Professional Documents
Culture Documents
i
First Edition April 2007
http://www.jtm.gov.my/kurikulum
All Rights Reserved. This document is classified as LIMITED. Not allowed to produce any
part of the training syllabus content in any form without permission from the Manpower
Department (JTM).
ii
ENDORSEMENT OF CURRICULUM STEERING COMMITTEE
CLUSTER OF ENGINEERING SERVICE
It is hereby notified that the syllabus of Quality Assurance , has been reviewed and
CONFIRMED by the Curriculum Steering Committee, Department of Human Resources in
the 1/2016 meeting held on the 14th June 2016. Consequently, the syllabus must be
used effective July 2016 throughout ILJTM.
.................................................. ...................................................
(Azkar Albar bin Abu Bakar) (SYED MOHAMAD NOOR BIN SYED MAT ALI)
Chairman of Cluster Chairman of the Curriculum Steering
Committee
iii
CONTENTS
3. TRAINING STRUCTURE.............................................................................................. 3
iv
K04-03-16 CNC PRGRAMMING................................................................... 149
K04-03-16 CNC PRGRAMMING ................................................................... 150
K04-03-16 CNC PRGRAMMING ................................................................... 151
K04-03-16 CNC PRGRAMMING ................................................................... 152
4.4 TABLE OF CONTACT HOURS DISTRIBUTION ............................................. 168
K04-04-11 ADVANCED CALIBRATION ........................................................ 169
K04-04-11 ADVANCED CALIBRATION ........................................................ 170
K04-04-11 ADVANCED CALIBRATION ........................................................ 171
K04-04-11 ADVANCED CALIBRATION ........................................................ 172
K04-04-13 PRODUCT ANALYSIS ............................................................... 180
K04-04-13 PRODUCT ANALYSIS ............................................................... 181
K04-04-13 PRODUCT ANALYSIS ............................................................... 183
K04-04-14 PRODUCT QUALITY CONTROL ................................................ 186
K04-04-14 PRODUCT QUALITY CONTROL ................................................ 187
K04-04-14 PRODUCT QUALITY CONTROL ................................................ 188
K04-04-14 PRODUCT QUALITY CONTROL ................................................ 189
K04-04-14 PRODUCT QUALITY CONTROL ................................................ 190
K04-04-14 PRODUCT QUALITY CONTROL ................................................ 191
K04-04-15 LEAN MANUFACTURING .......................................................... 193
K04-04-15 LEAN MANUFACTURING .......................................................... 194
K04-04-16 SUPERVISORY .......................................................................... 198
K04-04-16 SUPERVISORY .......................................................................... 202
v
LIST OF ABBREVIATIONS
L Lecture
D Demo
P Practice
PT Practical Test
PR Project
A Assignment
OT Oral Test
WT Written Test
O Observation
SP Special Project
WIM Written Instructional Material
IS Information Sheet
AS Assignment Sheet
WS Work Sheet
CU Competency Unit
WA Work Activities
vi
1. PRELIMINARY
1.1. Introduction
1.2. Objective
1.3. Pre-Requisites
a) Malay Language
d) English
vii
Duration of full-time training for this course is 2 years and 3 months for On Job
Training (OJT).
ILJTM training method for the certificate level is based on skills, which is 70%
practical or laboratory and 30% lectures.
6 Industrial Training
viii
Upon graduation, graduates will become Quality Assurance Technician and
Quality Control Technician.
ix
2. COMMITTEE MEMBERS
(Cluster Chairman)
2. Cik Sharifah Dora Binti Syed Abd Bahri (Ketua) ADTEC Shah Alam
(Coordinator)
Facilitator
i
Syllabus Development Sessions
Session 1 :
Date : 22 - 25 Mei 2016
Venue : IPG Kampus Pendidikan Teknik Bandar Enstek, Negeri Sembilan
Session 2 :
Date : 31 Mei 02 Jun 2016
Venue : ADTEC TAIPING
ii
3. TRAINING STRUCTURE
Prepare incoming, in
Identify
PRODUCT / Identify incoming process and outgoing Set work area for
product/process Conduct incoming
PROCESS inspection activities inspection tools, incoming
inspection inspection
INSPECTION requirements equipment, procedure inspection
procedures
and guideline
C01 01 L2 02 L2 03 L2 04 L2 05 L2
06 L2 07 L2 08 L2 09 L2 10 L2
C02 01 L2 02 L2 03 L2 04 L2 05 L2
06 L2 07 L2 08 L2
Record measuring
MEASURING Identify measuring Prepare measuring Execute measuring Confirm measuring
equipment
EQUIPMENT equipment handling equipment handling equipment handling equipment handling
handling work
HANDLING requirements work activities work activities result
activities
C03 01 L2 02 L2 03 L2 04 L2 05 L2
E01 01 L2 02 L2 03 L2
E02 01 L2 02 L2 03 L2
E03 01 L2 02 L2 03 L2
Identify Geometrical
ENGINEERING Construct details Execute Detail
Dimensional Record Drawing
DRAWING drawing Drawing
Tolerance Activities
E04 01 L2 02 L2 03 L2 04 L2
MACHINING Identify machining Execute machining Record machining
PROCESS process process progress
E05 01 L2 02 L2 03 L2
ELECTRICAL &
Identify Electric and Execute Electric and Record Electric and
ELECTRONIC
Electronic Electronic Electronic
PRINCIPLES
E06 01 L2 02 L2 03 L2
QUALITY
ASSURANCE Identify inspection & Confirm inspection
Plan inspection & Develop inspection Summaries
STANDARD testing procedure & testing procedure
testing procedure checklist based on inspection
OPERATING preparation preparation result
preparation checklist requirement information
PROCEDURE requirements
PREPARATION
C01 01 L3 02 L3 03 L3 04 L3 05 L3
STATISTICAL
Identify (SPC) Establish statistical Confirm SPC result
PROCESS Plan SPC application
application Apply SPC tools control points
CONTROL (SPC) procedures
requirements requirements
APPLICATION
C02 01 L3 02 L3 03 L3 04 L3 05 L3
Report SPC
activities
06 L3
C03 01 L3 02 L3 03 L3 04 L3 05 L3
Record control
handling activities
06 L3
Identify measuring
MEASURING Prepare measuring Prepare work area Confirm measuring
equipment Execute calibration
EQUIPMENT equipment calibration for measuring equipment
calibration activities
CALIBRATION tools and equipments equipment calibration calibration result
requirements
C04 01 L3 02 L3 03 L3 04 L3 05 L3
Report measuring
equipment
calibration activities
06 L3
Check shopfloor
SHOP FLOOR Identify shop floor Prepare shopfloor Execute shopfloor Report shopfloor
quality
QUALITY quality improvement quality improvement improvement quality
improvement
IMPROVEMENT requirements tools and equipments activities improvement
activities
activities
C05 01 L3 02 L3 03 L3 04 L3 05 L3
PRODUCT/PROCE Identify
SS NON- product/process Plan non Segregate non Execute non Conduct corrective
CONFORMANCE non conformance conformance control conformance conformance action meeting
CONTROL control parts activity product/process product disposition
requirements
C06 01 L3 02 L3 03 L3 04 L3 05 L3
Report
Monitor corrective product/process non
action effectiveness conformance control
activities
06 L3 07 L3
Execute product
PRODUCT Identify product Identified process Check product
quality acceptance Determine quality
QUALITY quality acceptance deviation calculated quality test index
due to process acceptance criteria
ACCEPTANCE requirements and test index result
abnormality
C07 01 L3 02 L3 03 L3 04 L3 05 L3
Report product
quality acceptance
activities
06 L3
Identify customer Analysis customer
CUSTOMER Prepare customer Execute customer Report customer
feedback/response/ feedback/
FEEDBACK/RESPO feedback/response/ feedback/response/ feedback/response
survey response/ survey
NSE/SURVEY survey activity survey activities / survey result
requirements result/data
C08 01 L3 02 L3 03 L3 04 L3 05 L3
Report supervision
administrative
activities
06 L3
E01 01 L3 02 L3
ADVANCED
Conduct Multi- Conduct 3D
METROLOGY
Gauging Inspection measurement
E01 01 L3 02 L3
Prepare customer
CUSTOMER Identify customer Address customer Evaluate customer Report customer
needs, requirement
REQUIREMENT needs, requirement needs, requirements requirement requirement
and specification
ESTABLISHMENT and specification and specification fulfillment activities
guidelines
C01 01 L4 02 L4 03 L4 04 L4 05 L4
C02 01 L4 02 L4 03 L4 04 L4 05 L4
Report product
Evaluate control
control plan
plan completeness
development
activities
06 L4 07 L4
C03 01 L4 02 L4 03 L4 04 L4 05 L4
Evaluate audit
Report of auditing
finding completion
activities
and accuracy
06 L4 07 L4
C04 01 L4 02 L4 03 L4 04 L4 05 L4
06 L4 07 L4 08 L4 09 L4
C05 01 L4 02 L4 03 L4 04 L4 05 L4
Identify process non Confirm method of Classify non Confirm product Evaluate non
NON CONFORMITY
conformity non conformity conformity non conformity conformity
ASSESSMENT
assessment assessment assessment assessment assessment result
C06 01 L4 02 L4 03 L4 04 L4 05 L4
Report non
conformity
assessment finding
06 L4
Evaluate Corrective
CUSTOMER Plan method of Analyse customer Propose problem
Identify customer and Preventive
FEEDBACK customer feedback feedback solving customer
feedback category Action (CAPA)
ANALYSIS rectification information/survey feedback
effectiveness
C07 01 L4 02 L4 03 L4 04 L4 05 L4
06 L4 07 L4
QUALITY Identify record and Evaluate record Report and record
Plan quality Execute quality
ASSURANCE document control and document document control
assurance document assurance document
DOCUMENT coordination control coordination coordination work
control control activities
CONTROL requirement work activities activities
C08 01 L4 02 L4 03 L4 04 L4 05 L4
STATISTICAL
Confirm control item Evaluate process Report SPC
PROCESS Identify SPC Monitor SPC
characteristic/parame capability and effectiveness
CONTROL (SPC) requirement activities
ter stability corrective action
ANALYSIS
C09 01 L4 02 L4 03 L4 04 L4 05 L4
C10 01 L4 02 L4 03 L4 04 L4 05 L4
Report supplier
performance
activities
06 L4
PRODUCT Identify product Execute product Evaluate product
Confirm method of Evaluate product
LIABILITY liability services liability services work liability services
product containment liability analysis
ANALYSIS requirement activities work activities
E11 01 L4 02 L4 03 L4 04 L4 05 L4
Report product
liability services
activities
06 L4
3.2 Training Pathway (Whole Semester)
MULA
Identify one dimensional (1D)
measuring equipment
01.01 1/4
01.03 3/4
01.04 4/4
02.01 1/4
02.03 3/4
A
Confirm and report process quality
improvement result and activities
02.04 4/4
A Identify process quality improvement
03.01 1/3
INTRODUCTION TO
QUALITY Execute process quality improvement
K04-01-13
03.02 2/3
03.03 3/3
04.01 1/3
TECHNICAL
DRAWING
Perform freehand (sketching)
K04-01-14 techniques
04.02 2/3
04.03 3/3
05.02 2/3
TAMAT
Fabrication process
05.03 3/3
K04 DIPLOMA TEKNOLOGI JAMINAN KUALITI SEMESTER 2
MULA
Identify Testing Method and Equipment
01.01 1/4
TESTING AND
Carry Out Destructive Testing
INSPECTION
01.02 2/4
K04-02-11
01.04 4/4
03.01 1/3
DIMENSIONAL
TECHNOLOGY Execute Metrology Works and Activities
03.03 3/3
B
B
04.01 1/3
05.03 3/4
05.04 4/4
06.01 1/3
MULA
Determine overall safety, health and
environment parameters
01.01 1/4
OCCUPATIONAL SAFETY
AND HEALTH Promote safety, health and
environmental practice awareness
K04-03-11
01.02 2/4
01.03 4/4
1/4
QUALITY SYSTEM
Check record control handling result
and activities
K04-03-12
02.01 2/4
02.02 4/4
03.02 2/2
ADVANCED METROLOGY
05.01 1/2
K04-03-15
Conduct three-dimensional (3d)
measurement
05.02 2/2
D
D
CNC PRGRAMMING
06.01 1/2
K04-03-16
Conduct three-dimensional (3d)
measurement
06.02 2/2
TAMAT
K04 DIPLOMA TEKNOLOGI JAMINAN KUALITI SEMESTER 4
MULA
MEASURING CALIBRATION
01.01 1/2
K04-04-11
Conduct calibration
01.02 2/2
02.03 4/4
02.04 4/4
E
Confirm process, product, method,
E assessment of non conformity
03.01 1/4
03.03 4/4
04.02 2/5
Execute non-conformance
product/process non-conformance
control requirements
04.04 4/5
F
Conduct corrective action
04.05 5/5
F Identify activities of CQI programme
05.01 1/4
05.03 4/4
05.04 4/4
06.03 4/4
06.04 4/4
TAMAT
K04 DIPLOMA TEKNOLOGI JAMINAN KUALITI SEMESTER 5
01.01 1/4
02.01 1/3
MEASUREMENT SYSTEM
ANALYSIS (MSA) Execute MSA Activities
02.02 2/3
K04-05-12
H
H
Identify Types of Audit
03.01 1/4
03.02 2/4
K04-05-13
03.03 3/4
03.04 4/4
04.01 1/4
PRODUCT QUALITY
PLANNING Prepare Planning Critical Control Point
Establishment
K04-05-14
04.02 2/4
04.03 3/4
05.01 1/4
05.03 3/4
05.04 4/4
06.01 1/4
FUNDAMENTAL OF
EXPERIMENTAL DESIGN Confirm PDCA and terminology
(DOE)
06.03 3/4
06.04 4/4
TAMAT
CODE
C01L2
COCU
CU. WA
CO CU
PROCESS
PRODUCT/
INSPECTION
inspection
inspection
inspection
requirements
and guideline
TASK
inspection tools,
Identify incoming
quality inspection
Conduct outgoing
Conduct sampling
Conduct incoming
Execute in process
inspection activities
MODULE CODE
incoming inspection
Prepare incoming, in
process and outgoing
WORK ACTIVITIES/
equipment, procedure
inspection procedures
Identify product/process
MODULE NAME
NO.
