Project Title: REHABILITATION OF KULAURA-SHAHBAZPUR RAILWAY PROJECT

CLIENT: BANGLADESH RAILWAY

Volume Estimation of Abutment

Length (m) Unit(m3)


Volume
Bridge ID Item Name Quantity Area (m2)

BR-226 Abutment , A1 1 7.408 6.85 50.746


Abutment , A2 1 7.4082 6.85 50.746

BR-230 Abutment , A1 1 6.8542 6.85 46.951


Abutment , A2 1 6.8542 6.85 46.951

BR-233 Abutment , A1 1 7.7872 6.85 53.342


Abutment , A2 1 7.7872 6.85 53.342

BR-234 Abutment , A1 1 6.4902 6.85 44.458


Abutment , A2 1 6.4902 6.85 44.458

BR-237 Abutment , A1 1 7.4082 6.85 50.746


Abutment , A2 1 7.4082 6.85 50.746

BR-243 Abutment , A1 1 5.3742 6.85 36.813


Abutment , A2 1 5.3742 6.85 36.813

BR-246 Abutment , A1 1 3.7052 6.85 25.381


Abutment , A2 1 3.7052 6.85 25.381

BR-251 Abutment , A1 1 3.6742 6.85 25.168


Abutment , A2 1 3.6742 6.85 25.168

BR-252 Abutment , A1 1 4.2742 6.85 29.278


Abutment , A2 1 4.2742 6.85 29.278

BR-259 Abutment , A1 1 3.6162 6.85 24.771


Abutment , A2 1 3.6162 6.85 24.771

BR-265 Abutment , A1 1 2.1742 6.85 14.893


Abutment , A2 1 2.1742 6.85 14.893

BR-269 Abutment , A1 1 3.6242 6.85 24.826


Abutment , A2 1 3.6242 6.85 24.826
BR-270 Abutment , A1 1 4.8252 6.85 33.053
Abutment , A2 1 4.8252 6.85 33.053

BR-271 Abutment , A1 1 4.0942 6.85 28.045


Abutment , A2 1 4.0942 6.85 28.045

BR-274 Abutment , A1 1 3.7642 6.85 25.785


Abutment , A2 1 3.7642 6.85 25.785

BR-277 Abutment , A1 1 4.3542 6.85 29.826


Abutment , A2 1 4.3542 6.85 29.826

BR-278 Abutment , A1 1 5.6742 6.85 38.868


Abutment , A2 1 5.6742 6.85 38.868
Volume of
Volume (m3) Total Volume (m3) Reinforcement of
Concrete
50.746
106.567
50.746

46.951
98.598
46.951

53.342
112.019
53.342

44.458
93.362
44.458

50.746
106.567
50.746

36.813
77.308
36.813

25.381
53.299
25.381

25.168
52.853
25.168

29.278
61.484
29.278 Details of Abutment

24.771
52.019
24.771

14.893
31.276
14.893

24.826
52.134
24.826
33.053
69.411
33.053

28.045
58.895
28.045

25.785
54.148
25.785

29.826
62.635
29.826

38.868
81.623
38.868
Calculations

BR226 BR233

A1 300 1238 371400 A1 300 1238


A2 1340 500 670000 A2 1340 500
A3 1000 500 500000 A3 1000 500
A4 500 340 85000 A4 500 340
A5 1000 5657 5657000 A5 1000 6036
A6 650 192 124800 A6 650 192
sum = 7.4082 sum =

BR230 BR234

A1 300 1238 371400 A1 300 1238


A2 1340 500 670000 A2 1340 500
A3 1000 500 500000 A3 1000 500
A4 500 340 85000 A4 500 340
A5 1000 5103 5103000 A5 1000 4739
A6 650 192 124800 A6 650 192
sum = 6.8542 sum =

BR246 BR251

A1 300 1238 371400 A1 300 1238


A2 1340 500 670000 A2 1340 500
A3 1000 500 500000 A3 1000 500
A4 500 340 85000 A4 500 340
A5 1000 1954 1954000 A5 1000 1923
A6 650 192 124800 A6 650 192
sum = 3.7052 sum =

BR259 BR265

A1 300 1238 371400 A1 300 1238


A2 1340 500 670000 A2 1340 500
A3 1000 500 500000 A3 1000 500
A4 500 340 85000 A4 500 340
A5 1000 1865 1865000 A5 1000 423
A6 650 192 124800 A6 650 192
sum = 3.6162 sum =

BR270 BR271
A1 300 1238 371400 A1 300 1238
A2 1340 500 670000 A2 1340 500
A3 1000 500 500000 A3 1000 500
A4 500 340 85000 A4 500 340
A5 1000 3074 3074000 A5 1000 2343
A6 650 192 124800 A6 650 192
sum = 4.8252 sum =

BR277 BR278

A1 300 1238 371400 A1 300 1238


A2 1340 500 670000 A2 1340 500
A3 1000 500 500000 A3 1000 500
A4 500 340 85000 A4 500 340
A5 1000 2603 2603000 A5 1000 3923
A6 650 192 124800 A6 650 192
sum = 4.3542 sum =
BR237

371400 A1 300 1238 371400


670000 A2 1340 500 670000
500000 A3 1000 500 500000
85000 A4 500 340 85000
6036000 A5 1000 5657 5657000
124800 A6 650 192 124800
7.7872 sum = 7.4082

BR243

371400 A1 300 1238 371400


670000 A2 1340 500 670000
500000 A3 1000 500 500000
85000 A4 500 340 85000
4739000 A5 1000 3623 3623000
124800 A6 650 192 124800
6.4902 sum = 5.3742

BR252

371400 A1 300 1238 371400


670000 A2 1340 500 670000
500000 A3 1000 500 500000
85000 A4 500 340 85000
1923000 A5 1000 2523 2523000
124800 A6 650 192 124800
3.6742 sum = 4.2742

BR269

371400 A1 300 1238 371400


670000 A2 1340 500 670000
500000 A3 1000 500 500000
85000 A4 500 340 85000
423000 A5 1000 1873 1873000
124800 A6 650 192 124800
2.1742 sum = 3.6242

BR274
371400 A1 300 1238 371400
670000 A2 1340 500 670000
500000 A3 1000 500 500000
85000 A4 500 340 85000
2343000 A5 1000 2013 2013000
124800 A6 650 192 124800
4.0942 sum = 3.7642

371400
670000
500000
85000
3923000
124800
5.6742
Project Title: REHABILITATION OF KULAURA-SHAHBAZPUR RAILWAY PROJECT
CLIENT: BANGLADESH RAILWAY

Volume Estimation of Filter Media(abutment)

Length (m) Unit(m3)


Volume
Bridge ID Item Name Quantity Area (m2)

BR-226 F.Media , A1 1 4.209 6.85 28.832


F.Media , A2 1 4.209 6.85 28.832

BR-230 F.Media , A1 1 3.8766 6.85 26.555


F.Media , A2 1 3.8766 6.85 26.555

BR-233 F.Media , A1 1 4.4364 6.85 30.389


F.Media , A2 1 4.4364 6.85 30.389

BR-234 F.Media , A1 1 3.6582 6.85 25.059


F.Media , A2 1 3.6582 6.85 25.059

BR-237 F.Media , A1 1 4.209 6.85 28.832


F.Media , A2 1 4.209 6.85 28.832

BR-243 F.Media , A1 1 2.9886 6.85 20.472


F.Media , A2 1 2.9886 6.85 20.472

BR-246 F.Media , A1 1 1.9872 6.85 13.612


F.Media , A2 1 1.9872 6.85 13.612

BR-251 F.Media , A1 1 1.9686 6.85 13.485


F.Media , A2 1 1.9686 6.85 13.485

BR-252 F.Media , A1 1 2.3286 6.85 15.951


F.Media , A2 1 2.3286 6.85 15.951

BR-259 F.Media , A1 1 1.9338 6.85 13.247


F.Media , A2 1 1.9338 6.85 13.247

BR-265 F.Media , A1 1 1.0686 6.85 7.320


F.Media , A2 1 1.0686 6.85 7.320
BR-269 F.Media , A1 1 1.9386 6.85 13.279
F.Media , A2 1 1.9386 6.85 13.279

