EXCELLENCE AWARDS
2017
QBS FAQs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
ACEC WI Member and Affiliate Firms . . . . 26
4
Judging and Awards
A panel of highly qualified judges from diverse backgrounds outside
State Finalist Awards are presented to entries demonstrating a high
the associations membership reviewed this years entries. Each entry was
judged on its own merits and specifically on the role of the engineering firm degree of client satisfaction through quality, cost-effective solutions.
submitting the project. The process involved a combination of individual This year, ACEC WI presented ten State Finalist Awards.
review of entry materials, group discussion and deliberation.
B QBS label indicates projects that were procured using QBS. QBS is a proven process to help owners find the highest-qualified en-
Q gineering or architectural firm or team for a project. Page 22 of this magazine provides information on the QBS process. Additional
Information is available at www.qbswi.org.
HILLARY PINK-BUDWORTH
Commercial Insurance Consultant | hpink-budworth@johnsonins.com
joh n s on in s .com
BANKING W E A LT H INSURANCE
5
2 0 17 E n g i n e e r i n g E x c e l l e n c e A w a r d s
6
ROCK RIVER WATER RECLAMATION DISTRICT Constructed Wetlands: A New Solution to Excess Flow Storage
www.acecwi.org
8
2 0 17 E n g i n e e r i n g E x c e l l e n c e A w a r d s
9
2 0 17 E n g i n e e r i n g E x c e l l e n c e A w a r d s
Q
B
S
The wetland provides storage and cleaning functions for the project and also accomodates native plants and animals.
Humans have an outsized impact on the environment but outflows can cause harmful bacteria to be dumped into the river
recently we have been getting better at addressing those impacts. which poses a danger to humans and animals. The wetland
The Rock River Water Reclamation District (RRWRD), in an effort instead absorbs and filters these bacteria through the intelligent
to reduce sanitary sewer outflows resulting from population use of plants and sandy soils. By incorporating a wetland basin, the
growth and human behavior, needed to create excess storage RRWRD will save money on energy use and chemical use while
capacity for use in major storms. The RRWRD stepped up to the adding to its environmental mission.
challenge with the environment in mind. Awards judge Dan Talarczyk praised the project, saying
Clark Dietz looked at a solution that went away from the This project exemplified an innovative green solution to an
conventional and achieved the overall goals of environmental engineering problem. It combined interesting design nuances
protection and promotion. They designed a new excess pump with natural process to create an aesthetically pleasing storage
station that would pump into a constructed wetland instead of the and treatment facility.
traditional impervious bottom basin. The excess pump station is Clark Dietz went above and beyond the call by designing a
more than capable of handling high intensity rains and will ensure wetland storage basin meeting the needs of the RRWRD while
that excess chemicals and nutrients are not dumped into the moving away from a static concrete basin. The wetland is a clear
Rock River. Additionally, the wetland has the same capacity as indicator that green solutions can be as effective as traditional
any facility but provided a secondary benefit of polishing effulent gray solutions and points to the harmonization of environmental
and cleaning up some additional sanitary sewer outflows. These and engineering goals.
10
2 0 17 E n g i n e e r i n g E x c e l l e n c e A w a r d s
Q
B
S
TOP: The new site preserves the natural beauty of the area while protecting the enviroment and providing significant cost and quality of life dividends.
BOTTOM RIGHT: With a new, more efficient biogas conversion system, the facility is able to meet green goals and save money.
The City of Eau Claire wanted to improve its wastewaster criteria in the short term while planning and budgeting for a more
treatment plants but was faced with some unique difficulties environmentally sustainable biological nutrient removal process
that required them to put additional thought and effort into their and facility and system upgrades. The facility upgrades have met
rennovations. First, the city is located at the confluence of the Eau or exceeded the prediction of the design modeling, resulting in
Claire and Chippewa Rivers which requires additional care to avoid substantially reduced total suspended solids, biological oxygen
runoff into those critical rivers and ultimately into the Mississippi demand, ammonia and nitrogen in the effluent while improving
River. The city was also faced with higher than usual ammonia odor control and reducing staff overtime.
levels and a mandate that those levels be reduced. Not only did the facility hit every metric required to reduce
Donohue & Associates set out goals from the beginning to ammonia and other pollutants but it was also delivered on time
create a facility that was resilient, robust and sustainable. To meet and $4 million under budget, in addition to the yearly cost savings.
these goals, the team used a Biological Nutrient Removal activated Donohues team worked collaboratively with Eau Claire to deliver
sludge system. This system minimized the chemical requirements a truly resilient, robust and sustainable wastewater treatment plant.
that are usually necessary for a wastewater facility with the
reduction in chemicals, the facility saves $225,000 annually.