WORK
C01.08
C01.07
C01.06
C01.05
C01.04
C01.03
C01.02
C01.01
ACTIVITIES
METROLOGY &
K04-01-11
MEASUREMENT
3.3 MAPPING CHART : NOSS VERSUS JTM MODULE (Whole Semester)
K04-04-16 SUPERVISORY
C03L2
COCU
CU. WA
T
CO CU
QUALITY
PROCESS
HANDLING
EQUIPMENT
area
(scope)
activities
Confirm
improvement
MEASURING requirements
categorization
TASK
improvement field
improvement tools
Identify measuring
improvement result
Prepare measuring
scheme suggestion
equipment handling
inspection activities
MODULE CODE
Implement in process
Confirm improvement
Select process quality
improvement activities
Report process quality
Identify process quality
WORK ACTIVITIES/
Contribute in employee
C03.02
C03.01
C02.08
C02.07
C02.06
C02.05
C02.04
C02.03
C02.02
C02.01
C01.10
C01.09
ACTIVITIES
METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-04-16 SUPERVISORY
C01L3
COCU
CU. WA
N
CO CU
QUALITY
STANDARD
OPERATING
ASSURANCE
PROCEDURE
PREPARATIO
result
checklist
information
requirement
work activities
work activities
TASK
testing procedure
testing procedure
testing procedure
preparation result
Record measuring
checklist based on
Confirm measuring
Develop inspection
Execute measuring
equipment handling
preparation activities
MODULE CODE
C01.06
C01.05
C01.04
C01.03
C01.02
C01.01
C03.05
C03.04
C03.03
ACTIVITIES
METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-04-16 SUPERVISORY
C04L3
C03L3
C02L3
COCU
CU. WA
(SPC)
CO CU
RECORD
PROCESS
CONTROL
CONTROL
APPLICATION
activities
document
procedures
identification
Apply record
CALIBRATION requirements
requirements
requirements
control points
handling result
TASK
handling requirement
Report SPC activities
C02.03
C04.01
C03.06
C03.05
C03.04
C03.03
C03.02
C03.01
C02.06
C02.05
C02.04
C02.02
C02.01
ACTIVITIES
METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-04-16 SUPERVISORY
T
CO CU
QUALITY
result
activities
activities
calibration
and equipments
Report measuring
equipment calibration
equipment calibration
equipment calibration
measuring equipment
Prepare work area for
tools and equipments
improvement activities
improvement activities
improvement activities
WORK ACTIVITIES/
C05.05
C05.04
C05.03
C05.02
C05.01
C04.06
C04.05
C04.04
C04.03
C04.02
ACTIVITIES
METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-04-16 SUPERVISORY
C07L3
COCU
CU. WA
NON-
CO CU
QUALITY
PROCESS
PRODUCT
CE CONTROL
meeting
activities
Segregate
effectiveness
C06L3 CONFORMAN requirements
TASK
product/process
nonconformance
Determine quality
acceptance due to
acceptance criteria
product disposition
control parts activity
Plan nonconformance
nonconformance control
nonconformance control
acceptance requirements
Conduct corrective action
Execute nonconformance
NO. MODULE NAME
WORK
C07.03
C07.02
C07.01
C06.07
C06.06
C06.05
C06.04
C06.03
C06.02
C06.01
ACTIVITIES
METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-04-16 SUPERVISORY
C08L3
COCU
CU. WA
CO CU
SURVEY
FEEDBACK/
CUSTOMER
RESPONSE/
SUPERVISOR
forms
test index
survey result
administrative
survey activity
test index result
Identify process
TASK
survey activities
Report customer
and specification
Identify customer
Identified process
survey result/data
Prepare customer
Execute customer
Analysis customer
feedback/response/
feedback/response/
feedback/response/
feedback/response/
feedback/response/
survey requirements
acceptance activities
supervision requirement
deviation calculated and
NO. MODULE NAME
WORK
C09.02
C09.01
C08.05
C08.04
C08.03
C08.02
C08.01
C07.06
C07.05
C07.04
ACTIVITIES
METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-04-16 SUPERVISORY
C01L4
COCU
CU. WA
NT
CO CU
CUSTOMER
ESTABLISHME
SUPERVISION
appraisal
accidents
parameters
specification
specification
TASK
requirements and
Confirm industrial
WORK PLACE and environmental
Evaluate customer
Report supervision
place environmental
MODULE CODE
Administer personnel
requirement fulfillment
SAFETY AT Promote safety, health
WORK ACTIVITIES/
administrative activities
specification guidelines
Identify customer needs,
Conduct section meeting
C01.04
C01.03
C01.02
C01.01
C10.04
C10.03
C10.02
C10.01
C09.06
C09.05
C09.04
C09.03
ACTIVITIES
METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-04-16 SUPERVISORY
C03L4
C02L4
COCU
CU. WA
ENT
PLAN
RING/
CO CU
SYSTEM
AUDITING
CONTROL
PRODUCT
ESTABLISHM
plan
point
activities
(CTQ) point
and checklist
establishment
completeness
Report customer
TASK
and requirement
plan requirement
plan development
requirement activities
MODULE CODE
C03.06
C03.05
C03.04
C03.03
C03.02
C03.01
C02.07
C02.06
C02.05
C02.04
C02.03
C02.02
C02.01
C01.05
ACTIVITIES
METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-04-16 SUPERVISORY
C05L4
C04L4
COCU
CU. WA
(MSA)
CO CU
NT (CQI)
ANALYSIS
S QUALITY
IMPROVEME
CONTINUOU (VA/VE)
activities
programme
Identify MSA
improvement
NT SYSTEM requirements
Report quality
Identify quality
Prepare quality
TASK
Organize quality
Value Engineering
Experiment (DOE)
Conduct Design of
Deployment (QFD)
process capabilities
improvement activities
improvement guidelines
C05.03
C05.02
C05.01
C04.09
C04.08
C04.07
C04.06
C04.05
C04.04
C04.03
C04.02
C04.01
C03.07
ACTIVITIES
METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-04-16 SUPERVISORY
C07L4
COCU
CU. WA
NON
CO CU
ANALYSIS
FEEDBACK
CUSTOMER
C06L5 CONFORMITY
feedback
uncertainty
assessment
TASK
Identify customer
Preventive Action
Analyze customer
assessment result
information/survey
feedback category
customer feedback
assessment finding
Identify process non
MODULE CODE
feedback rectification
(CAPA) effectiveness
Report MSA activities
C06.01
C07.05
C07.04
C07.03
C07.02
C07.01
C06.06
C06.05
C06.04
C06.03
C06.02
C05.05
C05.04
ACTIVITIES
METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-04-16 SUPERVISORY
C09L4
C08L4
COCU
CU. WA
(SPC)
CO CU
QUALITY
ANALYSIS
PROCESS
CONTROL
CONTROL
DOCUMENT
STATISTICAL
activities
activities
Identify SPC
requirements
Execute quality
TASK
Evaluate process
document control
document control
document control
document control
coordination work
coordination work
assurance document
feedback satisfaction
characteristic/parameter
feedback analysis timely
coordination requirement
NO. MODULE NAME
WORK
C09.04
C09.03
C09.02
C09.01
C08.05
C08.04
C08.03
C08.02
C08.01
C07.07
C07.06
ACTIVITIES
METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-04-16 SUPERVISORY
E01L4
C10L4
COCU
CU. WA
CO CU
QUALITY
LIABILITY
ANALYSIS
PRODUCT
SUPPLIER
action
analysis
assessment
Report SPC
Plan supplier
Report supplier
Identify supplier
TASK
Evaluate supplier
services activities
Confirm method of
performance quality
performance activity
product containment
MODULE CODE
services requirement
performance activities
effectiveness corrective
C09.05
C011.06
C011.05
C011.04
C011.03
C011.02
C011.01
C010.06
C010.05
C010.03
C010.02
C010.01
C010.04
ACTIVITIES
METROLOGY &
K04-01-11
MEASUREMENT
K04-01-12 PRODUCT INSPECTION
K04-04-16 SUPERVISORY
Prepare incoming, in
Identify
PRODUCT / Identify incoming process and outgoing Set work area for
product/process Conduct incoming
PROCESS inspection activities inspection tools, incoming
inspection inspection
INSPECTION requirements equipment, procedure inspection
procedures
and guideline
C01 01 L2 02 L2 03 L2 04 L2 05 L2
06 L2 07 L2 08 L2 09 L2 10 L2
C02 01 L2 02 L2 03 L2 04 L2 05 L2
06 L2 07 L2 08 L2
Record measuring
MEASURING Identify measuring Prepare measuring Execute measuring Confirm measuring
equipment
EQUIPMENT equipment handling equipment handling equipment handling equipment handling
handling work
HANDLING requirements work activities work activities result
activities
C03 01 L2 02 L2 03 L2 04 L2 05 L2
E01 01 L2 02 L2 03 L2
E02 01 L2 02 L2 03 L2
4.2 TRAINING PATHWAY CHART SEMESTER 1
MULA
Identify one dimensional (1D)
measuring equipment
01.01 1/4
01.03 3/4
01.04 4/4
02.01 1/4
02.03 3/4
A
Confirm and report process quality
improvement result and activities
02.04 4/4
A Identify process quality improvement
03.01 1/3
INTRODUCTION TO
QUALITY Execute process quality improvement
K04-01-13
03.02 2/3
03.03 3/3
04.01 1/3
TECHNICAL
DRAWING
Perform freehand (sketching)
K04-01-14 techniques
04.02 2/3
04.03 3/3
05.02 2/3
TAMAT
Fabrication process
05.03 3/3
4.3 MAPPING CHART
INTRODUCTION TO QUALITY
WORKSHOP TECHNOLOGY
TAJUK MODUL
(JTM)
PRODUCT INSPECTION
TECHNICAL DRAWING
PROFIL PEKERJAAN
(NOSS)
MODUL 1
MODUL 2
MODUL 3
MODUL 4
MODUL 5
COCU NO.
