1 : 10 : 100
Standard floating element
Options
Project reference
Projectmanagement
Strukton Sustainable Energy
Turbines
Tocardo International BV
Contract sum
EUR 15 mio
Realization term
Dec 2014 - October 2015
Daughter company of Strukton
Limited land
acquisition needed
(15 m by 20 m)
Provinsi Nusa Tenggara Timur, Larantuka
Location:
19
Head of Agreement
1st Phase
FEASIBILITY STUDY
20
Head of Agreement
1st Phase
FEASIBILITY STUDY
2nd Phase
21
Head of Agreement
1st Phase
FEASIBILITY STUDY
2nd Phase
3rd Phase
22
The socio-economic impact of the Palmerah Tidal Bridge
July 2016
Direct Socio economic benefits
24
Indirect Socio economic benefits
Tourism Health
Education Waste
25
Two elements in project
26
Two elements in project
1. The Connection
Crucial infra structure
Extension of regio NTT
Reducing number of accidents
Development of Traffic
27
Two elements in project
28
Two elements in project
Investment of $ 75 million
FMO
Participation of Dutch governmental parties RVO
in Export Finance
Provides loan Repays loan
FMO and other banks considering
to provide finance based on
government to government Public Works
RVO considering development
subsidy
Design & Construct Contract
Tidal Bridge realizes the Connection based
on Design & Construct contract
Tidal Bridge
Reducing cash out Indonesian Government
31
Finance of The Energy part
32
Offer of November 29th 2016
With reference to our meeting and your request for quotation dated 23rd November 2016 for tidal energy
from the Larantuka Strait in NTT, Tidal Bridge B.V. is very pleased to submit its proposal. This proposal has
been prepared for The Minister of Energy and Mineral resources of the Republic of Indonesia (hereinafter
referred to as MINISTRY) by Tidal Bridge B.V. (hereinafter referred to as TIDAL BRIDGE).
Assumptions
TIDAL BRIDGE is a leading tidal energy developer, a daughter of Strukton International being a civil
Energy capacity 18 to 23 MW per line engineering and construction company and one of the top EPC Companies in the Netherlands. In light of
the demands discussed, we believe TIDAL BRIDGE fits perfectly for the work discussed, not just in terms of
technology requirements, but also in terms of the nature of the services required. TIDAL BRIDGE is, in all
Extension to five lines respects, having sufficient expertise and resources available.
Based on the information received, the various site visits and field surveys we are able to submit a price of
Capacity load 39% the energy produced of
$ 161,50 per MWh.
Maximum current speed of 3,5 m/s (One hundred sixty-one dollar and 50 dollar cents per Megawatt hour)
We sincerely hope that this proposal, based on renewable energy while representing a discount of nearly
20% of the energy generated based on diesel, will be of interest to you. We look forward attending a
meeting at your convenience to clarify any points you may wish to raise.
Building bridge
Subject to Finance
NAME: E.H.L.A van den Eijnden
TITLE: Managing Director
MINISTRY: TIDAL BRIDGE B.V.
DATE: 29th November 2016 33
Advice on Feed in Tariffs
300
200
Subsidy in Million $
150
100 Norway
France
50
China US Ireland
Canada
Advice on the Feed in Tariffs Germany
0
for Water
0
Energy50in Indonesia
100 150 200 250 300 350 400
200
Subsidy in Million $
150
Very active
100 Norway
France
Not active
50
China US Ireland
Canada
Advice on the Feed in Tariffs Germany
0
for Water
0
Energy50in Indonesia
100 150 200 250 300 350 400
150
Very active
100 Norway
France
Not active
50
China US Ireland
Canada
Advice on the Feed in Tariffs Germany
0
for Water
0
Energy50in Indonesia
100 150 200 250 300 350 400
Tidal movement
37
Hybrid Energy model: integrate Diesel and Cold storage
Tidal movement
Energy production
38
Hybrid Energy model: integrate Diesel and Cold storage
39
Hybrid Energy model: Integrate solar panels
40
Conclusions
All is renewable
How it is done
By Multi-Billion $ Company
42
Conclusions
43
Contacts
TIDAL BRIDGE
Strijpsestraat 4, 5616 GR Eindhoven,The Netherlands
www.tidalbridge.com
Partners Tidal Bridge
Electrical Solutions
Turbine Suppliers
Battery Supplier
Energy company
45
5. Minimum requirements for signing a Design and Construct Contract
1. Indonesian design
In collaboration with the NTT region and local
architects a design for the Palmerah bridge will be
developed.
46
4. Proces Planning (pre) FS project
47
6. Palmerah Bridge project planning
48