You are on page 1of 2

ERECTION OF SECONDARY TRUSSES

Sr # STEP SAFETY KEY POINT


1 Shifting of scaffolding material to location Scaffolding material may fall down

10 ft scaffolding pipe will be horizontally laid


2 Pipes may be slipped
on channel just below secondary truss
10 ft pipe will be laid horizontally on lowest
3 Pipes may be slipped
angle of secondary truss

4 Both these layers will be clamped with 6 ft


vertical pipes
These 6 ft vertical pipes will be interlinked with
5 braces using fixed joints
Planks will be laid on lowest layer of 10 ft
6 Planks may be slipped and may be fell down
horizontal pipes

7 At peripherry of scaffolding plateform, hand Objects may fell down from space between
railing will be erected top and bottom pipe

8 Working will be started on this plateform Welding or grinding spatters may fall down

Marking of truss will be done as per drawing


9 Person may be fall down
for erection.

10 Material will rigged manually, with rope rope can be broken through sharp edges

Tacking will be done by welder as per marked welding sparks and metal particals may be
11 locations. fell down
12 fit ups will be inspected. Person may be fall down
welding sparks and metal particals may be
After inspection final welding will be done.
13 fell down
SES
PREVENTION / COUNTERMEASURE
Maximum 20 KG load will be lifted by 2
persons
Pipes will be tied to structure with binding
wire
Pipes will be tied to structure with binding
wire

Planks will be interlinked with binding wire

Mid rail and toe board will also be erected

Handrail will be covered with fire cloth, so


that no spatters or anything may come out
of canopy

Person will wear safety harness

rope inspection will be carried out, area


will be baricated
Fire blanets will be tied to the area to
prevent the sparks
Person will wear safety harness
Fire blanets will be tied to the area to
prevent the sparks

You might also like