Professional Documents
Culture Documents
WORLD BANK ASSISTED PROJECT: Widening and Strengthening of Kandi Shadnagar Road From Km 0+165 to Km 68+400 in Medak, Rangared
Districts in Telangana State/APRSP/ICB/KS-05.
This questionnaire is aimed at collecting information on temporary labor influx and camp management in the aforementioned World Bank ass
The contract-wise information being requested in the Table below needs to be collected, verified and authenticated by the respective Contrac
Consultant/Independent Engineer and the Project Implementation Unit, and shared with the World Bank before January 9, 2017 (Monday).
This questionnaire is aimed at collecting information on temporary labor influx and camp management in the aforementioned World Bank ass
The contract-wise information being requested in the Table below needs to be collected, verified and authenticated by the respective Contrac
Consultant/Independent Engineer and the Project Implementation Unit, and shared with the World Bank before January 9, 2017 (Monday).
Whether d
Grievance Supervision Questionnai
Code of Medical and RedressalMe a
HIV/AIDS Awareness was Any other Contractor Indeendent Employer/
Consultant/
Conduct Health Facilities chanism is
conducted Issues PIU
Available are available available Engineer
Attending on
Awareness programme is
No Yes the receipt of No Yes Yes Yes
Conducted workers
Temporary Labor Influx/Camp Management Matrix
and Strengthening
WORLD BANK of ASSISTED
Kandi Shadnagar
PROJECT: Road
Widening
From and
Km 0+165
Strengthening
to Km 68+400
of Kandi
in Medak,
Shadnagar
Rangareddy,
Road From
Mehaboobnagar
Km 0+165 to Km 68+400 in Medak, Rangar
elangana State/APRSP/ICB/KS-05. Districts in Telangana State/APRSP/ICB/KS-05.
mationThis
on temporary
questionnaire
labor
is aimed
influx and
at collecting
camp management
informationinon
thetemporary
aforementioned
labor influx
Worldand
Bank
camp
assisted
management
road project.
in the aforementioned World Bank a
d in the
The
Table
contract-wise
below needs
information
to be collected,
being requested
verified and
in authenticated
the Table below
byneeds
the respective
to be collected,
Contractor,
verified
Supervision
and authenticated by the respective Contra
oject Implementation
Consultant/Independent
Unit, and shared
Engineer
with
andthe
theWorld
Project
Bank
Implementation
before January
Unit,
9, 2017
and (Monday).
shared with the World Bank before January 9, 2017 (Monday).
mationThis
on temporary
questionnaire
labor
is aimed
influx and
at collecting
camp management
informationinon
thetemporary
aforementioned
labor influx
Worldand
Bank
camp
assisted
management
road project.
in the aforementioned World Bank a
d in the
The
Table
contract-wise
below needs
information
to be collected,
being requested
verified and
in authenticated
the Table below
byneeds
the respective
to be collected,
Contractor,
verified
Supervision
and authenticated by the respective Contra
oject Implementation
Consultant/Independent
Unit, and shared
Engineer
with
andthe
theWorld
Project
Bank
Implementation
before January
Unit,
9, 2017
and (Monday).
shared with the World Bank before January 9, 2017 (Monday).
Attending on
Awareness programme is
No Yes the receipt of No
Conducted workers
Temporary Labor Influx/Camp Management Matrix
WORLD BANK ASSISTED PROJECT: Widening and Strengthening of Kandi Shadnagar Road From Km 0+165 to Km 68+400 in Medak, Rangare
Districts in Telangana State/APRSP/ICB/KS-05.
This questionnaire is aimed at collecting information on temporary labor influx and camp management in the aforementioned World Bank as
The contract-wise information being requested in the Table below needs to be collected, verified and authenticated by the respective Contra
Consultant/Independent Engineer and the Project Implementation Unit, and shared with the World Bank before January 9, 2017 (Monday).
Whether Info
For Workers in Labour Camps, Whether. authorized
Total No. of Of which, no.
Name of of outsiders/ Medical Grievance
S.No. Contract No. and Name Labor and Health RedressalM Any other
Contractor Firm Employed migrant
workers Facilities echanism is Issues Contractor
are
available available
Attending
APRSP/ICB/KS-05/Agt. No: M/s. RMN-
9/2012/2013/CE(R&B) CRN & Meenakshi (JV), An average on the
1 5 Yes No Yes
of 30 Nos. receipt of
MD, APRDC, Dt: 09.08.2012. Hyderabad. workers
WORLD BANK ASSISTED PROJECT: Widening and Strengthening of Kandi Shadnagar Road From Km 0+165 to Km 68+400 in Medak, Rang
Districts in Telangana State/APRSP/ICB/KS-05.
This questionnaire is aimed at collecting information on temporary labor influx and camp management in the aforementioned World Bank
The contract-wise information being requested in the Table below needs to be collected, verified and authenticated by the respective Con
Consultant/Independent Engineer and the Project Implementation Unit, and shared with the World Bank before January 9, 2017 (Monday