The BIMstitute Achieve BIM excellence

bimstitute.com

BIM at a glance
Building Information Modelling (BIM)
A collaborative way of working underpinned by digital technologies. These technologies allow for more efficient
methods of designing, delivering and maintaining physical built assets throughout their entire lifecycle.

Levels One integrated model


for use by build team

3D BIM models downloaded Level 3 maturity


according to specifications Ambitious vision for integrated design
allowing changes to be made in real
time. Level 3 entails full collaboration
2D + 3D Level 2 maturity between all disciplines by means of
Collaborative 3D BIM. All project and asset using a single, shared project model.
information, documentation and data is prepared
Level 1 maturity
digitally by different parties during the project
A mixture of 3D CAD for concept
life-cycle within the context of a common data
work, and 2D for drafting of
environment. Design information is shared which
statutory approval documentation
enables any party to be able to combine that data
and Production Information. CAD
with their own in order to make a federated BIM
standards are managed to BS
model, and carry out interrogative checks on it i.e
1192:2007. Models are not shared
clash detection.
between project team members, and
data is managed by the contractor.

Information Exchange
il .
d eta e (i.e D io
n
is n ge D ag l 3
t a at ing
d ) s h a / s i c . ` m r
e e
n ach raph nition or
se exc
M a
e ls elop ng th l (AI s t i o e inf f sh
a e g fi e o
od de ur d Cl can b ats.
v i e A a a f e t is s
M tion nd d n Mo r m iven the o of D an ean .
n fo ta g is vels rg IM
tio ation e for
n m
it o orma IM) a atio I n so am dB
a f d O L a D e l p i s
a f
m e, in del (P Infor
m
u nd form ftwar l o l 2D s). L ate ` he It
at ies. DM
an
r e
o s
nf ha Mo et Fo o i s
n o v a io qu
Le aphic ificat D e
n h
a t ili
m fac like
t C
- I ery p tion e Ass t ry les s ltiple - e t
s fi u gr c LO h g s
M v a h
AI deli form it's t n du t for on m e" L ODnon- d spe LOI/ sc tin ju
al xis on,
- I orma ally uag e i
/ e e I/ the s an ively ie s formand rmat
I M ng th ect In stag C O B i
L I ul lec CoOBie t new d inf
f n g s e t
P uri roj al IF pen atio lan i o
D e P tion O ern on LO hed ol
sc ta. C C ou ure
th era int mm a ab uct
o d
op "c st
r

Advisory | Implementation | Support www.bimstitute.com


Contracts Standards
OIR BEP BS 1192-2 (2007) Overview
The Organisational The BIM Execution Plan A consistent industry wide framework for collaborative
Information Requirements document is created, shared working and information management. This provides
(OIR) assesses people, and agreed by the project the benchmark for file-naming conventions.
processes and systems that team including team roles
affects BIM adoption. and responsibilities, formats PAS 1192-2 (2013) Delivery
and conventions for the PAS 1192-2 builds on British Standard BS 1192:2007 by
project. providing the framework of information management
AIR
requirements. The PAS aims to ensure that building
The Asset Information
MIDP information can be used and re-used throughout the
Requirements (AIR)
Fed from the BEP, the lifecycle of an asset.
developed from the OIR
is an asset management Master Information Delivery
strategy that informs the EIR. Plan communicates what
PAS 1192-3 (2014) Asset Management
information is needed,
Specification for information management for the
timescales and who delivers
operational phase of assets using building information
EIR the information.
modelling.
The Employer's Information
Requirements document
sets out what information BIM Protocol BS 1192-4: (2014) CoBie output
(Technical, Commercial and A supplementary legal Collaborative production of information fulfilling
Management.) the client agreement incorporated employers information exchange requirements using
requires, so service teams into professional services COBie Code of Practice.
know what to deliver without appointments and
excessive information. construction contracts.
PAS 1192-5 (2015) Security
Specifies the processes that will assist organisations
in identifying and implementing appropriate and
proportionate measures to reduce the risk of loss or
disclosure of information which could impact on the
Collaboration safety and security.

CDE (Common Data Environment) GSL - Government Soft Landings


This is a server, extranet or cloud based system which is A key part of Level 2 to encourage early engagement
accessible by all members of the project team on which of end-users with a strong focus on commissioning,
is stored specifications, schedules, cost plans, drawings handover and training.
and programmes.

Uniclass Classification
Federated Model Uniclass 2015 is a unified UK classification of items of all
Used from Level 2 onwards, the model is a composite scale from a facility such as a railway down through to
model developed between disciplines. Clash detection products such as a CCTV camera in a railway station.
is the key benefit i.e. testing and validation of models
(architect, structural, MEP etc.) against each other to
avoid clashes i.e. pipes and structural beams. NBS Digital Plan of Works
Enabling an employer to define the deliverables
required at each stage of a construction project from
4D BIM (Construction Simulation) developing the strategy through to managing the
Schedule data added to a 3D model generating asset - updated over time. and made available to all
accurate programme information and having staged participants.
visuals of the project development. This enables
detection of problems early, avoiding economic losses
and wasted time in execution progress.

Point Cloud Conversion (Scan to BIM)


We can help you with all these areas of BIM and
Point cloud data obtained from lazer scans of assets
can be converted into useful 3D models to enable more. Stay fully informed with BIM updates email
navigation and better understanding of the data. BIM@bimstitute.com

Update June 2017