Professional Documents
Culture Documents
GUIDE
ALL phases of this installation must comply with
NATIONAL, STATE AND LOCAL CODES
Model: TWE018P1
TWE024P13,0B,FB
TWE042P13,0B, FB
TWE048P13,0B, FB Convertibl 1 ... n
TWE030P13,0B, FB TWE060P13,0B,FB
TWE036P13,0B,FB TWE063P13,0B,FB Air Handle
IMPORTANT-ThisDocumentiscustomerproperty and is to remain with this unit.
most effective and satisfaction. For proper where the wire enters.
~"''""~~'v" the following items must be considered:
5. If the unit is installed
This cable local codes may limit
Code ofFederal Part 3280 or the only in a residence.
"SUITABLE FOR MOBILE HOME USE"
6. If the outdoor unit is to be installed
then installation of the air handler must be made to allow
access for refrigerant
air handler when
American Standard 1999 sions for
6/99
B. UNIT INSTALLATIONS
installed for
installed filter should then be removed from
HORIZONTAL RIGHT
INSTALLER'S GUIDE
c. Unit must be suspended from both ends as well as the Downflow Kit hardware and installation requires
Cage nuts are not provided for horizontal the installer to:
left suspension. a. Remove and discard the coil and mounting
d. For additional installation instructions see #1 "Horizon- brackets. These parts are not required for downflow appli-
tal Right" cation (see figure 2).
VERTICAL INSTALLATIONS b. Detach the coil from the drain pan screws
3. VERTICAL UPFLOW
2.
c. Remove the front triangular baffle from the and
a. Position unit on Pedestal or other suitable foundation. If
install the 112" wide gasket provided per Figure 2. Trim the
Pedestal is not used, a frame strong enough to support the
total weight must be provided. Provide a minimum height length to fit the the baffle to coil,
of 14 inches for proper unrestricted airflow. See TWE with gasket material compressed against the coil.
Convertibility Chart on page 7. d. Install the water blow-offbaffles
b. If a return air duct is connected to the air handler, it of the coil with the flange at the
must be the same dimensions as the return opening, The bottom of the baffle is to be
shown in the outline coil.
c. Pedestal and unit should be isolated from the foundation e. Install the 7/8" wide in each side of the drain pan
using a suitable isolating material. as shown in Figure 2
4. VERTICAL DOWNFLOW
f. The 5 ton model 2 water diverter baffles to be
underneath the on the of the drain
REQUIRESINSTALLATIONOFWATERDIVERTER Fill the bend in the baffle which fits the inner
BAFFLE KIT INCLUDED WITH UNIT. of the drain pan with RTV type adhesive/sealant
Conversion to vertical from "as shipped;' re- before the
quires the removal of coil by sliding it out on the coil g. The unit is then with the blower side down and
channel supports. See Convertibility chart on page 7. the coil is replaced on the coil "'"'""'-"'"
drain connections
downflow with front access.
WATER
BLOW-OFF
BAFFLES
ATTACH WITH
2 SCREWS
EACH SIDE
3
D. REFRIGERANT PIPING E. CONDENSATE DRAIN
NOTE: must be routed main-
tain service access to blower and pro-
vide easy removal of filter access and filter.
""'"~"'"L" are made outside the cabinet.
"~:::~uJ..l~ and
those instructions. Read those instructions before
installation of
BRAZING TO EVAPORATOR SECTION
NOTE: A h..-."''"'i~n
INSTALLER'S GUIDE
TWE CONVERTIBILITY CHART
Unit is shipped as
1 Horizontal right
""n~+nn Conversion
unit on end
Note connections
and access are now
on back side of unit
from Horizontal left
-(Rear Access)
-(Rear Access)
7
TWE018P
21.50
TWE063P
INSTALLER'S GUIDE
TWE-P AIR HANDLERS WITH SINGLE SPEED COOLING, 2 STAGE HEAT
ION
HAZARDOUS VOLTAGE! USE COPPER CONDUCTORS ONLY!
INCLUDING REMOTE DESIGNED TO ACCEPT OTHER
I_
AIR HANDLER
L_
RNING
HAZARDOUS VOLTAGE!
INCLUDING REMOTE
AIR HANDLER
L _j
I_
9
R
3
DISCHARGE
OPENING
ilI I K
I
TOP VIEW
AIRFLOW
I
t-r
/
1.1
1.64
> 88
FIGURE 1 FIGURE2
FIG.1 FIG.2
MODEL NO. J K J K
TWE018P13
TWE024P13
19.22 18.221
TWE030P13
TWE036P13
12.02 11.02
TWE042P13 21.22 20.22
SIDE VIEW TWE048P13
~
TWE060P13 21.22 20.221
TWE063P13
I
18. OJ 2. 0 I
VERTICAL UPFLOW
~
Flow Gas Line Liq. Line
J-
MODEl NO. A B c D E F G H Control BRAZE BRAZE
J-
~
RETURN
OPENING TWE018P13 5/8 1/4
43
TVVE024P13,030P13 21.50 19.50 15.57 3.65 5.77 3.62 3/4 5/16
1.89 CJ5
TWE036P13 45.00
00 7/8 G)
-rn
TXV/NB
BOTTOM VIEW TWE042P13
TWE048P13,060P13
51.75
57.90
23.50 21.50 18.33 4.65 6.77 3.62
3/8 c:
TWE063P13 62.75
26 24 27.12 5.90 8.02 3.21 1.48 H/8 CJ
- --- - -- - - -- - -- --