Professional Documents
Culture Documents
LTEInstallationMOP_MTNI
LTE
Installation MOP
Jan2016/ammar.Faleh@nokia.com
2
LTEInstallationMOP_MTNI
29-March-
Version 2.1 Charbel Chehwan Adding labelling
2016
Jan2016/ammar.Faleh@nokia.com
3
LTEInstallationMOP_MTNI
Contents:
Introduction....... 4
H&S..... 4
Ch1 / Overview of the System Module (FSMFa) with installation procedure for relevant cables ............11
Ch2 / Overview of the RRH (FZQE) with installation procedure for relevant cables .....27
Ch3 / Power distribution module (FPFC) with installation procedure for relevant cables .................38
Jan2016/ammar.Faleh@nokia.com
4
LTEInstallationMOP_MTNI
1. Introduction
The purpose of this document is to provide installation instructions and guidelines to ensure high quality of
installation for MTN Irancell LTE.
Safety Procedures are detailed documents to cover the implementation of safe systems of work. As such they
constitute a mandatory element in the attainment of the required safety standards given either by industrial
standards or by law.
The project safety procedures are to ensure utmost safety of all individuals, materials, machines, vehicles,
environment and the Customers property.
The Project Health & Safety Coordinator or the designated person will ensure that the safety procedures are kept
up to date and under constant review in the light of a feedback from operational experience and from safety audit
reports. Changes will be initiated where existing safety procedures are found to be inadequate or in need of
improvement.
NOKIAs occupational health and safety (H&S) practice supports our efforts to protect and promote the health,
safety and well-being of NOKIA employees.
It also reflects NOKIAs responsibility as a corporate citizen, striving to make a fitting contribution to the
communities in which we live and work.
Complying with, and where feasible, exceeding the requirements of applicable H&S laws and regulations of
countries where we operate;
Providing safe and healthy working conditions for all our employees and promoting well being at work;
Working with external contractors, suppliers and customers in meeting their safety commitments;
Integrating occupational health and safety management into our business and processes at all levels,
emphasizing line management and also individual responsibility for H&S;
Promoting H&S awareness in the company through effective communication, education and training;
Jan2016/ammar.Faleh@nokia.com
5
Developing and introducing new H&S technologies and methods and continuously improving our H&S
performance through sound management.
LTEInstallationMOP_MTNI
Jan2016/ammar.Faleh@nokia.com
6
CS73327.25 Shrinking sleeve, Y-type
LTEInstallationMOP_MTNI
CS73178.17 MCMK-HF/XCMK-HF 2x10+10 cable
4. Details of tools and testers are given below for Flexi eNB
implementation:
3. Side Cutter.
4. Monkey Wrench.
8. Hammer Drill.
20. Scissor.
23. Site Master which includes VSWR, Power & Frequency Meter (Anritsu/Bird)
Jan2016/ammar.Faleh@nokia.com
7
24. Digital Multimeter (Fluke)
LTEInstallationMOP_MTNI
25. Optical Power Meter
5. Project Scope
The solution of this project will be feeder less for all sites and there are two types of LTE will be installed :
And for the TDD there are two scenario for installation of the RF module (FZQE):
RRH (FZQE) can be located back to the antenna, as shown in below photo
Jan2016/ammar.Faleh@nokia.com
8
LTEInstallationMOP_MTNI
1. TDD with Wimax showing below the connection for one sector; other sectors will be same
Jan2016/ammar.Faleh@nokia.com
9
LTEInstallationMOP_MTNI
Jan2016/ammar.Faleh@nokia.com
10
LTEInstallationMOP_MTNI
Jan2016/ammar.Faleh@nokia.com
11
LTEInstallationMOP_MTNI
Jan2016/ammar.Faleh@nokia.com
12
LTEInstallationMOP_MTNI
Jan2016/ammar.Faleh@nokia.com
13
LTEInstallationMOP_MTNI
Property Value
Property Value
Jan2016/ammar.Faleh@nokia.com
14
The FSMFa will be installed on the ground or mounted (wall or pole) by using Flexi Mounting kit for Floor, Wall
and Pole (FMFA). FMFA is required in SM installation according to scope and it provides grounding points for
LTEInstallationMOP_MTNI
System module grounding.
Plinth (FMFA)
2. Installation of FMFA:
Clearance space should be taken care off before starting the installation as in next point
First keep the Plinth on the floor and mark the holes as per the given drawing
Grout the Plinth as per Points shown in the picture with either Anchor Bolts in the case of Foundation or
Coach Bolts in case of shelter.
Jan2016/ammar.Faleh@nokia.com
15
LTEInstallationMOP_MTNI
Put Casing on top of the plinth; make sure all 4 holes on the mechanical unit fit all 4 studs on plinth.
After fixation properly the mechanical unit to the back side and then tighten the screws.
Cabling of FSMF
1. Strip each DC power cable and wrap with tape; this will protect the rubber boot.
2. Remove the plug from the rubber boot.
Note: if the cables do not fit, carefully cut the rubber boot with scissors until the cables fit, it
should be a good tight fit.
Jan2016/ammar.Faleh@nokia.com
16
3. Feed the taped ends of the DC power cables into the rubber boot.
4. Remove the tape from the DC power cables.
LTEInstallationMOP_MTNI
Jan2016/ammar.Faleh@nokia.com
17
LTEInstallationMOP_MTNI
Jan2016/ammar.Faleh@nokia.com
18
LTEInstallationMOP_MTNI
6. Remove the protective cap from the second optical transceiver and insert it into the RF Module
8. Remove the protective plugs from the optical connector and clean the tips
according to instructions. Connect the optical cable to the RF Module. Make sure it
clicks into place.
9. Push the connector boot firmly into place.
1. Remove the connector seal from the relevant transmission unit connector. Store
3. Pull back the connector boot covering the transmission cable connector.
Jan2016/ammar.Faleh@nokia.com
19
LTEInstallationMOP_MTNI
LED Color
EIF2/RF/6 Red: No connection.
RF/EXT link 6 status or Green: Connection OK.
transport interface 2 status Yellow: Not in use.
RF/EXT1 Red: No connection.
RF link 1 status Green: Connection OK.
Yellow: Not in use.
RF/EXT2 Red: No connection.
RF link 2 status Green: Connection OK.
Yellow: Not in use.
RF/EXT3 Red: No connection.
RF link 3 status Green: Connection OK.
Yellow: Not in use.
EIF1 Red: No connection.
Transport interface 1 Green: Connection OK.
status Yellow: Not in use.
Fan status Red: Fan fault.
Green: Fan OK.
System Module status Red: Module self-test or reset (LED red for <5 seconds) or major alarm or
critical alarm.
Red, blinking: Major alarm.
Yellow: Stand-by or blocked.
Yellow, blinking: SW download or configuration ongoing, module non-
operational.
Green: Module operational.
Green, blinking: Module is loading software or parameters or local
maintenance access when modules are operational.
Jan2016/ammar.Faleh@nokia.com
20
LTEInstallationMOP_MTNI
For Greenfield site, the rectifier will be located on the floor (Slab) plus the plinth content with
delivery
For Rooftop site, the rectifier will be located on the I beam plus the plinth from content the
delivery
Jan2016/ammar.Faleh@nokia.com
21
LTEInstallationMOP_MTNI
Jan2016/ammar.Faleh@nokia.com
22
LTEInstallationMOP_MTNI
Jan2016/ammar.Faleh@nokia.com
23
LTEInstallationMOP_MTNI
As shown
you will see
the CAB
roxtec
Jan2016/ammar.Faleh@nokia.com
24
LTEInstallationMOP_MTNI
Jan2016/ammar.Faleh@nokia.com
25
LTEInstallationMOP_MTNI
Symmetry cable
BatteryConnectionKitisuseforvandalismAlarmwhenoneofthesymmetrycablebedisconnectedformore
than3seconds,thevandalismalarmappearsonsmartpackcontrollerandrelayoutput5beactivated.
Note: for clearing the vandlism alarm, reconnect cables
and then reset alarm manually by power suit software.
