d E.N. fs F d CP M
1 7.92 cm2 21.73 cm 0.002373 4,982.51 kg/cm2 33.26 Tn 16.75 cm 5.57 Tn.m
2 3.96 cm2 10.56 cm 0.001153 2,421.68 kg/cm2 9.59 Tn 5.58 cm 0.54 Tn.m
3 3.96 cm2 -0.61 cm -0.000066 -139.16 kg/cm2 -0.55 Tn -5.58 cm 0.03 Tn.m
4 7.92 cm2 -11.78 cm -0.001286 -2,700.00 kg/cm2 -21.38 Tn -16.75 cm 3.58 Tn.m
CONCRETO Cc = 0.85*f'c*a*b 187.61 Tn 10.82 cm 20.30 Tn.m
P = 208.53 Tn M = 30.02 Tn.m
k) CONSIDERANDO LA PROFUNDIDAD DEL EJE NEUTRO IGUAL A UN PORCENTAJE DEL PERALTE EFECTIVO c = 0.80 * d
d = 39.25 cm
c = 31.40 cm
=
a = 26.69 cm
c 0.85*f'c
s1 C'1
C=0.85*f'c*a*b 22.50 cm
d c s2 a C'2
CP
s3 C'3
E.N
22.50 cm
s4 T4
alexosmar_19@hotmail.com
ALEX OSMAR ACUA VASQUEZ - ING. CIVIL - CONCRETO ARMADO
.. = *Es = * = *
=
Capa As d E.N. fs F d CP M
1 7.92 cm2 25.66 cm 0.002451 5,147.20 kg/cm2 33.26 Tn 16.75 cm 5.57 Tn.m
2 3.96 cm2 14.49 cm 0.001384 2,906.47 kg/cm2 11.51 Tn 5.58 cm 0.64 Tn.m
3 3.96 cm2 3.32 cm 0.000317 665.73 kg/cm2 2.64 Tn -5.58 cm -0.15 Tn.m
4 7.92 cm2 -7.85 cm -0.000750 -1,575.00 kg/cm2 -12.47 Tn -16.75 cm 2.09 Tn.m
CONCRETO Cc = 0.85*f'c*a*b 214.41 Tn 9.15 cm 19.63 Tn.m
P = 249.34 Tn M = 27.78 Tn.m
l) CONSIDERANDO LA PROFUNDIDAD DEL EJE NEUTRO IGUAL A UN PORCENTAJE DEL PERALTE EFECTIVO c = 0.90 * d
d = 39.25 cm
c = 35.33 cm
=
a = 30.03 cm
c 0.85*f'c
s1 C'1
22.50 cm
d c s2 a C=0.85*f'c*a*b
C'2 CP
s3
C'3
E.N 22.50 cm
s4 T4
.. = *Es = * = *
=
Capa As d E.N. fs F d CP M
1 7.92 cm2 29.58 cm 0.002512 5,275.29 kg/cm2 33.26 Tn 16.75 cm 5.57 Tn.m
2 3.96 cm2 18.41 cm 0.001564 3,283.53 kg/cm2 13.00 Tn 5.58 cm 0.73 Tn.m
3 3.96 cm2 7.24 cm 0.000615 1,291.76 kg/cm2 5.12 Tn -5.58 cm -0.29 Tn.m
4 7.92 cm2 -3.93 cm -0.000333 -700.00 kg/cm2 -5.54 Tn -16.75 cm 0.93 Tn.m
CONCRETO Cc = 0.85*f'c*a*b 241.21 Tn 7.49 cm 18.06 Tn.m
P = 287.05 Tn M = 25.00 Tn.m
m) CONSIDERANDO LA PROFUNDIDAD DEL EJE NEUTRO IGUAL A UN PORCENTAJE DEL PERALTE EFECTIVO c = 1.00 * d
d = 39.25 cm
c = 39.25 cm
=
a = 33.37 cm
c 0.85*f'c
s1 C'1
22.50 cm
d c s2 a C=0.85*f'c*a*b
C'2
s3 CP
C'3
22.50 cm
s4 T4 E.N
alexosmar_19@hotmail.com
ALEX OSMAR ACUA VASQUEZ - ING. CIVIL - CONCRETO ARMADO
.. = *Es = * = *
=
Capa As d E.N. fs F d CP M
1 7.92 cm2 33.51 cm 0.002561 5,377.76 kg/cm2 33.26 Tn 16.75 cm 5.57 Tn.m
2 3.96 cm2 22.34 cm 0.001707 3,585.17 kg/cm2 14.20 Tn 5.58 cm 0.79 Tn.m
3 3.96 cm2 11.17 cm 0.000854 1,792.59 kg/cm2 7.10 Tn -5.58 cm -0.40 Tn.m
4 7.92 cm2 0.00 cm 0.000000 0.00 kg/cm2 0.00 Tn -16.75 cm 0.00 Tn.m
CONCRETO Cc = 0.85*f'c*a*b 268.01 Tn 5.82 cm 15.59 Tn.m
P = 322.57 Tn M = 21.56 Tn.m
alexosmar_19@hotmail.com
ALEX OSMAR ACUA VASQUEZ - ING. CIVIL - CONCRETO ARMADO
DIAGRAMAS DE INTERACCIN:
DIAGRAMA DE INTERACCIN: M3
400.0
300.0
M3n(+)
200.0
CARGAS (Tn)
M3n(-)
100.0 M3u(+)
M3u(-)
0.0 Cargas
-35.0 -15.0 5.0 25.0
-100.0
-200.0
MOMENTOS (Tn.m)
DIAGRAMA DE INTERACCIN: M2
400.0
300.0
200.0 M2n(+)
CARGAS (Tn)
M2n(-)
100.0
M2u(+)
M2u(-)
0.0
-35.0 -15.0 5.0 25.0 Cargas
-100.0
-200.0
MOMENTOS (Tn.m)
CLCULO DE ESTRIBOS:
0.3*Ag*f'c = 127.58 Tn
Pu = 101.84 Tn
Por tanto:
Pu 0.3*Ag*f'c
alexosmar_19@hotmail.com
ALEX OSMAR ACUA VASQUEZ - ING. CIVIL - CONCRETO ARMADO
S = 9.53 cm
9.00 cm
L = 45.00 cm
45.00 cm
# . =
# estr. = 5 estrbs
S = 9.53 cm
10.00 cm
Ln = 2.60 cm
hx
bc = 36.05 cm
bc
hc = 36.05 cm
hx = 33.51 cm
hc
Direccion X-X
Direccion Y-Y