67339

Proposed Rules Federal Register


Vol. 67, No. 214

Tuesday, November 5, 2002

This section of the FEDERAL REGISTER interested persons may attend, and encouraged to coordinate their efforts
contains notices to the public of the proposed registration is not required. with others who may have similar
issuance of rules and regulations. The 2. The conference will address interests. Based on the requests to
purpose of these notices is to give interested specific issues related to liability participate, panels of speakers will be
persons an opportunity to participate in the provisions in the Commission’s specified in a subsequent notice.
rule making prior to the adoption of the final
proposed Standard Market Design 5. Transcripts of the conference will
rules.
Tariff, as described in the Notice of be immediately available from Ace
Proposed Rulemaking (NOPR) issued in Reporting Company (202–347–3700 or
DEPARTMENT OF ENERGY this docket on July 31, 2002: 1–800–336–6646), for a fee. They will be
a. Is there a need to include liability available for the public on the
Federal Energy Regulatory provisions in the Commission’s pro Commission’s FERRIS system two
Commission forma Standard Market Design tariff? weeks after the conference.
b. Under what circumstances should Additionally, Capitol Connection offers
18 CFR Part 35 liability protection be provided in a the opportunity for remote listening and
Commission open access transmission viewing of the conference. It is available
[Docket No. RM01–12–000] tariff? For example, should the for a fee, live over the Internet, via C-
Commission provide such protection Band Satellite. Persons interested in
Remedying Undue Discrimination only when it is not available through receiving the broadcast, or who need
Through Open Access Transmission state tariffs, or should such protection information on making arrangements
Service and Standard Electricity be included for all transmission uses? should contact David Reininger or Julia
Market Design; Notice of Technical c. If the Commission adopts liability Morelli at the Capitol Connection (703–
Conference provisions, should they be generic or do 993–3100) as soon as possible or visit
October 28, 2002. they need to be adopted on a regional the Capitol Connection Web site at
AGENCY: Federal Energy Regulatory basis? http://www.capitolconnection.gmu.edu
Commission, DOE. d. Should the standards adopted in a and click on ‘‘FERC.’’
Commission pro forma tariff reflect 6. For more information about the
ACTION: Notice of technical conference.
what was previously provided under conference, please contact Jignasa
SUMMARY: On July 31, 2002, the state law? If so, how should this issue Gadani at (202) 502–8608 or
Commission issued a Notice of be resolved in the multistate context of jignasa.gadani@ferc.gov.
Proposed Rulemaking (NPRM) in the an Independent System Operator or Magalie R. Salas,
above-captioned docket, proposing to Regional Transmission Operator?
Secretary.
amend its regulations to remedy undue 3. The Commission asks interested
[FR Doc. 02–28047 Filed 11–4–02; 8:45 am]
discrimination through open access speakers to include in their requests to
BILLING CODE 6450–01–P
transmission service and standard speak specific proposed tariff language
electricity market design. See 67 FR for the liability provisions the speaker
55452 (Aug. 29, 2002). The Commission supports (if any) and a summary of the
DEPARTMENT OF ENERGY
has scheduled a public conference to basis for those provisions. Draft liability
address specific issues related to the provisions may address other liability- Federal Energy Regulatory
inclusion of liability provisions in the related issues beyond those enumerated Commission
Commission’s Standard Market Design above, and other liability-related issues
Tariff, as discussed in the NPRM. may be addressed at the conference as 18 CFR Part 35
DATES: The conference will be held on:
necessary. Those interested in
submitting comments regarding liability [Docket No. RM01–12–000]
December 11, 2002. Requests to speak
are due: November 8, 2002. issues should be aware that the due date
for such comments remains November Remedying Undue Discrimination
ADDRESSES: Send requests to speak to:
15, 2002. However, if participants wish Through Open Access Transmission
Office of the Secretary, Federal Energy to submit additional written comments Service and Standard Electricity
Regulatory Commission, 888 First regarding liability issues after the Market Design; Notice of Extension of
Street, NE., Washington, DC 20426. technical conference, they may do so on Time To File Requests To Speak at
FOR FURTHER INFORMATION CONTACT: or before January 10, 2003. Technical Conferences
Jignasa Gadani, Office of the General 4. Persons interested in speaking October 24, 2002.
Counsel, Federal Energy Regulatory should file a request to speak on or AGENCY: Federal Energy Regulatory
Commission, 888 First Street, NE., before November 8, 2002, in Docket No. Commission, DOE.
Washington, DC 20426. (202) 502–8608. RM01–12–000. The request should ACTION: Notice of extension of time.
SUPPLEMENTARY INFORMATION: clearly specify the name of the speaker;
1. Take notice that a technical his or her title; the person or entity the SUMMARY: On October 22, 2002, the
conference will be held on December speaker represents; and the speaker’s Commission issued a Notice of
11, 2002, beginning at 9:30 a.m., in the mailing address, telephone number, Technical Conferences in this docket.
Commission Meeting Room on the facsimile number and e-mail address. See 67 FR 65913 (Oct. 29, 2002). The
second floor of the offices of the Federal As the number of potential speakers Commission’s notice scheduled a series
Energy Regulatory Commission, 888 may exceed the time allotted for the of technical conferences for November
First Street, NE., Washington, DC. All conference, interested speakers are 6, 2002, November 19, 2002 and