SUBJECT
CARMONA5 BSC Ater Upgrade

REFERENCE NUMBER REVISION AUTHOR DATE


Benedick Roque M. Tandoc July 12, 2010

Objective:
To increase the capacity of the A interface of the Huawei BSC in order to resolve traffic congestion

Activity Description:
To upgrade the A and/or A-ter interface link of a Huawei BSC

Change Priority:
Emergency ✘ High Low

Change Category:
Critical Major ✘ Minor

Service Impact:
There is no expected outage/s during implementation on all elements involve.

Network Elements:
BSC BACOOR8

Target Date of Implementation:


July 14 2010; 0800H – 2200H

Name of Implementer/Contact No:


GT NOC Radio Access / 09062592561
HT – Zhang Songlin (Support) / 09225760167

Support Groups Name/Contact No:


BRE: GT Benedick Tandoc / 09054169772
IS: GT Ronald Singson / 09062592495
NEXT LEVEL IS: GT Jude Miclat / 09062592493

CC Engr.: GT Wylor Merandilla / 09179630774


IS: GT Donald Virtucio / 09062592550
Next Level IS: GT Daisy Melevo / 09177976500

Activity Procedure:
Note: 1) For every activity that has unexpected alarms, immediate revert should be done
2) Log the activity from start to finish

PRE-PROCEDURE DETAILS:
1. Login to m2000. Go to “Maintenance” window and select “MML Command”
a. After the activity (whether successful or reverted), send a text file to the initiator indicating all the
commands used along with its results (done by using the “Save As…” command in the results window)
2. Make a fallback /safecopy file (for BSC6900 only)
EXP CFGMML
3. Check and log/export the existing status of the interface link (for BSC6900 only)
DSP N7DPC
4. Check the availability status of the ports to be used
DSP E1T1: SRN=<subrack number>, SN=<slot number>, PN=<port number>;

PROCEDURE DETAILS:
1) Add the E1’s one at a time
ADD AE1T1: SRN=<subrack number>, SN=<slot number>, PN=<port number>, STCIC=<CIC>,
DPCGIDX=<DPC group index>;

2) Check the definition made on the E1’s


LST AE1T1: SRN=<subrack number>, SN=<slot number>, PN=<port number>;
3) Inform GT FO / test-caller to do CIC testing per ET

Success Criteria:
CONFIDENTIAL Page 2 of 2
SUBJECT
CARMONA5 BSC Ater Upgrade

REFERENCE NUMBER REVISION AUTHOR DATE


Benedick Roque M. Tandoc July 12, 2010

1. Check the availability status of the ports used


DSP E1T1: SRN=<subrack number>, SN=<slot number>, PN=<port number>;
2. Check and log/export the existing status of the interface link (for BSC6900 only)
DSP N7DPC
3. All CIC testing per ET of the test-caller are successful

Rollback and Fallback Procedure:


1) Remove the additional E1’s implemented in this activity
RMV AE1T1: SRN=<subrack number>, SN=<slot number>, PN=<port number;

2) Please send logs of the deferred/reverted activity to bmtandoc@globetel.com.ph (GT TANDOC, Benedick Roque
M.).

Escalation Procedure:
BRE: GT Benedick Tandoc / 09054169772
IS: GT Ronald Singson / 09062592495
NEXT LEVEL IS: GT Jude Miclat / 09062592493

CC Engr.: GT Wylor Merandilla / 09179630774


IS: GT Donald Virtucio / 09062592550
Next Level IS: GT Daisy Melevo / 09177976500

Contingency Plan:
Restoration from fallback from the exported “CFGMML” file.

Supporting Documents: