Poseidon Med II: the roadmap to LNG bunkering

in Eastern Mediterranean

Anna Apostolopoulou,
Poseidon Med II EU Projects Management &
Coordination Leader

SIGTTO
Mediterranean Regional Forum
Athens
8/6/2017
Agenda

Poseidon Med II
Port installations studies
Vessels & shipyards
Regulatory framework
Awareness & dissemination
POSEIDON MED II - LNG Bunkering

POSEIDON MED which a European co-


funded project which aims to bring the
wide adoption of LNG as fuel in Eastern
Mediterranean, while making Greece an
international marine bunkering and
distribution hub for LNG in South Eastern
Europe.

Poseidon Med II is the continuation of


Poseidon Med (COSTA II East) &
Archipelago-LNG

3
Roadmap to LNG bunkering operations
Where are we now Poseidon
in East Med
Med II

Planning Analysis Detailed Safety Assessments


Implementation Study, Detailed Technical Studies
Detailed Pilot Studies Works
Regulatory Gap Analysis Regulatory action follow up
Proposal
Poseidon Med II

6 Ports
Piraeus
Patras 0
1 Terminal Herakleion
Revithoussa LNG Igoumenitsa Duration: June2015 Dec2020

Terminal Lemesos
Budget: ~53
Venice
Coordinator: DEPA S.A

Technical DESFA
coordinator:

3 countries Partners: 26

Greece Financing: 50% EU-CEF


Cyprus
Italy

5
Partners

6
Project activities
port studies

5 ports &
Revithoussa
terminal

retrofit
financial Financial New building vessel
models Feeders- designs
assessment Funding Small-scale
mechanisms carriers

Work with
ministries, Qnq,
training

Regulatory
framework

7
Project Activities for 26 partners
Activity 1 Project Management
Activity 2 Dissemination
Activity 3 Social & public consultation - awareness
Activity 4 Installation Financial assessment
Activity 5 Financial Instrument for Global Project Inv
Activity 6 Environmental, Safety, & Detailed Site Planning studies
Activity 7 Updating of the Ports Master Plans
Activity 8 Supporting (Baseline) Engineering Studies
Activity 9 Preliminary Eng. design additional harbour infrastr
Activity 10 Environmental and Safety Studies
Activity 11 Final Construction eng design additional port infrastr.
Activity 12 Tender Documents
Activity 13 Adaptation and implementation regulatory framework on LNG bunkering
Activity 14 Vessel Installations
Activity 15 Pilot Case: Executive Design and Construction of an Innovative LNG Vessel
Activity 16 Efficient Supply Chain (Logistics) Activities
Activity 17 Sustainable LNG pricing patterns
Poseidon Med II
Port installations studies
Vessels & shipyards
Regulatory framework
Awareness & dissemination
Safety studies for ports

Exclusion
zones

Navigational
simulation

Hazard
identification
studies
Hazard Identification Studies (HAZID)
Scope
Evaluate potential bunkering operation scenarios
Assess bunkering fuel capacity (current & future)
Port-vessel interaction
Risk assessment
Recommendations & further actions

Methodology
2-day technical workshops
On-site surveys
Risk ranking methodology
Hazard Identification Studies (HAZID)
5 studies

13 potential scenarios
under evaluation

No intolerable
risks found
Exclusion zones

exclusion
consequence
zones
analysis
techniques

likelihood of simultaneous
ignition operations
Navigational simulation

Feeder vessel LNG barge


vessel
performing 5 ports/ 90
performing
bunkering bunkering scenarios
operations operations

Wind
R (kts)
Arrival / Tugs (Max Waves (Hs, Current
u Vessel
Departure BP used) T, Dir) (kts)
n
(gusting)
Feeder Tanker 2.0 / 6.3 /
1 (Loaded) Arr 2 x 70T 20 / 090 -
070
Feeder Tanker 0.3 / 2.9 /
2 (Loaded) Arr 2 x 70T 30 / 270 -
250
Feeder Tanker 2.0 / 6.3 /
3 (Loaded) Arr 2 x 70T 30 / 090 -
070
Feeder Tanker 2.0 / 6.3 /
4 (Ballast) Dep 2 x 70T 30 / 090 -
070
Feeder Tanker 0.3 / 2.9 /
5 (Ballast) Dep - 30 / 270 -
250
Bunker Barge 2.0 / 6.3 /
6 Arr - 25 / 090 -
(Loaded) 070
Bunker Barge 0.3 / 2.9 /
7 Arr - 25 / 270 -
(Loaded) 250
Bunker Barge 0.3 / 2.9 /
8 Dep - 25 / 270 -
(Ballast) 250
Feeder Tanker 2.5 / 7.2 / 2.0 /
9 (Loaded) Arr 2 x 70T 25 / 270 125
250
1 Feeder Tanker 2.5 / 7.2 / 2.0 /
Arr 2 x 70T 25 / 090 125
0 (Loaded) 070

14
Poseidon Med II
Why LNG
Port installations studies
Vessels & shipyards
Regulatory framework
Awareness & dissemination
Vessels aspect

10 retrofits
5 basic designs
5 detailed designs: HAZID, HAZOP
assessments
New-buildings
Feeder vessel
Barge vessel
LNG fuelled newbuilding:
Detailed design
LNG fuelled newbuilding:
Basic Design

16
Shipyard Preparedness

Pipe Outfitting work New steel Material


workshop on board workshop stock yard

Production planning & project Floating


management control dock

Steel and Machinery


berthing
Workshop

Spanopoulos Yard,
Chalkis Yard,
Kanellos Bros Yard
Megatechnica
Psarros
Skaramagkas
Navep

17
Poseidon Med II
Why LNG
Port installations studies
Vessels & shipyards
Regulatory framework
Awareness & dissemination
Regulatory Framework: key drivers

Global sulphur limit of 0.50% for marine fuels


commencing on 1/1/2020

EU Directive 2014/94 for development of


alternative fuels infrastructure (greek legislation
. 4439/20.11.2016)

19
Work on regulatory framework

Work with Ministries

Quality & Quantity

Training & competence

20
Work with Ministries

281.20.12.2007.,

Current legislation record (national, 153.19.06.2003..

14.31.01.2001._
international) .
1978
General & special port regulations 966.28.05.2015.
.._

Synergies with key stakeholders 376.19.03.2007.

.SEVESO

_..2008.
_.22
, 88.19.01.2008.
.


, 272.16.12.1996..


, 58.20.03.1998.
987.11.04.2016..


2136.05.08.2014.
2012.33.
212012
58.20.03.1998.
, 1389.10.09.2004.

21
LNG Quality & Quality

Key considerations on LNG QnQ Design an effective

Quality of LNG is NOT uniform globally verification process


No standards regarding LNG composition
Methodology/tools/technolo
No fixed agreement to characterise LNG gies

quality for end use


Variances in quality do impact engine Best practices/case
studies
operations

Review current
rules/regulations

22
Training & Competence

Target: crew, port & terminal staff, truck drivers,


LNG operators, management team
Training modulars focusing on
Operating/regulatory framework & procedures
Roles/responsibilities
Equipment check/system connections
Safe transfer/monitoring processes
Emergency situation response

23
LRs work under Poseidon Med II

Regulatory work:
procedures,
Approval in policies, training,
Principle of new Quantity-Quality
HAZID, HAZOP buildings designs
for LNG barges
and AiP for vessel
retrofit designs and LNG Feeder
ongoing
Shipyard
vessels
Preparedness
Navigational Assessment
Simulation
ongoing
Exclusion Zone workshops for all ongoing
assessment for all ports
HAZID workshops ports ongoing
for all ports
completed
completed
completed

24
LNG and PMED II general
Port installations studies
Vessels & shipyards
Regulatory framework
Awareness & dissemination
Awareness & dissemination

Workshops & Conferences


increasing public awareness

Synergy building promoting


LNG as fuel option

Participation in industry
conferences raising input on
developments

26