A Power Transformers 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11
B Service Transformers
Cleaning, Inspection of terminal box and
1 Bus duct and their tightness of
Transformers ESP 2A. 2B
Cleaning, Inspection of terminal box and
2 Bus duct and their tightness of
Transformers AHT 2B.
Cleaning, Inspection of terminal box and
3 Bus duct and their tightness of
Transformers INT silo 1,3 & Final silo
Cleaning, Inspection of terminal box and
Bus duct and their thightness of
4
Transformers WTP 2A & 2B & IDCT 2A &
2B
Cleaning, Inspection terminal box and Bus
5 duct and their tightness of Transformers
UST 2A & 2B
he work is performed in
parallel with other
cies/services Engineers
o there may be some
anges possible in the
dule as per available of
e system & equipment
CHHABRA THERMAL POWER PLANT
ELECTRICAL MAINTENANCE CIRCLE
Annual maintenance programme of 250 MW Unit # 3 for the year 2016.
Area:- Electrical System (Power transformers, Service Transformers & IPBD of Unit # 3).
PERT CHART
S.
Description of Works/Active Day (03 August 2016 to 23 August 2016)
No.
A Power Transformers 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Remarks
Oil leakage in ST#3
Preventive maintenance and associated
1 will be attended by
work of Generator Transformer#3
ourselves only w.o. for
Preventive maintenance of station hiring of oil filtration
2 Transformer#3 and oil leakage will also machine has been
be attended. placed therefore any
emergency may be
Inspection of terminal box, Bus duct and handled by topping up
3 their thightness in UAT#3A & UAT#3B the oil.
Transformers
S. Name of
No.
Date
Equipment
Description of Works/Activity Remarks
In the given
General cleaning of Transformer with cloth including
Preventive
radiator, marshalling box cooling fan, tightness of schedule all the
maintenance and preventive
flanges. Inspection of Silica Gel and replacement if
1 15.10.2016 associated work of maintenance
required checking of oil level and BDV in Service
Generator works are
Transformers and yard cleaning, preventive
Transformer#1 included which
maintenance of cooling fans.
may be perform
General cleaning of Transformer with cloth including during the charged
Preventive Transformers
radiator, marshalling box cooling fan, tightness of
maintenance and
flanges. Inspection of Silica Gel and replacement if taking with all
2 16.10.2016 associated work of
required checking of oil level and BDV in Service safety measures
Station
Transformers and yard cleaning, preventive and rest
Transformer#1
maintenance of cooling fans. maintenance work
will be done with
General cleaning of Transformer with cloth including proper PTW and
Preventive
radiator, marshalling box cooling fan, tightness of supply isolation
maintenance and
flanges. Inspection of Silica Gel and replacement if and
3 17.10.2016 associated work of
required checking of oil level and BDV in Service changeover/shiftin
Generator
Transformers and yard cleaning, preventive
Transformer#2 g of load to
maintenance of cooling fans.
adjacent
Transformer.
General cleaning of Transformer with cloth including
Preventive
radiator, marshalling box cooling fan, tightness of
maintenance and
flanges. Inspection of Silica Gel and replacement if
4 18.10.2016 associated work of
required checking of oil level and BDV in Service
Station
Transformers and yard cleaning, preventive
Transformer#2
maintenance of cooling fans.
Page 13 of 32
General cleaning of Transformer with cloth including
Preventive
radiator, marshalling box cooling fan, tightness of
maintenance and
flanges. Inspection of Silica Gel and replacement if
8 22.10.2016 associated work of
required checking of oil level and BDV in Service
Station
Transformers and yard cleaning, preventive
Transformer#4
maintenance of cooling fans.
In the given
General cleaning of Transformer with cloth including
Preventive radiator, marshalling box cooling fan, tightness of schedule all the
maintenance and flanges. Inspection of Silica Gel and replacement if preventive
9 23.10.2016 maintenance
associated work of required checking of oil level and BDV in Service
ICT Transformers and yard cleaning, preventive works are
maintenance of cooling fans. included which
may be perform
Preventive General cleaning of Transformer with cloth including during the charged
maintenance and radiator, marshalling box cooling fan, tightness of Transformers
associated work in flanges. Inspection of Silica Gel and replacement if taking with all
10 24.10.2016
UAT#1A & required checking of oil level and BDV in Service safety measures
UAT#1B Transformers and yard cleaning, preventive and rest
Transformers maintenance of cooling fans. maintenance work
will be done with
Preventive General cleaning of Transformer with cloth including proper PTW and
maintenance and radiator, marshalling box cooling fan, tightness of supply isolation
associated work in flanges. Inspection of Silica Gel and replacement if and
11 25.10.2016
UAT#2A & required checking of oil level and BDV in Service changeover/shiftin
UAT#2B Transformers and yard cleaning, preventive g of load to
Transformers maintenance of cooling fans. adjacent
Transformer.
Preventive General cleaning of Transformer with cloth including
maintenance and radiator, marshalling box cooling fan, tightness of
associated work in flanges. Inspection of Silica Gel and replacement if
12 26.10.2016
UAT#3A & required checking of oil level and BDV in Service
UAT#3B Transformers and yard cleaning, preventive
Transformers maintenance of cooling fans.
