Professional Documents
Culture Documents
COURSE SYLLABUS
Other Supplemental
Materials
b. Prerequisites
Co-requisites AR 211S2 (Architectural Design 3); PHYS 009L1 (Physics I)
c. Course Required
Classification
(Required/elective/
selected elective)
The course aims to acquire adequate understanding on the fundamental concepts and
principles, general design and installation of water supply, sanitary drainage systems, storm
drainage system, waste disposal systems, and fire protection systems in buildings consistent
with trade practices and recommendations. It aims to inculcate in their minds the importance of
sanitation as well as plumbing in the context of building structures as a component of the
overall building services function. The course also aims to comprehend and apply pertinent
code provisions relative to designing, installation, operation and maintenance of plumbing
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES
COURSE SYLLABUS
systems and its components and to express common engineering language associated with
plumbing, sanitary and fire protection systems
b. Course Outcomes
2. Inculcate in their minds the importance of sanitation as well as plumbing in the context of
building structures as a component of the overall building services function.
4. Express common engineering language associated with plumbing, sanitary and fire
protection systems
COURSE TOPICS
TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES
COURSE SYLLABUS
Prelim Period (Weeks 16)
I. Introduction: TIP Vision and Mission; TIP Graduate Attributes/ Institutional
Intended Learning Outcomes; Program Educational Objectives/Student
Outcomes; Course Objectives/ Course Intended Learning Outcomes; Course
Policies
II. Fundamentals of Water Supply System : Sources and uses of water; Physical,
chemical and biological properties of water; Water treatment methods; Water
storage and distribution systems (Hot and Cold Water);
III. Sanitary Drainage Systems- Soil, waste (direct and indirect waste piping
systems) and vent piping systems: Ventilation and Ventilation System; Plumbing
traps
IV. Storm Drainage Systems (Surface and subsurface storm water)
Midterm Period (Weeks 7-12)