Professional Documents
Culture Documents
in Eastern Mediterranean
Anna Apostolopoulou,
Poseidon Med II EU Projects Management &
Coordination Leader
SIGTTO
Mediterranean Regional Forum
Athens
8/6/2017
Agenda
Poseidon Med II
Port installations studies
Vessels & shipyards
Regulatory framework
Awareness & dissemination
POSEIDON MED II - LNG Bunkering
3
Roadmap to LNG bunkering operations
Where are we now Poseidon
in East Med
Med II
6 Ports
Piraeus
Patras 0
1 Terminal Herakleion
Revithoussa LNG Igoumenitsa Duration: June2015 Dec2020
Terminal Lemesos
Budget: ~53
Venice
Coordinator: DEPA S.A
Technical DESFA
coordinator:
3 countries Partners: 26
5
Partners
6
Project activities
port studies
5 ports &
Revithoussa
terminal
retrofit
financial Financial New building vessel
models Feeders- designs
assessment Funding Small-scale
mechanisms carriers
Work with
ministries, Qnq,
training
Regulatory
framework
7
Project Activities for 26 partners
Activity 1 Project Management
Activity 2 Dissemination
Activity 3 Social & public consultation - awareness
Activity 4 Installation Financial assessment
Activity 5 Financial Instrument for Global Project Inv
Activity 6 Environmental, Safety, & Detailed Site Planning studies
Activity 7 Updating of the Ports Master Plans
Activity 8 Supporting (Baseline) Engineering Studies
Activity 9 Preliminary Eng. design additional harbour infrastr
Activity 10 Environmental and Safety Studies
Activity 11 Final Construction eng design additional port infrastr.
Activity 12 Tender Documents
Activity 13 Adaptation and implementation regulatory framework on LNG bunkering
Activity 14 Vessel Installations
Activity 15 Pilot Case: Executive Design and Construction of an Innovative LNG Vessel
Activity 16 Efficient Supply Chain (Logistics) Activities
Activity 17 Sustainable LNG pricing patterns
Poseidon Med II
Port installations studies
Vessels & shipyards
Regulatory framework
Awareness & dissemination
Safety studies for ports
Exclusion
zones
Navigational
simulation
Hazard
identification
studies
Hazard Identification Studies (HAZID)
Scope
Evaluate potential bunkering operation scenarios
Assess bunkering fuel capacity (current & future)
Port-vessel interaction
Risk assessment
Recommendations & further actions
Methodology
2-day technical workshops
On-site surveys
Risk ranking methodology
Hazard Identification Studies (HAZID)
5 studies
13 potential scenarios
under evaluation
No intolerable
risks found
Exclusion zones
exclusion
consequence
zones
analysis
techniques
likelihood of simultaneous
ignition operations
Navigational simulation
Wind
R (kts)
Arrival / Tugs (Max Waves (Hs, Current
u Vessel
Departure BP used) T, Dir) (kts)
n
(gusting)
Feeder Tanker 2.0 / 6.3 /
1 (Loaded) Arr 2 x 70T 20 / 090 -
070
Feeder Tanker 0.3 / 2.9 /
2 (Loaded) Arr 2 x 70T 30 / 270 -
250
Feeder Tanker 2.0 / 6.3 /
3 (Loaded) Arr 2 x 70T 30 / 090 -
070
Feeder Tanker 2.0 / 6.3 /
4 (Ballast) Dep 2 x 70T 30 / 090 -
070
Feeder Tanker 0.3 / 2.9 /
5 (Ballast) Dep - 30 / 270 -
250
Bunker Barge 2.0 / 6.3 /
6 Arr - 25 / 090 -
(Loaded) 070
Bunker Barge 0.3 / 2.9 /
7 Arr - 25 / 270 -
(Loaded) 250
Bunker Barge 0.3 / 2.9 /
8 Dep - 25 / 270 -
(Ballast) 250
Feeder Tanker 2.5 / 7.2 / 2.0 /
9 (Loaded) Arr 2 x 70T 25 / 270 125
250
1 Feeder Tanker 2.5 / 7.2 / 2.0 /
Arr 2 x 70T 25 / 090 125
0 (Loaded) 070
14
Poseidon Med II
Why LNG
Port installations studies
Vessels & shipyards
Regulatory framework
Awareness & dissemination
Vessels aspect
10 retrofits
5 basic designs
5 detailed designs: HAZID, HAZOP
assessments
New-buildings
Feeder vessel
Barge vessel
LNG fuelled newbuilding:
Detailed design
LNG fuelled newbuilding:
Basic Design
16
Shipyard Preparedness
Spanopoulos Yard,
Chalkis Yard,
Kanellos Bros Yard
Megatechnica
Psarros
Skaramagkas
Navep
17
Poseidon Med II
Why LNG
Port installations studies
Vessels & shipyards
Regulatory framework
Awareness & dissemination
Regulatory Framework: key drivers
19
Work on regulatory framework
20
Work with Ministries
281.20.12.2007.,
Current legislation record (national, 153.19.06.2003..
14.31.01.2001._
international) .
1978
General & special port regulations 966.28.05.2015.
.._
Synergies with key stakeholders 376.19.03.2007.
.SEVESO
_..2008.
_.22
, 88.19.01.2008.
.
, 272.16.12.1996..
, 58.20.03.1998.
987.11.04.2016..
2136.05.08.2014.
2012.33.
212012
58.20.03.1998.
, 1389.10.09.2004.
21
LNG Quality & Quality
Review current
rules/regulations
22
Training & Competence
23
LRs work under Poseidon Med II
Regulatory work:
procedures,
Approval in policies, training,
Principle of new Quantity-Quality
HAZID, HAZOP buildings designs
for LNG barges
and AiP for vessel
retrofit designs and LNG Feeder
ongoing
Shipyard
vessels
Preparedness
Navigational Assessment
Simulation
ongoing
Exclusion Zone workshops for all ongoing
assessment for all ports
HAZID workshops ports ongoing
for all ports
completed
completed
completed
24
LNG and PMED II general
Port installations studies
Vessels & shipyards
Regulatory framework
Awareness & dissemination
Awareness & dissemination
Participation in industry
conferences raising input on
developments
26