Weighted No. of
Item No. DESCRIPTION % Days Amount 15 Days 30 Days 45 Days 52 Days
100 %
B.5 Project Billboard/ Signboard 0.23 1 6,920.00 0.23
B.7 Occupational Safety and Health Program 1.13 52 33,216.00 0.20 0.30 0.30 0.33
FROM THE OFFICE OF: PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMMITED: APPROVAL RECOMMENDED: APPROVED: SHEET NO.
01 of 01
RETROFITTING / STRENGTHENING OF LALAO BRIDGE (B00460CB) GAVINO T. UMALI BEETHOVEN XAVIER B. EGOS MARLON D. MAROLLANO RENULT G. RICARDO JAMES D. DELLOSA Lt. Col. PA Res
GEN. ENGINEERING & BUILDING CONTRACTOR
PROJECT ENGINEER ARCHITECT II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER SET NO.
Pakigne, Minglanilla Cebu
Tel. No. (032) 272-0661 Telefax No. (032) 490-4323 LOCATION : MALABUYOC, CEBU ADDRESS: PAKIGNE, MINGLANILLA CEBU DATE: DATE: DATE: