Work order on Hydrolic hose pipe line for new 144 CAV,Husky m/c-07 water line(supply and return) connections to machine
Unit Price Tk. Total Price
Sl.No Description Unit Hose Length
Tk.
1.0 Hose pipe for moving platen(header to m/c) with SS fittings on both side mm 8000 33,500.00 33,500.00
2.0 Hose pipe for moving platen( m/c to header) with SS fittings on both side mm 8000 33,500.00 33,500.00
3.0 Hose pipe for stationary platen(header to m/c) with SS fittings both on side mm 4880 26,000.00 26,000.00
4.0 Hose pipe for stationary platen(m/c to header) with SS fittings both on side mm 4880 26,000.00 26,000.00
5.0 Hose pipe for robot part(header to m/c) with SS fittings on both side mm 4880 26,000.00 26,000.00
6.0 Hose pipe for robot part( m/c to header) with SS fittings on both side mm 4880 26,000.00 26,000.00
7.0 Hose pipe for dehumidifier ( header to m/c) with SS fittings on both side mm 1250 6,000.00 6,000.00
8.0 Hose pipe for dehumidifier ( m/c to header) with SS fittings on both side mm 1250 6,000.00 6,000.00
9.0 Hose pipe for resin dryer(header to m/c) with SS fittings on both side mm 4880 10,500.00 10,500.00
10.0 Hose pipe for resin dryer( m/c to header) with SS fittings on both side mm 4880 10,500.00 10,500.00
11.0 Hose pipe for oil cooler(header to m/c) with SS fittings on both side mm 4880 19,000.00 19,000.00
12.0 Hose pipe for oil cooler( m/c to header) with SS fittings on both side mm 4880 19,000.00 19,000.00
Total(Tk) 242,000.00
VAT & AIT@15% Excluding
Grand Total(Tk) 242000.00
Supply & installetion /Job completion Date, Time & Place: The delivery must be completed by 10 days from the date W/O Bagher
issued atbazar Plant
Gazipur Plant.
VAT & Tax issue:AIT & VAT to be deducted from the bill as per relevant laws.
Warranty: To be reworked/redelivery at free of cost for any problem due to construction quality issues.
Penalty: In case of delay completion from specified date, 5% of total contract/ WO value will be deducted as penalty for every weeks delay but total
penalty will not exceeds over 25% of contract value. If causes of delay is beyond control of contractor or company, decision will be taken on mutual
understanding.
Others:
1. During the work, value of work order may change due to change of job volume. In that case value of actual bill will be based on actual
measurements and rates are on mutual understanding. If any change are necessary during the execution of work these will be done with
mutual aggrement.
2. The contractor's pepole must follow the industrial safety rules and regulations and best policies, if they not followed safety regulations
they will not be allowed to do the work. Contractor will be liable for all accidential loss caused by their activities. Contractor's people will
resides outside of the premises.
Work order on Hydrolic hose pipe line for new 144 CAV,Husky m/c-07 water line(supply and return) connections to machine
Unit Price Tk. Total Price
Sl.No Description Unit Hose Length
Tk.
1.0 Hose pipe for moving platen(header to m/c) with SS fittings on both side mm 8000 33,500.00 33,500.00
2.0 Hose pipe for moving platen( m/c to header) with SS fittings on both side mm 8000 33,500.00 33,500.00
3.0 Hose pipe for stationary platen(header to m/c) with SS fittings both on side mm 4880 26,000.00 26,000.00
4.0 Hose pipe for stationary platen(m/c to header) with SS fittings both on side mm 4880 26,000.00 26,000.00
5.0 Hose pipe for robot part(header to m/c) with SS fittings on both side mm 4880 26,000.00 26,000.00
6.0 Hose pipe for robot part( m/c to header) with SS fittings on both side mm 4880 26,000.00 26,000.00
7.0 Hose pipe for dehumidifier ( header to m/c) with SS fittings on both side mm 1250 6,000.00 6,000.00
8.0 Hose pipe for dehumidifier ( m/c to header) with SS fittings on both side mm 1250 6,000.00 6,000.00
9.0 Hose pipe for resin dryer(header to m/c) with SS fittings on both side mm 4880 10,500.00 10,500.00
10.0 Hose pipe for resin dryer( m/c to header) with SS fittings on both side mm 4880 10,500.00 10,500.00
11.0 Hose pipe for oil cooler(header to m/c) with SS fittings on both side mm 4880 19,000.00 19,000.00
12.0 Hose pipe for oil cooler( m/c to header) with SS fittings on both side mm 4880 19,000.00 19,000.00
Total(Tk) 242,000.00
VAT & AIT@15% Excluding
Grand Total(Tk) 242000.00
Supply & installetion /Job completion Date, Time & Place: The delivery must be completed by 10 days from the date W/O Bagher
issued atbazar Plant
Gazipur Plant.
VAT & Tax issue:AIT & VAT to be deducted from the bill as per relevant laws.
Warranty: To be reworked/redelivery at free of cost for any problem due to construction quality issues.
Penalty: In case of delay completion from specified date, 5% of total contract/ WO value will be deducted as penalty for every weeks delay but total
penalty will not exceeds over 25% of contract value. If causes of delay is beyond control of contractor or company, decision will be taken on mutual
understanding.
Others:
1. During the work, value of work order may change due to change of job volume. In that case value of actual bill will be based on actual
measurements and rates are on mutual understanding. If any change are necessary during the execution of work these will be done with
mutual aggrement.
2. The contractor's pepole must follow the industrial safety rules and regulations and best policies, if they not followed safety regulations
they will not be allowed to do the work. Contractor will be liable for all accidential loss caused by their activities. Contractor's people will
resides outside of the premises.
Work order on Hydrolic hose pipe line for new 144 CAV,Husky m/c-07 water line(supply and return) connections to machine
Unit Price Tk. Total Price
Sl.No Description Unit Hose Length
Tk.
1.0 Hose pipe for moving platen(header to m/c) with SS fittings on both side mm 8000 33,500.00 33,500.00
2.0 Hose pipe for moving platen( m/c to header) with SS fittings on both side mm 8000 33,500.00 33,500.00
3.0 Hose pipe for stationary platen(header to m/c) with SS fittings both on side mm 4880 26,000.00 26,000.00
4.0 Hose pipe for stationary platen(m/c to header) with SS fittings both on side mm 4880 26,000.00 26,000.00
5.0 Hose pipe for robot part(header to m/c) with SS fittings on both side mm 4880 26,000.00 26,000.00
6.0 Hose pipe for robot part( m/c to header) with SS fittings on both side mm 4880 26,000.00 26,000.00
7.0 Hose pipe for dehumidifier ( header to m/c) with SS fittings on both side mm 1250 6,000.00 6,000.00
8.0 Hose pipe for dehumidifier ( m/c to header) with SS fittings on both side mm 1250 6,000.00 6,000.00
9.0 Hose pipe for resin dryer(header to m/c) with SS fittings on both side mm 4880 10,500.00 10,500.00
10.0 Hose pipe for resin dryer( m/c to header) with SS fittings on both side mm 4880 10,500.00 10,500.00
11.0 Hose pipe for oil cooler(header to m/c) with SS fittings on both side mm 4880 19,000.00 19,000.00
12.0 Hose pipe for oil cooler( m/c to header) with SS fittings on both side mm 4880 19,000.00 19,000.00
Total(Tk) 242,000.00
VAT & AIT@15% Excluding
Grand Total(Tk) 242000.00
Supply & installetion /Job completion Date, Time & Place: The delivery must be completed by 10 days from the date W/O Bagher
issued atbazar Plant
Gazipur Plant.
VAT & Tax issue:AIT & VAT to be deducted from the bill as per relevant laws.
Warranty: To be reworked/redelivery at free of cost for any problem due to construction quality issues.
Penalty: In case of delay completion from specified date, 5% of total contract/ WO value will be deducted as penalty for every weeks delay but total
penalty will not exceeds over 25% of contract value. If causes of delay is beyond control of contractor or company, decision will be taken on mutual
understanding.
Others:
1. During the work, value of work order may change due to change of job volume. In that case value of actual bill will be based on actual
measurements and rates are on mutual understanding. If any change are necessary during the execution of work these will be done with
mutual aggrement.
2. The contractor's pepole must follow the industrial safety rules and regulations and best policies, if they not followed safety regulations
they will not be allowed to do the work. Contractor will be liable for all accidential loss caused by their activities. Contractor's people will
resides outside of the premises.