Page 14 of 32
Preventive General cleaning of Transformer with cloth including
maintenance and radiator, marshalling box cooling fan, tightness of
17 31.10.2016 associated work of flanges. Inspection of Silica Gel and replacement if
Service Transformer required checking of oil level and BDV in Service
of unit#1 Transformers and yard cleaning.
In the given
Preventive General cleaning of Transformer with cloth including schedule all the
maintenance and radiator, marshalling box cooling fan, tightness of preventive
18 01.10.2016 associated work of flanges. Inspection of Silica Gel and replacement if maintenance
Service Transformer required checking of oil level and BDV in Service works are
of unit#1 Transformers and yard cleaning. included which
may be perform
during the charged
Preventive General cleaning of Transformer with cloth including Transformers
maintenance and radiator, marshalling box cooling fan, tightness of taking with all
19 02.10.2016 associated work of flanges. Inspection of Silica Gel and replacement if safety measures
Service Transformer required checking of oil level and BDV in Service and rest
of unit#1 Transformers and yard cleaning. maintenance work
will be done with
Preventive General cleaning of Transformer with cloth including proper PTW and
maintenance and radiator, marshalling box cooling fan, tightness of supply isolation
20 03.11.2016 associated work of flanges. Inspection of Silica Gel and replacement if and
Service Transformer required checking of oil level and BDV in Service changeover/shiftin
of unit#2 Transformers and yard cleaning. g of load to
adjacent
Transformer.
Preventive General cleaning of Transformer with cloth including
maintenance and radiator, marshalling box cooling fan, tightness of
21 04.11.2016 associated work of flanges. Inspection of Silica Gel and replacement if
Service Transformer required checking of oil level and BDV in Service
of unit#2 Transformers and yard cleaning.
Page 15 of 32
Preventive General cleaning of Transformer with cloth including
maintenance and radiator, marshalling box cooling fan, tightness of
26 09.11.2016 associated work of flanges. Inspection of Silica Gel and replacement if
Service Transformer required checking of oil level and BDV in Service
of unit#4 Transformers and yard cleaning.
In the given
Preventive General cleaning of Transformer with cloth including schedule all the
maintenance and radiator, marshalling box cooling fan, tightness of preventive
27 10.11.2016 associated work of flanges. Inspection of Silica Gel and replacement if maintenance
Service Transformer required checking of oil level and BDV in Service works are
of unit#4 Transformers and yard cleaning. included which
may be perform
during the charged
Preventive General cleaning of Transformer with cloth including Transformers
maintenance and radiator, marshalling box cooling fan, tightness of taking with all
28 11.11.2016 associated work of flanges. Inspection of Silica Gel and replacement if
safety measures
Service Transformer required checking of oil level and BDV in Service
of unit#4 Transformers and yard cleaning. and rest
maintenance work
will be done with
Preventive proper PTW and
General cleaning of Transformer with cloth including
radiator, marshalling box cooling fan, tightness of supply isolation
maintenance and
associated work of and
29 12.11.2016 flanges. Inspection of Silica Gel and replacement if
Switchyard
required checking of oil level and BDV in Service changeover/shiftin
Transformer of g of load to
Transformers and yard cleaning.
unit#1 & 2 adjacent
Transformer.
Preventive
General cleaning of Transformer with cloth including
maintenance and
radiator, marshalling box cooling fan, tightness of
associated work of
30 13.11.2016 flanges. Inspection of Silica Gel and replacement if
Switchyard
required checking of oil level and BDV in Service
Transformer of
Transformers and yard cleaning.
unit#3 & 4
Page 16 of 32
Annual shutdown works (2017-18) of Power and service Transformers for unit#4at CTPP Chhab
S.No. Description of Works Work order/ Contract Status of spares
A Power Transformers
Inspection of terminal box, Bus duct and their M/s Sunil Enterprises Kota vide
thightness in UAT#4A & UAT#4B Transformers, W.O. No. No specific spare
3
cleaning and tightening of marshalling box. RVUNL/CTPP/SE(Gen.)/D-112 dt. required
Checking of emulsifier system. 21.05.2016. TN-55/2015-16.
Checking of Transformer Oil level, BDV & M/s Sunil Enterprises Kota vide
topping up of oil if required if any leakage W.O. No. No specific spare
5
persisting attending the same, Inspection and RVUNL/CTPP/SE(Gen.)/D-112 dt. required
replacment of silica gel. 21.05.2016. TN-55/2015-16.
B Service Transformers
Annual maintenance and associated work of
M/s Sunil Enterprises Kota vide
Transformers ESP 4A. 4B AHT 4A. Including
W.O. No. No specific spare
1 cleaning, Inspection of terminal box and their
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
tightness & Checking of various protection
21.05.2016. TN-55/2015-16.
schemes.