BR-270 F.Media , A1 1 2.6592 6.85 18.216


F.Media , A2 1 2.6592 6.85 18.216

BR-271 F.Media , A1 1 2.2206 6.85 15.211


F.Media , A2 1 2.2206 6.85 15.211

BR-274 F.Media , A1 1 2.0226 6.85 13.855


F.Media , A2 1 2.0226 6.85 13.855

BR-277 F.Media , A1 1 2.3766 6.85 16.280


F.Media , A2 1 2.3766 6.85 16.280

BR-278 F.Media , A1 1 3.1686 6.85 21.705


F.Media , A2 1 3.1686 6.85 21.705
Volume of
Volume (m3) Total Volume (m3) Reinforcement of
Concrete
28.832
60.546
28.832

26.555
55.765
26.555

30.389
63.818
30.389

25.059
52.623
25.059

28.832
60.546
28.832

20.472
42.991
20.472

13.612
28.586
13.612

13.485
28.318
13.485

15.951
33.497
15.951

13.247
27.818
13.247

7.320
15.372
7.320
13.279
27.887
13.279

18.216
38.253
18.216

15.211
31.943
15.211

13.855
29.095
13.855

16.280
34.187
16.280

21.705
45.580
21.705
Calculations

BR226 BR233

A1 600 883 529800 A1 600 883


A2 600 475 285000 A2 600 475
A3 600 5657 3394200 A3 600 6036

sum = 4.209 sum =

BR230 BR234

A1 600 883 529800 A1 600 883


A2 600 475 285000 A2 600 475
A3 600 5103 3061800 A3 600 4739

sum = 3.8766 sum =

BR246 BR251

A1 600 883 529800 A1 600 883


A2 600 475 285000 A2 600 475
A3 600 1954 1172400 A3 600 1923

sum = 1.9872 sum =

BR259 BR265

A1 600 883 529800 A1 600 883


A2 600 475 285000 A2 600 475
A3 600 1865 1119000 A3 600 423

sum = 1.9338 sum =

BR270 BR271
A1 600 883 529800 A1 600 883
A2 600 475 285000 A2 600 475
A3 600 3074 1844400 A3 600 2343

sum = 2.6592 sum =

BR277 BR278

A1 600 883 529800 A1 600 883


A2 600 475 285000 A2 600 475
A3 600 2603 1561800 A3 600 3923

sum = 2.3766 sum =


BR237

529800 A1 600 883 529800


285000 A2 600 475 285000
3621600 A3 600 5657 3394200

4.4364 sum = 4.209

BR243

529800 A1 600 883 529800


285000 A2 600 475 285000
2843400 A3 600 3623 2173800

3.6582 sum = 2.9886

BR252

529800 A1 600 883 529800


285000 A2 600 475 285000
1153800 A3 600 2523 1513800

1.9686 sum = 2.3286

BR269

529800 A1 600 883 529800


285000 A2 600 475 285000
253800 A3 600 1873 1123800

1.0686 sum = 1.9386

BR274
529800 A1 600 883 529800
285000 A2 600 475 285000
1405800 A3 600 2013 1207800

2.2206 sum = 2.0226

529800
285000
2353800

3.1686
Project Title: REHABILITATION OF KULAURA-SHAHBAZPUR RAILWAY PROJECT
CLIENT: BANGLADESH RAILWAY

Volume Estimation of Toe Wall

Bridge ID Item Name Quantity Area (m2) Height (m) Radius (m) Length(m) Unit Volume (m3) Voume (m3)
BR-226 Toe Wall , A1 2 0.36 6.90 12.075 18.96741 6.828 13.657
Toe Wall , A2 2 0.36 6.90 12.075 18.96741 6.828 13.657

BR-230 Toe Wall , A1 2 0.36 6.35 11.1125 17.455515 6.284 12.568


Toe Wall , A2 2 0.36 6.35 11.1125 17.455515 6.284 12.568

BR-233 Toe Wall , A1 2 0.36 7.29 12.7505 20.0284854 7.210 14.421


Toe Wall , A2 2 0.36 7.29 12.7505 20.0284854 7.210 14.421

BR-234 Toe Wall , A1 2 0.36 5.99 10.4825 16.465911 5.928 11.855


Toe Wall , A2 2 0.36 5.99 10.4825 16.465911 5.928 11.855

BR-237 Toe Wall , A1 2 0.36 6.91 12.0925 18.994899 6.838 13.676


Toe Wall , A2 2 0.36 6.91 12.0925 18.994899 6.838 13.676

BR-243 Toe Wall , A1 2 0.36 5.37 9.3975 14.761593 5.314 10.628


Toe Wall , A2 2 0.36 5.37 9.3975 14.761593 5.314 10.628

BR-246 Toe Wall , A1 2 0.36 3.27 5.7225 8.988903 3.236 6.472


Toe Wall , A2 2 0.36 3.27 5.7225 8.988903 3.236 6.472

BR-251 Toe Wall , A1 2 0.36 3.17 5.5475 8.714013 3.137 6.274


Toe Wall , A2 2 0.36 3.17 5.5475 8.714013 3.137 6.274

BR-252 Toe Wall , A1 2 0.36 3.77 6.5975 10.363353 3.731 7.462


Toe Wall , A2 2 0.36 3.77 6.5975 10.363353 3.731 7.462

BR-259 Toe Wall , A1 2 0.36 3.17 5.5475 8.714013 3.137 6.274


Toe Wall , A2 2 0.36 3.17 5.5475 8.714013 3.137 6.274

BR-265 Toe Wall , A1 2 0.36 1.67 2.9225 4.590663 1.653 3.305


Toe Wall , A2 2 0.36 1.67 2.9225 4.590663 1.653 3.305

BR-269 Toe Wall , A1 2 0.36 3.11 5.4425 8.549079 3.078 6.155


Toe Wall , A2 2 0.36 3.11 5.4425 8.549079 3.078 6.155

BR-270 Toe Wall , A1 2 0.36 4.39 7.6825 12.067671 4.344 8.689


Toe Wall , A2 2 0.36 4.39 7.6825 12.067671 4.344 8.689

BR-271 Toe Wall , A1 2 0.36 3.59 6.2825 9.868551 3.553 7.105


Toe Wall , A2 2 0.36 3.59 6.2825 9.868551 3.553 7.105

BR-274 Toe Wall , A1 2 0.36 3.26 5.705 8.961414 3.226 6.452


Toe Wall , A2 2 0.36 3.26 5.705 8.961414 3.226 6.452

BR-277 Toe Wall , A1 2 0.36 3.85 6.7375 10.583265 3.810 7.620


Toe Wall , A2 2 0.36 3.85 6.7375 10.583265 3.810 7.620

BR-278 Toe Wall , A1 2 0.36 5.17 9.051 14.2173108 5.118 10.236


Toe Wall , A2 2 0.36 5.17 9.051 14.2173108 5.118 10.236
Area Calculations

A1 300 600 0.18


A2 600 300 0.18
TOTAL= 0.36 m2
Slope= 1.75
Total Voume (m3)
28.679

26.393

30.283

24.896

28.720

Section of Toe Wall


22.320

13.591

13.176
13.176

15.669

13.176

6.941

12.926

18.246

14.921

13.550

16.002

21.497
Project Title: REHABILITATION OF KULAURA-SHAHBAZPUR RAILWAY PROJECT
CLIENT: BANGLADESH RAILWAY

Volume Estimation of PCC, Toe Wall

Bridge ID Item Name Quantity Area (m2) Height (m) Radius (m) Length(m) Unit Volume (m3) Voume (m3)
BR-226 Toe Wall , A1 2 0.08 6.90 12.075 18.96741 1.517 3.035
Toe Wall , A2 2 0.08 6.90 12.075 18.96741 1.517 3.035