CU/DUTI WORK ACTIVITIES/TASK
CODE TASK
Identify incoming
inspection activities C01.01
requirements
Identify product/process
C01.02
inspection procedures
Prepare incoming, in
process and outgoing
C01.03
inspection tools, equipment,
procedure and guideline
PRODUCT/
C01L2 PROCESS Set work area for incoming
C01.04
INSPECTION inspection
Conduct incoming
C01.05
inspection
Execute in process
C01.06
inspection
Confirm product/process
C01.09
inspection result
INTRODUCTION TO QUALITY
WORKSHOP TECHNOLOGY
TAJUK MODUL
(JTM)
PRODUCT INSPECTION
TECHNICAL DRAWING
PROFIL PEKERJAAN
(NOSS)
MODUL 1
MODUL 2
MODUL 3
MODUL 4
MODUL 5
COCU NO.
CU/DUTI WORK ACTIVITIES/TASK
CODE TASK
Implement in process
C02.03
improvement
Contribute in employee
C02.06
scheme suggestion
Confirm process quality
C02.07
improvement result
Report process quality
C02.08
improvement activities
Identify measuring
equipment handling C03.01
requirements
Prepare measuring
equipment handling work C03.02
activities
MEASURING Execute measuring
C03L2 EQUIPMENT C03.03
equipment handling work
HANDLING activities
Confirm measuring
C03.04
equipment handling result
Record measuring
equipment handling work C03.05
activities
4.4 TABLE OF CONTACT HOURS DISTRIBUTION
CORE ABILITIES 27 - - - -
KK-1071 KO-KURIKULUM 1 - 27 HW
JUMLAH LATIHAN (SUBJEK UMUM) 162 27 5
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 30Hrs
Course : QUALITY ASSURANCE TECHNOLOGY Practical Hours : 50Hrs
Semester : 1 Total Hours : 80Hrs
NOSS Code : MC-041-1-C03 Credit Hours :3
Terminal Performance Objective:
Perform basic metrology and measurement activities by using various types of measuring tools, equipment and techniques, handle measuring
equipment and keep measuring equipment safe so that the measurement of product can be obtained, technique of handling equipment and can be
performed, and the measurement tools accuracy can be confirmed in accordance with the specification and standard requirement.
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C03.01, C03.02, C03.03, C03.04, C03.05 / L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C03.01, C03.02, C03.03, C03.04, C03.05 / L2
WIM
Learning Activities
L WT IS
AS
2.1 Measuring equipment availability 7
2.2 Measuring equipment standard
2.3 Measuring equipment handling work activities master
schedule
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C03.01, C03.02, C03.03, C03.04, C03.05 / L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C03.01, C03.02, C03.03, C03.04, C03.05 / L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C01.01, C01.02, C01.3, C01.4, C01.5, C01.06, C01.07, C01.8, C01.9, C01.10 / L2
WIM
Learning Activities
LA 1. IDENTIFY PROCESS INSPECTION ACTIVITIES REQUIREMENT AND PROCEDURES (C01.01, C01.02 / L2)
6 L WT IS
1.1 Incoming material requirements AS
1.2 Product specifications
1.3 Incoming inspection work scope and workflow
Purposes of product/process procedure
1.4 Applicable product/process inspection procedure
1.5 Product/process inspection sheet
K04-01-12 PRODUCT INSPECTION
Module :
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C01.01, C01.02, C01.3, C01.4, C01.5, C01.06, C01.07, C01.8, C01.9, C01.10 / L2
WIM
Learning Activities
LA 2. PREPARE INCOMING, INPROCESS AND OUTGOING INSPECTION TOOLS (1.03, 1.04 / L2)
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C01.01, C01.02, C01.3, C01.4, C01.5, C01.06, C01.07, C01.8, C01.9, C01.10 / L2
WIM
Learning Activities
LA 3. CONDUCT QUALITY INSPECTION AND SAMPLING (C01.05, C01.06, C01.07, C01.08 / L2)
12 L WT IS
3.1 Product measurement tolerance AS
3.2 Type of product defects
3.3 Segregation of raw material
3.4 Labeling of incoming material
3.5 Inspection of material condition
3.6 Procedure of measuring product dimension
3.7 Technique of product dimension
3.8 Inspection check sheet
K04-01-12 PRODUCT INSPECTION
Module :
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C01.01, C01.02, C01.3, C01.4, C01.5, C01.06, C01.07, C01.8, C01.9, C01.10 / L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C01.01, C01.02, C01.3, C01.4, C01.5, C01.06, C01.07, C01.8, C01.9, C01.10 / L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C01.01, C01.02, C01.3, C01.4, C01.5, C01.06, C01.07, C01.8, C01.9, C01.10 / L2
WIM
Learning Activities
1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-
87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook,
ISBN 0-02-916682-9
Reference Books (Tittle, Atr, Publisher) :
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN
0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Jurans Quality Control Handbook, ISBN 0-
07-033176-6
Manuals :
Core Ability
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 30Hrs
Course : QUALITY ASSURANCE TECHNOLOGY Practical Hours : 51Hrs
Semester : 1 Total Hours : 81Hrs
NOSS Code : MC-041-1-C01 Credit Hours :3
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.3, C02.4, C02.5, C02.6, C02.7, C02.8 / L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.3, C02.4, C02.5, C02.6, C02.7, C02.8 / L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.3, C02.4, C02.5, C02.6, C02.7, C02.8 / L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.3, C02.4, C02.5, C02.6, C02.7, C02.8 / L2
WIM
Learning Activities
1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-
0-87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook,
ISBN 0-02-916682-9
Reference Books (Tittle, Atr, Publisher) :
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way,
ISBN 0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Jurans Quality Control Handbook, ISBN
0-07-033176-6
Manuals :
Core Ability
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 23Hrs
Course : QUALITY ASSURANCE TECHNOLOGY Practical Hours : 31Hrs
Semester : 1 Total Hours : 54Hrs
NOSS Code : MC-041-1-E01 Credit Hours :2
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E01.01, E01.02, E01.03 / L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E01.01, E01.02, E01.03 / L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E01.01, E01.02, E01.03 / L2
WIM
Learning Activities
4.0
2.1 Basic sketching tools
L WT IS
2.2 Freehand and measured sketch techniques.
AS
2.3 Sketch parallel, perpendicular and evenly 7
spaced line.
2.4 Sketch a circle and arc.
2.5 Use sketching techniques to keep the sketch
D PT WS
Proportionate.
2.6 Sketch an object on isometric grid paper.
2.7 Sketch the primary views of an orthographic
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E01.01, E01.02, E01.03 / L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E01.01, E01.02, E01.03 / L2
WIM
Learning Activities
D PT WS
3.8 Apply views creating technique
3.9 Interpret data
3.9.1 3D data
3.9.2 Drawing sheet
3.9.3 Real object
3.10 Apply isometric drawing method.
3.11 Apply isometric drawing techniques.
Total Hours 23 30
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E02.01, E02.02, E02.03/L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E02.01, E02.02, E02.03/L2
WIM
Learning Activities
2.1 Introduction 7 L WT IS
2.2 Classification of materials AS
K04-01-15 WORKSHOP TECHNOLOGY
Module :
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E02.01, E02.02, E02.03/L2
WIM
Learning Activities
3.1 Introduction 10
3.2 Basic fabrication
3.3 Classifications of welding
3.4 Commonly welded base metals
3.5 Advantages and disadvantages of welding
3.6 Welding as compared to riveting and casting
K04-01-15 WORKSHOP TECHNOLOGY
Module :
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E02.01, E02.02, E02.03/L2
WIM
Learning Activities
E03 01 L2 02 L2 03 L2
Identify Geometrical
ENGINEERING Construct details Execute Detail
Dimensional Record Drawing
DRAWING drawing Drawing
Tolerance Activities
E04 01 L2 02 L2 03 L2 04 L2
E05 01 L2 02 L2 03 L2
ELECTRICAL &
Identify Electric and Execute Electric and Record Electric and
ELECTRONIC
Electronic Electronic Electronic
PRINCIPLES
E06 01 L2 02 L2 03 L2
QUALITY
ASSURANCE Identify inspection & Confirm inspection
Plan inspection & Develop inspection Summaries
STANDARD testing procedure & testing procedure
testing procedure checklist based on inspection
OPERATING preparation preparation result
preparation checklist requirement information
PROCEDURE requirements
PREPARATION
C01 01 L3 02 L3 03 L3 04 L3 05 L3
STATISTICAL
Identify (SPC) Establish statistical Confirm SPC result
PROCESS Plan SPC application
application Apply SPC tools control points
CONTROL (SPC) procedures
requirements requirements
APPLICATION
C02 01 L3 02 L3 03 L3 04 L3 05 L3
Report SPC
activities
06 L3
4.2 TRAINING PATHWAY CHART SEMESTER 2
MULA
Identify Testing Method and Equipment
01.01 1/4
TESTING AND
Carry Out Destructive Testing
INSPECTION
01.02 2/4
K04-02-11
01.04 4/4
03.01 1/3
DIMENSIONAL
TECHNOLOGY Execute Metrology Works and Activities
03.03 3/3
B
B
04.01 1/3
05.03 3/4
05.04 4/4
06.01 1/3
INTRODUCTION TO STATISTICAL
SILIBUS
DIMENSIONAL METROLOGY
TESTING AND INSPECTION
TAJUK MODUL
MACHINING PROCESS
PROFIL PEKERJAAN
(NOSS)
MODUL 1
MODUL 2
MODUL 3
MODUL 4
MODUL 5
MODUL 6
NO.
NO DUTI CU/DUTI WORK ACTIVITIES/TASK
TASK
INTRODUCTION TO STATISTICAL
K04-02-12 22 32 0.6 1.4 2 2
PROCESS CONTROL (SPC)
CORE ABILITIES 27 - - - - -
KK 2071 CO-CURICULUM 2 - 27 HW
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 31 Hrs
Course : QUALITY ASSURANCE Practical Hours : 50 Hrs
Semester : 2 Total Hours : 81 Hrs
NOSS Code : MC-041-2 Credit Hours :3
Terminal Performance Objective:
Perform Testing and Inspection using various method of analysis , test standard and appropriate testing equipment and procedure so that appropriate
testing method can be determined, interpretation of results meet the required standard and the recommend action according to the standard
requirement and SOP.
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C01/L3, C01.01, C01.02, C01.03, C01.04, C01.05, C01.06
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C01/L3, C01.01, C01.02, C01.03, C01.04, C01.05, C01.06
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C01/L3, C01.01, C01.02, C01.03, C01.04, C01.05, C01.06
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C01/L3, C01.01, C01.02, C01.03, C01.04, C01.05, C01.06
WIM
Learning Activities
Total Hours 31 50
Eddy current test equipment, Copland, Calibration block, Test procedure, Code and standard, Cleaning
Tools/ Equipment/ Materials :
material, Test pieces, Checklist
1) Analysis of Stress and Deformation, Introduction To Contact Mechanics, Elastic Indentation Stress
Fields, Chapter 5, pp. 116-117.(Not Prior Art Based on Date).
2) S.P. Timoshenko and J.N. Goodier, The Propagation of Waves in Elastic Solid Media, Theory of
Elasticity, Third Edition, Chapter 14, pp. 485-504.
3) H. Kolsky, Plastic Waves and Shock Waves, Stress Waves in Solids, Chapter VII, pp. 163-182.
Reference Books (Title, Atr, Publisher) : 4) Antonio C. Rufin, ASME (Jun. 1-4, 1992), Extending the Fatigue Life of Aircraft Engine Components
by Hole Cold Expansion Technology, International Gas Turbine and Aeroengine Congress and
Exposition, Cologne, Germany, (9 pages).
5) Joseph L. Phillips, (Oct. 16-18, 1973), Fatigue Improvement by Sleeve Coldworking, National
Aerospace Engineering and Manufacturing Meeting, Los Angeles, California, (13 pages).
1. BS 5166: 1974, Method for Metallographic Replica Technique Of Surface Examination (= ISO 3057
: 1074), British Standard Institution, London.
2. BS 5289: 1983, Code of Practice, Visual Inspection of Fusion Weld Joints, British Standard
Manuals :
Institution, London.
3. BS 5165: 1974, Guide to the Selection of Low-Power Magnifiers Used In Visual Inspection, British
Standard Institution, London.
Core abilities :
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 22 Hrs
Course : QUALITY ASSURANCE Practical Hours : 32 Hrs
Semester : 2 Total Hours : 54 Hrs
NOSS Code : MC-041-2-C02 Credit Hours :2
Apply statistical technique using various quality tools and document so that manufacturing process implemented in accordance with quality
improvement guidelines.
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C02/L3, C02.01, C02.02, C02.03, C02.05, C02.06
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C02/L3, C02.01, C02.02, C02.03, C02.05, C02.06
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C02/L3, C02.01, C02.02, C02.03, C02.05, C02.06
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C02/L3, C02.01, C02.02, C02.03, C02.05, C02.06
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C02/L3, C02.01, C02.02, C02.03, C02.05, C02.06
WIM
Learning Activities
Total Hours 22 32
1. Graph paper
Tools/ Equipment/ Materials :
2. TQM Handbooks
1. Total Quality Management, S. Rajaram Dreamtech Press, 2008, R. S. Naagarazan-New Age
International, 2005
Reference Books (Tittle, Atr, 2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook, ISBN
Publisher) : 0-02-916682-9
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN 0-13-
952433-9
Manuals : Reference Manuals
Core Abilities :
SYLLABUS PROFILE
Perform metrology activities and works using non contact measuring instrument, two dimensional, various type of pneumatic gauges, manual,
standard and schedule so that the actual profile, size and measurement of component is obtained as per specification, the measuring tools accuracy
meets the standard requirement and the machine tools calibration activities can be carried out according to the standard requirement.
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E01.01, E01.02, E01.03/L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
1.16. CU.WA No./ Level : E01.01, E01.02, E01.03/L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
1.17. CU.WA No./ Level : E01.01, E01.02, E01.03/L2
WIM
Learning Activities
Total Hours 30 51
1. Profile Projector
2. Toolmaker Microscope
3. Laser Auto Clinometers
4. Laser Dimension Sensor
5. Optical Projector
Tools/ Equipment/ Materials : 6. Surface Texture Instrument
7. Roundness Measuring Machine
8. Contour Tracing Machine
9. Pneumatic gauge and accessories
10. Electro-Pneumatic Gauge
11. CMM (2D measurement only)
1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-87389-
745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook, ISBN 0-
Reference Books (Tittle, Atr, 02-916682-9
Publisher) : 3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN 0-13-
952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Jurans Quality Control Handbook, ISBN 0-07-
033176-6
Manuals :
Core Abilities :
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 22Hrs
Course : QUALITY ASSURANCE Practical Hours : 32Hrs
Semester : 2 Total Hours : 54Hrs
NOSS Code : MC-041-1-E02 Credit Hours :2
Perform basic machining using lathe, milling and grinding machine and other related equipment so that the cutting tools technology are applied, basic
turning operation, basic milling operation and basic grinding operation are carried out according to specifications.
Delivery Methods
Module : K04-02-14 MACHINING PROCESS
Assessment
Methods
CU.WA No./ Level : E02.01, E02.02, E02.03/L2
WIM
Learning Activities
Assessment
Methods
CU.WA No./ Level : E02.01, E02.02, E02.03/L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E02.01, E02.02, E02.03/L2
WIM
Learning Activities
Total Hours 22 32
1. Lathe machine and accessories
2. Milling machine and accessories
3. Grinding machine and accessories
4. Grinding wheel
Tools/ Equipment/ Materials : 5. Safety gears
6. Holder
7. Tool bit
8. Blueprint
9. Work piece
1. Manufacturing Processes & Systems 9th Edition Philip F Ostwald and Jairo Munoz ISBN 0-
471-04741-4, Chapter 9 Page 205 to 222, Chapter 11 Page 223 to 257, Chapter 12 Page 263
to 284.
2. Processes and Material of Manufacture 4th Edition (1990) Roy A. Lindberg ISBN 0-205-11817
8 Chapter 6 Pages 234 to 263, Chapter 8 Page 305 to 345, and Chapter 9 Page 347 to 389.
Reference Books (Title, Atr, Publisher) : 3. Material and Processes in Manufacturing 5th Edition (1979), E Paul Degarmo ISBN 0 02
978760 2 Part 3 Page 583 to to 635, Page 647 to 673.
4. S.Kalpakjian Steven R.Schnid. Manufacturing Engineering and Technology (4th Edition).
Prentice Hall Int.Inc. (2001). ISBN0-210-36131-0.
5. Advanced Manufacturing Technology TH Allegri, P.E ISBN 0-8306-2746-4.
6. Grinding Operating Manual Model Kuroda GS-64NC.
Manuals :
Core Abilities :
SYLLABUS PROFILE
Course Code : K04 Theory Hours :22Hrs
Course : QUALITY ASSURANCE Practical Hours :32Hrs
Semester : 2 Total Hours :54 Hrs
NOSS Code : MC-041-1-E03 Credit Hours :2
Terminal Performance Objective:
Perform drawing activities including draw part, detail and assembly drawing using stationeries, drawing folder, client standard, work instructions,
instrument diagram, office equipment, CAD software, computer and plotter so that the actual geometrical dimensional tolerance and allowances
requirement for a given work can identified and interpreted, 2D and 3D drawing are construction and printer out according to the sizes for intended
use.
Module 1.18.
: K04-02-15 ENGINEERING DRAWING
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E03.01, E03.02, E03.03, E03.04/L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E03.01, E03.02, E03.03, E03.04/L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E03.01, E03.02, E03.03, E03.04/L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E03.01, E03.02, E03.03, E03.04/L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E03.01, E03.02, E03.03, E03.04/L2
WIM
Learning Activities
TOTAL HOURS 22 32
Tools/ Equipment/ Materials : Computer with CAD System, plotter, paper, CAD instruction manual
The Geometrical Toleance Desk Reference, Paul Green / 13th Edition Technical Drawing, Pearson
Reference Books (Title, Atr, Publisher) :
International Edition
Manuals :
Core Abilities:
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 22 Hrs.
Course : QUALITY ASSURANCE Practical Hours : 32Hrs.
Semester : 2 Total Hours : 54 Hrs.
NOSS Code : MC-041-1-E04 Credit Hours :2
Carry out fundamental electrical and electronic testing using test equipment so that the product will meet standard requirement.
Module 1.19.
: K04-02-16 ELECTRIC & ELECTRONIC
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E04.01, E04.02, E04.03/L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E04.01, E04.02, E04.03/L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E04.01, E04.02, E04.03/L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E04.01, E04.02, E04.03/L2
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E04.01, E04.02, E04.03/L2
WIM
Learning Activities
22 32
1. Resistors, Capacitors, Inductors, Power supply unit, Function generator, Breadboard, Wires,
Multimeter, Oscilloscope, Circuit diagram, Semiconductor passive and active component
2. Etching solution, PCB transfer (including etching pen), Drilling tool and accessories, Lacquer,
Tools/ Equipment/ Materials :
Etching tray, Solder and disolder tools and accessories, Pliers, PCB processor, Cutters, Tweezers
3. Voltmeter, Ammeter, Ohmmeter, Analogue multimeter, Digital multimeter, Wattmeter, Galvano meter,
Oscilloscope and Frequency counter.
1. Zam Zam Khairani, Prinsip Elektrik, IBS Sdn Bhd, ISBN 967-950-082-9.
2. Thomas L. Floyd, Electronics Fundamentals, Circuits, Devices and Application Prentice Hall
Reference Books (Title, Atr, Publisher) : International, ISBN 0-13-758434-2.
3. William David Cooper, Electronic Instrumentation and measurement Techniques, Prentice Hall
International, ISBN 0-13-251801-5.
Manuals :
Core Abilities:
SEMESTER 3
4.1 COMPETENCY PROFILE CHART
C03 01 L3 02 L3 03 L3 04 L3 05 L3
Record control
handling activities
06 L3
Identify measuring
MEASURING Prepare measuring Prepare work area Confirm measuring
equipment Execute calibration
EQUIPMENT equipment calibration for measuring equipment
calibration activities
CALIBRATION tools and equipments equipment calibration calibration result
requirements
C04 01 L3 02 L3 03 L3 04 L3 05 L3
Report measuring
equipment
calibration activities
06 L3
Check shopfloor
SHOP FLOOR Identify shop floor Prepare shopfloor Execute shopfloor Report shopfloor
quality
QUALITY quality improvement quality improvement improvement quality
improvement
IMPROVEMENT requirements tools and equipments activities improvement
activities
activities
C05 01 L3 02 L3 03 L3 04 L3 05 L3
E01 01 L3 02 L3
C03 01 L4 02 L4 03 L4 04 L4 05 L4
Evaluate audit
Report of auditing
finding completion
activities
and accuracy
06 L4 07 L4
Execute Value
CONTINUOUS Identify quality Prepare quality
Identify activities of Added Value Review product and
QUALITY CQI programme
improvement improvement plan
Engineering process capabilities
IMPROVEMENT (CQI) guidelines activity
(VA/VE)
C04 01 L4 02 L4 03 L4 04 L4 05 L4
06 L4 07 L4 08 L4 09 L4
Identify process non Confirm method of Classify non Confirm product Evaluate non
NON CONFORMITY
conformity non conformity conformity non conformity conformity
ASSESSMENT
assessment assessment assessment assessment assessment result
C06 01 L4 02 L4 03 L4 04 L4 05 L4
Report non
conformity
assessment finding
06 L4
Evaluate Corrective
CUSTOMER Plan method of Analyse customer Propose problem
Identify customer and Preventive
FEEDBACK feedback category
customer feedback feedback solving customer
Action (CAPA)
ANALYSIS rectification information/survey feedback
effectiveness
C07 01 L4 02 L4 03 L4 04 L4 05 L4
06 L4 07 L4
C08 01 L4 02 L4 03 L4 04 L4 05 L4
4.2 TRAINING PATHWAY CHART
MULA
Determine overall safety, health and
environment parameters
01.01 1/4
OCCUPATIONAL SAFETY
AND HEALTH Promote safety, health and
environmental practice awareness
K04-03-11
01.02 2/4
01.03 4/4
1/4
QUALITY SYSTEM
Check record control handling result
and activities
K04-03-12
02.01 2/4
02.02 4/4
02.03 4/4
C
C
03.02 2/2
04.04 4/4
ADVANCED METROLOGY
05.01 1/2
K04-03-15
Conduct three-dimensional (3d)
measurement
05.02 2/2
D
4.3 MAPPING CHART
INDUSTRIAL MANAGEMENT
ADVANCED METROLOGY
PROJECT MANAGEMENT
SILIBUS
TAJUK MODUL
CNC PROGRAMMING
(JTM)
QUALITY SYSTEM
HEALTH
PROFIL PEKERJAAN
(NOSS)
MODUL 1
MODUL 2
MODUL 3
MODUL 4
MODUL 5
MODUL 6
NO
CU/DUTI WORK ACTIVITIES/TASK NO. WA
DUTI
INDUSTRIAL MANAGEMENT
ADVANCED METROLOGY
PROJECT MANAGEMENT
SILIBUS
TAJUK MODUL
CNC PROGRAMMING
(JTM)
QUALITY SYSTEM
HEALTH
PROFIL PEKERJAAN
(NOSS)
MODUL 1
MODUL 2
MODUL 3
MODUL 4
MODUL 5
MODUL 6
NO
CU/DUTI WORK ACTIVITIES/TASK NO. WA
DUTI
INDUSTRIAL MANAGEMENT
ADVANCED METROLOGY
PROJECT MANAGEMENT
SILIBUS
TAJUK MODUL
CNC PROGRAMMING
(JTM)
QUALITY SYSTEM
HEALTH
PROFIL PEKERJAAN
(NOSS)
MODUL 1
MODUL 2
MODUL 3
MODUL 4
MODUL 5
MODUL 6
NO WORK
CU/DUTI NO. WA
DUTI ACTIVITIES/TASK
Execute quality
QUALITY ASSURANCE assurance document
C08.03
8 DOCUMENT CONTROL control activities
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 22Hrs.
Course : QUALITY ASSURANCE Practical HOURS : 32Hrs.
Semester : 3 Total Hours : 54Hrs.
NOSS Code : MC-041-3-C10 Credit Hours :2
Terminal Performance Objective :
Organize Industrial Safety, Health And Environment (SHE) activity using SHE standard, company guideline and audit plan so that industrial accidents
can be prevented, the parameters are continuously adhered and improved and awareness on SHE will be improved.
Delivery Methods
Assessment
Methods
CU.WA No./ Level : CU10.01/L3, CU10.02/L3, CU10.03/L3, CU10.4/L3
WIM
Learning Activities
7
L WT IS
1.1 Department safety needs
AS
1.2 Department OHSAS 18001 factors
1.3 OHSAS 18001 instruction /manual OHSAS 18001
parameter
K04-03-11 OCCUPATIONAL SAFETY AND HEALTH
Module :
Delivery Methods
Assessment
Methods
CU.WA No./ Level : CU10.01/L3, CU10.02/L3, CU10.03/L3, CU10.4/L3
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : CU10.01/L3, CU10.02/L3, CU10.03/L3, CU10.4/L3
WIM
Learning Activities
5
3.4 Obtain occupational safety accidents
information
3.5 Classify type of accidents
3.6 Brainstorm on probable causes D PT WS
3.7 Present industrial accident report
1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-87389-745-7
References: (3-5 references, valid yrs 2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook, ISBN 0-02-916682-9
5)
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN 0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Jurans Quality Control Handbook, ISBN 0-07-033176-6
Manuals :
Core Ability :
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 22 Hrs.
Course : QUALITY ASSURANCE Practical HOURS : 32 Hrs.
Semester : 3 Total Hours : 54Hrs.
NOSS Code : MC-041-3-C3/L3, C8/L4 Credit Hours :2
Terminal Performance Objective :
Manage document and record control using standard operation procedure, reference standard, check list and check sheet so that document
storage to meet companys Standard Operating Procedure (SOP) and required company quality.
Delivery Methods
Assessment
CU. WA No./ Level: C03.01/L3,C03.02/L3, C03.03/L3, C03.04/L3, C03.05/L3, C03.06/L3, C08.01/L4, C08.02/L4,
Methods
C08.03/L4, C08.04/L4, C08.05/L4
WIM
Learning Activities
LA 1. IDENTIFY RECORD AND DOCUMENT CONTROL HANDLING REQUIREMENT (C03.01/L3, C03.02/L3, C03.03/L3, C03.04/L3, C08.01
/L4)
Delivery Methods
Assessment
CU. WA No./ Level : C03.01/L3,C03.02/L3, C03.03/L3, C03.04/L3, C03.05/L3, C03.06/L3, C08.01/L4, C08.02/L4,
Methods
C08.03/L4, C08.04/L4, C08.05/L4
WIM
Learning Activities
Delivery Methods
Assessment
CU. WA No./ Level : C03.01/L3,C03.02/L3, C03.03/L3, C03.04/L3, C03.05/L3, C03.06/L3, C08.01/L4, C08.02/L4,
Methods
WIM
C08.03/L4, C08.04/L4, C08.05/L4
Learning Activities
Delivery Methods
Assessment
CU. WA No./ Level : C03.01/L3,C03.02/L3, C03.03/L3, C03.04/L3, C03.05/L3, C03.06/L3, C08.01/L4, C08.02/L4,
Methods
WIM
C08.03/L4, C08.04/L4, C08.05/L4
Learning Activities
LA 3. PLAN QUALITY ASSURANCE DOCUMENT CONTROL AND EXECUTE QUALITY ASSURANCE DOCUMENT CONTROL ACTIVITIES
(C08.02 /L4, C08.03 /L4 )
3.1 Document control coordination procedures 6 L WT IS
3.2 Qualified personnel arrangement AS
3.3 Prepare document control work activity facilities
3.4 Document control classification procedure
3.5 Document distribution list
3.6 Quality control document master list
3.7 Document control record status
Delivery Methods
Assessment
CU. WA No./ Level : C03.01/L3,C03.02/L3, C03.03/L3, C03.04/L3, C03.05/L3, C03.06/L3, C08.01/L4, C08.02/L4,
Methods
WIM
C08.03/L4, C08.04/L4, C08.05/L4
Learning Activities
Delivery Methods
Assessment
CU. WA No./ Level : C03.01/L3,C03.02/L3, C03.03/L3, C03.04/L3, C03.05/L3, C03.06/L3, C08.01/L4, C08.02/L4,
Methods
WIM
C08.03/L4, C08.04/L4, C08.05/L4
Learning Activities
Total Hours 22 32
1. Policy standard
2. Reference procedure
3. Computer
4. Work instruction
5. ISO 9000
Tools/ Equipment/ Materials :
6. QS 9000
7. ISO/TSM 16949
8. Gantt Chart
9. Organization structure
10. Business Plan
1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN
978-0-87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive
Reference Books (Tittle, Atr, Publisher) : Handbook, ISBN 0-02-916682-9
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese
Way, ISBN 0-13-952433-9
Manuals :
Core Ability
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 32Hrs.
Course : QUALITY ASSURANCE Practical HOURS : 49Hrs.
Semester : 3 Total Hours :81Hrs.
NOSS Code : E01 Credit Hours :3
Terminal Performance Objective :
Perform industrial management using production and planning control (PPC), process and time study procedure and techniques so that various
production activities is in line with organizational objective.
Delivery Methods
Assessment
Methods
CU. WA No./ Level: E01/L3
WIM
Learning Activities
Assessment Methods
Module :
Delivery Methods
CU. WA No./ Level : E01/L3
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU. WA No./ Level : E01/L3
WIM
Learning Activities
Total Hours 32 49
Analysis Chart and symbols, stop watch, production schedule, data and reference, operation
Tools/ Equipment/ Materials :
management, Handbook, process flow chart
1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-
87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook,
ISBN 0-02-916682-9
Reference Books (Tittle, Atr, Publisher) :
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN
0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Jurans Quality Control Handbook, ISBN 0-
07-033176-6
Manuals :
Core Ability
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 32Hrs.
Course : QUALITY ASSURANCE Practical Hours : 49Hrs.
Semester : SEMESTER 3 Total Hours : 81Hrs.
NOSS Code : MC-041-3-C05 Credit hours :3
Terminal Performance Objective :
Perform and supervise quality improvement project and process activities using references and documented proposal so that the project can be
identified and can be approved, subordinate functions, monitoring of subordinate, develop skills, subordinate training, appraisal of subordinate and
reporting to superior determined according to SOP and able to segregate non-conformance product/process, executing non-conformance product
disposition and conduct corrective action meeting to meet companys requirement.
Assessment
Methods
Methods
Delivery
CU.WA No./ Level :C05 /L3
WIM
Learning Activities
Assessment
Methods
CU.WA No./ Level :C05 /L3
WIM
Learning Activities
10 D PT WS
1.3 Determine improvement area P
1.4 Determine shop floor quality improvement
guidelines
1.5 Determine product requirements
1.6 Refer process flow
1.7 Determine quality improvement target
Assessment
Methods
CU.WA No./ Level :C05 /L3
WIM
Learning Activities
Delivery Methods
Module :
Assessment
Methods
CU.WA No./ Level :C08/L3:
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level :C05 /L3
WIM
Learning Activities
TOTAL HOURS 32 49
1. Computer
2. Software
Tools/ Equipment/ Materials : 3. Customer requirement sheet
4. Measuring and Test Instruments
5. Components/Parts Specification
1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN
978-0-87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive
Handbook, ISBN 0-02-916682-9
Reference Books (Tittle, Atr, Publisher) :
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese
Way, ISBN 0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Jurans Quality Control Handbook,
ISBN 0-07-033176-6
Manuals :
Core Abilities:
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 32 Hrs.
Course : QUALITY ASSURANCE Practical HOURS : 49 Hrs.
Semester : 3 Total Hours : 81Hrs.
NOSS Code : MC-041-3-E02/L3 Credit Hours :3
Terminal Performance Objective :
Advanced Metrology using work holding fixtures, electronic probes , manual probe head, auto probe head, scanning probe head, dial gauges,
CMM and accessories, work piece and master block so that types of inspection gauges and fixture are identified, multi gauging fixture are designed
and fabricated, inspection gauges are setup to fixtures, work piece is measured and scanned using manual and auto probing for reverse
engineering conducted by three-dimensional (3D) measurement, types of three-dimensional measurement are identified according to specification.
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E02/L3
WIM
Learning Activities
12 L WT IS
1.1 Types of inspection gauges
AS
1.2 Types of inspection fixtures
1.3 Fundamental of multi gauging fixtures design
1.4 Types of gauging fixtures
1.5 Inspection gauges feature and limitation
1.6 Metric imperial conversion chart
Module : K04-03-15 ADVANCED METROLOGY
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E02/L3
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level :E02/L3
WIM
Learning Activities
Assessment
Methods
Methods
Delivery
CU.WA No./ Level : E02/L3
WIM
Learning Activities
Manuals :
Core Abilities:
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 22 Hrs.
Course : QUALITY ASSURANCE Practical Hours : 32 Hrs.
Semester : 3 Total Hours : 54 Hrs.
NOSS Code : MC-041-3-E03 Credit Hours :2
Terminal Performance Objective :
Carry out Basic CNC turning operation using CNC lathe machine, CNC Milling Machine, machine operating manual, cutting tools (CNC lathe),
measuring instrument, tool holder (CNC lathe), chuck, gauge, tool setter, part drawing, work piece material so that part drawing interpreted,
CNC lathe machine is setup, CNC programming generated, work piece is setup, CNC turning process executed and finished part confirmed in
accordance with standard operating procedure and drawing specification.
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E03/L3
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E03/L3
WIM
Learning Activities
L WT IS
2.1 Identify different control system
AS
2.1.1 Type of control system use on CNC and Various
5
type of CNC Control
2.1.2 Character of CNC program
2.1.3 Safety precaution related to handling of CNC
Machine
K04-03-16 CNC PRGRAMMING
Module :
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E03/L3
WIM
Learning Activities
L WT IS
2.2. Determine machining process. 13 AS
2.2.1 Type of machining processes and sequence
2.2.2 Machine code such as G, M , F , S and T
2.2.3 Sub program
Delivery Methods
Assessment
Methods
CU.WA No./ Level : E03/L3
WIM
Learning Activities
Manuals :
Core Abilities
SEMESTER 4
4.1 COMPETENCY PROFILE CHART
Identify measuring
MEASURING Prepare measuring Prepare work area Confirm measuring
equipment Execute calibration
EQUIPMENT equipment calibration for measuring equipment
calibration activities
CALIBRATION tools and equipments equipment calibration calibration result
requirements
C04 01 L3 02 L3 03 L3 04 L3 05 L3
Report measuring
equipment
calibration activities
06 L3
PRODUCT/PROCE Identify
SS NON- product/process Plan non Segregate non Execute non Conduct corrective
CONFORMANCE non conformance conformance control conformance conformance action meeting
CONTROL control parts activity product/process product disposition
requirements
C06 01 L3 02 L3 03 L3 04 L3 05 L3
Report
Monitor corrective product/process non
action effectiveness conformance control
activities
06 L3 07 L3
Execute product
PRODUCT Identify product Identified process Check product
quality acceptance Determine quality
QUALITY quality acceptance deviation calculated quality test index
due to process acceptance criteria
ACCEPTANCE requirements and test index result
abnormality
C07 01 L3 02 L3 03 L3 04 L3 05 L3
Report product
quality acceptance
activities
06 L3
Report supervision
administrative
activities
06 L3
Prepare customer
CUSTOMER Identify customer Address customer Evaluate customer Report customer
needs, requirement
REQUIREMENT needs, requirement needs, requirements requirement requirement
and specification
ESTABLISHMENT and specification and specification fulfillment activities
guidelines
C01 01 L4 02 L4 03 L4 04 L4 05 L4
C04 01 L4 02 L4 03 L4 04 L4 05 L4
06 L4 07 L4 08 L4 09 L4
Identify process non Confirm method of Classify non Confirm product Evaluate non
NON CONFORMITY
conformity non conformity conformity non conformity conformity
ASSESSMENT
assessment assessment assessment assessment assessment result
C06 01 L4 02 L4 03 L4 04 L4 05 L4
Report non
conformity
assessment finding
06 L4
Evaluate Corrective
CUSTOMER Plan method of Analyse customer Propose problem
Identify customer and Preventive
FEEDBACK customer feedback feedback solving customer
feedback category Action (CAPA)
ANALYSIS rectification information/survey feedback
effectiveness
C07 01 L4 02 L4 03 L4 04 L4 05 L4
06 L4 07 L4
E11 01 L4 02 L4 03 L4 04 L4 05 L4
Report product
liability services
activities
06 L4
4.2 TRAINING PATHWAY CHART
MULA
MEASURING CALIBRATION
01.01 1/2
K04-04-11
Conduct calibration
01.02 2/2
02.03 4/4
02.04 4/4
E
Confirm process, product, method,
E assessment of non conformity
03.01 1/4
03.03 4/4
03.04 4/4
04.02 2/5
Execute non-conformance
product/process non-conformance
control requirements
F 04.04 4/5
04.05 5/5
4.3 MAPPING CHART
LEAN MANUFACTURING
SILIBUS
CUSTOMER SERVICE
PRODUCT ANALYSIS
(JTM)
TAJUK MODUL
SUPERVISORY
MANAGEMENT
PROFIL PEKERJAAN
(NOSS)
MODUL 1
MODUL 2
MODUL 3
MODUL 4
MODUL 5
MODUL 6
NO WORK NO.
CU/DUTI
DUTI ACTIVITIES/TASK WA
Identify measuring
equipment calibration C04.01
requirements
Prepare measuring
equipment calibration C04.02
tools and equipment
Identify product/process
non-conformance control C06.01
PRODUCT/PROCE requirements
SS NON-
Plan non-conformance
C06L3 CONFORMANCE C06.02
control parts activity
CONTROL
Segregate non-
conformance C06.03
product/process
PRODUCT QUALITY CONTROL
MEASURING CALIBRATION
LEAN MANUFACTURING
SILIBUS
CUSTOMER SERVICE
PRODUCT ANALYSIS
(JTM)
TAJUK MODUL
SUPERVISORY
MANAGEMENT
PROFIL PEKERJAAN
(NOSS)
MODUL 1
MODUL 2
MODUL 3
MODUL 4
MODUL 5
MODUL 6
NO WORK NO.
CU/DUTI
DUTI ACTIVITIES/TASK WA
Execute non-conformance
C06.04
product disposition
Conduct corrective action
C06.05
meeting
Monitor corrective action
effectiveness C06.06
Report product/process
non-conformance control C06.07
activities
Identify product quality
acceptance requirements C07.01
Determine quality
PRODUCT C07.03
acceptance criteria
C07L3 QUALITY
ACCEPTANCE Identified process
deviation calculated and C07.04
test index
LEAN MANUFACTURING
SILIBUS
CUSTOMER SERVICE
PRODUCT ANALYSIS
(JTM)
TAJUK MODUL
SUPERVISORY
MANAGEMENT
PROFIL PEKERJAAN
(NOSS)
MODUL 1
MODUL 2
MODUL 3
MODUL 4
MODUL 5
MODUL 6
NO WORK NO.
CU/DUTI
DUTI ACTIVITIES/TASK WA
Execute customer
feedback/response/ C08.03
survey activities
Analysis customer
feedback/response/ C08.04
survey result/data
Report customer
feedback/response/ C08.05
survey result
Identify process
supervision requirement C09.01
and specification
Prepare subordinate
administrative information, C09.02
data and forms
SUPERVISORY Administer personnel
C09L3 C09.03
FUNTIONS appraisal
Execute in-house training
C09.04
Report supervision
C09.06
administrative activities
K04 DIPLOMA TEKNOLOGI JAMINAN KUALITI / TAHAP 4 SEMESTER 4
MEASURING CALIBRATION
LEAN MANUFACTURING
SILIBUS
CUSTOMER SERVICE
PRODUCT ANALYSIS
TAJUK MODUL
PRODUCT QUALITY
(JTM)
SUPERVISORY
MANAGEMENT
CONTROL
PROFIL PEKERJAAN
(NOSS)
MODUL 1
MODUL 2
MODUL 3
MODUL 4
MODUL 5
MODUL 6
NO WORK NO.
CU/DUTI
DUTI ACTIVITIES/TASK TASK
Identify customer
needs, requirement
C01.01
and specification
Prepare customer
needs, requirement
and specification C01.02
guidelines
CUSTOMER
REQUIREMENT
C01L4 Address customer
ESTABLISHMENT
needs, requirements
C01.03
and specification
Evaluate customer
requirement fulfilment C01.04
Report customer
requirement activities C01.05
Identify quality
improvement guidelines C04.02
CONTINUOUS
QUALITY
C04L4 Prepare quality
IMPROVEMENT
(CQI) improvement plan
C04.03
activity
LEAN MANUFACTURING
SILIBUS
CUSTOMER SERVICE
PRODUCT ANALYSIS
TAJUK MODUL
PRODUCT QUALITY
(JTM)
SUPERVISORY
MANAGEMENT
CONTROL
PROFIL PEKERJAAN
(NOSS)
MODUL 1
MODUL 2
MODUL 3
MODUL 4
MODUL 5
MODUL 6
NO WORK NO.
CU/DUTI
DUTI ACTIVITIES/TASK TASK
Conduct Design of
C04.06
Experiment (DOE)
Execute Quality
Function Deployment C04.07
(QFD)
Report quality
improvement activities C04.08
LEAN MANUFACTURING
SILIBUS
CUSTOMER SERVICE
PRODUCT ANALYSIS
TAJUK MODUL
PRODUCT QUALITY
(JTM)
SUPERVISORY
MANAGEMENT
CONTROL
PROFIL PEKERJAAN
(NOSS)
MODUL 1
MODUL 2
MODUL 3
MODUL 4
MODUL 5
MODUL 6
NO WORK NO.
CU/DUTI
DUTI ACTIVITIES/TASK TASK
Plan method of
customer feedback
C07.02
rectification
Analyse customer
feedback
C07.03
information/survey
Propose problem
solving customer
C07.04
feedback
Evaluate customer
feedback satisfaction C07.06
Report customer
feedback analysis timely C07.07
CU/DUTI
PROFIL PEKERJAAN
analysis
WORK
services activities
SILIBUS
(JTM)
ACTIVITIES/TASK
TAJUK MODUL
NO.