Jan2016/ammar.Faleh@nokia.com
26
LTEInstallationMOP_MTNI
Pair: wire
Description Eltek Alarm text
color
Door of power cabinet & Door of
1: Black EXT_AL0_H X1:6
battery cabinet
AC fail & AC low & AC high &
2: Brown EXT_AL1_H X1:9
OVP
1: Battery low & battery high &
EXT_AL2_H X2:10
White/Black battery fuse
A/C power cab.& A/C battery
2: White/ cab.& Temperature batter
EXT_AL3_H X2:13
Brown cab.&smoke power cab. high &
battery fuse
3: Red EXT_AL4_H X2:16 (Vandalism) battery symmetry
4: Orange EXT_AL5_H X2:19 Rectifier alarm
3: White/Red Digital thermostat,
EXT_CTRL0_EXT_AL6_H Hight temperature
White/Grey pin 4 and 5
4:
EXT_CTRL1_EXT_AL7_H
White/Orange
5: Yellow EXT_CTRL2_EXT_AL8_H
6: Green EXT_CTRL3_EXT_AL9_H
5:
EXT_CTRL4_EXT_AL10_H
White/Yellow
6:
EXT_CTRL5_EXT_AL11_H
White/Green
7: Blue P5V0_EAC
7: White/Blue P5V0_EAC
8: Violet PROT_CAN_H_P5V_EAC
9: Grey GND X1:5, 8
8:
PROT_CAN_L_P5V_EAC
White/Violet
10: Pink GND X2: 9, 12, 15, 18
Jan2016/ammar.Faleh@nokia.com
27
LTEInstallationMOP_MTNI
Jan2016/ammar.Faleh@nokia.com
28
LTEInstallationMOP_MTNI
Picture2Explodedview,generalviewandfrontpanelofFZQE
Jan2016/ammar.Faleh@nokia.com
29
LTEInstallationMOP_MTNI
4. UNIT INTERFACES
Jan2016/ammar.Faleh@nokia.com
30
LTEInstallationMOP_MTNI
Picture3FrontviewofFZQE
5. INSTALLATION SOLUTIONS
FZQERRHunitcanbeassembledonpolewithmountingkitsolutionFPKA(471649A.)andonwallwith4pcsM8
screws.
Power cabling
RRHhaveascrewterminalsolutionandarubberboottobeused:
Maximumsize2x25/16,overalldiameter:25.0mm.
Screwterminalfixingtorque2.2NmusingTX25screwdriver.
Jan2016/ammar.Faleh@nokia.com
31
LTEInstallationMOP_MTNI
7. INSTALLATION TOOLS
Torquescrewdriver/TorxbitTX20/2.2Nm
Torquescrewdriver/TorxbitTX25/2.2Nm
Torquewrenchlongreachsocket18mm/1.7Nm
PneumaticPulseHandTorqueDriver,driveBit,M8HEX/20Nm.
8. UNIT CLEARANCES
Will be mounted using FPKA without FMFA and will connect the FZQE direct to the mount kit (FPKA), shown below
the FPKA structure and the method of the installation by using FPKA
Jan2016/ammar.Faleh@nokia.com
32
LTEInstallationMOP_MTNI
NOTICE: The unit's airflow runs from the lower to the upper side of the unit. Make sure
that the unit is installed in a room that allows proper ventilation.
NOTICE: Electrostatic discharge (ESD) might damage the equipment. Wear an ESD
wrist strap or use a corresponding method when handling the equipment.
Procedure
The module presented in the pictures is FZHM RRH, but the instructions can be applied
to each of the modules listed in Introduction to Flexi RRH modules.
Jan2016/ammar.Faleh@nokia.com
33
LTEInstallationMOP_MTNI
Jan2016/ammar.Faleh@nokia.com
34
LTEInstallationMOP_MTNI
Jan2016/ammar.Faleh@nokia.com
35
LTEInstallationMOP_MTNI
5 Screw two screws to the upper part of the FPKA bracket. Do not tighten the
screws yet. Lift the module RRH with the pre-assembled bracket to the FPKA.
NOTICE: Do not lift the RRH on the pole by the handle. Use the lifting point instead.
NOTICE: Use a rope which is strong enough to support the module.
Jan2016/ammar.Faleh@nokia.com
36
LTEInstallationMOP_MTNI
1_A
2
1_B
Assembly phase and Care points
a. Tighten the screws(3_A) to fix RRH to the
FPKA assembly.
b. Hang up the RRH to FPKA assembly by the 3_B
gourd hole.
c. Adjust the position of FPKA assembly (1_B).
d. Tighten the screws (3_B).
The FPKA has room for a maximum of four 3U Flexi modules (12U total). Two modules (or casings) can be installed
on opposite sides of the FPKA.
Jan2016/ammar.Faleh@nokia.com
37
LTEInstallationMOP_MTNI
Fix the upper mounting bracket on the pole and attach the mounting bracket screws on the bracket.
Fix one half (the one with threads) of the lower pole mounting bracket on then FZQE adapter mechanics
with the mounting screws.
Lift the FZQE on the pole and fit it to the pole mounting bracket's mounting screws.
Place the counterpart of the lower pole mounting bracket in its place and tighten the screws.
Make sure that the pole mounting brackets are aligned and the FZQE is not twisted.
If a second FZQE or plinth is required, install it on the other side of the pole mounting bracket (if there is
enough space).
Fix the adapter mechanics on the FZQE or plinth as described in Step 3 above.
Lift the FZQE or plinth on the pole and fit it to the pole mounting bracket's mounting screws and tighten
the screws.
Insert the lower fixing screws to fix the FZQE or plinth on the lower pole mounting bracket. Tighten the
mounting screws.
Make sure that the FZQE or plinth is not twisted. When the plinth is in a correct position, tighten the two
remaining screws in the lower bracket of the adapter mechanics.
Jan2016/ammar.Faleh@nokia.com
38
LTEInstallationMOP_MTNI
InputConnector
Outline of FPFC
Jan2016/ammar.Faleh@nokia.com
39
LTEInstallationMOP_MTNI
Steps
1. Connect the ESD wrist strap between the Ground and your wrist.
Note:
For safety, 2pcs M5 screw should be assembly on casing as picture shown. The lock screw can stop unit drop out
when connect cable
Make sure all the cable is prepared, the big size cable (outer diameter >20mm) is too hard to routing with cable
entry and front cover.
Jan2016/ammar.Faleh@nokia.com
40
LTEInstallationMOP_MTNI
Note:
Make sure EAC cable sealing is properly installed to the EAC connector. In order to install EAC cable,
please follow the step:
GNDfixingpoints
screw
Jan2016/ammar.Faleh@nokia.com
41
LTEInstallationMOP_MTNI
Stripped the outer jacket as picture shown. The inner jacket can be reservation for cable cross
sealing.
Assembly cold shrinking tubing follow cold shrinking tubing install instruction. The type of
cold shrinking tubing (CS73327.26)
Coldshrinkingtubing
Broken the centry of sealing ports as picture shown; cut out a 4mm hole in center of sealing, make
sure reinforcement ring is OK,
Cablediameter515mm
a) Cut Hole on sealing
If the outer diameter of input cable big than 15mm, the biggest port should be cut away as picture
shown
Cablediameter
Cable diameter
Jan2016/ammar.Faleh@nokia.com
42
LTEInstallationMOP_MTNI
Route cable carefully, make sure the sealing wrap up cable without leak. Make sure the cable size
should meet ports spec.
Assembly sealing
The copper shielding wire should also be wrap up with single cold shrinking tubing as picture
shown. The type of shrinking tubing CS930345 (CYG ELECTRONICS(SHANGHAI) CO.LTD CB-
CSS35/11-188)
Singlecoldshrinkingtubing
Note: Make sure the end of tubing wrap up sealing without any leakage.
7. Strip the necessary conductor wires of the input and output cables. This step can also be finished
before step 6.
Jan2016/ammar.Faleh@nokia.com
43
LTEInstallationMOP_MTNI
Note:
8. Connect the 48V DC input cable and 48V output cable as picture 10 shown. Fasten clamp in connector
with Torx 20 screwdriver. Assembly sealing with input connector and output connector.
20mm2
50mm2 80mm2
Jan2016/ammar.Faleh@nokia.com
44
LTEInstallationMOP_MTNI
Note:
The input cable can connect with input connector on Input 1 or Input 2.
Make sure that all the cables are properly installed to the connectors.