With other improvements such as efficient biogas conversion and
new control system upgrades, the new facility saves more than
$525,000 in total annually.
The project was also made more difficult by the requirement
that the plant remain functional during the upgrades. This required
extensive collaboration between Donohue and city engineers to
ensure that necessary systems operated effectively.
From awards judge Meg Galloway, PE: This project provided
a phased approach to assure the facility could meet new effluent
11
2 0 17 E n g i n e e r i n g E x c e l l e n c e A w a r d s
Q
B
S
TOP: In a first for North America, the PONDUS technology enhances biogas production for use in electricity generation. BOTTOM RIGHT: In a first for
North America, the PONDUS technology enhances biogas production for use in electricity generation.
Kenosha set out a progressive goal of a more sustainable Awards judge Anna Varney, PE, said This design is a great
wastewater treament plant. The current plant handles more than example of integrating innovative technologies into existing
22 million gallons of wastewater a day and the solids left over infrastructure. Now the main heat energy supply comes from
from the process had to be loaded onto trucks and hauled away waste heat, biogas is converted into electricity and biosolids are
to a separate landfill. Additionally, the electricity to run the plant Class A to be used as fertilizer instead of Class B which was
increased costs because the facility did not produce its own energy. previously hauled to a landfill.
Donohue & Associates came in with a plan to address all of these
issues. The designs used technologies that had not yet been used in The project was focused
North America the PONDUS system that was installed is one of a on a solution that was both
handful in use in the world and delivered a 30% increase in biogas practical and sustainable.
production because of its superior methods in breaking down Donohue delivered by using
waste solids. Alongside this system, a centrifuge was installed that cutting-edge technology
significantly reduced the amount of water needed to use the system. that met environmental
This allowed the facility to cut the number of digesters in half, saving goals and reusing waste
money on operations and maintenance costs. materials to realize extreme
Because of the improvements, biosolids that previously had cost savings.
to be transferred to a landfill were reclassified and the nutrients
were able to be reused in a beneficial way. The biosolids can
now be used for compost projects or as fertilizer at local farms.
The increase in biogas production has allowed the facility to use
that energy to power the plant, cutting down on costs. Overall,
the new plant is expected to pay for itself in eight years and save
$750,000 a year.
12
Milwaukee Intermodal Station
Passenger Train Concourse Reconstruction Congratulations
2017 ACEC-WI State Finalist
to all 2017 ACEC Award Winners!
39th Avenue
STH 165 to 97th Street
2017 ACEC-WI State Finalist Photograph courtesy of Steve Hall Hedrich Blessing
PROACTIVE
Award-Winning
Engineering CTH D BRIDGE OVER FOX RIVER
Town of Rochester, Racine County, WI
INNOVATIVE with Alfred Benesch & Company ACEC STATE FINALIST
RESPONSIVE Full Service Engineering Capabilities in
Wisconsin and Beyond:
Our thanks and congratulations to the Town of Rochester
and Racine County for the success of this innovative project.
Aviation Local Roads
Bridges MEP
Buildings Railroads
Construction Services Site Planning
Cost Management Stormwater
Electrical Survey
Environmental Traffic
Geotechnical Transportation www.ksinghengineering.com
Highways Value Engineering Wauwatosa | Janesville | Lombard
ITS Water/Wastewater
Landscape Architecture
w w w. b e n e s c h . co m
CONGRATULaTE
www.graef-usa.com
Wisconsin Ave. Transmission Main & Temporary Booster Station Milwaukee Intermodal Station Passenger Train Concourse
(in partnership with the City of Wauwatosa Water Utility) (with Alfred Benesch & Company, project team leader)
Q
B
S
TOP: Careful bridge reconstruction was essential to protecting the creek from contamination while also meeting traffic needs. BOTTOM RIGHT: The newly
reconstructed road enhances the visibility of local businesses and ensures smooth traffic flow on a vital state highway.
