Thomas is an experienced Chartered Engineer with a strong background in all types


of construction. He is the Contracts Director since 2003 and the Managing Director in
P. Clarke and Sons Ltd since 2008. The company has three divisions; Quarry
Products, Contracts (building and civils) and Surfacing. The company currently has
contracts in Ireland, Manchester, Somerset and Kurdistan Iraq. Tommy started as a
site engineer in 1991 and progressed to Site Agent, Contracts Manager and Contracts
Director in 2003 before becoming Managing Director.
Qualifications
B Eng (Hons) Civil Engineering
Career
2008 - Present Managing & Contracts Director P. Clarke and Sons Ltd
2003 - 2008 Contracts Director P. Clarke and Sons Ltd
1993 - 2003 Contracts Manager P. Clarke and Sons Ltd
1991 - 1993 Site Engineer/Site Agent P. Clarke and Sons Ltd
Professional Development
Member of the Institute of Engineers of Ireland
Tommy Clarke Essential Health & Safety for Senior Executives
BEng in Civil Engineering
Chartered Engineer
Other Training:
Managing Safely in Construction
Profession:
Safe Pass
Civil Engineer
Professional Experience
Thomas directs the business on day to day basic, directs
Position in Firm: a board including a financial director and Health and
Managing & Contracts Safety director and manages a team of senior managers
Director setting goals for the short, medium and long term. He
ensures that the team deliver contracts on time, to
specification and to the highest of safety. He drives the
Experience: company to be professional in all its endeavours and
22 years continually looks for improvement in all areas.

As well as directing the business Thomas has recently


Key Qualifications:
been overlooking a number of major projects, including:
BEng (Hons)
New Islington, Building Contracts, Manchester.
Professional (7.5m) - 81 Apartments & 13 Houses with associated
Memberships: site works.
BAU and BDUK Contract for Carillion Telent in
Chartered Engineer Somerset, 2014 - 2016, Estimated value 6.5 million
NRA Framework Agreement for Pavement and
Member of the Institute of Managing & Associated Minor Works, 4 Lots, 2011 2014, Value to
Engineers of Ireland 2008 -
Contracts date is over 5 million
Director Present
Term Roads Contract in Fermanagh for DRD Roads
Service (22 million to date)
Various Industrial Buildings, Civil and Surfacing works
in Kurdistan, Northern Iraq. ($11.5m)
N55 Road Realignment Scheme, Co. Cavan.
(5.5m) - Construct 3km complete with tie-ins &
Contact Details:
+44 (0) 28 6772 1286 (Office) associated works
+353 (0)7876 341549 (Mob) Water Meter Installation NE Region for Irish Water
email:t.clarke@clarkeltd.com (3.3m)
Hospital Overflow Carpark, Enniskillen (0.25m) -
Construct 140no car space parking with lighting,
surfacing & associated works
Flood Alleviation Contract Broadbottom,
Manchester, UK for Balfour Beatty Utilities Ltd
Involvement in various road improvement
schemes

As Contracts Director, Thomas was responsible for all contracts which included
Procurement, Management and Delivery within budget and in the agreed time
frame. Sectors of Work include Road Construction, Water, Commercial
Building and Infrastructure with values up to 20M. Regions of Operation were
N. Ireland, UK Mainland, Republic of Ireland and International.

Major projects, included:


Contracts
Director 170 Housing Units & Site Development, Convent Lands, Carrickmacross 2003 - 2008
for Respond Housing (15.8m)
20nr New Build & Social Houses Moneynure Drumshambo, Co Leitrim
(2.55m)
16nr New Build & 38nr Refurbs St Finnian Housing Park, Drogheda
(2.42m)
44nr New Build & Social Houses Mullagh, Co.Cavan (4.15m)
N5 Dublin Street, Longford Co.Longford Street Refurb (1.1m)

As Contracts Manager Thomas main responsibilities included project


management of a portfolio of civil engineering and building projects, managing
Contracts
a team of Site Engineers/Site Agents/Site Supervisors to ensure successful
Manager
delivery and ensuring that all sub-contractors on sites are compliant with all
legislative and P Clarke and Sons Limited.

Site Thomas monitored progress, overseen delivery of materials and carried out 1991 - 1993
Engineer/Site safety checks and sorted out any problems which could hold up work as they
Agent, arouse. He also ensured that work complied with building regulations and
health and safety legislation as well as other legal requirements.