No Drawing No. Title Rev.


.
1 UTM/2016/AR/001 Architectures Landscape, Site Key Plan, Site
Location Plan & General Rules.
2 UTM/2016/AR/002 Ground Floor Plan
3 UTM/2016/AR/003 1st Floor Plan
4 UTM/2016/AR/004 2nd Floor Plan
5 UTM/2016/AR/005 3rd Floor Plan
6 UTM/2016/AR/006 4th Floor Plan
7 UTM/2016/AR/007 5th Floor Plan
8 UTM/2016/AR/008 6th Floor Plan
9 UTM/2016/AR/009 7th Floor Plan
10 UTM/2016/AR/010 8th Floor Plan
11 UTM/2016/AR/011 9th Floor Plan
12 UTM/2016/AR/012 10th Floor Plan
13 UTM/2016/AR/013 11th Floor Plan
14 UTM/2016/AR/014 12th Floor Plan
15 UTM/2016/AR/015 13th Floor Plan
16 UTM/2016/AR/016 14th Floor Plan
17 UTM/2016/AR/017 15th Floor Plan
18 UTM/2016/AR/018 16th Floor Plan
19 UTM/2016/AR/019 Roof Floor Plan 1
20 UTM/2016/AR/020 Roof Floor Plan 2
21 UTM/2016/AR/021 Left View
22 UTM/2016/AR/022 Right View
23 UTM/2016/AR/023 Front View
24 UTM/2016/AR/024 Rear View
25 UTM/2016/AR/025 Section A-A
26 UTM/2016/AR/026 Section B-B
27 UTM/2016/AR/027 Roof Details
28 UTM/2016/AR/028 Section C-C, Section D-D & Staircase Details
29 UTM/2016/AR/029 Window & Door Schedule
Engineering Drawing List
Project Title : Propose to construct 18th floors of UTM Block A academic and
education building (Phase 1) at Bandar Indera Mahkota, Kuantan,
Pahang, Malaysia.
Project Location : B2-34, Jalan IM 7/1 Bandar Indera Mahkota, 25300, Kuantan,
Pahang, Malaysia.
Consultant Company : D-Maps Consultant Sdn. Bhd.

No Drawing No. Title Rev.


.
1 UTM/2016/ST/001 Structural Key Plan (Ground - 4th Floor)
2 UTM/2016/ST/002 Structural Key Plan (5th Floor)
3 UTM/2016/ST/003 Structural Key Plan (6th - 7th Floor)
4 UTM/2016/ST/004 Structural Key Plan (8th 15th Floor)
5 UTM/2016/ST/005 Structural Key Plan (14th Roof floor plan 1)
6 UTM/2016/ST/006 Structural Key Plan (Roof floor plan 2)
7 UTM/2016/ST/007 Beam Details (Along Gridline C at each floor)
8 UTM/2016/ST/008 Slab cut section 1
9 UTM/2016/ST/009 Slab cut section 2
10 UTM/2016/ST/010 Column Details
11 UTM/2016/ST/011 Pile foundation details
APPENDIXES
Wind Speed, Dead Load and Live Load Used
Project Title : Propose to construct 18th floors of UTM Block A academic and
education building (Phase 1) at Bandar Indera Mahkota, Kuantan,
Pahang, Malaysia.
Project Location : B2-34, Jalan IM 7/1 Bandar Indera Mahkota, 25300, Kuantan,
Pahang, Malaysia.
Consultant Company : D-Maps Consultant Sdn. Bhd.

Load (kN/m2)
Code Element
Gk Qk
MS 1553:2002 Wind Speed at Kuantan Area **V50 = 29.8 m/s
UBBL 1984 (pg106) Assembly area without fixed
seating (UTM Open area & 5.0
counseling area)
UBBL 1984 (pg107) Laboratory including equipment 3.0
Store 4.0
Dining room (cafeteria) 2.0
kitchen 5.0
Classroom (Study area) 3.0
UBBL 1984 (pg108) Corridor & passageways 5.0
Toilet 2.0
UBBL 1984 (pg111) Motor Room (AHU & TNB Room) 7.5
Office with computing & data
processing ( IT Centre, EDC lab)
3.5
Reading room without book storage
(Discussion area)
2.5
Room with book storage 4.0
BS 6399-1:1996 (pg 7) Office for general use (Department
2.5
office)
BS 6399-1:1996 (pg 8) Shop floor for the sales (UTM Mini
4.0
Market)
UBBL 1984 (pg110) Assembly are with fixed seating 4.0
Guide to fire protection
** Hose reels location & requirement
in Malaysia (pg 105)
Guide to fire protection
** Minimum distance between exist diagram (4.4.5.3)
in Malaysia (pg 57)

IS: 804-1967 (pg 1) Water tank


(Volume required = 270m3) 4.72 25.0
3
(Propose volume = 281m )
** Staircase size
UBBL 1984 or BS 5395 Public Building (R 180mm & G 255mm)
Private Building (R 200mm, 250mm G 400mm)
Load (kN/m2)
Code Element
Gk Qk
Guide to fire protection T-turn for road design
**min 6m radius
in Malaysia (pg 26)
Project Title:
Propose to construct 18th floors of UTM Block A
academic and education building (Phase 1) at
Bandar Indera Mahkota, Kuantan, Pahang,
Malaysia.