Rehabilitation of major roadways is never a simple proposition resources, Mead & Hunt redesigned the roadway to avoid
but upgrades to a section of USH 14 required a unique amount of realignment of the creek and created a stormwater basin that
collaboration and expertise. The road was shared by the Wisconsin would collect runoff from the road and keep it out of the creek.
Department of Transportation and the village of Cross Plains, each Awards judge Matt Grove, PE, praised the project, saying This
with their own design ideas and requirements. There were also project design demonstrated many aspects necessary to be
unique environmental factors to consider. considered an award-winning project. Stakeholder coordination,
Mead & Hunt bridged this gap and delivered a stretch of road environmental concerns and innovation were all strongly
that exceeded everyones expectations. The first step was to sit considered and successfully implemented into the project.
down with stakeholders to understand what items were necessary Through careful consideration of local, state and environmental
for success. Overall, the project featured five public meetings, a interests, the design team was able to redesign a safer roadway
hearing, along with site visits and business walks. that enhances the environment and the village of Cross Plains.
The team then moved to put those features into action. Traffic
flow on a busy section of a state highway was improved by
reducing the number of direct access points to the road and
reconstructing the signal intersections in the village. This phase
also included the construction of two new bridges and met
environmental concerns. As the main artery through Cross Plains,
the village benefits by increasing pedestrian visibility on the road
which was a concern for local businesses and restaurants.
But by far the biggest challenge was the environmental
complications. Near the road is Black Earth Creek which is a
federally-funded and protected waterway that is considered one
of the best trout streams in Wisconsin. To protect the natural
14
2 0 17 E n g i n e e r i n g E x c e l l e n c e A w a r d s
TOP: The temporary station was able to keep up with the demands of supplying 1.5 million gallons daily and no complaints were received. BOTTOM RIGHT:
The pump was located in the median which allowed efficient operation and no disruption of traffic.
15
INTRODUCING
2017 Wisconsin
construction summit
& Golf EvEnt
The Daily Reporters Newest Signature Event
THURSDAY, MAY 4, 2017
at The American Club in Kohler, WI
Unique panel discussions
Golf 18 holes at The Irish at Whistling Straits - ranked #35
in GolfWeeks 2015 Best Resort Courses & #47 in Golf Digests
2015/2016 Americas 100 Greatest Public Golf Courses
Network with Leaders in the Industry
16
2 0 17 E n g i n e e r i n g E x c e l l e n c e A w a r d s
Q
local gateway, the Wisconsin Department of Transportation
B
(WisDOT) and the village of Pleasant Prairie were faced
S
with some unique challenges. Other construction projects
threatened to derail a tight schedule, utility conflicts
interfered with the necessary traffic requirements and
environmental considerations had to be taken into account.
Alfred Benesch surmounted these hurdles with
effective design solutions. Extensive coordination with all
stakeholders allowed the project to move forward on time
and avoided unnecessary delays from other construction.
This also provided an opportunity to relocate the utilities
and maintain service but no impair the design of the project.
A roundabout was designed that would replace a previous
intersection that both slowed traffic and was dangerous; the
roundabout dealt with many problems like variable roadway
widths and other irregularities. The design team used a
laser screed machine which saved time and money and was
one of the first uses of this machine on a WisDOT project.
Environmental challenges were also a concern because
of the presence of a local stream. The design team created
a rock check dam that prevented impact to the stream
from construction and the new roadway design. Overall, the
design team was the glue that held many parts together
The aerial view demonstrates the complexity of the roundabout, with multiple lanes and and resulted in a new, sustainable roadway that is safer and
allowance for emergency vehicles and bike and pedestrian accommodations. a welcoming gateway to Pleasant Prairie.
Powered by 800.666.3103
www.AyresAssociates.com
www.propelmarketing.com
Q
away from an industrial past. This creates problems with
B
contaminated sites that are usually inappropriate for other
S
uses and pose a barrier to redevelopment. Oshkosh was faced
with river property that was designed with barge traffic and
chemical usage in mind, an unsuitable use in todays economy
and a severe detriment to a major natural resource.
AECOM worked with city, environmental and public
stakeholders to redesign the area and make it a benefit for
everyone. Boating facilities were created for recreational use on
the river. This was an issue immediately because the site had to
accommodate old industrial fill from when barges, not kayaks,
populated the river. The site also incorporated re-vegetation on
the shoreline and was made to be ADA accessible. In addition to
the river utilization, the design team created a pedestrian bridge
designed to look like other bridges in the area and paid homage
to the citys industrial history. This bridge connects with a trail
system and other amenities that bring citizens to the waterfront
to enjoy the river and the associated park. These recreational
improvements will benefit all residents substantially.
Through smart design and cooperation with multiple parties,
The new boating facilities and trail allow residents to benefit from the river running AECOM was able to turn a contaminated eyesore into an
through their city in ways that were unavailable before. economically beneficial and revitalized site.
DAY: Get
your facts first, then you
can distort them
as you please
. Mark Twain
or two
VOL. 118
NO. 13
Y, JANUARY
nning that
WEDNESDA
Homebuyer
A N D T,
lot more pla ter.
ILDEBR
KEVIN H
Theres a
nt
mana geme
ago in pre
Miron
e
bewarcult
Dan Shaw
ies
dan.shaw@d
ts diffi
Case highligh t by contractor
of proving thef
orter.com
ailyrep
-by-
visit us any time at dailyreporter.com.
County theft
An Ozaukee on its way to
case is
contractor ple of the
prime exam
becoming a ens must
private citiz
difficult path g to prove theyve
tryin lder.
trod when by a homebui
been defrauded District Attorney
The Ozaukee t on Nov.
inal complain
filed a crim thy Rigsby, the own-
Rigsby had
alleging that provided in trust for
ey
priated mon m-built
TRUTH
uon. Rigsby ls blocking along
house in Meq theft by contrac- s the weath
er as he instal
t of rden battle project.
THE COLD
felony coun unt Jeremy Meve sha office building
ected trust-acco tructions
tor over susp occurred while he Miron Cons
ing day at
the One Mena
below-freez
violations that house for James
21
2 0 17 E n g i n e e r i n g E x c e l l e n c e A w a r d s
Q
checked a couple of boxes on WisDOTs list. The old design
B
had a high crash rate from two dangerous intersections that
S
created significant safety concerns. In addition, this interchange
was on an alternative route for the stretch of I-39 that would be
significantly renovated.
For an intersection valued at over 13 million dollars, multiple
engineering firms combined their expertise as Dane Partners.
The team developed a wide variety of options to evaluate
before choosing one that would meet all of the goals: a jug
handle interchange. This design eliminated left handed turns
onto US 12/18 and eliminated the previous dangerous
intersections. The design also reduces intersection conflict
points. All of these innovations were designed to minimize
crashes and to accommodate a growing amount of traffic that
would be displaced from construction on I-39. Synchronizing
these traffic systems was also a concern and it pushed an
aggressive schedule forward for the STH 73 interchange.
Designing an innovative interchange within these time
constraints was difficult but the team managed to provide an
excellent design within 24 months.
The new interchange substantially increased the safety of the
area and met severe time and design constraints. Motorists now
An innovative design shaped like a jug handle minimizes crashes and facilitates traffic have this alternative route available during I-39 construction and
flow between two major highways. the surrounding community benefits from a new and safe gateway.
UV DISINFECTION FACILITY
CDM SMITH INC. Client: Sheboygan Water Utility | Category: Water Resources
Water, the kind we use every day, can have a lot of issues
Q
that arise that make it unsafe to use. The Sheboygan Water
B
Utility decided to take a proactive approach to its citizens
S
health by enacting new procedures to reduce the risk of
bacterial issues like cryptosporidium.
CDM Smith designed a new UV disinfection facility that
would provide a multi-barrier disinfection approach and
was uniquely suited to dealing with bacteria. One of the
main issues was the small site plan the existing treatment
plant is located on Lake Michigan and does not have room
for serious expansion. By reexamining space previously
thought to be unusable, the design team was able to
install a separate UV facility that also reduced the need
for intermediate pumping. The gains in efficiency allowed
the plant to stay in operation during construction and be
finished on schedule. Another major improvement was close
coordination with state officials to create a memorandum
of understanding that allowed the facility to receive
environmental credits from the state for its UV facility. This
joint discussion and design was the first in Wisconsin and
sets a precedent for future treatment plant projects.
Through clever siting and careful negotiation, the design
The UV facility utilizes a small footprint to treat water contaminants that might slip team was able to meet client expectations and provide even
through traditional disinfection methods. safer and more reliable water for the population of Sheboygan.
qualifications-based selection
2 0 17 E n g( e e r i n g E x c)
i nqbs
S ellence Awards
QBS FAQs
Q
Wisconsin Excellence Awards
Lifecycle Costs of a Typical Project
qualifications
S engineer or architect for your
www.qbswi.org -basedvsselection
enigeering construction(qbs )
& maintence costs
B
g a professional When Quality and Value Matter
QBS FAQs
Q
ct? use Qualifications-based Selection to get
www.qbswi.org lifecycle Costs of a Typical Project
est overall value for your project.
engineering vs. construction & maintenance costs
QBS FAQs
nyone is faced with an engineering or architectural need, the most important decision for the
success is Hiring a professional
the selection engineer
of a qualified professional or architect
engineering for
or architectural your project? Use
firm.
Qualifications-Based Selection
Hiring a professional engineer to get the
or architect for best
your overall value for
ctual engineering costs make up a very small percentage of a projects total life cycle costs,
your
ecision influences project.
project? useofQualifications-based
the level Selection
success for every project element. to getsite selection,
These include
the
ternatives, Whenbest
budget, overall
schedule,
anyone value
is permits,
faced foranyour
aesthetics
with and project.
operatingorcosts,
engineering to name a few.
architectural need, the most important
decision for the projects success is the selection of a qualified professional engineering Engineering Costs 2%
When anyone is faced with an engineering or architectural need, the most important decision for theConstruction & Maintenance Costs 98%
or architectural firm.
projects success is the selection of a qualified professional engineering or architectural firm.
alifications-Based
Why? Actual engineering costs make up a very small percentage of a projects total life
Why? Actual engineering costs make up a very small percentage of a projects total life cycle costs,
ection is a cycle
proven
yet
costs, yet thisHow
this decision influences does
decision
the level of successone
influences select
for every
the levelaofdesignsuccess for
project element. These includeprofessional?
every project element.
site selection,
Engineering Costs 2%
Construstrion & Maintenance Costs 98%
These
rocess to help include site selection, design alternatives, budget, schedule, permits, aesthetics and
design alternatives, budget, schedule, permits, aesthetics and operating costs, to name a few.
operating costs, toFor nameinformation
a few. on the QBS selection process, frequently asked questions andEngineering the benefits ofCostsQualifications-Based
2%
ers find the highest
Selection visit www.qbswi.org. In addition, QBS Wisconsin will provide, Construction
at no charge,&a Maintenance
facilitator to helpCosts
owners98%learn about
ified architectural
engineering firm the QBS process.
Qualifications-Based
r their projects.Selection is a proven How How does does oneone select select
a design a design professional?
professional?
is an objective, process to help For information on the QBS selection process, frequently
For information on the QBS selection process, frequently asked questions asked
and the questions
benefits and the benefits of Qualifications-
of Qualifications-Based
, defensible and Which
owners find the highest
qualified architectural
organizations
Based Selection use
visit QbS?
www.qbswi.org. In addition, QBS Wisconsin will provide,
Selection visit www.qbswi.org. In addition, QBS Wisconsin will provide, at no charge, a facilitator to help owners learnat noabout
charge, a facilitator to
petitive selection the help
QBS owners
process.