TASK
E01.06
E01.05
CUSTOMER SERVICE
MODUL 2
MANAGEMENT
PRODUCT QUALITY
MODUL 4
CONTROL
MODUL 6 SUPERVISORY
4.4 TABLE OF CONTACT HOURS DISTRIBUTION
CORE ABILITIES 30 -
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 32Hrs
Course : QUALITY ASSURANCE Practical Hours : 49Hrs
Semester : 4 Total Hours :81Hrs
NOSS Code : MC-041-3-C04/L3 Credit Hours :3
Terminal Performance Objective :
Perform calibration on measuring equipment and machine tools using suitable calibration equipment and reference standard so that the
calibration on machine tool and equipment are performed and accuracy of the machine tools are maintained accordance with Standard
Operating Procedure (SOP).
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C04/L3
WIM
Learning Activities
LA 1. SET UP WORK AREA FOR CALIBRATION (C04.01/ L3,C04/ L3.02, C04.03 / L3)
L WT IS
1.1 Types of measuring equipment
12 AS
1.2 Measuring equipment
K04-04-11 ADVANCED CALIBRATION
Module :
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C04/L3
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C04/L3
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level :C04/L3
WIM
Learning Activities
Total Hours 32 49
1. Calibration schedule
2. Master calibration tools
Tools/ Equipment/ Materials :
3. Measuring and Test Instruments
4. Components/Parts Specification
1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-
87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook,
ISBN 0-02-916682-9
Reference Books (Tittle, Atr, Publisher) :
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN 0-
13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Jurans Quality Control Handbook, ISBN 0-
07-033176-6
Manuals :
Core Abilities:
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 32Hrs.
Course : QUALITY ASSURANCE Practical Hours : 49Hrs.
Semester : 4 Total Hours : 81Hrs.
NOSS Code : MC-041-3-C01/L4,C07/L4, C08/L3 Credit Hours :3
Terminal Performance Objective :
Handle customer service by establish customer requirements and analyze feedback survey in accordance with customer requirement and
classification feedback. The personnel who are competent in customer requirement and feedback shall be able to address customer requirements,
analyze and propose problem solving on customer feedback in order to meet required quality.
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C01/L4, C07/L4,C08/L3
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C01/L4, C07/L4,C08/L3
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C01/L4, C07/L4,C08/L3
Learning Activities
Hour
Theory Practical Hours
s
2.9 Check the information accuracy 10 D PT WS
2.10 Assess the customer requirement adequacy P
2.11 Determine recording format
2.12 Adhere to file and record keeping
procedures
2.13 Compile customer requirement
Assessment
Methods
Methods
Delivery
CU.WA No./ Level : C01/L4, C07/L4,C08/L3
WIM
Learning Activities
Theory Hours Practical Hours
3.8 Determine type of customer companies 18 D PT WS
3.9 Determine customer suggestion P
3.10 Determine customer feedback workflow
3.11 Confirm method to rectify customer feedback
3.12 Identify customer feedback information/
survey data
3.13 Obtain customer feedback information/
survey
3.14 Analyse customer feedback information/
survey
3.15 Suggest problem solving customer feedback
LA 4. REPORT CUSTOMER SATISFACTION MEASUREMENT (C07/L4,C08/L3)
4.1 Customer feedback analysis timely activities 8 L WT IS
reporting format AS
4.2 Customer feedback analysis timely reporting
criteria
4.3 Procedure to write Customer feedback
analysis timely report
4.4 Record keeping procedures
4.5 Customer feedback satisfaction accuracy
within tolerance
Module : K04-04-12 CUSTOMER SERVICE MANAGEMENT
Assessment
Methods
Methods
Delivery
CU.WA No./ Level : C01/L4, C07/L4,C08/L3
WIM
Learning Activities
Theory Hours Practical Hours
4.6 Customer feedback satisfaction according to
specification
4.7 Customer feedback satisfaction appearance
according to requirement
4.8 Customer feedback satisfaction completeness
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C06/L4, E01/L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C06/L4, E01/L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C06/L4, E01/L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C06/L4, E01/L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C06/L4, E01/L4
WIM
Learning Activities
32 49
Total Hours
1. Standard Operating
2. Procedures
3. Specification
Tools/ Equipment/ Materials : 4. Data/engineering analysis
5. Product shelf life requirements
6. Product technical specifications
7. schedule and timeline
1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-
87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook,
ISBN 0-02-916682-9
Reference Books (Tittle, Atr, Publisher) :
3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN
0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Jurans Quality Control Handbook, ISBN 0-
07-033176-6
Manuals :
04.08 Develop and negotiate staffing plans.
04.09 Prepare project/work plans.
04.10 Utilize science and technology to achieve goals.
Core Abilities 05.03 Allocate and record usage of financial and physical resources.
05.04 Delegate responsibilities and/ or authority.
05.05 Coordinate contract and tender activities.
06.08 Identify and analyze effect of technology on the environment.
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 32Hrs.
Course : QUALITY ASSURANCE Practical Hours : 49Hrs.
Semester : SEMESTER 4 Total Hours : 81Hrs.
NOSS Code : MC-041-3-C06, C07 Credit hours :3
Terminal Performance Objective :
Carry out acceptance of product quality and control non conformance element in accordance with product quality manual and companys SOP.
Delivery Methods
Assessment
CU. WA No./ Level: C07.01/L3,C07.02/L3, C07.03/L3, C07.04/L3, C07.05/L3, C07.06/L3, C06.01/L3, C06.02/L3,
Methods
C06.03/L3, C06.04/L3, C06.05/L3, C06.06/L3,C06.07/L3,
WIM
Learning Activities
Delivery Methods
Assessment
CU. WA No./ Level : C07.01/L3,C07.02/L3, C07.03/L3, C07.04/L3, C07.05/L3, C07.06/L3, C06.01/L3, C06.02/L3,
Methods
C06.03/L3, C06.04/L3, C06.05/L3, C06.06/L3,C06.07/L3,
WIM
Learning Activities
Delivery Methods
Assessment
CU. WA No./ Level : C07.01/L3,C07.02/L3, C07.03/L3, C07.04/L3, C07.05/L3, C07.06/L3, C06.01/L3, C06.02/L3,
Methods
WIM
C06.03/L3, C06.04/L3, C06.05/L3, C06.06/L3,C06.07/L3,
Learning Activities
Delivery Methods
Assessment
CU. WA No./ Level : C07.01/L3,C07.02/L3, C07.03/L3, C07.04/L3, C07.05/L3, C07.06/L3, C06.01/L3, C06.02/L3,
Methods
WIM
C06.03/L3, C06.04/L3, C06.05/L3, C06.06/L3,C06.07/L3,
Learning Activities
Delivery Methods
Assessment
CU. WA No./ Level : C07.01/L3,C07.02/L3, C07.03/L3, C07.04/L3, C07.05/L3, C07.06/L3, C06.01/L3, C06.02/L3,
Methods
WIM
C06.03/L3, C06.04/L3, C06.05/L3, C06.06/L3,C06.07/L3,
Learning Activities
Delivery Methods
Assessment
CU. WA No./ Level : C07.01/L3,C07.02/L3, C07.03/L3, C07.04/L3, C07.05/L3, C07.06/L3, C06.01/L3, C06.02/L3,
Methods
WIM
C06.03/L3, C06.04/L3, C06.05/L3, C06.06/L3,C06.07/L3,
Learning Activities
Total Hours 32 49
1. SPC Tools
2. Calculator
Tools/ Equipment/ Materials :
3. Measuring and test instrument
4. Components/Part
4. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-
87389-745-7
2 J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook,
ISBN 0-02-916682-9
Reference Books (Tittle, Atr, Publisher) :
3 Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way,
ISBN 0-13-952433-9
4 J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Jurans Quality Control Handbook, ISBN
0-07-033176-6
Manuals :
Core Ability
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 32 Hrs.
Course : QUALITY ASSURANCE Practical Hours : 49 Hrs.
Semester : 4 Total Hours : 81 Hrs.
NOSS Code : MC-041-4 C04/L4 Credit Hours :3
Terminal Performance Objective :
Continuous quality improvement (CQI) is to quality improvement in accordance with quality requirements. The personnel who are competent in quality improvement shall be able to
execute Value Added / Value Engineering (VA/VE), review product and process capabilities to meet organisation policy.
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C04/L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C04/L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C04/L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C04/L4
WIM
Learning Activities
TOTAL HOURS
32 49
1. Application software
2. Total Preventive Maintenance reference book
Tools/ Equipment/ Materials :
3. Organisational chart
4. Process control chart
1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-
0-87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook,
ISBN 0-02-916682-9
Reference Books (Tittle, Atr, Publisher) : 3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way,
ISBN 0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Jurans Quality Control Handbook, ISBN
0-07-033176-6
1. Kaizen manual
Manuals : 2. QCC manual
Core Abilities
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 22Hrs.
Course : QUALITY ASSURANCE Practical Hours : 32Hrs.
Semester : 4 Total Hours : 54Hrs.
NOSS Code : MC-041-3-C09/L3 Credit Hours :2
Terminal Performance Objective :
Supervisory functions is to monitor and supervise process activities in accordance with company SOP, company policy, OSHA, The personnel who are
competent in process supervision shall be able to determine subordinate functions, monitoring of subordinate, develop skills, subordinate training,
appraisal of subordinate and reporting to superior according to SOP
K04-04-16 SUPERVISORY
Module :
Assessment
Methods
Methods
Delivery
CU.WA No./ Level : C09/L3
WIM
Learning Activities
Assessment
Methods
Methods
Delivery
CU.WA No./ Level :C09/L3
WIM
Learning Activities
Assessment
Methods
Methods
Delivery
CU.WA No./ Level : C09/L3
WIM
Learning Activities
Assessment
Methods
Methods
Delivery
CU.WA No./ Level : C09/L3
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level :C09
WIM
Learning Activities
TOTAL HOURS 22 32
Tools/ Equipment/ Materials : Audio visual aids, Hand outs,Venue, SOP, Code of Practice
5 Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-87389-745-7
Reference Books (Tittle, Atr, Publisher) :
J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook, ISBN 0-02-916682-9
Manuals :
Core Abilities:
SEMESTER 5
4.1 COMPETENCY PROFILE CHART
STATISTICAL
Confirm control item Evaluate process Report SPC
PROCESS Identify SPC Monitor SPC
characteristic/parame capability and effectiveness
CONTROL (SPC) requirement activities
ter stability corrective action
ANALYSIS
C09 01 L4 02 L4 03 L4 04 L4 05 L4
C05 01 L4 02 L4 03 L4 04 L4 05 L4
C02 01 L4 02 L4 03 L4 04 L4 05 L4
Report product
Evaluate control
control plan
plan completeness
development
activities
06 L4 07 L4
MANUFACTURING Identify audit Prepare audit
Identify types of Prepare audit Execute audit
/ SYSTEM procedure and schedule and
audit document activities
AUDITING requirement checklist
C03 01 L4 02 L4 03 L4 04 L4 05 L4
Evaluate audit
Report of auditing
finding completion
activities
and accuracy
06 L4 07 L4
C04 01 L4 02 L4 03 L4 04 L4 05 L4
06 L4 07 L4 08 L4 09 L4
STATISTICAL
Identify supplier Confirm supplier
PROCESS Plan supplier Execute supplier Evaluate supplier
performance evaluation and
CONTROL (SPC) performance activity assessment performance quality
requirement selection
ANALYSIS
C10 01 L4 02 L4 03 L4 04 L4 05 L4
Report supplier
performance
activities
06 L4
4.2 TRAINING PATHWAY CHART
01.01 1/4
02.01 1/3
MEASUREMENT SYSTEM
ANALYSIS (MSA) Execute MSA Activities
02.02 2/3
K04-05-12
H
H
Identify Types of Audit
03.01 1/4
03.02 2/4
K04-05-13
03.03 3/4
03.04 4/4
04.01 1/4
PRODUCT QUALITY
PLANNING Prepare Planning Critical Control Point
Establishment
K04-05-14
04.02 2/4
04.03 3/4
MEASUREMENT SYSTEM
EXPERIMENTAL DESIGN
(JTM)
TAJUK MODUL
SUPPLIER QUALITY
FUNDAMENTAL OF
ANALYSIS (MSA)
QUALITY AUDIT
MANAGEMENT
PROFIL PEKERJAAN
(NOSS)
MODUL 1
MODUL 2
MODUL 3
MODUL 4
MODUL 5
MODUL 6
COCU WORK ACTIVITIES NO.