Volume 3/3
Prepared By:
Tie Tzer Sheng (141012273)
Leki Pelzang (132911447)
Wong Siew Ming (133011832)
Abdulwakeel (133912130)
Kinley Dorji (132911449)
Comparison of SFD & BMD by using StaadPro & Manual Calculation
Ground Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 285.0 285.9 0.32 577 595.9 3.28
Midspan 2 72.9 423 395.1 -6.60
Support 4 45 42.8 -4.89 599 638.0 6.51
Support 5 43.6 761 763.8 0.37
Midspan 6 283.4 546 529.1 -3.10
Support 7B 295.0 296.9 0.64 765 793.7 3.75

1st Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 320 285.9 -10.66 577 257.1 -55.44
Midspan 2 72.9 423 345.6 -18.30
Support 4 330 299.0 -9.39 599 275.2 -54.06
Support 5 389 283.4 -27.15 761 136.0 -82.13
Midspan 6 70.4 546 374.28 -31.45
Support 7B 413 296.9 -28.11 765 991.0 29.54

2nd Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 285 273.3 -4.11 513 217.2 -57.66
Midspan 2 76.4 386 346.6 -10.21
Support 4 205 269.1 31.27 546 794.2 45.46
Support 5 286 282.2 -1.33 555 238.3 -57.06
Midspan 6 97.1 399 374.3 -6.19
Support 7B 295 289.1 -2.00 546 876.5 60.53
3rd Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 272 273.3 0.48 496 235.5 -52.52
Midspan 2 76.4 359 345.8 -3.68
Support 4 269 269.1 0.04 501 775.9 54.87
Support 5 283 282.2 -0.28 549 443.2 -19.27
Midspan 6 97.1 391 379.5 -2.94
Support 7B 288 289.1 0.38 548 671.6 22.55

4th Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 272 273.3 0.48 501 258.9 -48.32
Midspan 2 76.4 354 346.3 -2.18
Support 4 269 269.1 0.04 506 732.5 44.76
Support 5 283 282.2 -0.28 555 284.3 -48.77
Midspan 6 97.1 385 375.5 -2.47
Support 7B 288 289.1 0.38 555 830.5 49.64

5th Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 271 374.6 38.23 481 438.8 -8.77
Midspan 2 85.1 367 450.3 22.70
Support 4 271 371.7 37.16 498 912.9 83.31
Support 5 284 300.8 5.92 547 332.1 -39.29
Midspan 6 76.4 399 406.2 1.80
Support 7B 287 311.9 8.68 534 853.2 59.78
6th Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 368 301.94 -17.95 590 321.0 -45.59
Midspan 2 82.9 504 408.0 -19.05
Support 4 378 295.0 -21.96 664 742.7 11.85
Support 5 307 350.1 14.04 577 441.0 -23.57
Midspan 6 87.3 455 486.0 6.81
Support 7B 306 351.2 14.77 525 893.8 70.25

7th Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 295 335.3 13.66 484 406.0 -16.12
Midspan 2 91.5 432 460.0 6.48
Support 4 302 64.0 -78.81 540 786.0 45.56
Support 5 355 298.5 -15.92 667 361.0 -45.88
Midspan 6 74.0 # 522 414.0 -20.69
Support 7B 347 298.2 -14.06 596 762.0 27.85

8th Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 328 336.1 2.47 538 426.9 -20.65
Midspan 2 98.54 481 452.6 -5.90
Support 4 340 334.4 -1.65 608 799.6 31.51
Support 5 302 396.4 31.26 565 496.7 -12.09
Midspan 6 136.5 444 507.2 14.23
Support 7B 295 395.4 34.03 508 803.5 58.17

9th Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 331 371.2 12.15 545 429.2 -21.25
Midspan 2 99.7 490 318.2 -35.06
Support 4 339 388.1 14.48 610 843.2 38.23
Support 5 340 313.0 -7.94 645 423.5 -34.34
Midspan 6 77.4 513 447.5 -12.77
Support 7B 343 314.0 -8.45 587 770.0 31.18
10th Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 379 371.2 -2.06 638 439.7 -31.08
Midspan 2 99.7 509 318.7 -37.39
Support 4 380 388.1 2.13 664 822.3 23.84
Support 5 314 313.0 -0.32 594 447.5 -24.66
Midspan 6 77.4 458 448.1 -2.16
Support 7B 313 314.0 0.32 557 746.0 33.93

11th Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 382 371.2 -2.83 665 460.6 -30.74
Midspan 2 99.7 497 519.1 4.45
Support 4 378 388.1 2.67 663 801.0 20.81
Support 5 312 313.0 0.32 595 466.6 -21.58
Midspan 6 77.4 # 446 448.6 0.58
Support 7B 315 314.0 -0.32 579 727.2 25.60