Note:
The knob can be adjust with flat screw driver. Only channel 3---6 output current can be adjusted,
Jan2016/ammar.Faleh@nokia.com
45
LTEInstallationMOP_MTNI
1. Connect the ESD wrist strap between the Ground and your wrist.
4. Push back unit it stop and align with the first module
Jan2016/ammar.Faleh@nokia.com
46
LTEInstallationMOP_MTNI
1. Follow chapter01, connect the cable and assembly cable entry and other steps
Jan2016/ammar.Faleh@nokia.com
47
LTEInstallationMOP_MTNI
Antenna to be used
The antenna that will be used in our project for TDD is BroadRadio DS S-VPX0410R
TECHNICAL SPECIFICATIONS
Rate Current: 5A
Jan2016/ammar.Faleh@nokia.com
48
LTEInstallationMOP_MTNI
Diameter: 8 mm
1m AFM-P8C6-1M
2m AFM-P8C6-2M
3m AFM-P8C6-3M
5m AFM-P8C6-5M
10m AFM-P8C6-10M
15m AFM-P8C6-15M
20m AFM-P8C6-20M
Jan2016/ammar.Faleh@nokia.com
49
LTEInstallationMOP_MTNI
For Wiimax sites, the connection after replacing the antenna is as shown below
Port 8 Port 1
For non Wiimax sites, the connection after replacing the antenna is as shown below
Jan2016/ammar.Faleh@nokia.com
50
LTEInstallationMOP_MTNI
Jan2016/ammar.Faleh@nokia.com
51
LTEInstallationMOP_MTNI
Chapter4
FlexiMultiradio10BTSCapacityExtension
SubModule(FBBA)
Contents of the Capacity Extension sub-module (FBBA) delivery
Jan2016/ammar.Faleh@nokia.com
52
LTEInstallationMOP_MTNI
ConnectingFlexiMultiradio10BTSCapacityExtensionSubModule(FBBA)cabling
Beforeyoustart
NOTICE:Incorrectcablesandsealsmaynotprovideappropriateingressprotection.UseonlytestedIP65classoutdoorcableswith
sealsprovidedbyNokia.Thisisrequiredforbothindoorandoutdoorinstallations,includingtheoutdoorcabinet.
Procedure
1 RemoveIPsealsfromtheFBBAportsthatyouaregoingtouse.
Storethesealsforlateruse.
2 Connectthepowercable(995297)fromtheDCoutportontheFSMxcoretotheDCinportontheFBBAfrontpanel.
Makesureitclicksintoplace.
Figure: Connectingpowercable
Jan2016/ammar.Faleh@nokia.com
53
LTEInstallationMOP_MTNI
3 Pushtheconnectorsealsfirmlyinplace.
4 IfusingtwoFBBAsubmodules,chainthepowercablefromtheDCoutportofthefirstFBBAtotheDCinportofthesecondFBBA.
Figure: Chainingpowercable
5 Pushtheconnectorsealsfirmlyinplace.
6 ConnectaQSFPcable(995298)fromtheBBEXT1portontheFSMxcoretotheBBEXTportontheFBBAfrontpanel.
NOTICE:MakesurethepowercableisconnectedbeforeconnectingtheQSFPcable.
Makesureitclicksintoplace.
Figure: ConnectingQSFPcable
Jan2016/ammar.Faleh@nokia.com
54
LTEInstallationMOP_MTNI
7 Pushtheconnectorsealsfirmlyinplace.
8 IfusingtwoFBBAsubmodules,connectaQSFPcable(995298)fromtheBBEXT2portontheFSMxcoretotheBBEXTportofthe
secondFBBA.
Figure: ConnectingsecondQSPFcable
9 Pushtheconnectorsealsfirmlyinplace.
10 Makesurethatalltheconnectorsealsareproperlyinstalled.
11 Ifapplicable,installafrontcoverontheFSMx.
NOTICE:Donotbreakthemaximumbendingradiusof40mm(1.57in.)fortheQSFPcables.Bendthecablesupwardsas
showninFigure:BendingtheQSFPcables(1)andFigure:BendingtheQSFPcables(2),ensuringthattheouteredgesofthe
cablesarewithinthefrontcoverinnerdimensions.
Jan2016/ammar.Faleh@nokia.com
55
LTEInstallationMOP_MTNI
Figure: BendingtheQSFPcables(1)
Figure: BendingtheQSFPcables(2)
Id:DN09107822
2015NokiaSolutionsandNetworks.Allrightsreserved.