American Public Works Association
learn about the QBS process. Wisconsin League of Municipalities
or engineering firm
ocess based onfor their projects. Federal Highway Administration Wisconsin Rural Water Association
ifications related It is an objective,
U.S. Army Corps of Engineers
Which
Which organizations
organizations use useQbS? QBS? Wisconsin Towns Association
o your project. fair, defensible and Wisconsin Department of Commerce American Bar Association
competitive selection American
American PublicBarWorks Association
Association Wisconsin League of Municipalities
Wisconsin Association of School Boards
Experience by process based on Wisconsin Department of Administration
Natural Resources Companies American Council ofDepartment
Engineering of Companies
Federal
American Highway Council of Engineering Wisconsin Rural
WisconsinWater Association Natural Resources
deral and state qualifications related
Wisconsin Department of ofPublic Instruction American Institute ofDepartment
Architects of Transportation
U.S. Army Corps
American Engineers
Institute of Architects Wisconsin Towns
Wisconsin Association
encies and manyto your project. Wisconsin Department of Commerce American Bar Association
Wisconsin DepartmentAmerican of Transportation
Public Works Association National Society
Wisconsin of Division
Professional Engineers
of Facilities Development
unicipalities has Experience by Wisconsin
Federal Department
Highway of Natural Resources
Administration American Council
Wisconsin of Engineering
League Companies
of Municipalities
Wisconsin Division of State Facilities Many local units of government
wn using QBS isfederal and state Wisconsin
NationalDepartment
Society of Public
of InstructionEngineers American Institute
Professional Wisconsin of Architects
Rural Water Association
agencies and many Wisconsin Association of School Boards
e efficient, moremunicipalities has Wisconsin
U.S. Army Department
Corps of of Transportation
Engineers National Society
Wisconsin of Professional Engineers
Towns Association
Wisconsin Division of State Facilities Many local units of government
ective and lessshown using QBS is
Wisconsin Association of School Boards
ly in the long run Does
more efficient, more
effective and less
the bid law
Does the applybid lawtoapply the hiringto the hiringof an of architect
an architect or engineer?
or engineer?
bidding the work.
The bid law Does
costly in the long run forThe
localbidunits
the of
bid government
law only
apply applies
to the to construction
hiring of contracts.
an It
architect
law for local units of government only applies to construction contracts.does not
or apply when hiring
engineer? engineers,
It does not apply when
than bidding the work.
architects and The other professionals to work on municipal projects.
hiring engineers, architects and other professionals to work on municipal projects.
bid law for local units of government only applies to construction contracts. It does not apply when hiring engineers,
e QBS Process architects and other professionals to work on municipal projects.
CON
GRA
to a
ll of TUL
the
2013 ATIO
Top
Proje
cts
NS
Our
in
a pro dustry
is
Alth ject gets changin
ough b g
We chan uilt to th . From
kn
ge is e its
diffi relatio workforc
wor ow the
ked co nt
chan on m
an ractor
of th ges thro y of th s and cult, n
proj
ose
ch
ugho e 20 trade
ect su alleng ut cons 13 Top s people it is ships w e to ho
ofte e w
n ne all sha
cces es tru Proj w
sful. they w ction. Th ects m ho Build
Rece
ere
able ro ug
to m h all
ad e en ing Ad cess re.
indu
ive ou
rm
ake
the at
cour
build
age
vant
you
to
age
has ary.
stry-rel on th
ings gadv in cont ch
ange
ated thly e-ne build our m antage inue visit d too, an
new
s. Go wsletter ing m embe .org ing ou d we
any rs to
to ou Th of th are doin see all of r websit
r ho e Bluepr e To
p Pr g includ the grea
e
mep
age int to st ojec
ts. ing t
and ay on
click
the top of ev
Sign ents
-up
butt , projec
on to ts
regi and
Build st er to
ing Ad day!
vant
age,
3303
S. 10
3rd
Stree
t, Mi
lwau
kee,
WI 53
227
14
build
ingad
vant
age.o
rg
20TOP 2013
S
OJECT
TOP P14R TOP
PRO
OF 2 0 OF 2
013 JECT
S
PROJECTS OF 2015
25
2 0 17 E n g i n e e r i n g E x c e l l e n c e A w a r d s
www.strand.com
608-251-4843
11 Locations Nationwide
26
Building a Better World for All of Us
Congratulations to the
City for winning ACEC of
Wisconsins Best of State
award for this project.
sehinc.com
800.325.2055
BENEFITS OF A
As a professional in the Architectural, Engineering, and Construction MASTERGRAPHICS
industry, you have your hands full keeping your clients happy & PARTNERSHIP
delivering your projects on time & on budget. Your technology,
workflows, processes, and people should ENABLE these outcomes, not
become a barrier. But how do you know if youre truly leveraging your Reduce Project Rework
tools to their fullest potential or even using the right tools?
Leverage Industry Best
We have been helping clients like you for over 65 years fully adopt their Practices
technology, improve their processes, and develop workflows that build Outperform Your
a competitive advantage into EVERY PROJECT you deliver. Leverage our Competition
diverse experience to help identify and eliminate your gaps today!
Elevate Your BIM Game
Streamline Collaboration
WWW.MASTERGRAPHICS.COM | 800.873.7238