CU/DUTI
CODE /TASK TASK
1. Identify SPC
requirement
5. Report SPC
effectiveness corrective
action
1. Identify MSA
specification and
requirements
4. Evaluate MSA
accuracy / uncertainty
MEASUREMENT SYSTEM
EXPERIMENTAL DESIGN
(JTM)
TAJUK MODUL
SUPPLIER QUALITY
FUNDAMENTAL OF
ANALYSIS (MSA)
QUALITY AUDIT
MANAGEMENT
PROFIL PEKERJAAN
(NOSS)
MODUL 1
MODUL 2
MODUL 3
MODUL 4
MODUL 5
MODUL 6
COCU WORK ACTIVITIES NO.
CU/DUTI
CODE /TASK TASK
1. Identify Critical To
Quality (CTQ) point
2. Identify product control
plan requirement
3. Plan critical control point
establishment
MEASUREMENT SYSTEM
EXPERIMENTAL DESIGN
(JTM)
TAJUK MODUL
SUPPLIER QUALITY
FUNDAMENTAL OF
ANALYSIS (MSA)
QUALITY AUDIT
MANAGEMENT
PROFIL PEKERJAAN
(NOSS)
MODUL 1
MODUL 2
MODUL 3
MODUL 4
MODUL 5
MODUL 6
COCU WORK ACTIVITIES NO.
CU/DUTI
CODE /TASK TASK
2. Identify quality
improvement guidelines
3. Prepare quality
improvement plan activity
7. Execute Quality
Function Deployment
(QFD)
8. Organise quality
improvement
9. Report quality
improvement activities
1. Identify supplier
performance requirement
SUPPLIER QUALITY
C10L4
ASSURANCE
2. Plan supplier
performance activity
PRODUCT QUALITY PLANNING
SILIBUS
MEASUREMENT SYSTEM
EXPERIMENTAL DESIGN
(JTM)
TAJUK MODUL
SUPPLIER QUALITY
FUNDAMENTAL OF
ANALYSIS (MSA)
QUALITY AUDIT
MANAGEMENT
PROFIL PEKERJAAN
(NOSS)
MODUL 1
MODUL 2
MODUL 3
MODUL 4
MODUL 5
MODUL 6
COCU WORK ACTIVITIES NO.
CU/DUTI
CODE /TASK TASK
3. Confirm supplier
evaluation and selection
4. Execute supplier
assessment
5. Evaluate supplier
performance quality
6. Report supplier
performance activities
JADUAL PEMBAHAGIAN JAM KREDIT
CORE ABILITIES 27 - - - -
JUMLAH LATIHAN (SUBJEK UMUM) 27 0 0
SYLLABUS PROFILE
Course Code : K04-05-11 Theory Hours : 32 Hrs
Course : DIPLOMA IN QUALITY ASSURANCE TECHNOLOGY Practical Hours : 49 Hrs
Semester : 5 Total Hours : 81 Hrs
NOSS Code : MC-041-4-C09 Credit Hours :3
Statistical Process Control (SPC) Analysis is to produce dough in accordance with SPC requirements. The personnel who are competent in analysis
shall be able to monitor SPC activities to meet required quality.
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C09.01, C09.02, C09.03, C09.04, C09.05/L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C09.01, C09.02, C09.03, C09.04, C09.05/L4
WIM
Learning Activities
2. CONDUCT CONTROL ITEM CHARACTERISTIC/PARAMETER AND MONITORING SPC ACTIVITIES (C09.02, C09.03)
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C09.01, C09.02, C09.03, C09.04, C09.05/L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C09.01, C09.02, C09.03, C09.04, C09.05/L4
WIM
Learning Activities
Delivery Methods
Module : K04-05-12 MEASUREMENT SYSTEM ANALYSIS (MSA)
Assessment
Methods
CU.WA No./ Level : (C05.01, C05.02, C05.03, C05.04, C05.05/L4)
WIM
Learning Activities
Assessment
Methods
CU.WA No./ Level : (C05.01, C05.02, C05.03, C05.04, C05.05/L4)
WIM
Learning Activities
Assessment
Methods
CU.WA No./ Level : (C05.01, C05.02, C05.03, C05.04, C05.05/L4)
WIM
Learning Activities
Assessment
Methods
CU.WA No./ Level : (C05.01, C05.02, C05.03, C05.04, C05.05/L4)
WIM
Learning Activities
Total Hours 32 49
1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-87389-
745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook, ISBN
References: 0-02-916682-9
(3-5 references, valid years 5) 3. K04oru IshiK04wa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN
0-13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Jurans Quality Control Handbook, ISBN 0-07-
033176-6
Manuals :
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 32Hrs
Course : QUALITY ASSURANCE Practical Hours : 49Hrs
Semester : 5 Total Hours : 81Hrs
NOSS Code : MC-041-4-C03 Credit Hours :3
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C03.01, C03.02, C03.03, C03.04, C03.05, C03.06, C03.07 / L4
WIM
Learning Activities
18 L WT IS
1.1 Type of audits AS
1.2.1 Internal quality audit
1.2.2 Supplier audit
1.2.3 Third party audit
1.3 Product / process flow
1.4 Audit process flow
1.5 Audit procedure
1.6 Audit requirement
1.7 Area to be audited
K04-05-13 QUALITY AUDIT
Module :
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C03.01, C03.02, C03.03, C03.04, C03.05, C03.06, C03.07 / L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C03.01, C03.02, C03.03, C03.04, C03.05, C03.06, C03.07 / L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C03.01, C03.02, C03.03, C03.04, C03.05, C03.06, C03.07 / L4
WIM
Learning Activities
8. Reference Standard
9. Calculator
10. Calibration tools
Tools/ Equipment/ Materials : 11. Measuring and Test Instrument
12. Components/Part Specification
13. Checklist and Check sheet
14. Calibration tools
5. J.Luis Guasch, Makhtar Diop, Jean-Louis Racine, Isabel Sanchez, Quality Systems and
References: Standard for A Competitive Edge (2007), The World Bank
(3-5 references, valid years 5) 6. Vincent K. Omachonu, Ph.D. Joel E. Ross,Ph.D, Principles of Total Quality 3rd Edition, CRC
Press
Manuals :
Core Abilities :
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 22Hrs
Course : QUALITY ASSURANCE Practical Hours : 32Hrs
Semester : 1 Total Hours : 54Hrs
NOSS Code : MC-041-4-C02 Credit Hours :2
Terminal Performance Objective :
Product Quality Planning is to develop control plan in accordance with product control and development . The student who are competent in plan
development should be able to establish critical control point and develop product control plan to meet organization policy.
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05, C02.06, C02.07/L4
WIM
Learning Activities
1. IDENTIFY CRITICAL TO QUALITY (CTQ) POINT AND PRODUCT CONTROL PLANNING (C02.01, C02.02)
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05, C02.06, C02.07/L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05, C02.06, C02.07/L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C02.01, C02.02, C02.03, C02.04, C02.05, C02.06, C02.07/L4
WIM
Learning Activities
Total Hours 22 32
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C010.01, C10.02, C10.03,C10.04, C10.05, C10.06 / L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C010.01, C10.02, C10.03,C10.04, C10.05, C10.06 / L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C010.01, C10.02, C10.03,C10.04, C10.05, C10.06 / L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C010.01, C10.02, C10.03,C10.04, C10.05, C10.06 / L4
WIM
Learning Activities
Total Hours 22 32
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C04.06 / L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C04.06 / L4
WIM
Learning Activities
2 L WT
2.1 Identify PDCA Cycle
2.2 Terminology DOE Model
2.2.1 System
2.2.2 Input
2.2.3 Output
2.2.4 Factors
2.2.5 Levels
2.2.6 Uncontrollable factors
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C04.06 / L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C04.06 / L4
WIM
Learning Activities
Delivery Methods
Assessment
Methods
CU.WA No./ Level : C04.06 / L4
WIM
Learning Activities
Total Hours 22 32
5. Application software
6. Total Preventive Maintenance reference book
7. Organizational chart
Tools/ Equipment/ Materials :
8. Process control chart
9. Kaizen manual
10. QCC manual
1. Connie M. Borror, ASQ, Third Edition, The Certified Quality Engineer Handbook, ISBN 978-0-
87389-745-7
2. J.M.Juran, The Free Press, (1989), Juran of Leadership For Quality an Executive Handbook, ISBN
References: 0-02-916682-9
(3-5 references, valid years 5) 3. Kaoru Ishikawa, Quality Press (ASQC), What Is Total Quality Control? The Japanese Way, ISBN 0-
13-952433-9
4. J.M. Juran, McGraw-Hill, Inc, 1988 (Fourth Edition), Jurans Quality Control Handbook, ISBN 0-07-
033176-6
Manuals :
Core Abilities :
SYLLABUS PROFILE
Course Code : K04 Theory Hours : 16 Hrs
Course : QUALITY ASSURANCE Practical Hours : 185 Hrs
Semester : 5 Total Hours : 201 Hrs
NOSS Code : MC-041-4 Credit Hours :5
Terminal Performance Objective: The course will provide student to build a project based on the proposal submitted and apply all knowledge
covered for diploma program. Students are able to exhibit the commitment in planning, developing, establishing and completing the work of the final
year project. Students able to produce a written report composed of the abstract, project content, observation, conclusion and future suggestion of
the project. Students able to perform a verbal presentation with the aid of AVA by promoting the ideas, content, observation and result of the
project. Students able to execute the demonstration by displaying the product / outcome / result of the project.
Delivery Methods
Assessment
Methods
CU.WA No./ Level :
WIM
Learning Activities
1. INTRODUCTION
IS
1.1 Project proposal review 2 L WT
AS
1.2 Preparation of project tools, equipment
and materials
1.3 Preparation of project development D
60 PT
P
K04-05-17 FINAL YEAR PROJECT
Module :
Delivery Methods
Assessment
Methods
CU.WA No./ Level :
WIM
Learning Activities
2. PROJECT DEVELOPMENT
5. DOCUMENTATION (C09.05/L4)
5.1 Documentation 10 L WT