Jan2016/ammar.Faleh@nokia.com
56
LTEInstallationMOP_MTNI
Chapter5
ConnectingFlexiMultiradio10BTSRRH(FZQE)cabling
TwoFBBAsarerequiredforthisconfiguration.
Note:Thepictureshowonlythefirstsectorconnection,theothersectorsaredoneinthesamewayastheonein
thepicture
Jan2016/ammar.Faleh@nokia.com
57
LTEInstallationMOP_MTNI
Chapter6
GPSGLONASSReceiverAntenna(FYGB)
FYGB is an external GNSS (supports GPS +
Glonass) RF antenna & receiver used for
providing 1PPS + ToD synchronization to the
BTS
Power supply +15V from the Sync In (HDMI) port
of the System Module
BTSoperationandcontroloverexistingGPSReceiver
BTSSM,includingalarmreporting(plugandplay)
Outdoor&Indoor*,IP67,40~85C
95x72.5mm(DxH),0.154kg
472748A:FYGBGPSGLONASSReceiverAntenna
Optional:
471605AFYMAGPSMountingKit
471606AFYHAGPSCableSet30m,or
471653AFYHBGPSCableSet100m
472510AFTSEGPSCableAssembly,30m,or
472577AFTSHGPSCableAssembly,100m,or
472870AFTSMFlexiMR10GPScable300m
471812AFYEAGPSSurgeProtectorKit(optional)
Jan2016/ammar.Faleh@nokia.com
58
LTEInstallationMOP_MTNI
TheFYEAenclosureisconnectedbetweentheSystemModuleandtheGPSantenna.
TheFYEAcanbeinstalledonthesystemmodulecasingasshowninthebelowphoto.
1 OpenthelidoftheFYEAenclosure.
Figure: OpeningtheFYEAlid
Jan2016/ammar.Faleh@nokia.com
59
LTEInstallationMOP_MTNI
2 Connectthegroundingcable.
RoutethegroundingcablefromthebottomrightcorneroftheFYEAenclosuretothegroundingpointontheplinth.
Figure:Connectingthegroundingcable
3 CuttheGPScable.
CuttheGPScableandremovearound70mm(2.76in)ofthecablejacketand8mm(0.31in)ofthewirecovering.
Figure: Exposingthewires
Jan2016/ammar.Faleh@nokia.com
60
LTEInstallationMOP_MTNI
4 RemovetheglandnutsandIPplugs.
5 Threadthecablethroughtheglandnuts.
6 ConnectthecablestotheFYEAenclosure.
ConnectthewirestotheFYEAenclosureinthefollowingway:
Table: FYEAconnections
Pair PositionOUT(toGPS
Color PositionIN(toSystemModule)
number antenna)
Brown 1 2
4
White 3 4
Green 7 8
3
White 9 10
Orange 11 12
2
White 13 14
Blue 17 18
1
White 19 20
Figure:Connectingcables
Jan2016/ammar.Faleh@nokia.com
61
LTEInstallationMOP_MTNI
7 Tightentheglandnutsto2.5Nm(1.84ft.lb.).
8 RoutetheGPScablestotheSystemModuleandtotheGPSantennarespectively.
9 ChecktheFYEAconnectionsandclosethelid.
Figure: ClosingtheFYEAlid
10 ConnecttheGPScableendstotheSystemModuleandGPSantennarespectively.
Jan2016/ammar.Faleh@nokia.com
62
LTEInstallationMOP_MTNI
Labeling
To be sure that all the items will be labeled with the right way and with the agreed format.
Be sure that you leave the site proper and clean as it should be.
