Professional Documents
Culture Documents
SEATRAIN A-314
RAM
Issued REVISION APPROVED
Seatrain Assessment 1 Page 2 of 5
23.02.2016 005 SA
SEATRAIN A-314
RAM
Issued REVISION APPROVED
Seatrain Assessment 1 Page 3 of 5
23.02.2016 005 SA
PART A
SEATRAIN A-314
RAM
Issued REVISION APPROVED
Seatrain Assessment 1 Page 4 of 5
23.02.2016 005 SA
SEATRAIN A-314
RAM
Issued REVISION APPROVED
Seatrain Assessment 1 Page 5 of 5
23.02.2016 005 SA
D All the
above.
14 Which is not
a Hazard in the Flwg.
A Darkness
B Toxicity
C
Slipping,causing a
minor injury.(Y)
D Slippery
surface
15 When should
practical risk
assessment
Be carried out
as per Selandias SMS.
A Before
major/odd repair
jobs,other non-
Routine
repairs.
B Other
potentially hazardous
operations
Conducted on
board.
C Before new or
non-routine tasks.
D All the
above(Y).
SEATRAIN A-314