Annual maintenance and associated work of M/s Sunil Enterprises Kota vide
Neutral grounding cubicle, including Cleaning W.O. No. No specific spare
2 and tightening of LAVT cubicle and hot air RVUNL/CTPP/SE(Gen.)/D-112 dt. required
blowing system. 21.05.2016. TN-55/2015-16.
4at CTPP Chhabra
Remark
Annual shutdown works (2017-18) of Power and service Transformers for unit#3 at CTPP Chhab
S.No. Description of Works Work order/ Contract Status of spares
A Power Transformers
Inspection of terminal box, Bus duct and their M/s Sunil Enterprises Kota vide
thightness in UAT#3A & UAT#3B Transformers, W.O. No. No specific spare
3
cleaning and tightening of marshalling box. RVUNL/CTPP/SE(Gen.)/D-112 dt. required
Checking of emulsifier system. 21.05.2016. TN-55/2015-16.
Checking of Transformer Oil level, BDV & M/s Sunil Enterprises Kota vide
topping up of oil if required if any leakage W.O. No. No specific spare
5
persisting attending the same, Inspection and RVUNL/CTPP/SE(Gen.)/D-112 dt. required
replacment of silica gel. 21.05.2016. TN-55/2015-16.
B Service Transformers
Annual maintenance and associated work of
M/s Sunil Enterprises Kota vide
Transformers ESP 3A. 3B AHT 3A. Including
W.O. No. No specific spare
1 cleaning, Inspection of terminal box and their
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
tightness & Checking of various protection
21.05.2016. TN-55/2015-16.
schemes.
Annual maintenance and associated work of M/s Sunil Enterprises Kota vide
Neutral grounding cubicle, including Cleaning W.O. No. No specific spare
2 and tightening of LAVT cubicle and hot air RVUNL/CTPP/SE(Gen.)/D-112 dt. required
blowing system. 21.05.2016. TN-55/2015-16.
3 at CTPP Chhabra
Remark
Annual shutdown works (2017-18) of Power and service Transformers for unit#2 at CTPP Chhab
S.No. Description of Works Work order/ Contract Status of spares
A Power Transformers
Inspection of terminal box, Bus duct and their M/s Sunil Enterprises Kota vide
thightness in UAT#2A & UAT#2B Transformers, W.O. No. No specific spare
3
cleaning and tightening of marshalling box. RVUNL/CTPP/SE(Gen.)/D-112 dt. required
Checking of emulsifier system. 21.05.2016. TN-55/2015-16.
Checking of Transformer Oil level, BDV & M/s Sunil Enterprises Kota vide
topping up of oil if required if any leakage W.O. No. No specific spare
5
persisting attending the same, Inspection and RVUNL/CTPP/SE(Gen.)/D-112 dt. required
replacment of silica gel. 21.05.2016. TN-55/2015-16.
B Service Transformers
Annual maintenance and associated work of
M/s Sunil Enterprises Kota vide
Transformers ESP 2A. 2B AHT 2B. Including
W.O. No. No specific spare
1 cleaning, Inspection of terminal box and their
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
tightness & Checking of various protection
21.05.2016. TN-55/2015-16.
schemes.
Annual maintenance and associated work of M/s Sunil Enterprises Kota vide
Neutral grounding cubicle, including Cleaning W.O. No. No specific spare
2 and tightening of LAVT cubicle and hot air RVUNL/CTPP/SE(Gen.)/D-112 dt. required
blowing system. 21.05.2016. TN-55/2015-16.
2 at CTPP Chhabra
Remark
Annual shutdown works (2017-18) of Power and service Transformers for unit#1 at CTPP Chhab
S.No. Description of Works Work order/ Contract Status of spares
A Power Transformers
Inspection of terminal box, Bus duct and their M/s Sunil Enterprises Kota vide
thightness in UAT#1A & UAT#1B Transformers, W.O. No. No specific spare
3
cleaning and tightening of marshalling box. RVUNL/CTPP/SE(Gen.)/D-112 dt. required
Checking of emulsifier system. 21.05.2016. TN-55/2015-16.
Checking of Transformer Oil level, BDV & M/s Sunil Enterprises Kota vide
topping up of oil if required if any leakage W.O. No. No specific spare
6
persisting attending the same, Inspection and RVUNL/CTPP/SE(Gen.)/D-112 dt. required
replacment of silica gel. 21.05.2016. TN-55/2015-16.
B Service Transformers
Annual maintenance and associated work of
M/s Sunil Enterprises Kota vide
Transformers ESP 1A. 1B AHT 2A. Including
W.O. No. No specific spare
1 cleaning, Inspection of terminal box and their
RVUNL/CTPP/SE(Gen.)/D-112 dt. required
tightness & Checking of various protection
21.05.2016. TN-55/2015-16.
schemes.
Annual maintenance and associated work of M/s Sunil Enterprises Kota vide
Neutral grounding cubicle, including Cleaning W.O. No. No specific spare
2 and tightening of LAVT cubicle and hot air RVUNL/CTPP/SE(Gen.)/D-112 dt. required
blowing system. 21.05.2016. TN-55/2015-16.
1 at CTPP Chhabra
Remark