Jan2016/ammar.Faleh@nokia.com
Cable Label Set for FDD/TDD - LTE
Textsize Labelsize
NUMBER OF BAG SPECIFIC USE LabelName Quantity Remarks
(mm) (mm)
TDD Jumper cable of Sec1 from Antenna to RRH port 1 TDDA1.R1 3 35x10 2 Acrilyc
TDD Jumper cable of Sec1 from Antenna to RRH port 2 TDDA1.R2 3 35x10 2 Acrilyc
TDD Jumper cable of Sec1 from Antenna to RRH port 3 TDDA1.R3 3 35x10 2 Acrilyc
TDD Jumper cable of Sec1 from Antenna to RRH port 4 TDDA1.R4 3 35x10 2 Acrilyc
TDD Jumper cable of Sec1 from Antenna to RRH port 5 TDDA1.R5 3 35x10 2 Acrilyc
TDD Jumper cable of Sec1 from Antenna to RRH port 6 TDDA1.R6 3 35x10 2 Acrilyc
TDD Jumper cable of Sec1 from Antenna to RRH port 7 TDDA1.R7 3 35x10 2 Acrilyc
TDD Jumper cable of Sec1 from Antenna to RRH port 8 TDDA1.R8 3 35x10 2 Acrilyc
TDD Jumper cable of Sec1 from Antenna to RRH BF TDDA1.R9 3 35x10 2 Acrilyc
TDD Jumper cable of Sec2 from Antenna to RRH port 1 TDDA2.R1 3 35x10 2 Acrilyc
TDD Jumper cable of Sec2 from Antenna to RRH port 2 TDDA2.R2 3 35x10 2 Acrilyc
TDD Jumper cable of Sec2 from Antenna to RRH port 3 TDDA2.R3 3 35x10 2 Acrilyc
TDD Jumper cable of Sec2 from Antenna to RRH port 4 TDDA2.R4 3 35x10 2 Acrilyc
TDD JUMPER CABLES TDD Jumper cable of Sec2 from Antenna to RRH port 5 TDDA2.R5 3 35x10 2 Acrilyc
TDD Jumper cable of Sec2 from Antenna to RRH port 6 TDDA2.R6 3 35x10 2 Acrilyc
TDD Jumper cable of Sec2 from Antenna to RRH port 7 TDDA2.R7 3 35x10 2 Acrilyc
TDD Jumper cable of Sec2 from Antenna to RRH port 8 TDDA2.R8 3 35x10 2 Acrilyc
TDD Jumper cable of Sec2 from Antenna to RRH BF TDDA2.R9 3 35x10 2 Acrilyc
TDD Jumper cable of Sec3 from Antenna to RRH port 1 TDDA3.R1 3 35x10 2 Acrilyc
TDD Jumper cable of Sec3 from Antenna to RRH port 2 TDDA3.R2 3 35x10 2 Acrilyc
TDD Jumper cable of Sec3 from Antenna to RRH port 3 TDDA3.R3 3 35x10 2 Acrilyc
TDD Jumper cable of Sec3 from Antenna to RRH port 4 TDDA3.R4 3 35x10 2 Acrilyc
TDD Jumper cable of Sec3 from Antenna to RRH port 5 TDDA3.R5 3 35x10 2 Acrilyc
TDD Jumper cable of Sec3 from Antenna to RRH port 6 TDDA3.R6 3 35x10 2 Acrilyc
TDD Jumper cable of Sec3 from Antenna to RRH port 7 TDDA3.R7 3 35x10 2 Acrilyc
TDD Jumper cable of Sec3 from Antenna to RRH port 8 TDDA3.R8 3 35x10 2 Acrilyc
TDD Jumper cable of Sec3 from Antenna to RRH BF TDDA3.R9 3 35x10 2 Acrilyc
FDD Jumper cable of Sec1 from Antenna to RFM1 port 1 FDDA1.R1 3 35x10 2 Acrilyc
FDD Jumper cable of Sec1 from Antenna to RFM1 port 2 FDDA1.R2 3 35x10 2 Acrilyc
FDD Jumper cable of Sec1 from Antenna to RFM1 port 3 FDDA1.R3 3 35x10 2 Acrilyc
FDD JUMPER FOR 2T2R