12th Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 382 371.2 -2.83 578 490.8 -15.09
Midspan 2 99.7 447 519.6 16.24
Support 4 377 388.1 2.94 594 779.8 31.28
Support 5 312 313.0 0.32 660 491.9 -25.47
Midspan 6 77.4 498 499.2 0.24
Support 7B 315 314.0 -0.32 665 701.7 5.52

13th Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 382 371.2 -2.83 666 515.9 -22.54
Midspan 2 99.7 497 520.2 4.67
Support 4 377 388.1 2.94 661 755.2 14.25
Support 5 312 313.0 0.32 595 517.9 -12.96
Midspan 6 77.4 446 449.9 0.87
Support 7B 315 314.0 -0.32 579 675.6 16.68
14th Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 380 354.7 -6.66 645 584.5 -9.38
Midspan 2 100.2 507 471.1 -7.08
Support 4 379 352.6 -6.97 661 706.4 6.87
Support 5 313 380.8 21.66 594 606.6 2.12
Midspan 6 105.2 456 565.1 23.93
Support 7B 314 387.8 23.50 561 782.1 39.41

15th Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 352 354.7 0.77 605 611.6 1.09
Midspan 2 100.2 494 472.9 -4.27
Support 4 355 352.6 -0.68 642 679.3 5.81
Support 5 390 380.8 -2.36 727 637.9 -12.26
Midspan 6 105.2 549 567.3 3.33
Support 7B 379 387.8 2.32 687 751.6 9.40

16th Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 358 237.9 -33.55 610 420.2 -31.11
Midspan 2 67.1 491 314.9 -35.87
Support 4 355 236.6 -33.35 644 452.4 -29.75
Support 5 389 258.2 -33.62 727 481.3 -33.80
Midspan 6 66.5 545 353.1 -35.21
Support 7B 379 255.4 -32.61 695 508.1 -26.89

17th Floor
SF value (kN) BM value (kNm)
Element
StaadPro Manual % StaadPro Manual %
Support 1a 229 237.9 3.89 340 430.1 26.50
Midspan 2 67.1 361 314.7 -12.83
Support 4 245 236.6 -3.43 437 442.5 1.26
Support 5 268 258.2 -3.66 494 467.2 -5.43
Midspan 6 66.5 401 353.3 -11.90
Support 7B 246 255.4 3.82 387 522.2 34.94
Comparison between Esteem Software & Manual Calculation in term of structural
design characteristics
Slab Design
Esteem Manual Calculation
Location
StaadPro Manual % StaadPro Manual %
Support 1a 285.0 285.9 0.32 577 595.9 3.28
Midspan 2 72.9 423 395.1 -6.60
Support 4 45 42.8 -4.89 599 638.0 6.51
Support 5 43.6 761 763.8 0.37
Midspan 6 283.4 546 529.1 -3.10
Support 7B 295.0 296.9 0.64 765 793.7 3.75
Building Work
Item Description Page No Amount
No. (RM)

TO GRAND SUMMARY
Slab Design
Element / Location Designer
1st floor (Grid 4-5/B1-C) Abdulwakeel
5th floor (Grid 2-4/B1-C) Wong Siew Ming
6th floor (Grid 6-7B/B1-C) Leki Pelzang
8th floor (Grid 1a-2/B1-C) Kinley Dorji
14th floor (Grid 5-6/B1-C) Tie Tzer Sheng
Taking off & BQ
(1st floor)
By
Abdulwakeel
Element Location
Work Below Lowest Floor Finish Column stump, pile cap
(WBLFF) at B1/1a
st
Upper Floor 1 floor suspended slab
(Grid 4-5/B1-C)
Frame Beam along Gridline C
& Column at B1/1a
Taking off & BQ
(5th floor)
By
Wong Siew Ming
Element Location
Work Below Lowest Floor Finish Column stump, pile cap
(WBLFF) at 4/C
th
Upper Floor 5 floor suspended slab
(Grid 2-4/B1-C)
Frame Beam along Gridline C
& Column at 4/C
Taking off & BQ
(6th floor)
By
Leki Pelzang
Element Location
Work Below Lowest Floor Finish Column stump, pile cap
(WBLFF) at 7B/C
th
Upper Floor 7 floor suspended slab
(Grid 6-7B/B1-C)
Frame Beam along Gridline C
& Column at 7B/C
Taking off & BQ
(8th floor)
By
Kinley Dorji
Element Location
Work Below Lowest Floor Finish Column stump, pile cap
(WBLFF) at 1a/C
st
Upper Floor 1 floor suspended slab
(Grid 1a-2/B1-C)
Frame Beam along Gridline C
& Column at 1a/C
Taking off & BQ
(14th floor)
By
Tie Tzer Sheng
Element Location
Work Below Lowest Floor Finish Column stump, pile cap
(WBLFF) at 5/C
st
Upper Floor 1 floor suspended slab
(Grid 5-6/B1-C)
Frame Beam along Gridline C
& Column at 5/C
Infrastructure Design
Drainage Design
Sewage Design
Sediment Basin Design
Cur & Fill measurement