BR-230 Toe Wall , A1 2 0.08 6.35 11.1125 17.455515 1.396 2.793


Toe Wall , A2 2 0.08 6.35 11.1125 17.455515 1.396 2.793

BR-233 Toe Wall , A1 2 0.08 7.29 12.7505 20.0284854 1.602 3.205


Toe Wall , A2 2 0.08 7.29 12.7505 20.0284854 1.602 3.205

BR-234 Toe Wall , A1 2 0.08 5.99 10.4825 16.465911 1.317 2.635


Toe Wall , A2 2 0.08 5.99 10.4825 16.465911 1.317 2.635

BR-237 Toe Wall , A1 2 0.08 6.91 12.0925 18.994899 1.520 3.039


Toe Wall , A2 2 0.08 6.91 12.0925 18.994899 1.520 3.039

BR-243 Toe Wall , A1 2 0.08 5.37 9.3975 14.761593 1.181 2.362


Toe Wall , A2 2 0.08 5.37 9.3975 14.761593 1.181 2.362

BR-246 Toe Wall , A1 2 0.08 3.27 5.7225 8.988903 0.719 1.438


Toe Wall , A2 2 0.08 3.27 5.7225 8.988903 0.719 1.438

BR-251 Toe Wall , A1 2 0.08 3.17 5.5475 8.714013 0.697 1.394


Toe Wall , A2 2 0.08 3.17 5.5475 8.714013 0.697 1.394

BR-252 Toe Wall , A1 2 0.08 3.77 6.5975 10.363353 0.829 1.658


Toe Wall , A2 2 0.08 3.77 6.5975 10.363353 0.829 1.658

BR-259 Toe Wall , A1 2 0.08 3.17 5.5475 8.714013 0.697 1.394


Toe Wall , A2 2 0.08 3.17 5.5475 8.714013 0.697 1.394

BR-265 Toe Wall , A1 2 0.08 1.67 2.9225 4.590663 0.367 0.735


Toe Wall , A2 2 0.08 1.67 2.9225 4.590663 0.367 0.735

BR-269 Toe Wall , A1 2 0.08 3.11 5.4425 8.549079 0.684 1.368


Toe Wall , A2 2 0.08 3.11 5.4425 8.549079 0.684 1.368

BR-270 Toe Wall , A1 2 0.08 4.39 7.6825 12.067671 0.965 1.931


Toe Wall , A2 2 0.08 4.39 7.6825 12.067671 0.965 1.931

BR-271 Toe Wall , A1 2 0.08 3.59 6.2825 9.868551 0.789 1.579


Toe Wall , A2 2 0.08 3.59 6.2825 9.868551 0.789 1.579

BR-274 Toe Wall , A1 2 0.08 3.26 5.705 8.961414 0.717 1.434


Toe Wall , A2 2 0.08 3.26 5.705 8.961414 0.717 1.434

BR-277 Toe Wall , A1 2 0.08 3.85 6.7375 10.583265 0.847 1.693


Toe Wall , A2 2 0.08 3.85 6.7375 10.583265 0.847 1.693

BR-278 Toe Wall , A1 2 0.08 5.17 9.051 14.2173108 1.137 2.275


Toe Wall , A2 2 0.08 5.17 9.051 14.2173108 1.137 2.275
Area Calculations

A1 800 100 0.08

TOTAL= 0.08 m2
Slope= 1.75
Total Voume (m3)
6.373

5.865

6.730

5.533

6.382

4.960

3.020

2.928
2.928

3.482

2.928

1.542

2.872

4.055

3.316

3.011

3.556

4.777