FDD Jumper cable of Sec1 from Antenna to RFM1 port 4 FDDA1.R4 3 35x10 2 Acrilyc
FDD Jumper cable of Sec1 from Antenna to RFM1 port 5 FDDA1.R5 3 35x10 2 Acrilyc
FDD Jumper cable of Sec1 from Antenna to RFM1 port 6 FDDA1.R6 3 35x10 2 Acrilyc
FDD Jumper cable of Sec1 from Antenna to RFM2 port 1 FDDA2.R1 3 35x10 2 Acrilyc
FDD Jumper cable of Sec1 from Antenna to RFM2 port 2 FDDA2.R2 3 35x10 2 Acrilyc
FDD Jumper cable of Sec1 from Antenna to RFM2 port 3 FDDA2.R3 3 35x10 2 Acrilyc
FDD JUMPER FOR 4T4R
FDD Jumper cable of Sec1 from Antenna to RFM2 port 4 FDDA2.R4 3 35x10 2 Acrilyc
FDD Jumper cable of Sec1 from Antenna to RFM2 port 5 FDDA2.R5 3 35x10 2 Acrilyc
FDD Jumper cable of Sec1 from Antenna to RFM2 port 6 FDDA2.R6 3 35x10 2 Acrilyc
TDD DC Cable from RRH Sector1 to FPFC slot3 TDDDCPWRSec1 3 35x10 2 Acrilyc
TDD DC Cable from RRH Sector2 to FPFC slot4 TDDDCPWRSec2 3 35x10 2 Acrilyc
TDD DC Cable from RRH Sector3 to FPFC slot5 TDDDCPWRSec3 3 35x10 2 Acrilyc
FDD DC Cable from RFM1 to FPFC slot1 FDDDCPWRRFM1 3 35x10 2 Acrilyc
DC SUPPLY CABLES
FDD DC Cable from RFM2 to FPFC slot2 FDDDCPWRRFM2 3 35x10 2 Acrilyc
FPFC DC cable from FPFC input to Rectifier CB FPFCINREC 3 35x10 2 Acrilyc
FSMF-TDD DC cable from FSMF input to Rectifier CB FSMFTDDREC 3 35x10 2 Acrilyc
FSMF-FDD DC cable from FSMF input to Rectifier CB FSMFFDDREC 3 35x10 2 Acrilyc
AC SUPPLY CABLES Rectifier AC Cable from PDB CB to Rectifier CB ACpower 3 35x10 2 Acrilyc
Alarm Cables FSMF-TDD EAC from Rectifier to FSMF EAC port EXTAlarm 3 35x10 2 Acrilyc
FSMF TDD FSMFTDD 3 35x10 1 Sticker
FSMF FDD FSMFFDD 3 35x10 1 Sticker
Circuit Breaker
FPFC FPFC 3 35x10 1 Sticker
AC Rectifier from PDB CB to Rectifier CB PDBRectifierTDD/FDD 3 35x10 2 Sticker
TDD-RRH FO cable Sec1 CPRITDDSec1 3 35x10 2 Acrilyc
TDD-RRH FO cable Sec1 CPRITDDSec1 3 35x10 2 Acrilyc
TDD-RRH FO cable Sec2 CPRITDDSec2 3 35x10 2 Acrilyc
TDD-RRH FO cable Sec2 CPRITDDSec2 3 35x10 2 Acrilyc
TDD-RRH FO cable Sec3 CPRITDDSec3 3 35x10 2 Acrilyc
Fiber Cable
TDD-RRH FO cable Sec3 CPRITDDSec3 3 35x10 2 Acrilyc
FDD-RFM1 FO cable CPRIFDDRFM1.1 3 35x10 2 Acrilyc
FDD-RFM1 FO cable CPRIFDDRFM1.2 3 35x10 2 Acrilyc
FDD-RFM2 FO cable CPRIFDDRFM2.1 3 35x10 2 Acrilyc
FDD-RFM2 FO cable CPRIFDDRFM2.2 3 35x10 2 Acrilyc
GPS GPS Cable Antenna GPSSyncIN 3 35x10 2 Acrilyc
Ground Cable of RECTIFIER GNDTDDRECTIFIER 3 35x10 2 Acrilyc
FSMFplinth GNDFSMF 3 35x10 2 Acrilyc
TDDRRHSec1 GNDRRHSec1 3 35x10 2 Acrilyc
TDDRRHSec2 GNDRRHSec2 3 35x10 2 Acrilyc
GROUNDING
TDDRRHSec3 GNDRRHSec3 3 35x10 2 Acrilyc
FDDRFM1 GNDRFM1 3 35x10 2 Acrilyc
FDDRFM2 GNDRFM2 3 35x10 2 Acrilyc
FPFCplinth GNDFPFC 3 35x10 2 Acrilyc